CN220815180U - Guardrail for construction of hydraulic structures of sewage plants - Google Patents

Guardrail for construction of hydraulic structures of sewage plants Download PDF

Info

Publication number
CN220815180U
CN220815180U CN202322495686.3U CN202322495686U CN220815180U CN 220815180 U CN220815180 U CN 220815180U CN 202322495686 U CN202322495686 U CN 202322495686U CN 220815180 U CN220815180 U CN 220815180U
Authority
CN
China
Prior art keywords
guardrail
positioning
stand
spring
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322495686.3U
Other languages
Chinese (zh)
Inventor
羊海文
蒋宏伟
王赵
李汶远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Municipal Facility Construction Engineering Co ltd
Original Assignee
Wuxi Municipal Facility Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Municipal Facility Construction Engineering Co ltd filed Critical Wuxi Municipal Facility Construction Engineering Co ltd
Priority to CN202322495686.3U priority Critical patent/CN220815180U/en
Application granted granted Critical
Publication of CN220815180U publication Critical patent/CN220815180U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a guardrail for hydraulic structure construction of a sewage plant, which comprises a first upright post and a second upright post which is arranged opposite to the first upright post, wherein the first upright post and the second upright post are the same in height, the upper end and the lower end of the outer wall of one side of the first upright post are respectively provided with a positioning slot, the front surfaces of the two positioning slots are respectively fixedly provided with a spring positioning piece, the upper end and the lower end of the outer wall of one side of the second upright post are respectively fixedly provided with a connecting plug block, the connecting plug blocks and the positioning slots are arranged in an adapting structure, and plug block positioning holes are formed in the outer surfaces of the connecting plug blocks.

Description

Guardrail for construction of hydraulic structures of sewage plants
Technical Field
The utility model relates to the technical field of construction of sewage plants, in particular to a guardrail for construction of a hydraulic structure of a sewage plant.
Background
The sewage plant is also called a sewage treatment plant or a sewage plant in a city, is arranged at a common treatment station of the plant, and is a pretreatment facility when effluent is put into a city drainage pipeline;
The hydraulic structure guardrail of the sewage plant is also called as a galvanized plastic-sprayed steel guardrail, is attractive and novel, easy to install, safe and reliable, has a preferential price, and can play a role in warning and protecting in the construction process, and a leading product, namely a solar anti-dazzle guardrail and a galvanized steel isolation guardrail;
In the assembly work of the guardrails of the conventional sewage plant hydraulic structure, one guardrail is generally close to the other guardrail, the two guardrails are relatively independent, and in actual use, the guardrail lacks certain integrity, is inconvenient to assemble the guardrails, has poor stable connection performance between the structures and is inconvenient to use, so the utility model provides the guardrail for constructing the sewage plant hydraulic structure, which is convenient for fixedly connecting the guardrails.
Disclosure of utility model
The utility model aims to provide a guardrail for construction of a hydraulic structure of a sewage plant, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a guardrail is used in construction of sewage plant hydraulic structure, includes a stand and the stand of No. two that set up relatively with a stand, a stand is highly the same with No. two stands, a stand one side outer wall upper and lower both ends all have been seted up the positioning slot, two positioning slot openly just are located a stand outer wall on all fixed mounting have the spring setting piece, no. two stand one side outer wall upper and lower ends all fixed mounting have the connection inserted block, connection inserted block and positioning slot are the adaptation structure setting, have seted up the inserted block locating hole on the connection inserted block surface;
The spring positioning piece further comprises a spring box, the interior of the spring box is of a hollow structure design, an outer end cover is fixedly arranged on the outer wall of one end of the spring box, and a positioning inserting column is inserted into the interior of the spring box.
Preferably, a fixing plate is fixedly arranged on the outer wall of the middle part of the positioning inserting column, and an inserting spring is fixedly arranged on the outer wall of one side of the fixing plate, which is close to the outer end cover.
Preferably, the plug spring is sleeved outside the positioning plug column, and one end of the plug spring, which is far away from the fixing plate, is fixedly connected with the outer end cover.
Preferably, one end of the positioning inserting column is inserted into the positioning slot, the other end of the positioning inserting column penetrates through the outer end cover to be fixedly connected with a handle, and the positioning inserting column is in sliding connection with the outer end cover.
Preferably, two guardrail cross bars are fixedly arranged between the first upright post and the second upright post, and the two guardrail cross bars are vertically symmetrically distributed.
Preferably, a plurality of guardrail vertical rods are fixedly arranged between the two guardrail cross rods, and the guardrail vertical rods are linearly distributed at equal intervals.
Compared with the prior art, the utility model has the beneficial effects that:
The guardrail for construction of the hydraulic structures of the sewage plant can extremely conveniently complete the assembly and connection work between two or more guardrails in actual use, can be assembled and connected through a simple pulling and inserting rebound structure, can greatly improve the assembly speed and the assembly efficiency between guardrails by replacing the original screw installation in the mode, is convenient to disassemble, can separate the two guardrails by pulling the positioning inserting column in the process of disassembly, has the use characteristics of quick assembly and quick disassembly of the guardrails in the process of use, greatly improves the assembly and disassembly efficiency of the guardrails, and is convenient in structure use;
Meanwhile, the structural stability of the guardrail assembly can be effectively improved by assembling a plurality of guardrails together, the overall quantity of guardrails can be dynamically increased or reduced, the guardrail assembly can be applied to hydraulic structures of sewage plants with more sizes, the dynamic regulation performance is greatly improved, the application range is wide, the overall assembly structure is simple, the manufacturing and maintenance cost is low, and the guardrail assembly is suitable for popularization and use.
Drawings
FIG. 1 is a schematic view of the external perspective structure of a guardrail according to an embodiment of the present utility model;
FIG. 2 is a schematic view of a right plane structure of a guardrail according to an embodiment of the present utility model;
FIG. 3 is a schematic view of the outer structure of a spring retainer according to an embodiment of the present utility model;
FIG. 4 is a schematic view of the internal structure of a spring case according to an embodiment of the present utility model.
In the figure: 1. a first upright post; 2. a second upright post; 3. positioning the slot; 4. a spring positioning member; 401. a spring case; 402. an outer end cap; 403. positioning the inserted column; 404. a fixing plate; 405. a plug spring; 406. a handle; 5. connecting the plug blocks; 6. a plug positioning hole; 7. guard rail cross bars; 8. and a guardrail vertical rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1-4, an embodiment of the present utility model is provided: the utility model provides a guardrail is used in construction of sewage plant hydraulic structure, including a stand 1 and with a stand 1 set up the second stand 2 relatively, a stand 1 is highly the same with a stand 2, thereby can improve the holistic aesthetic property of this guardrail, a stand 1 side outer wall upper and lower both ends all have been seted up positioning slot 3, two positioning slot 3 openly just are located a fixed mounting on a stand 1 outer wall, a stand 2 side outer wall upper and lower end all fixed mounting has connecting insert 5, connecting insert 5 and positioning slot 3 are the adaptation structure setting, insert locating hole 6 has been seted up on connecting insert 5 surface;
The structural design can enable the connecting plug blocks 5 of the guardrails to be inserted into the positioning slots 3 of the guardrails of the other same type, so that the preliminary connection work between the two guardrails can be completed;
The spring positioning piece 4 further comprises a spring box 401, the spring box 401 is arranged on the front outer wall of the first upright column 1, the interior of the spring box 401 is of a hollow structure design, an outer end cover 402 is fixedly arranged on the outer wall of one end of the spring box 401, and a positioning inserting column 403 is inserted into the interior of the spring box 401;
Further, a fixing plate 404 is fixedly installed on the outer wall of the middle part of the positioning inserting column 403, and an inserting spring 405 is fixedly installed on the outer wall of one side of the fixing plate 404, which is close to the outer end cover 402;
Furthermore, the plug spring 405 is sleeved outside the positioning plug post 403, and one end of the plug spring 405 away from the fixing plate 404 is fixedly connected with the outer end cover 402;
One end of a positioning inserting column 403 is inserted into the positioning slot 3, the other end of the positioning inserting column 403 penetrates through the outer end cover 402 and is fixedly connected with a handle 406, and the positioning inserting column 403 is in sliding connection with the outer end cover 402;
According to the structural design, when the guardrails are required to be assembled and installed, the guardrails of the same type can be integrally installed and used, and in the specific installation, a worker can manually pull the positioning inserting column 403 through the handle 406, so that the positioning inserting column 403 moves and falls off in the positioning slot 3, and the top end of the positioning inserting column 403 and the inner wall of one side of the positioning slot 3 are positioned on the same vertical horizontal plane (namely, the inside of the positioning slot 3 is in a hollowed-out state, and the inside of the positioning slot is not blocked by a transverse fork of the positioning inserting column 403);
When the positioning plunger 403 is pulled by external force, the fixing plate 404 thereon moves along, so that the plug spring 405 can be compressed by the fixing plate 404;
At this time, the connecting plug 5 on the other guardrail to be assembled is inserted into the positioning slot 3, after the connecting plug 5 is completely inserted into the positioning slot 3, the plug positioning hole 6 on the connecting plug 5 is aligned with the positioning plug column 403, at this time, the handle 406 is released, and when the positioning plug column 403 is not pulled by external force, the compressed plug spring 405 on the positioning plug column 403 is reset and rebounded, so that the positioning plug column 403 is inserted into the plug positioning hole 6, and the assembly and connection work between the two guardrails can be completed;
When the guardrail is required to be disassembled, the positioning plug posts 403 can be pulled again through the handles 406, so that the positioning plug posts 403 are separated from the plug positioning holes 6, and then the connecting plug 5 in the positioning slot is pulled out, so that the disassembling work between the two guardrails can be completed.
In this embodiment, in order to ensure the normal enclosure of the guardrail, two guardrail crossbars 7 are fixedly installed between the first upright post 1 and the second upright post 2, the two guardrail crossbars 7 are vertically and symmetrically distributed, a plurality of guardrail vertical rods 8 are fixedly installed between the two guardrail crossbars 7, and the plurality of guardrail vertical rods 8 are linearly distributed at equal intervals, so that the normal enclosure of the guardrail can be completed through the structures of the guardrail crossbars 7 and the plurality of guardrail vertical rods 8, and the normal use of the guardrail is ensured;
Further, in order to improve the use and warning effect, the guardrail montant 8 is when in-service use, accessible glue adhesion reflection of light strip to carry out reflection of light at night and remind, have better warning, suggestion effect, improve the safety in utilization of guardrail.
Working principle: when the guardrail is used, the guardrail is moved to an area needing warning and reminding, and when the guardrails are required to be assembled and installed, the guardrails of the same type can be integrally installed and used;
during specific installation, a worker can manually pull the positioning inserting column 403 through the handle 406, so that the positioning inserting column 403 moves in the positioning slot 3 to be separated, and the top end of the positioning inserting column 403 and the inner wall on one side of the positioning slot 3 are positioned on the same vertical horizontal plane during pulling (namely, the positioning slot 3 is in a hollowed-out state, and the inside of the positioning inserting column is not blocked by a transverse fork of the positioning inserting column 403);
When the positioning plunger 403 is pulled by external force, the fixing plate 404 thereon moves along, so that the plug spring 405 can be compressed by the fixing plate 404;
At this time, the connecting plug 5 on the other guardrail to be assembled is inserted into the positioning slot 3, and after all the connecting plug 5 is inserted into the positioning slot 3, the plug positioning hole 6 on the connecting plug 5 is aligned with the positioning plug post 403;
At this time, when the handle 406 is released and the positioning plug post 403 is not pulled by external force, the compressed plug spring 405 will rebound, so that the positioning plug post 403 is inserted into the plug positioning hole 6, and the assembly connection work between the two guardrails can be completed;
When the guardrail is required to be disassembled, the positioning plug posts 403 can be pulled again through the handles 406, so that the positioning plug posts 403 are separated from the plug positioning holes 6, and then the connecting plug 5 in the positioning slot is pulled out, so that the disassembling work between the two guardrails can be completed.
In summary, the guardrail for constructing the hydraulic structure of the sewage plant can extremely conveniently complete the assembly and connection work between two or more guardrails in actual use, and can be assembled and connected through a simple pulling and inserting rebound structure, so that the assembly speed and the assembly efficiency between guardrails can be greatly improved, the guardrail is convenient to disassemble, and the guardrail can be detached by pulling the positioning plug post only when the two guardrails are separated, has the use characteristics of quick assembly and quick disassembly of the guardrails in use, greatly improves the assembly and disassembly efficiency of the guardrails, and is convenient to use in structure;
Meanwhile, the structural stability of the guardrail assembly can be effectively improved by assembling a plurality of guardrails together, the overall quantity of guardrails can be dynamically increased or reduced, the guardrail assembly can be applied to hydraulic structures of sewage plants with more sizes, the dynamic regulation performance is greatly improved, the application range is wide, the overall assembly structure is simple, the manufacturing and maintenance cost is low, and the guardrail assembly is suitable for popularization and use.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a guardrail is used in construction of sewage plant hydraulic structure, includes stand (1) and with stand (1) relative setting No. two stand (2), its characterized in that, stand (1) and No. two stand (2) highly the same, positioning slot (3) have all been seted up to stand (1) one side outer wall upper and lower both ends, two positioning slot (3) are positive and lie in and all fixedly mounted with spring positioning piece (4) on stand (1) outer wall, connecting insert (5) are all fixedly mounted to stand (2) one side outer wall upper and lower extreme, connecting insert (5) are adapting structure setting with positioning slot (3), connecting insert (5) have seted up insert locating hole (6) on the surface;
The spring positioning piece (4) further comprises a spring box (401), the interior of the spring box (401) is of a hollow structure design, an outer end cover (402) is fixedly arranged on the outer wall of one end of the spring box (401), and a positioning inserting column (403) is inserted into the interior of the spring box (401).
2. The guardrail for construction of hydraulic structures of sewage plants according to claim 1, wherein: the fixing plate (404) is fixedly arranged on the outer wall of the middle part of the positioning inserting column (403), and the inserting spring (405) is fixedly arranged on the outer wall of one side of the fixing plate (404) close to the outer end cover (402).
3. The guardrail for construction of hydraulic structures of sewage plants according to claim 2, wherein: the plug spring (405) is sleeved outside the positioning plug column (403), and one end, far away from the fixing plate (404), of the plug spring (405) is fixedly connected with the outer end cover (402).
4. The guardrail for construction of hydraulic structures of sewage plants according to claim 1, wherein: one end of the positioning inserting column (403) is inserted into the positioning slot (3), the other end of the positioning inserting column (403) penetrates through the outer end cover (402) and is fixedly connected with the handle (406), and the positioning inserting column (403) is in sliding connection with the outer end cover (402).
5. The guardrail for construction of hydraulic structures of sewage plants according to claim 1, wherein: two guardrail cross bars (7) are fixedly arranged between the first upright post (1) and the second upright post (2), and the two guardrail cross bars (7) are distributed symmetrically up and down.
6. The guardrail for hydraulic construction of sewage plant according to claim 5, wherein: a plurality of guardrail vertical rods (8) are fixedly arranged between the two guardrail cross rods (7), and the guardrail vertical rods (8) are distributed linearly at equal intervals.
CN202322495686.3U 2023-09-14 2023-09-14 Guardrail for construction of hydraulic structures of sewage plants Active CN220815180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322495686.3U CN220815180U (en) 2023-09-14 2023-09-14 Guardrail for construction of hydraulic structures of sewage plants

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322495686.3U CN220815180U (en) 2023-09-14 2023-09-14 Guardrail for construction of hydraulic structures of sewage plants

Publications (1)

Publication Number Publication Date
CN220815180U true CN220815180U (en) 2024-04-19

Family

ID=90679663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322495686.3U Active CN220815180U (en) 2023-09-14 2023-09-14 Guardrail for construction of hydraulic structures of sewage plants

Country Status (1)

Country Link
CN (1) CN220815180U (en)

Similar Documents

Publication Publication Date Title
CN208219404U (en) A kind of combined type guardrail convenient for assembling
CN220815180U (en) Guardrail for construction of hydraulic structures of sewage plants
CN211622189U (en) Assemble anti-drop's outer wall curtain structure
CN201865195U (en) Novel movable board house
CN205302877U (en) Fast -assembling combination formula exhibition board
CN111734209A (en) A safety protection guardrail for building engineering construction
CN210485954U (en) Spraying terminal device
CN209752188U (en) Bead winding toy
CN208441260U (en) A kind of degradable steel construction assembled wallboard
CN2926403Y (en) Assembled connected fence for courtyard
CN220954056U (en) Curtain wall assembly structure convenient to install
CN219017163U (en) Box-type substation alarm
CN220267377U (en) Environment-friendly energy-saving landscape wall with splicing structure
CN204794821U (en) Fixed solar energy ground mounting system
CN220599441U (en) Bamboo shell guardrail structure convenient to installation
CN219471738U (en) Assembled fence
CN203192806U (en) Glass fiber reinforced plastic anticorrosion photovoltaic support
CN213457067U (en) Domestic protection type smart electric meter structure of easily installing
CN215443490U (en) Assembled fender that encloses of town road construction
CN220353078U (en) Detachable bottom plate structure for assembled house
CN220568178U (en) Konjak planting environment monitoring device
CN214005993U (en) Modularization cold-formed thin-walled steel integrated house convenient to equipment
CN215366959U (en) Urban rail transit safety enclosure device
CN217325160U (en) Municipal administration environment-friendly afforestation isolation barrier
CN221043826U (en) Spliced wood-plastic material landscape box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant