CN220814006U - Hydraulic tool for pile body deviation correction - Google Patents
Hydraulic tool for pile body deviation correction Download PDFInfo
- Publication number
- CN220814006U CN220814006U CN202322695476.9U CN202322695476U CN220814006U CN 220814006 U CN220814006 U CN 220814006U CN 202322695476 U CN202322695476 U CN 202322695476U CN 220814006 U CN220814006 U CN 220814006U
- Authority
- CN
- China
- Prior art keywords
- pile
- hydraulic
- positioning pile
- hydraulic cylinder
- pile body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002689 soil Substances 0.000 claims abstract description 26
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 17
- 230000006835 compression Effects 0.000 claims description 9
- 238000007906 compression Methods 0.000 claims description 9
- 230000002787 reinforcement Effects 0.000 claims description 8
- 239000004744 fabric Substances 0.000 claims description 5
- 239000007769 metal material Substances 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims 1
- 230000000087 stabilizing effect Effects 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 10
- 239000000428 dust Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 4
- 235000017491 Bambusa tulda Nutrition 0.000 description 4
- 241001330002 Bambuseae Species 0.000 description 4
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 4
- 239000011425 bamboo Substances 0.000 description 4
- 238000005461 lubrication Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000001125 extrusion Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 238000005728 strengthening Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 210000005069 ears Anatomy 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a hydraulic tool for correcting pile body deviation, which comprises a hydraulic cylinder, wherein the hydraulic cylinder is arranged on a positioning pile, a hydraulic top plate is arranged at the top of the hydraulic cylinder, the top end of the hydraulic top plate is contacted with the pile body, a reinforcing component is arranged on the outer wall of the positioning pile, a dustproof part is arranged on the surface of the top end of the positioning pile, a spike penetrates into the soil layer to reinforce the pile body, a threaded conical rod is matched with the inside of the reinforcing block to rotate deep into the soil layer to further strengthen the fixed positioning pile, the loosening condition is prevented, a handle is rotated, a pushing rod is inwards extruded, a limiting column is pushed to achieve the aim of fixing an extruded prefabricated foundation block, the stabilizing effect of the positioning pile is enhanced, the hydraulic cylinder in the positioning pile is protected to be stable, the hydraulic cylinder provides a good working environment, and the hydraulic tool is convenient to detach and install and is convenient to construct and use.
Description
Technical Field
The utility model relates to the technical field of hydraulic pile body deviation correction, in particular to a hydraulic tool for pile body deviation correction.
Background
Pile foundation deviation phenomenon is generally caused by too bad soil quality or large soil quality difference of a field;
The existing hydraulic tool for correcting the pile body can be directly used for supporting the pile body when working, and has no good stable supporting end face, so that the hydraulic tool is easy to produce a position deviation process in the working process of the hydraulic tool, a good working environment cannot be provided for the hydraulic tool, larger dust exists on a construction site in the pile body correction process, a long-time hydraulic rod is exposed, lubrication and hydraulic function reduction of the hydraulic tool can be caused, and the service life of the hydraulic tool is influenced.
Disclosure of utility model
The utility model provides a hydraulic tool for pile body deviation correction, which aims to solve the problems of stability and working environment of the hydraulic tool in the background technology.
The technical scheme of the utility model is realized as follows:
The utility model provides a hydraulic tool for pile body rectifies, includes hydraulic cylinder, pile, soil horizon, pile body and prefabricated foundation block, the hydraulic cylinder is installed on the pile, hydraulic roof is installed at the top of hydraulic cylinder, connects on hydraulic roof through the hydraulic stem in the hydraulic cylinder, be equipped with recess and rectangular channel in the pile, the recess is used for the installation of hydraulic cylinder, and the rectangular channel is used for the nestification on prefabricated foundation block, prefabricated foundation block is in depth in the soil horizon, hydraulic roof top contact has the pile body, the pile outer wall is equipped with the reinforcement subassembly, pile top surface mounting has dustproof part; the recess is used for the installation of hydraulic cylinder, is convenient for wrap up the hydraulic cylinder, strengthens the stabilization effect, can not produce the condition of skew in the use, and the rectangular channel is used for prefabricated foundation block installation, can stably install the spud pile on prefabricated foundation block, prevents the condition of skew.
The reinforcing component comprises: the pile comprises a reinforcing block, a threaded taper rod and spines, wherein the reinforcing block is fixed on the outer wall of a positioning pile, threads are arranged on the inner wall of the positioning pile, the threaded taper rod is connected inside the positioning pile in a threaded mode, and the spines are uniformly distributed at the bottom end of the positioning pile.
Preferably, the spike and the threaded taper penetrate into the soil layer. When carrying out hydraulic reinforcement to the pile body, with prefabricated foundation block in depth fixed in the soil horizon, establish the location stake cover on prefabricated foundation block top, the spike can pierce the soil horizon inside consolidate the pile body, and the cooperation screw thread awl pole is in consolidate the internal further strengthening of soil horizon of rotation in the piece, prevents to appear not hard up condition, and the hydraulic pressure section of thick bamboo in the protection location stake is stable to the hydraulic pressure section of thick bamboo provides good operational environment.
Preferably, the reinforcement assembly further comprises: the positioning pile comprises a built-in push plate, limiting columns and fixing blocks, wherein the limiting columns are provided with three limiting blocks which penetrate through the positioning pile and are in sliding connection, the built-in push plate is fixedly connected with the three limiting columns, the fixing blocks are fixedly connected with the outer wall of the positioning pile, and the fixing blocks are arranged on one side of the middle limiting column. When the positioning pile is sleeved on the top end of the prefabricated foundation block, the built-in push plate is used for extruding the prefabricated foundation block to strengthen the internal stabilizing effect.
Preferably, the fixed block is internally connected with a pushing rod in a threaded manner, and one side of the pushing rod is fixedly connected with a handle. Built-in push pedal, through rotatory handle, inwards extrudees the propelling rod, and the propelling rod effect is in the prescribing a limit to the post department in centre, promotes prescribing a limit to the post and reaches the fixed purpose of extrusion, strengthens the stable effect of spud pile, combines the use of spike and screw thread awl pole, can further strengthen the stability of pile body to and convenient to detach and installation, be convenient for consolidate the back of accomplishing, dismantle hydraulic cylinder and spud pile.
Preferably, the middle limiting column is sleeved and connected with a compression spring on the outer wall of the positioning pile, and the compression spring is supported on one side of the outer wall of the positioning pile and one side of the pushing rod. The compression spring gives the built-in push plate a rebound force to strengthen the stability of the built-in push plate and the automatic back and forth expansion force.
Preferably, the dust-proof member includes: the mounting plate passes through nut fixed mounting at spud top surface, the mounting plate top installation is equipped with tensile layer, the top fixed mounting on tensile layer has the connecting plate. When the hydraulic cylinder is installed, the pile body is supported by the hydraulic top plate to reach a proper position, and the stretching layer is pulled up for dust prevention.
Preferably, magnetic strips are fixedly arranged at two ends of the connecting plate, side lugs are fixedly arranged at two sides of the hydraulic top plate, and the side lugs are made of metal materials and are mutually adsorbed by the magnetic strips. The connecting plate is pulled to drive the stretching layer to move upwards, so that the magnetic force strips are adsorbed on the side lugs, and the stretching layer can be prevented from moving downwards automatically.
Preferably, the stretching layer is a folding dustproof cloth, the stretching layer can be expanded and contracted, and the stretching layer is wrapped outside the hydraulic cylinder. The dustproof cloth can provide a good working environment for the hydraulic cylinder, so that lubrication and hydraulic system descent caused by excessive dust accumulated by the hydraulic rod in the hydraulic cylinder are prevented, and after the reinforcement work is completed, the positioning pile is removed.
By adopting the technical scheme, the utility model has the beneficial effects that:
The utility model sets the locating pile, the prefabricated foundation block is deep in the soil layer to fix the stable foundation, the locating pile is sleeved on the top end of the prefabricated foundation block, the spike can penetrate into the soil layer to strengthen the pile body, the locating pile is further strengthened by matching with the rotation of the threaded conical rod in the strengthening block to deep in the soil layer, the loosening condition is prevented, the push rod is extruded inwards by rotating the handle, the limiting column is pushed to achieve the aim of extruding the prefabricated foundation block to fix, the stabilizing effect of the locating pile is strengthened, the hydraulic cylinder in the locating pile is protected to be stable, so that the hydraulic cylinder provides a good working environment, and the locating pile is convenient to detach and install and convenient to construct and use;
The matched dustproof component of the positioning pile can provide a good working environment for the hydraulic cylinder, and the phenomenon that the hydraulic system is lowered due to excessive dust accumulated by the hydraulic rod in the hydraulic cylinder is prevented.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions of the prior art, the drawings which are used in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings can be obtained according to these drawings without inventive faculty for a person skilled in the art.
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic view of the bottom structure of the present utility model;
FIG. 3 is a top view of a spud of the present utility model;
FIG. 4 is a cross-sectional view of FIG. 3 of the present utility model;
Fig. 5 is a schematic view of the installation and use structure of the present utility model.
Wherein: 1. a hydraulic cylinder; 11. a hydraulic top plate; 12. a lateral ear; 13. a soil layer; 14. a pile body; 15. prefabricating a base block; 2. positioning piles; 21. a groove; 22. rectangular grooves; 23. a reinforcing block; 231. a threaded taper rod; 232. spike; 24. a push plate is arranged in the inner part; 25. defining a column; 26. a fixed block; 27. a propulsion rod; 28. a handle; 29. a compression spring; 201. a mounting plate; 202. stretching the layer; 203. a connecting plate; 204. magnetic force strip.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, a hydraulic tool for pile correction comprises a hydraulic cylinder 1, a positioning pile 2, a soil layer 13, a pile body 14 and a prefabricated foundation block 15, wherein the hydraulic cylinder 1 is installed on the positioning pile 2, a hydraulic top plate 11 is installed at the top of the hydraulic cylinder 1, the hydraulic cylinder 1 is connected to the hydraulic top plate 11 through a hydraulic rod, a groove 21 and a rectangular groove 22 are formed in the positioning pile 2, the groove 21 is used for installing the hydraulic cylinder 1, the rectangular groove 22 is used for being nested on the prefabricated foundation block 15, the prefabricated foundation block 15 is deeply arranged in the soil layer 13, the pile body 14 is contacted at the top end of the hydraulic top plate 11, a reinforcing component is arranged on the outer wall of the positioning pile 2, and a dustproof component is installed on the surface of the top end of the positioning pile 2;
The recess 21 is used for the installation of hydraulic pressure section of thick bamboo 1, is convenient for wrap up hydraulic pressure section of thick bamboo 1, strengthens the stabilization effect, can not produce the circumstances of skew in the use, and rectangular channel 22 is used for prefabricating the base block 15 installation, can stably install spud 2 on prefabricating the base block 15, prevents the circumstances of skew to appear.
The reinforcing component comprises: the reinforcing block 23, the screw thread awl pole 231 and the spike 232, the reinforcing block 23 is fixed and is equipped with a plurality of at the spud 2 outer wall, and spud 2 inner wall is equipped with the screw thread, and spud 2 inside threaded connection has screw thread awl pole 231, and spud 2's bottom evenly distributed has spike 232.
Specifically, the spike 232 and the threaded taper 231 penetrate into the soil layer 13.
When the pile body 14 is hydraulically reinforced, the prefabricated foundation block 15 is fixed in the soil layer 13 in a deep manner, the positioning pile 2 is sleeved at the top end of the prefabricated foundation block 15, the spike penetrates into the soil layer 13 to reinforce the pile body 14, the threaded taper rod 231 is matched with the threaded taper rod 231 to rotate in the reinforcing block 23 to further strengthen the fixed positioning pile 2 in the soil layer 13, the loosening is prevented, the hydraulic cylinder 1 in the positioning pile 2 is protected to be stable, and the hydraulic cylinder 1 is convenient to provide a good working environment.
Specifically, the reinforcing component further comprises: the built-in push plate 24, the limiting column 25 and the fixed block 26 are arranged, the limiting column 25 is provided with three limiting columns 25 which penetrate through the positioning pile 2 and are in sliding connection, the built-in push plate 24 is fixedly connected with the three limiting columns 25, the fixed block 26 is fixedly connected with the outer wall of the positioning pile 2, and the fixed block 26 is arranged on one side of the middle limiting column 25.
When the positioning pile 2 is sleeved on the top end of the prefabricated foundation block 15, the built-in pushing plate 24 is used for extruding the prefabricated foundation block 15 to strengthen the internal stabilizing effect.
Specifically, a pushing rod 27 is screwed inside the fixed block 26, and a handle 28 is fixedly connected to one side of the pushing rod 27.
Built-in push pedal 24, through rotatory handle 28, inwards extrudees push rod 27, and push rod 27 is used in the middle limiting post 25 department, promotes limiting post 25 and reaches the fixed purpose of extrusion, strengthens the stable effect of spud 2, combines the use of spike 232 and screw thread awl pole 231, can further strengthen the stability of pile body 14 to and convenient to detach and installation, the back is accomplished in the convenience of reinforcement, dismantles hydraulic cylinder 1 and spud 2.
Specifically, the middle limiting column 25 is sleeved and connected with a compression spring 29 on the outer wall of the positioning pile 2, and the compression spring 29 is supported on one side of the outer wall of the positioning pile 2 and the pushing rod 27.
The compression spring 29 gives the built-in push plate 24 a rebound force to enhance the stability of the built-in push plate 24 and an automatic back and forth expansion force.
Specifically, the dust-proof member includes: the mounting plate 201 and the stretching layer 202, mounting plate 201 pass through nut fixed mounting at spud 2 top surface, and mounting plate 201 top installation is equipped with stretching layer 202, and stretching layer 202's top fixed mounting has connecting plate 203.
When the hydraulic cylinder 1 is installed, the pile body 14 is supported by the hydraulic top plate 11 to a proper position, and the tensile layer 202 is pulled up for dust-proof use.
Specifically, magnetic strips 204 are fixedly mounted at two ends of the connecting plate 203, side lugs 12 are fixedly mounted at two sides of the hydraulic top plate 11, and the side lugs 12 are made of metal and are mutually adsorbed with the magnetic strips 204.
The connecting plate 203 is pulled to drive the stretching layer 202 to move upwards, so that the magnetic force strips 204 are adsorbed on the side ears 12, and the stretching layer 202 can be prevented from moving downwards automatically.
Specifically, the stretching layer 202 is a folding dust-proof cloth, the stretching layer 202 can be expanded and contracted, and the stretching layer 202 is wrapped outside the hydraulic cylinder 1.
The dustproof cloth can provide a good working environment for the hydraulic cylinder 1, so that lubrication and hydraulic system descent caused by excessive dust accumulated by the hydraulic rod in the hydraulic cylinder 1 are prevented, and after the reinforcement work is completed, the positioning pile 2 is removed.
Working principle:
As shown in fig. 4, first, the prefabricated foundation block 15 is penetrated into the soil layer 13, the positioning pile 2 is stably installed on the prefabricated foundation block 15, the spike penetrates into the soil layer 13 to reinforce the pile body 14, the threaded taper rod 231 rotates in the reinforcing block 23 to penetrate into the soil layer 13 to further strengthen the fixed positioning pile 2, the pushing rod 27 is pressed inwards by rotating the handle 28, the pushing rod 27 acts on the middle limiting column 25, the limiting column 25 is pushed to achieve the aim of pressing the prefabricated foundation block 15 for fixing, and the stabilizing effect of the positioning pile 2 is enhanced;
Then, when the hydraulic pressure roof 11 supports the pile body 14 to a proper position, the stretching layer 202 is pulled up for dust prevention, and finally, after the reinforcement work is completed, the positioning pile 2 and the hydraulic cylinder 1 are removed.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, alternatives, and improvements that fall within the spirit and scope of the utility model.
Claims (8)
1. A hydraulic tool for pile body deviation rectification, its characterized in that: the hydraulic pile comprises a hydraulic cylinder (1), a positioning pile (2), a soil layer (13), a pile body (14) and a prefabricated foundation block (15), wherein the hydraulic cylinder (1) is installed on the positioning pile (2), a hydraulic top plate (11) is installed at the top of the hydraulic cylinder (1), the hydraulic cylinder (1) is connected to the hydraulic top plate (11) through a hydraulic rod, a groove (21) and a rectangular groove (22) are formed in the positioning pile (2), the groove (21) is used for installing the hydraulic cylinder (1), the rectangular groove (22) is used for being nested on the prefabricated foundation block (15), the prefabricated foundation block (15) is deeply arranged in the soil layer (13), the pile body (14) is contacted at the top end of the hydraulic top plate (11), a reinforcing component is arranged on the outer wall of the positioning pile (2), and a dust-proof component is installed on the surface of the top end of the positioning pile (2).
The reinforcing component comprises: the reinforcing block (23), the threaded taper rod (231) and the spines (232), the reinforcing block (23) is fixed on the outer wall of the positioning pile (2), threads are arranged on the inner wall of the positioning pile (2), the threaded taper rod (231) is connected inside the positioning pile (2), and the spines (232) are uniformly distributed at the bottom end of the positioning pile (2).
2. A hydraulic tool for pile body deviation correcting according to claim 1, wherein: the spike (232) and the threaded taper (231) penetrate into the soil layer (13).
3. A hydraulic tool for pile body deviation correcting according to claim 2, wherein: the reinforcement assembly further comprises: the novel positioning pile comprises a built-in push plate (24), limiting columns (25) and fixing blocks (26), wherein the limiting columns (25) are provided with three sliding joints penetrating through the positioning pile (2), the built-in push plate (24) is fixedly connected with the three limiting columns (25), the fixing blocks (26) are fixedly connected with the outer wall of the positioning pile (2), and the fixing blocks (26) are arranged on one side of the middle limiting column (25).
4. A hydraulic tool for pile body deflection correction as claimed in claim 3, wherein: the fixed block (26) is internally connected with a pushing rod (27) in a threaded manner, and one side of the pushing rod (27) is fixedly connected with a handle (28).
5. A hydraulic tool for pile body deflection correction as claimed in claim 3, wherein: the middle limiting column (25) is sleeved and connected with a compression spring (29) on the outer wall of the positioning pile (2), and the compression spring (29) is supported on one side of the outer wall of the positioning pile (2) and the pushing rod (27).
6. A hydraulic tool for pile body deviation correcting according to claim 1, wherein: the dust-proof member includes: the device comprises a mounting plate (201) and a stretching layer (202), wherein the mounting plate (201) is fixedly arranged on the top surface of a positioning pile (2) through a nut, the stretching layer (202) is arranged on the top of the mounting plate (201), and a connecting plate (203) is fixedly arranged on the top of the stretching layer (202).
7. A hydraulic tool for pile body deflection correction as claimed in claim 6, wherein: magnetic strips (204) are fixedly arranged at two ends of the connecting plate (203), side lugs (12) are fixedly arranged at two sides of the hydraulic top plate (11), and the side lugs (12) are made of metal materials and are mutually adsorbed with the magnetic strips (204).
8. A hydraulic tool for pile body deflection correction as claimed in claim 6, wherein: the stretching layer (202) is a folding dustproof cloth, the stretching layer (202) can be expanded and contracted, and the stretching layer (202) is wrapped outside the hydraulic cylinder (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322695476.9U CN220814006U (en) | 2023-10-09 | 2023-10-09 | Hydraulic tool for pile body deviation correction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322695476.9U CN220814006U (en) | 2023-10-09 | 2023-10-09 | Hydraulic tool for pile body deviation correction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220814006U true CN220814006U (en) | 2024-04-19 |
Family
ID=90674950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322695476.9U Active CN220814006U (en) | 2023-10-09 | 2023-10-09 | Hydraulic tool for pile body deviation correction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220814006U (en) |
-
2023
- 2023-10-09 CN CN202322695476.9U patent/CN220814006U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220814006U (en) | Hydraulic tool for pile body deviation correction | |
CN215329863U (en) | Anchor rod construction device for constructional engineering | |
CN111350181B (en) | Precast concrete tubular pile only bearing anti-pulling effect | |
CN213741051U (en) | Foundation excavation collapse prevention supporting structure is built in room | |
CN214089829U (en) | Building pile for building | |
CN211898441U (en) | Pipeline slot soil stone excavation protective structure | |
CN221193292U (en) | Steel support quick connector | |
CN217559212U (en) | Municipal works hydraulic pressure pipe jacking construction equipment | |
CN218843112U (en) | Bridge construction supporting device | |
CN217438837U (en) | Plant slope protection frame structure | |
CN216194667U (en) | Construction device for pile foundation engineering | |
CN221001169U (en) | Dam foundation seepage-proofing reinforcing structure | |
CN219118216U (en) | Diameter-variable photovoltaic bracket spiral pile foundation | |
CN217924430U (en) | Multi-section steel structure bearing support | |
CN218373804U (en) | Combined photovoltaic tubular pile | |
CN218090946U (en) | Pre-buried rag bolt positioning assembly that is under construction | |
CN219793882U (en) | Survey pole | |
CN214531405U (en) | Unit type curtain wall mounting system | |
CN221681821U (en) | Hollow pile for civil construction | |
CN220620146U (en) | High-pressure jet grouting reaming anchor cable structure | |
CN221681847U (en) | Foundation pit enclosing purlin supporting structure | |
CN221895788U (en) | Stable foundation pit supporting device | |
CN218324081U (en) | House engineering reinforcing and supporting device | |
CN208219687U (en) | A kind of reeded foundation pile for building of band | |
CN213538968U (en) | Piling purlin bracket for positioning steel sheet piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |