CN220828604U - Metal pipeline support for steel structure engineering construction - Google Patents

Metal pipeline support for steel structure engineering construction Download PDF

Info

Publication number
CN220828604U
CN220828604U CN202321029361.XU CN202321029361U CN220828604U CN 220828604 U CN220828604 U CN 220828604U CN 202321029361 U CN202321029361 U CN 202321029361U CN 220828604 U CN220828604 U CN 220828604U
Authority
CN
China
Prior art keywords
fixedly arranged
rod
bin body
threaded
air cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321029361.XU
Other languages
Chinese (zh)
Inventor
王世洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiongyu Zhugong Technology Hubei Co ltd
Original Assignee
Xiongyu Zhugong Technology Hubei Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiongyu Zhugong Technology Hubei Co ltd filed Critical Xiongyu Zhugong Technology Hubei Co ltd
Priority to CN202321029361.XU priority Critical patent/CN220828604U/en
Application granted granted Critical
Publication of CN220828604U publication Critical patent/CN220828604U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a metal pipeline bracket for steel structure engineering construction, which comprises a transverse plate, wherein four supporting rods are fixedly arranged at the bottom of the transverse plate, bases are fixedly arranged at the bottoms of the four supporting rods, a telescopic part is arranged on the transverse plate, an adjusting mechanism is arranged on the telescopic part, a clamping mechanism is arranged on the adjusting mechanism, the telescopic part is an air cylinder, the air cylinder is fixedly connected to the top of the transverse plate, the output end of the air cylinder penetrates through and extends to the lower part of the transverse plate, and the adjusting mechanism comprises a bin body which is fixedly connected to the output end of the air cylinder. This metal pipeline support is used in steel construction engineering construction is through setting up fixture, and the staff inserts fixture's inside with metal pipeline earlier, need not to use tools such as screwdriver, can carry out the centre gripping to the steel pipe, and the operation is comparatively simple, and labour saving and time saving has improved work efficiency to possess the advantage of being convenient for the centre gripping, made things convenient for the use.

Description

Metal pipeline support for steel structure engineering construction
Technical Field
The utility model relates to the technical field of steel structure construction, in particular to a metal pipeline bracket for steel structure engineering construction.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, mainly comprises steel beams, steel columns, steel trusses and other components made of steel sections, steel plates and the like, adopts rust removal and rust prevention processes such as silanization, pure manganese phosphating, washing and drying, galvanization and the like, and is connected with each component or part by adopting welding seams, bolts or rivets.
According to the retrieval, according to the Chinese patent application No. CN202222246651.1, a metal pipeline bracket for steel structure engineering construction is provided, the utility model content records that the metal pipeline bracket for steel structure engineering construction provided by the scheme effectively solves the problem of use limitation of a supporting and positioning mechanism during steel structure pipeline construction in the current market, realizes the clamping effect on pipelines with different diameters through the arrangement that the height and the clamping length can be adjusted, simultaneously obtains the achievement of adjusting the space according to the welding convenience, and improves the welding quality.
When the first clamping support piece and the second clamping support piece are not locked, the metal pipeline can drop downwards, a worker is required to prop against the second clamping support piece upwards, a tool such as a screwdriver is used for rotating the fixing screw rod, the first clamping support piece and the second clamping support piece are fixedly locked, the metal pipeline is clamped, the operation process is troublesome, time and labor are wasted, the working efficiency is influenced, and improvement is needed, so that the metal pipeline support for steel structure engineering construction is provided for solving the problems.
Disclosure of utility model
Aiming at the defects of the prior art, the utility model provides the metal pipeline bracket for the steel structure engineering construction, which has the advantages of being convenient to clamp and the like, and solves the problems that when a clamping support piece I and a clamping support piece II are not locked, a metal pipeline can drop downwards, a worker is required to prop against the clamping support piece II upwards, and simultaneously, a screw driver and other tools are used for rotating a fixing screw rod to fixedly lock the clamping support piece I and the clamping support piece II, so that the metal pipeline is clamped, the operation process is troublesome, time and labor are wasted, and the working efficiency is influenced.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a metal pipeline support is used in steel construction engineering construction, includes the diaphragm, the bottom fixed mounting of diaphragm has four bracing pieces, four the equal fixed mounting in bottom of bracing piece has the base, be provided with the extensible member on the diaphragm, be provided with adjustment mechanism on the extensible member, be provided with fixture on the adjustment mechanism.
Further, the extensible member is the cylinder, cylinder fixed connection is at the top of diaphragm, the output of cylinder runs through and extends to the below of diaphragm.
Further, adjustment mechanism includes the storehouse body, storehouse body fixed connection is at the output of cylinder, the equal rotation in inner wall left and right sides of the storehouse body installs the threaded rod, two the screw thread opposite direction of threaded rod, two the relative one side fixed connection of threaded rod, the interior roof of the storehouse body rotates and installs the worm, the bottom of worm runs through and extends to the below of the storehouse body, the bottom fixed mounting of worm has the hand wheel, one of them the outside fixed mounting of threaded rod has the worm wheel with worm engaged with, two the outside equal screw thread of threaded rod installs the thread bush, two the equal fixed mounting of bottom of thread bush runs through and extends to the movable rod of storehouse body below.
Further, the limiting groove is formed in the inner wall of the bin body, a limiting block extending into the limiting groove is fixedly arranged outside the threaded sleeve, and the limiting groove is matched with the limiting block.
Further, the bottom of the bin body is provided with a moving hole, and the moving hole is matched with the moving rod.
Further, fixture includes the casing, casing fixed connection is in the bottom of movable rod, the interior bottom wall fixed mounting of casing has first grip block, the interior roof fixed mounting of casing has the spring, the bottom fixed mounting of spring has the second grip block, the top fixed mounting of second grip block has the montant that runs through and extends to the casing top, the inside grafting of montant has the horizontal pole that runs through the montant and extends to the inside of movable rod.
Further, the top of montant fixed mounting has vertical pull block, the lateral wall fixed mounting of horizontal pole has horizontal pull block.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. This metal pipeline support is used in steel construction engineering construction is through setting up fixture, and the staff inserts fixture's inside with metal pipeline earlier, need not to use tools such as screwdriver, can carry out the centre gripping to the steel pipe, and the operation is comparatively simple, and labour saving and time saving has improved work efficiency to possess the advantage of being convenient for the centre gripping, made things convenient for the use.
2. This metal pipeline support is used in steel construction engineering construction through setting up adjustment mechanism, adjustment mechanism can be manual the distance between two metal pipeline and adjust, and adjustment mode is simple swift, need not to use the electric energy, has saved economic expenditure to possess the advantage of being convenient for adjust, convenient to use.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is an enlarged view of the utility model at A in FIG. 1;
FIG. 3 is an enlarged view of the utility model at B in FIG. 1;
fig. 4 is a schematic diagram of a second clamping plate structure according to the present utility model.
In the figure: the transverse drawing device comprises a transverse plate 1, a support rod 2, a base 3, a telescopic part 4, an adjusting mechanism 5, a bin body 51, a threaded rod 52, a worm 53, a hand wheel 54, a worm wheel 55, a threaded sleeve 56, a moving rod 57, a clamping mechanism 6, a shell 61, a first clamping plate 62, a spring 63, a second clamping plate 64, a vertical rod 65, a longitudinal drawing block 651, a transverse rod 66 and a transverse drawing block 661.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, a metal pipe bracket for steel structure engineering construction in this embodiment includes a transverse plate 1, four support rods 2 are fixedly installed at the bottom of the transverse plate 1, bases 3 are fixedly installed at the bottoms of the four support rods 2, a telescopic member 4 is arranged on the transverse plate 1, an adjusting mechanism 5 is arranged on the telescopic member 4, and a clamping mechanism 6 is arranged on the adjusting mechanism 5.
Specifically, the telescopic part 4 can automatically move the heights of the adjusting mechanism 5 and the clamping mechanism 6, the adjusting mechanism 5 can manually adjust the distance between two metal pipelines, the adjusting mode is simple and quick, electric energy is not required to be used, economic expenditure is saved, workers firstly insert the metal pipelines into the clamping mechanism 6, tools such as a screwdriver are not required to be used, the steel pipes can be clamped, the operation is simple, time and labor are saved, and the working efficiency is improved.
In this embodiment, the expansion member 4 is an air cylinder, the air cylinder is fixedly connected to the top of the transverse plate 1, and the output end of the air cylinder penetrates through and extends to the lower side of the transverse plate 1.
Specifically, the cylinder is a cylindrical metal part which guides the piston to perform linear reciprocating motion in the cylinder, air converts heat energy into mechanical energy through expansion in the engine cylinder, and gas is compressed by the piston in the compressor cylinder to increase pressure.
In this embodiment, the adjustment mechanism 5 includes a bin body 51, the bin body 51 is fixedly connected to an output end of the air cylinder, threaded rods 52 are rotatably installed on left and right sides of an inner wall of the bin body 51, thread directions of the two threaded rods 52 are opposite, one side of the two threaded rods 52 opposite is fixedly connected, a worm 53 is rotatably installed on an inner top wall of the bin body 51, the bottom of the worm 53 penetrates and extends to a lower portion of the bin body 51, a hand wheel 54 is fixedly installed on the bottom of the worm 53, a worm wheel 55 meshed with the worm 53 is fixedly installed on the outer portion of one of the threaded rods 52, thread sleeves 56 are installed on the outer portions of the two threaded rods 52 in a threaded mode, and a moving rod 57 penetrating and extending to the lower portion of the bin body 51 is fixedly installed on the bottom of the two threaded sleeves 56.
Specifically, the cylinder can move the bin body 51 up and down, the hand wheel 54 is rotated to drive the worm 53 to rotate, the worm 53 drives the worm wheel 55 and the two threaded rods 52 to rotate, the two threaded rods 52 drive the two threaded sleeves 56 to move relatively or move reversely, and the two threaded sleeves 56 drive the two moving rods 57 to move relatively or move reversely.
In addition, the worm 53 and the two threaded rods 52 are both rotatably connected to the housing 51 by bearings.
In this embodiment, the inner wall of the bin body 51 is provided with a limiting groove 561, a limiting block 562 extending into the limiting groove 561 is fixedly installed outside the threaded sleeve 56, and the limiting groove 561 is matched with the limiting block 562.
Specifically, the threaded sleeve 56 drives the stopper 562 to linearly move inside the limiting groove 561, and the limiting groove 561 limits the movement range of the stopper 562.
In this embodiment, a moving hole is formed in the bottom of the bin 51, and the moving hole is matched with the moving rod 57.
Specifically, the moving rod 57 moves linearly inside the moving hole, and the moving hole limits the moving range of the moving rod 57.
In this embodiment, the clamping mechanism 6 includes a housing 61, the housing 61 is fixedly connected to the bottom of the moving rod 57, a first clamping plate 62 is fixedly mounted on an inner bottom wall of the housing 61, a spring 63 is fixedly mounted on an inner top wall of the housing 61, a second clamping plate 64 is fixedly mounted on the bottom of the spring 63, a vertical rod 65 penetrating through and extending to the upper portion of the housing 61 is fixedly mounted on the top of the second clamping plate 64, and a cross rod 66 penetrating through the vertical rod 65 and extending to the inner portion of the moving rod 57 is inserted into the vertical rod 65.
Specifically, the staff moves the montant 65 upward first, and montant 65 drives second grip block 64 to move upward, and second grip block 64 compresses spring 63, and when montant 65 moved the appointed position, horizontal pole 66 horizontal pass montant 65 and insert the inside of movable rod 57, can fix a position second grip block 64, then insert the inside of casing 61 to place at the top of first grip block 62, finally through horizontal movement horizontal pole 66, make horizontal pole 66 follow the inside of movable rod 57 and montant 65 and shift out, spring 63 resumes deformation and drives second grip block 64 and montant 65 and move downward, and second grip block 64 and first grip block 62 can carry out the centre gripping to the metal pipeline.
In addition, the first clamping plate 62 and the second clamping plate 64 are arc plates, and the number of the springs 63 is set as needed.
In this embodiment, the top of the vertical rod 65 is fixedly provided with a longitudinal pull block 651, and the side wall of the cross rod 66 is fixedly provided with a transverse pull block 661.
Specifically, pulling the longitudinal pull block 651 can drive the vertical rod 65 to move vertically, and pulling the transverse pull block 661 can drive the cross rod 66 to move horizontally.
The working principle of the embodiment is as follows:
(1) When the pipeline in the steel structure is installed, the transverse plate 1, the support rod 2 and the base 3 are erected outside the pipeline to be installed, and the adjusting mechanism 5 and the clamping mechanism 6 can be adjusted to proper heights through the telescopic piece 4;
(2) The staff moves the vertical pulling block 651 upwards firstly, the vertical pulling block 651 drives the vertical rod 65 and the second clamping plate 64 to move upwards, the second clamping plate 64 compresses the spring 63, when the vertical rod 65 moves to a designated position, the horizontal pulling block 661 horizontally moves the horizontal pulling block 661, the horizontal pulling block 661 drives the cross rod 66 to penetrate through the vertical rod 65 and be inserted into the movable rod 57, the second clamping plate 64 can be positioned, then a metal pipeline is inserted into the shell 61 and placed at the top of the first clamping plate 62, finally, the horizontal pulling block 661 horizontally moves the horizontal pulling block 661, the horizontal pulling block 661 drives the cross rod 66 to move out of the movable rod 57 and the inside of the vertical rod 65, the spring 63 returns to deform to drive the second clamping plate 64 and the vertical rod 65 to move downwards, the second clamping plate 64 and the first clamping plate 62 can clamp the metal pipeline without tools such as screwdrivers, the operation is simple, time and labor are saved, the working efficiency is improved, and the clamping is convenient;
(3) The staff rotates the hand wheel 54, the hand wheel 54 drives the worm 53 to rotate, the worm 53 drives the worm wheel 55 and the two threaded rods 52 to rotate, the two threaded rods 52 drive the two threaded sleeves 56 to move relatively or move oppositely, the two threaded sleeves 56 drive the two limiting blocks 562 to move relatively or move oppositely in the two limiting grooves 561, the limiting grooves 561 limit the moving range of the limiting blocks 562, the two threaded sleeves 56 drive the two moving rods 57, the two shells 61 and the two metal pipes to move relatively or move oppositely, the distance between the two metal pipes is adjusted manually, the adjusting mode is simple and fast, electric energy is not needed, economic expenses are saved, and accordingly the device has the advantage of being convenient to adjust, and the device is convenient to use.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. The utility model provides a metal pipeline support is used in steel construction engineering construction, includes diaphragm (1), the bottom fixed mounting of diaphragm (1) has four bracing piece (2), four the equal fixed mounting in bottom of bracing piece (2) has base (3), its characterized in that: the transverse plate (1) is provided with a telescopic part (4), the telescopic part (4) is provided with an adjusting mechanism (5), and the adjusting mechanism (5) is provided with a clamping mechanism (6);
The telescopic piece (4) is an air cylinder, the air cylinder is fixedly connected to the top of the transverse plate (1), and the output end of the air cylinder penetrates through and extends to the lower part of the transverse plate (1);
The adjusting mechanism (5) comprises a bin body (51), the bin body (51) is fixedly connected to the output end of the air cylinder, threaded rods (52) are rotatably arranged on the left side and the right side of the inner wall of the bin body (51), the threaded directions of the two threaded rods (52) are opposite, one side, opposite to the threaded rods (52), of each threaded rod is fixedly connected, a worm (53) is rotatably arranged on the inner top wall of the bin body (51), the bottom of the worm (53) penetrates through and extends to the lower portion of the bin body (51), a hand wheel (54) is fixedly arranged on the bottom of the worm (53), a worm wheel (55) meshed with the worm (53) is fixedly arranged on the outer portion of one threaded rod (52), threaded sleeves (56) are fixedly arranged on the outer portions of the two threaded rods (52), and a moving rod (57) penetrating through and extending to the lower portion of the bin body (51) is fixedly arranged on the bottom of the two threaded sleeves (56).
The clamping mechanism (6) comprises a shell (61), the bottom of movable rod (57) is fixedly connected with the shell (61), a first clamping plate (62) is fixedly arranged on the inner bottom wall of the shell (61), a spring (63) is fixedly arranged on the inner top wall of the shell (61), a second clamping plate (64) is fixedly arranged on the bottom of the spring (63), a vertical rod (65) penetrating through and extending to the upper portion of the shell (61) is fixedly arranged on the top of the second clamping plate (64), a longitudinal pulling block (651) is fixedly arranged on the top of the vertical rod (65), a cross rod (66) penetrating through the vertical rod (65) and extending to the inner portion of the movable rod (57) is inserted in the inner portion of the vertical rod (65), and a transverse pulling block (661) is fixedly arranged on the side wall of the cross rod (66).
2. The metal pipe bracket for steel structure engineering construction of claim 1, wherein: the inner wall of the bin body (51) is provided with a limit groove (561), a limit block (562) extending into the limit groove (561) is fixedly arranged outside the threaded sleeve (56), and the limit groove (561) is matched with the limit block (562).
3. The metal pipe bracket for steel structure engineering construction of claim 1, wherein: the bottom of the bin body (51) is provided with a moving hole, and the moving hole is matched with the moving rod (57).
CN202321029361.XU 2023-04-24 2023-04-24 Metal pipeline support for steel structure engineering construction Active CN220828604U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321029361.XU CN220828604U (en) 2023-04-24 2023-04-24 Metal pipeline support for steel structure engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321029361.XU CN220828604U (en) 2023-04-24 2023-04-24 Metal pipeline support for steel structure engineering construction

Publications (1)

Publication Number Publication Date
CN220828604U true CN220828604U (en) 2024-04-23

Family

ID=90722799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321029361.XU Active CN220828604U (en) 2023-04-24 2023-04-24 Metal pipeline support for steel structure engineering construction

Country Status (1)

Country Link
CN (1) CN220828604U (en)

Similar Documents

Publication Publication Date Title
CN209439957U (en) A kind of seamless steel pipe processing outer wall quick derusting equipment
CN209986266U (en) Drilling equipment is used in pipeline installation
CN106112094A (en) A kind of move easy to operate steel tube cutting machine
CN107717777B (en) A kind of plating circle clamping fixture
CN220828604U (en) Metal pipeline support for steel structure engineering construction
WO2022206075A1 (en) Reverse shipbuilding jig frame structure
CN107350711A (en) A kind of architectural engineering butt welding machine
CN110842256A (en) Secondary processing forming treatment machine and processing treatment method for galvanized steel pipe
CN109834370B (en) Welding device for straight-seam steel pipe
CN218192867U (en) Positioning device for pipeline cutting
CN217512899U (en) Steel pipe positioning and punching device for building engineering
CN217249993U (en) Automatic anti-corrosion paint spraying machine for stainless steel pipe fitting machining
CN114310086A (en) Multi-station flexible industrial welding robot
CN210147915U (en) Positioning fixture for rack and pinion steering gear
CN219113836U (en) Clamp for machining steel structure beam
CN219787092U (en) Welding device for steel structure construction
CN216399380U (en) Clamp sheath for pneumatic clamp
CN111069447A (en) Cold expanding equipment and process for seamless steel tube
CN217326393U (en) Quick adjustment instrument that component top held in palm
CN220612822U (en) Variable cross-section connecting structure and processing equipment for steel pipes made of different materials
CN221232484U (en) Workbench for processing large-caliber hot bend groove
CN218341947U (en) Clamp for machining steel structure beam
CN218556142U (en) Butt joint device for welding large-diameter pipelines
CN215631774U (en) Horizontal strutting arrangement in steel construction workshop
CN219211204U (en) Steel construction bending device

Legal Events

Date Code Title Description
GR01 Patent grant