CN220821025U - Project progress management device for building engineering project management - Google Patents

Project progress management device for building engineering project management Download PDF

Info

Publication number
CN220821025U
CN220821025U CN202321715923.6U CN202321715923U CN220821025U CN 220821025 U CN220821025 U CN 220821025U CN 202321715923 U CN202321715923 U CN 202321715923U CN 220821025 U CN220821025 U CN 220821025U
Authority
CN
China
Prior art keywords
display
management device
fixedly connected
project
plate body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321715923.6U
Other languages
Chinese (zh)
Inventor
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321715923.6U priority Critical patent/CN220821025U/en
Application granted granted Critical
Publication of CN220821025U publication Critical patent/CN220821025U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The utility model provides a project progress management device for building engineering project management, which comprises a support base, wherein an electronic display screen is movably arranged in a protection cavity, the outer side of a lifting seat is movably connected with a display board body, both ends of a rotating rod are fixedly sleeved with a wire collecting sleeve, and a traction wire is wound outside the wire collecting sleeve; according to the utility model, the lifting seat is pulled by the traction wire to lift, so that the display picture on the display plate body is conveniently replaced, meanwhile, the electronic display screen sliding in the protection cavity is arranged on the inner side of the lifting seat, during display, the display plate body can be pushed by the electric push rod to be unfolded upwards, the display angle is adjusted, and meanwhile, the electronic display screen slides downwards, so that the electronic display screen is matched with the display plate body to form up-down symmetrical display, construction details which cannot be displayed by the display plate body can be displayed by the electronic display screen, and the double display method is matched, so that the display is more detailed.

Description

Project progress management device for building engineering project management
Technical Field
The utility model belongs to the technical field of building engineering management, and relates to a project progress management device for building engineering project management.
Background
For audio-visual demonstration construction target value and progress condition, generally can use project progress management device, present project progress management device is usually by the show board constitutes, when using, the staff can write the concrete data of project progress on the show board, so that manage the analysis to the project progress condition, application number 202220802083.6 discloses a project progress management device for building engineering project management, the on-line screen storage device comprises a base, a support, first show board, second show board and angle adjustment mechanism, support fixed connection is at the base upper surface, first show board rotates to be connected in one side of support, the second show board rotates to be connected at the opposite side of support, and be relative setting between first show board and the second show board, angle adjustment mechanism sets up in one side of support, and angle adjustment mechanism is connected with first show board, second show board homogeneous phase. This project progress management device for building engineering project management passes through angle adjustment mechanism's setting to can adjust the angular position of first show board and second show board, make it can be applicable to different people to the different user demands with the angular position of first show board and second show board.
The above-mentioned management device has two defects, and first demonstration height is fixed to be set up, and when needs change show content, comparatively troublesome, the second can only carry out the picture show, when carrying out project management, often still includes other more careful contents, and these contents just are difficult to show completely through a single show board, need improve.
Disclosure of utility model
The utility model aims to provide a project progress management device for building engineering project management, which aims to solve the problems in the background technology.
The aim of the utility model can be achieved by the following technical scheme:
The utility model provides a project progress management device for building engineering project management, includes support base, removal, footstock, show plate body and electronic display screen, the top fixedly connected with bracing piece of support base, bracing piece top fixedly connected with footstock, the inner chamber has been seted up to the inside of footstock, lateral displacement spout has all been seted up to the internal face both sides of inner chamber, the inside of inner chamber has the lift seat through lateral displacement spout sliding connection, the protection chamber has been seted up to the inside of lift seat, the inside activity of protection chamber is provided with electronic display screen, the outside swing joint of lift seat has the show plate body, the inside of show plate body has been seted up the show groove, the top activity in the show groove is provided with the glass apron, the top activity in the inner chamber is provided with the bull stick, the equal fixed cover in both ends of bull stick is equipped with the receipts line sleeve, receive line sleeve's outside winding has the line, the bottom and the couple fixed connection at lift seat top of haulage line.
In the project progress management device for construction project management, the bottom end side of the supporting base is fixedly connected with moving wheels, and the moving wheels are provided with four groups.
In the project progress management device for construction project management, the bearing seats are arranged on two sides of the inner wall surface of the inner cavity, and two ends of the rotating rod are respectively sleeved with the supporting bearings in the bearing seats.
In the project progress management device for construction project management, one end of the rotating rod penetrates through the inner cavity and is fixedly connected with the second bevel gear on the outer side of the top seat.
In the project progress management device for construction project management, a motor plate is fixedly arranged on one side of the top seat, a driving motor is fixedly arranged on the top end of the motor plate, a first conical gear is fixedly connected with the output end of the driving motor, and the first conical gear is meshed with the second conical gear.
In the project progress management device for construction project management, the electric push rod is movably arranged on the side of the bottom of the lifting seat, the output end of the electric push rod is fixedly connected with the side of the inner part of the display plate body, the lifting cylinder is arranged at the top of the protection cavity, and the output end of the lifting cylinder is fixedly connected with the middle part of the top end of the electronic display screen.
Compared with the prior art, the project progress management device for the construction project management has the advantages that:
According to the application, the top of the supporting base is provided with the top seat through the supporting rod, the movable lifting seat is arranged in the top seat, the top of the top seat is provided with the rotating rod driven by the first conical gear and the second conical gear, when the rotating rod rotates, the traction wire can be pulled, and then the lifting seat is pulled to lift through the traction wire, so that a display picture on the display board body can be conveniently replaced, meanwhile, the inner side of the lifting seat is provided with the electronic display screen sliding in the protective cavity, and during display, the electronic display screen can be pushed by the electric push rod to be unfolded upwards, the display angle is adjusted, and simultaneously, the electronic display screen slides downwards, so that the electronic display screen is matched with the display board body to form up-down symmetrical display, construction details which cannot be displayed on the display board body can be displayed through the electronic display screen, and the double display method is matched, and the display is more detailed.
Drawings
Fig. 1 is a schematic structural view of a project progress management apparatus for construction project management according to the present utility model.
Fig. 2 is a schematic diagram of a top seat structure of a project progress management device for managing a construction project according to the present utility model.
FIG. 3 is a schematic view of an electronic display screen of a project progress management apparatus for construction project management according to the present utility model.
In the figure, 1, a supporting base; 2. a moving wheel; 3. a support rod; 4. a top base; 5. an inner cavity; 6. a lifting seat; 7. a glass cover plate; 8. a display board body; 9. a display slot; 10. a side displacement chute; 11. a rotating rod; 12. a wire winding sleeve; 13. a traction wire; 14. a hook; 15. a driving motor; 16. a first bevel gear; 17. a second bevel gear; 18. an electronic display screen; 19. a protective cavity; 20. an electric push rod.
Detailed Description
The following are specific embodiments of the present utility model and the technical solutions of the present utility model will be further described with reference to the accompanying drawings, but the present utility model is not limited to these embodiments.
The utility model provides a project progress management device for building engineering project management, including supporting base 1, remove wheel 2, footstock 4, show plate body 8 and electronic display screen 18, the top fixedly connected with of supporting base 1's bracing piece 3, bracing piece 3 top fixedly connected with footstock 4, inner chamber 5 has been seted up to the inside of footstock 4, lateral displacement spout 10 has all been seted up to the internal face both sides of inner chamber 5, lateral displacement spout 10 sliding connection has elevating seat 6 in the inside of inner chamber 5, protection cavity 19 has been seted up to the inside of elevating seat 6, protection cavity 19's inside activity is provided with electronic display screen 18, elevating seat 6's outside swing joint has show plate body 8, show groove 9 has been seted up to the inside of show plate body 8, the top activity in the show groove 9 is provided with glass apron 7, the top activity in the inner chamber 5 is provided with bull stick 11, the equal fixed cover in both ends of bull stick 11 is equipped with receipts line sleeve 12, the outside winding of receipts line sleeve 12 has traction wire 13, the bottom and the couple 14 fixed connection at elevating seat 6 top.
As shown in fig. 1, 2 and 3, the project progress management device for building engineering project management of the present utility model is specifically that a movable wheel 2 is fixedly connected to a bottom end side of a support base 1, and the movable wheel 2 is provided with four groups, and the support base 1 can be moved by the movable wheel 2 to adjust a position.
As shown in fig. 1, 2 and 3, the project progress management device for construction project management of the present utility model is specifically provided with bearing seats on both sides of an inner wall surface of an inner cavity 5, and both ends of a rotating rod 11 are respectively sleeved with support bearings in the bearing seats, and both ends of the rotating rod 11 are movably supported by the bearing seats.
As shown in fig. 1, 2 and 3, the project progress management device for managing a construction project of the present utility model, specifically, one end of a rotating rod 11 passes through an inner cavity 5 and is fixedly connected with a second bevel gear 17 on the outer side of the top of a top seat 4.
As shown in fig. 1, 2 and 3, the project progress management device for managing a building project of the present utility model is specifically provided with a motor plate fixedly arranged on one side of the top of a top seat 4, a driving motor 15 is fixedly arranged on the top end of the motor plate, the output end of the driving motor 15 is fixedly connected with a first bevel gear 16, and the first bevel gear 16 is meshed with a second bevel gear 17.
As shown in fig. 1, 2 and 3, the project progress management device for building engineering project management of the present utility model is specifically provided with an electric push rod 20 movably arranged at the bottom side of a lifting seat 6, an output end of the electric push rod 20 is fixedly connected with the inner side of a display board body 8, a lifting cylinder is arranged at the top in a protection cavity 19, and an output end of the lifting cylinder is fixedly connected with the middle part of the top of an electronic display screen 18.
According to the project progress management device for building engineering project management, the top of the supporting base 1 is provided with the top seat 4 through the supporting rod 3, the movable lifting seat 6 is arranged in the top seat 4, the top of the top seat 4 is provided with the rotating rod 11 driven by the first bevel gear 16 and the second bevel gear 17, when the rotating rod 11 rotates to drive the wire collecting sleeve 12 to rotate, the traction wire 13 can be pulled, the lifting seat 6 is pulled to lift through the traction wire 13, the lifting seat 6 descends to the supporting base 1, the project progress picture on the display plate body 8 is conveniently replaced, meanwhile, the inner side of the lifting seat 6 is arranged on the electronic display screen 18 sliding in the protective cavity 19, the display plate body 8 can be pushed to be unfolded upwards through the electric push rod 20, the display angle is adjusted, meanwhile, the electronic display screen 18 is driven to slide downwards through the lifting cylinder, accordingly, the electronic display screen 18 is matched with the display plate body 8, the effect of up-down symmetry is formed, the construction details which cannot be displayed on the display plate body 8 can be displayed through the electronic display screen 18 in detail, and the double display method is adopted, and the display progress is more detail.
What is not described in detail in this specification is prior art known to those skilled in the art. The specific embodiments described herein are offered by way of example only to illustrate the spirit of the utility model. Those skilled in the art may make various modifications or additions to the described embodiments or substitutions thereof without departing from the spirit of the utility model or exceeding the scope of the utility model as defined in the accompanying claims.

Claims (6)

1. The project progress management device for building engineering project management comprises a supporting base (1), a movable wheel (2), a top seat (4), a display plate body (8) and an electronic display screen (18), and is characterized in that the top end of the supporting base (1) is fixedly connected with two symmetrical supporting rods (3), the top end of each supporting rod (3) is fixedly connected with the top seat (4), an inner cavity (5) is formed in the top seat (4), side displacement sliding grooves (10) are formed in two sides of the inner wall surface of the inner cavity (5), a lifting seat (6) is slidably connected in the inner cavity (5) through the side displacement sliding grooves (10), a protection cavity (19) is formed in the lifting seat (6), the electronic display screen (18) is movably arranged in the protection cavity (19), the display plate body (8) is movably connected in the outer side of the lifting seat (6), a display groove (9) is formed in the inner portion of each display plate body (8), a glass cover plate (7) is movably arranged in the inner cavity (5), a pull wire (12) is wound on the outer portion of the pull wire (12), the bottom end of the traction wire (13) is fixedly connected with a hook (14) at the top of the lifting seat (6).
2. The project progress management device for construction project management according to claim 1, wherein the bottom end side of the support base (1) is fixedly connected with a moving wheel (2), and the moving wheel (2) is provided with four groups.
3. The project progress management device for construction project management according to claim 1, wherein bearing seats are arranged on both sides of the inner wall surface of the inner cavity (5), and both ends of the rotating rod (11) are respectively sleeved with support bearings in the bearing seats.
4. The project progress management device for construction project management according to claim 1, wherein one end of the rotating rod (11) penetrates through the inner cavity (5) and is fixedly connected with a second bevel gear (17) on the outer side of the top seat (4).
5. The project progress management device for construction project management according to claim 1, wherein a motor plate is fixedly arranged on one side of the top seat (4), a driving motor (15) is fixedly arranged on the top end of the motor plate, a first conical gear (16) is fixedly connected to the output end of the driving motor (15), and the first conical gear (16) is meshed with a second conical gear (17).
6. The project progress management device for construction project management according to claim 1, wherein an electric push rod (20) is movably arranged at the bottom side of the lifting seat (6), the output end of the electric push rod (20) is fixedly connected with the inner side of the display plate body (8), a lifting cylinder is arranged at the top in the protection cavity (19), and the output end of the lifting cylinder is fixedly connected with the middle part of the top end of the electronic display screen (18).
CN202321715923.6U 2023-07-03 2023-07-03 Project progress management device for building engineering project management Active CN220821025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321715923.6U CN220821025U (en) 2023-07-03 2023-07-03 Project progress management device for building engineering project management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321715923.6U CN220821025U (en) 2023-07-03 2023-07-03 Project progress management device for building engineering project management

Publications (1)

Publication Number Publication Date
CN220821025U true CN220821025U (en) 2024-04-19

Family

ID=90701389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321715923.6U Active CN220821025U (en) 2023-07-03 2023-07-03 Project progress management device for building engineering project management

Country Status (1)

Country Link
CN (1) CN220821025U (en)

Similar Documents

Publication Publication Date Title
CN203802111U (en) Timing type display and storage integrated cabinet for collections
CN210979192U (en) Environment-friendly public welfare propaganda is with portable L ED display screen
CN113012552A (en) Sand table for building construction planning and construction
CN220821025U (en) Project progress management device for building engineering project management
CN107121392A (en) A kind of novel geological rock core scanning integrated machine
CN209700731U (en) Logistics trolley
CN215831578U (en) Collapse prevention structure based on digital media design show shelf
CN214759802U (en) Novel support frame for civil engineering structural design
CN211647211U (en) Elevating platform for construction
CN209177937U (en) A kind of novel multi-use formula promotion vehicle
CN110718167A (en) Show shelf for energy-saving technology popularization
CN112634729A (en) Municipal construction is with simulation sand table
CN207727979U (en) A kind of hydraulic template trolley poured for top plate
CN207057499U (en) A kind of device for low-temperature transport tank car tank body fit
CN214663428U (en) Integrated multi-position computer rotating frame
CN219889191U (en) Multimedia scene interaction display stand
CN218338106U (en) BIM (building information modeling) display device
CN217921317U (en) Paper tube hoisting frame
CN218055736U (en) Self-propelled winding machine
CN213935540U (en) Display device is used in teaching of digital media specialty
CN219510541U (en) Sand table deduction display device with adjustable height
CN212805018U (en) Elevating gear is used in electromechanical installation
CN218064161U (en) Engineering cost surveying instrument with height adjusting mechanism
CN219585262U (en) Sand lifting device
CN213664604U (en) Engineering is managed with design drawing show stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant