Cable installation adjusting frame for power engineering construction Download PDF

Info

Publication number
CN220822473U
CN220822473U CN202322142863.XU CN202322142863U CN220822473U CN 220822473 U CN220822473 U CN 220822473U CN 202322142863 U CN202322142863 U CN 202322142863U CN 220822473 U CN220822473 U CN 220822473U
Authority
CN
China
Prior art keywords
fixedly connected
cable
engineering construction
power engineering
cable installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322142863.XU
Other languages
Chinese (zh)
Inventor
何鹏举
梅振兴
刘国武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Enshi Jie Rui Electric Power Engineering Co ltd
Original Assignee
Enshi Jie Rui Electric Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Enshi Jie Rui Electric Power Engineering Co ltd filed Critical Enshi Jie Rui Electric Power Engineering Co ltd
Priority to CN202322142863.XU priority Critical patent/CN220822473U/en
Application granted granted Critical
Publication of CN220822473U publication Critical patent/CN220822473U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a cable installation adjusting frame for power engineering construction, which comprises a U-shaped plate, wherein two arc-shaped blocks are arranged above the U-shaped plate, a first screw is fixedly connected to the bottom of the U-shaped plate, and two vertical plates are arranged below the U-shaped plate. According to the utility model, the second motor drives the arc blocks to move to fix the cable through the second screw, the first motor is started to drive the gear to rotate, the gear drives the circular tube to rotate through the outer gear ring to rotate, the circular tube rotates to drive the first screw to move upwards, the first screw drives the U-shaped plate to move upwards, the U-shaped plate drives the two arc blocks to move upwards, and the two arc blocks drive the cable to move upwards, so that the height of the cable is adjusted, the height of the two arc blocks is convenient to adjust according to practical requirements, the cable is convenient to fix, two persons do not need to lift the cable for a long time during use, time and labor are saved, the cable is convenient to use, the limitation is small, and the use range is large.

Description

Cable installation adjusting frame for power engineering construction
Technical Field
The utility model relates to the technical field of power engineering construction, in particular to a cable installation adjusting frame for power engineering construction.
Background
In power engineering, the cable with longer length is heavier, and when the cable is installed at some heights, the cable installation adjusting frame is needed for auxiliary installation.
However, the existing cable installation adjusting frame for power engineering construction is relatively fixed in general height, is inconvenient to adjust according to practical needs, is inconvenient to fix the cable, needs two people to lift the cable for a long time during use, is time-consuming and labor-consuming, is inconvenient to use, is large in limitation, and causes a small use range, and therefore, the cable installation adjusting frame for power engineering construction is used for solving the problems.
Disclosure of utility model
The utility model aims to provide a cable installation adjusting frame for power engineering construction, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a cable installation alignment jig for power engineering construction, which comprises a U-shaped plate, the top of U-shaped plate is equipped with two arc pieces, the first screw rod of bottom fixedly connected with of U-shaped plate, the below of U-shaped plate is equipped with two risers, fixedly connected with same diaphragm between one side that two risers are close to each other, the outside threaded connection of first screw rod has circular pipe, the outside fixed cover of circular pipe is equipped with the bearing, the bearing sets up in the central point of diaphragm, the outside fixed cover of circular pipe is equipped with outer ring gear, the left side fixedly connected with supporting shoe of left side riser, the first motor of top fixedly connected with of supporting shoe, the output shaft end fixedly connected with gear of first motor, the gear meshes with outer ring gear mutually, all rotate on the both sides inner wall of U-shaped plate and be connected with the second screw rod.
Further preferably, the threads of the two second screws are opposite in rotation direction, and one side, close to each other, of each second screw is welded.
Further preferably, the outer side of the second screw is in threaded connection with a vertical block, and two sides of the vertical blocks, which are close to each other, are fixedly connected with a connecting block.
Further preferably, the connecting block is fixedly connected with the corresponding arc-shaped block, and two square rods are fixedly connected between the inner walls of the two sides of the U-shaped plate.
Further preferably, the vertical block is slidably sleeved on the outer side of the corresponding square rod, and the left side of the U-shaped plate is fixedly connected with a second motor.
Further preferably, the output shaft end of the second motor is fixedly connected with the left end of one second screw rod on the left side, the bottom of the vertical plate is fixedly connected with two rectangular blocks, the bottom of each rectangular block is rotationally connected with a roller, and the right side of one vertical plate on the right side is fixedly connected with a pushing handle.
Further preferably, the four corners of the bottom of the U-shaped plate are fixedly connected with positioning rods, and the vertical plate is slidably sleeved on the outer sides of the two corresponding positioning rods.
Compared with the prior art, the utility model has the beneficial effects that: according to the utility model, the second motor drives the arc blocks to move to fix the cable through the second screw, the first motor is started to drive the gear to rotate, the gear drives the circular tube to rotate through the outer gear ring to rotate, the circular tube rotates to drive the first screw to move upwards, the first screw drives the U-shaped plate to move upwards, the U-shaped plate drives the two arc blocks to move upwards, and the two arc blocks drive the cable to move upwards, so that the height of the cable is adjusted, the height of the two arc blocks is convenient to adjust according to practical requirements, the cable is convenient to fix, two persons do not need to lift the cable for a long time during use, time and labor are saved, the cable is convenient to use, the limitation is small, and the use range is large.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic view of a left-hand perspective structure of the present utility model;
FIG. 3 is a schematic bottom perspective view of the present utility model;
Fig. 4 is an enlarged perspective view of the area a in fig. 3.
In the figure: 1. a U-shaped plate; 2. an arc-shaped block; 3. a first screw; 4. a riser; 5. a cross plate; 6. a circular tube; 7. a bearing; 8. an outer ring gear; 9. a support block; 10. a first motor; 11. a gear; 12. a second screw; 13. a vertical block; 14. a connecting block; 15. square rods; 16. a second motor; 17. rectangular blocks; 18. a roller; 19. a pushing handle; 20. and a positioning rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides a cable installation alignment jig for electric power engineering construction, including U-shaped plate 1, the top of U-shaped plate 1 is equipped with two arc pieces 2, the bottom fixedly connected with first screw rod 3 of U-shaped plate 1, the below of U-shaped plate 1 is equipped with two risers 4, fixedly connected with same diaphragm 5 between one side that two risers 4 are close to each other, the outside threaded connection of first screw rod 3 has circular pipe 6, the outside fixed cover of circular pipe 6 is equipped with bearing 7, bearing 7 sets up in the central point of diaphragm 5, the outside fixed cover of circular pipe 6 is equipped with outer ring gear 8, the left side fixedly connected with supporting shoe 9 of one riser 4 of left side, the top fixedly connected with first motor 10 of supporting shoe 9, the output shaft end fixedly connected with gear 11 of first motor 10, gear 11 meshes with outer ring gear 8 mutually, all rotate on the both sides inner wall of U-shaped plate 1 and be connected with second screw rod 12, second motor 16 drives arc piece 2 through the second screw rod 12 and remove and fix the cable, start-up first motor 10 drives gear 11 and rotates, gear 11 rotates through outer ring gear 8 and drives pipe 6 and rotate, the first arc piece 6 and drive the cable 3 is convenient to use the arc piece to move to two, the high to rotate, the cable is difficult to use, the two height is convenient for use, the cable is moved to the two arc pieces 2, the height is adjusted to the top is convenient for use, the cable is moved to the arc piece is moved to the height to the top is more than 2, and is convenient for the top to be used to the cable is used to the top to be used.
In this embodiment, specific: the screw threads of the two second screw rods 12 are opposite in rotation direction, one sides of the two second screw rods 12 close to each other are welded, vertical blocks 13 are connected to the outer side of the second screw rods 12 in a screw thread mode, connecting blocks 14 are fixedly connected to one sides of the two vertical blocks 13 close to each other, and the second screw rods 12 are arranged to achieve a locking effect;
In this embodiment, specific: the connecting blocks 14 are fixedly connected with the corresponding arc-shaped blocks 2, two square rods 15 are fixedly connected between the inner walls of the two sides of the U-shaped plate 1, the vertical blocks 13 are slidably sleeved on the outer sides of the corresponding square rods 15, the left side of the U-shaped plate 1 is fixedly connected with a second motor 16, and the square rods 15 are arranged to achieve a positioning effect;
In this embodiment, specific: the end part of the output shaft of the second motor 16 is fixedly connected with the left end of a second screw rod 12 on the left side, the bottom of the vertical plate 4 is fixedly connected with two rectangular blocks 17, the bottom of each rectangular block 17 is rotationally connected with a roller 18, the right side of one vertical plate 4 on the right side is fixedly connected with a push handle 19, and the push handle 19 has the effect of convenient operation;
In this embodiment, specific: the bottom four corners of U-shaped board 1 all fixedly connected with locating lever 20, and riser 4 slip cap is established in the outside of two locating levers 20 that correspond, and locating lever 20's setting has played the effect of location.
The utility model works when in work: during the use, promote to push away the handle 19 and remove arc piece 2 to suitable position through gyro wheel 18, place the cable between two arc pieces 2, immediately start second motor 16, second motor 16 work drives a left second screw rod 12 rotation, a left second screw rod 12 rotation drives a right second screw rod 12 rotation, second screw rod 12 rotation drives perpendicular piece 13 and removes, perpendicular piece 13 slides in the outside of corresponding square rod 15, perpendicular piece 13 drives corresponding connecting block 14 and removes, connecting block 14 drives corresponding arc piece 2 and removes, thereby arc piece 2 is fixed the cable, when the height of two arc pieces 2 is adjusted to the needs, immediately start first motor 10, first motor 10 drives gear 11 rotation, gear 11 drives outer ring gear 8 rotation, outer ring gear 8 rotation drives corresponding circular tube 6 rotation, circular tube 6 rotation drives first screw rod 3 and upwards moves, first screw rod 3 drives U-shaped plate 1 and upwards move, U-shaped plate 1 drives four locating lever 20, thereby drive two arc pieces 2 upwards remove, two arc pieces 2 drive cable, the cable and the height of cable is adjusted when the height of two arc pieces 2 is required, thereby the cable is adjusted to the height is convenient for use, the cable is adjusted to the height of two arc pieces is convenient for use, the cable is adjusted to the height of a person is convenient to use, the cable is limited to be convenient for use, the cable is adjusted to the height is convenient to use.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a cable installation regulating frame for power engineering construction, includes U-shaped board (1), its characterized in that: the top of U-shaped board (1) is equipped with two arc pieces (2), the bottom fixedly connected with first screw rod (3) of U-shaped board (1), the below of U-shaped board (1) is equipped with two risers (4), two fixedly connected with one and the same diaphragm (5) between one side that riser (4) are close to each other, the outside threaded connection of first screw rod (3) has circular pipe (6), the outside fixed cover of circular pipe (6) is equipped with bearing (7), bearing (7) set up in the central point of diaphragm (5), the outside fixed cover of circular pipe (6) is equipped with outer ring gear (8), one on the left side fixedly connected with supporting shoe (9), the top fixedly connected with first motor (10) of supporting shoe (9), the output shaft end fixedly connected with gear (11) of first motor (10), gear (11) mesh with outer ring gear (8), all be connected with second screw rod (12) on the both sides inner wall rotation of U-shaped board (1).
2. The cable installation adjusting frame for power engineering construction according to claim 1, wherein: the threads of the two second screws (12) are opposite in rotation direction, and one sides of the two second screws (12) close to each other are welded.
3. The cable installation adjusting frame for power engineering construction according to claim 2, wherein: the outside threaded connection of second screw rod (12) has perpendicular piece (13), and two perpendicular piece (13) are close to each other one side all fixedly connected with connecting block (14).
4. A cable installation jig for electric power engineering construction according to claim 3, wherein: the connecting blocks (14) are fixedly connected with the corresponding arc-shaped blocks (2), and two square rods (15) are fixedly connected between the inner walls of the two sides of the U-shaped plate (1).
5. The cable installation adjusting frame for power engineering construction according to claim 4, wherein: the vertical blocks (13) are slidably sleeved on the outer sides of the corresponding square rods (15), and the left sides of the U-shaped plates (1) are fixedly connected with second motors (16).
6. The cable installation adjusting frame for power engineering construction according to claim 5, wherein: the output shaft end of the second motor (16) is fixedly connected with the left end of one second screw rod (12) on the left side, two rectangular blocks (17) are fixedly connected to the bottom of the vertical plate (4), rollers (18) are rotatably connected to the bottom of each rectangular block (17), and a pushing handle (19) is fixedly connected to the right side of one vertical plate (4) on the right side.
7. The cable installation adjusting frame for power engineering construction according to claim 6, wherein: the locating rods (20) are fixedly connected to four corners of the bottom of the U-shaped plate (1), and the vertical plates (4) are slidably sleeved on the outer sides of the two corresponding locating rods (20).
CN202322142863.XU 2023-08-08 2023-08-08 Cable installation adjusting frame for power engineering construction Active CN220822473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322142863.XU CN220822473U (en) 2023-08-08 2023-08-08 Cable installation adjusting frame for power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322142863.XU CN220822473U (en) 2023-08-08 2023-08-08 Cable installation adjusting frame for power engineering construction

Publications (1)

Publication Number Publication Date
CN220822473U true CN220822473U (en) 2024-04-19

Family

ID=90673436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322142863.XU Active CN220822473U (en) 2023-08-08 2023-08-08 Cable installation adjusting frame for power engineering construction

Country Status (1)

Country Link
CN (1) CN220822473U (en)

Similar Documents

Publication Publication Date Title
CN208137383U (en) A kind of liftable architectural engineering scaffold
CN206707332U (en) A kind of construction support meanss
CN215803326U (en) Assembled wall body installation auxiliary assembly
CN220822473U (en) Cable installation adjusting frame for power engineering construction
CN216490149U (en) Supporting tool for maintaining wind driven generator rotor
CN214994186U (en) Ground flattening device for municipal works construction
CN213928234U (en) Perforating device for constructional engineering
CN216007195U (en) Pipeline positioning support for water supply and drainage engineering
CN213449624U (en) Floor slab supporting frame for house construction engineering
CN212857193U (en) Building aluminum formwork straightening equipment
CN210264031U (en) Stable aluminum formwork height adjusting device
CN211965708U (en) Automatic bending device for reinforcing steel bars
CN106835548A (en) A kind of knitting Full-width rinsing machine
CN206928661U (en) Concreting workbench is built in a kind of room
CN217840852U (en) Aluminum alloy template wallboard bottom regulator
CN219118779U (en) Fixed bolster for building engineering template
CN213849336U (en) Municipal water supply and drainage aided design drawing system
CN215711473U (en) Automobile repair lifting frame for automobile repair major
CN217581324U (en) Steel stand horizontal straightening device capable of improving mounting efficiency of steel stand
CN217812207U (en) Steel construction building stair fixed point installation supporting mechanism
CN209339544U (en) A kind of construction wall plastering levelling device
CN212403316U (en) Fixed hoisting device for assembled wall
CN219113899U (en) Subway track panel assembly auxiliary device
CN217269080U (en) Modular elevator leveling connecting mechanism
CN220886871U (en) Anti-corrosion pipeline installation butt joint device