CN220813575U - Traffic guiding guardrail - Google Patents

Traffic guiding guardrail Download PDF

Info

Publication number
CN220813575U
CN220813575U CN202322350960.8U CN202322350960U CN220813575U CN 220813575 U CN220813575 U CN 220813575U CN 202322350960 U CN202322350960 U CN 202322350960U CN 220813575 U CN220813575 U CN 220813575U
Authority
CN
China
Prior art keywords
shaped
base
guardrail
collecting box
water collecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322350960.8U
Other languages
Chinese (zh)
Inventor
叶舟
梁轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322350960.8U priority Critical patent/CN220813575U/en
Application granted granted Critical
Publication of CN220813575U publication Critical patent/CN220813575U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The application discloses a traffic guiding guardrail, and belongs to the technical field of traffic guiding guardrails. The guardrail comprises a plurality of base posts, each base post is composed of a base and an industrial column, two ends of a transverse rail and two ends of a water collecting box can be connected with the two base posts in a fast plug-in fit mode, construction and installation are convenient, a supporting plate is fixedly installed in the water collecting box, a green planting basin is installed in a plurality of clamping cups on the supporting plate, green planting can be achieved in the green planting basin, water such as rainwater can be collected in the water collecting box, water is effectively saved, water supply can be conducted on the green planting planted in the green planting basin, the purpose of traffic guiding is achieved, the greening function is achieved when the guardrail is provided with the purpose of beautifying urban environments, the industrial columns are located at two ends of the guardrail, the vertical rods can be plug-in installed in U-shaped sleeves respectively, and the purpose of traffic guiding is achieved through the positioning bolts.

Description

Traffic guiding guardrail
Technical Field
The application relates to the technical field of traffic guiding guardrails, in particular to a traffic guiding guardrail.
Background
The utility model provides a traffic guardrail is a facility for traffic safety management, be used for dividing the road and protecting the pedestrian generally, and carry out traffic guidance to past vehicle and driving, realize orderly traffic environment, the design and the installation of traffic guardrail need follow relevant traffic regulation and standard generally, in order to ensure that it has good effect to traffic safety, namely the guardrail should possess sufficient intensity, stability and visibility, in order to provide effectual protection, the traffic guardrail structure among the prior art is a traffic guardrail that CN214328659U proposed, the device has solved current traffic guardrail and has not firmly stabilized enough to the fixing of guardrail when using, and be inconvenient for the user to install and dismantle, not only can reduce the guard effect to the vehicle, but also can influence the problem of workman's installation effectiveness, this traffic guardrail possesses the advantage of easy to install and dismantle and firmly stable, convenient to use person's use, the practicality of traffic guardrail has been improved, but during the use, guardrail both ends generally need set for setting up and install traffic sign, be used for the past vehicle and pedestrian, traffic guardrail structure is when installing the guardrail sign, the guardrail structure is the guardrail, the fixed on the traffic guardrail is used for setting up the guide plate with connecting sign, the fixed road is realized on the guardrail, the urban road is realized in order to improve the urban structure and the traffic guardrail structure is realized in order to do not to install the traffic structure, the improvement, the urban structure is realized in order to have the improvement, and the road structure is realized in order to be compressed and has been set up in the urban area.
Disclosure of utility model
1. Technical problem to be solved
The application aims to provide a traffic guiding guardrail, which solves the technical problems that traffic marking plates are required to be set and installed at two ends of the guardrail in the prior art and used for reminding passing vehicles and pedestrians, and compared with the prior art, a fixing rod connected with the marking plates is fixedly installed on the guardrail by using a clamp, the installation is inconvenient, the guardrail is used as a part of urban traffic environment, and in order to improve the quality of the urban environment, a green belt structure is usually selected to be arranged on the guardrail structure, so that the roadway spaces at two sides of a road are necessarily compressed, and the guardrail structure is required to be improved and optimized.
2. Technical proposal
The technical scheme of the application provides a traffic guiding guardrail, which comprises the following components: the guardrail comprises a plurality of base columns, the base columns are including base and worker's post, base and worker's post fixed connection, two peg graft between the base column and install the rail, two the joint is installed afforestation mechanism between the base column, afforestation mechanism is including the box that catchments, the box internal fixation that catchments is equipped with the layer board, layer board upper surface fixation is equipped with a plurality of card cups, green planting basin has been placed to the joint in the card cup, is located peg graft respectively on the base column at guardrail both ends and install a traffic guidance mark.
Through adopting above-mentioned technical scheme, the guardrail that traffic guidance was used comprises the foundation post that a plurality of was connected with the diaphragm, and every foundation post comprises base and worker's post, and the both ends of diaphragm can be pegged graft the cooperation with two foundation posts and be connected, and greening mechanism is installed to diaphragm upper end department, and the water collecting box both ends can be connected with foundation post joint, through at water collecting box internal fixation mounting layer board, install green planting basin in a plurality of card cups on the layer board, can realize planting green planting at green planting basin, when realizing that the guardrail possesses traffic guidance objective in succession, can realize greening function, beautify urban environment.
Optionally, both sides department of the worker post is all fixed and is equipped with two U-shaped covers, the worker post is pegged graft through the U-shaped cover and is installed the rail and the traffic is led and mark, the locating hole has all been seted up on the U-shaped cover, the locating bolt is installed to the downthehole screw thread of locating, four L-shaped grooves have all been seted up to the worker post both sides, two convex grooves have been seted up to the worker post upper end, the worker post passes through convex groove joint installation water collection box.
Through adopting above-mentioned technical scheme, the diaphragm both ends are through pegging graft the cooperation with the U-shaped cover on the worker's post and be connected, but quick installation diaphragm, and accessible locating bolt realize fastening purpose, increase the stability of structure, but the joint is installed in the convex slot of worker's post at water collection box both ends, easy to assemble water collection box.
Optionally, the traffic guidance marks including the sign, sign fixedly connected with pole setting, the pole setting is pegged graft and is installed in the U-shaped cover, two perforation have been seted up on the pole setting, peg graft in the perforation and install the locating bolt.
Through adopting above-mentioned technical scheme, be located the I-shaped post department of guardrail both ends department, can peg graft the pole setting respectively and install in the U-shaped cover to use the locating bolt to realize pole setting and I-shaped post fixed connection processing.
Optionally, the rail is including the barrier, two U-shaped poles of both ends fixedly connected with respectively of barrier, all seted up the through-hole on the U-shaped pole, the U-shaped pole is pegged graft and is installed in the U-shaped cover, all fixedly cup jointed the snap ring on the U-shaped pole, the U-shaped cover upper surface is connected in the laminating of snap ring bottom surface, fixedly be equipped with the conducting bar on the snap ring, conducting bar slidable mounting is in L inslot.
Through adopting above-mentioned technical scheme, the barrier both ends are pegged graft through the U-shaped pole respectively and are installed in the U-shaped cover, and the conducting bar on the snap ring is along the interior sliding mounting of L-shaped groove during installation, until snap ring bottom surface laminating connection U-shaped cover upper surface, then run through the through-hole of U-shaped pole through the locating bolt screw thread, realize the fixed connection of diaphragm and worker's post.
Optionally, the water collecting box both ends are all fixed and are equipped with the guide block, guide block slip joint is in the convex inslot, a plurality of spillway holes have all been seted up to water collecting box both sides surface, the fixed a plurality of backing plates that are equipped with in water collecting box bottom surface, the laminating of backing plate bottom surface is connected the rail.
By adopting the technical scheme, water such as rainwater can be collected in the water collecting box, water is effectively saved, and then water can be supplied to the green plants planted in the green plant pot.
3. Advantageous effects
One or more technical schemes provided in the technical scheme of the application at least have the following technical effects or advantages: the guardrail comprises a plurality of foundation columns, every foundation column comprises base and worker's post, the both ends of rail and water collecting box can be connected with two foundation columns quick grafting cooperation, construction simple to operate, through at the water collecting box internal fixation mounting layer board, install green basin of planting in a plurality of card cups on the layer board, can realize planting green planting at green basin, can collect moisture such as rainwater in the water collecting box, effectively practice thrift water, can carry out the moisture supply to the green planting of planting in the basin, realize realizing greening function when realizing that the guardrail possesses traffic guidance purpose in turn, beautify urban environment, be located the worker's post department of guardrail both ends department, can peg graft the pole setting respectively and install in U-shaped cover, and use the locating bolt to realize pole setting and worker's post fixed connection, realize traffic guidance purpose.
Drawings
FIG. 1 is a schematic view showing the overall structure of a traffic guiding rail according to a preferred embodiment of the present application;
FIG. 2 is a schematic view of a base pillar of a traffic guiding rail according to a preferred embodiment of the present application;
FIG. 3 is a schematic view of a traffic guiding rail according to a preferred embodiment of the present application;
FIG. 4 is a schematic view of a rail structure of a traffic guiding rail according to a preferred embodiment of the present application;
FIG. 5 is a schematic view of a greening mechanism of a traffic guiding rail according to a preferred embodiment of the present application;
The reference numerals in the figures illustrate: 1. a base column; 11. a base; 12. an i-column; 121. an L-shaped groove; 122. a convex groove; 13. a U-shaped sleeve; 131. positioning holes; 14. a positioning bolt; 2. traffic guidance marks; 21. a sign board; 22. a vertical rod; 23. perforating; 3. a rail; 31. a barrier; 32. a U-shaped rod; 321. a through hole; 33. a clasp; 331. a conducting bar; 4. a greening mechanism; 41. a water collecting box; 411. an overflow hole; 42. a guide block; 43. a backing plate; 44. a supporting plate; 45. a clamping cup; 46. and (5) planting a basin in a green manner.
Detailed Description
The application is described in further detail below with reference to the drawings.
Referring to fig. 1, 2 and 5, an embodiment of the present application provides a traffic guidance fence, including: the guardrail comprises a plurality of base posts 1, the base posts 1 comprise a base 11 and an industrial post 12, the base 11 and the industrial post 12 are fixedly connected, a rail 3 is inserted and installed between the two base posts 1, a greening mechanism 4 is installed between the two base posts 1 in a clamping mode, the greening mechanism 4 comprises a water collecting box 41, a supporting plate 44 is fixedly arranged in the water collecting box 41, a plurality of clamping cups 45 are fixedly arranged on the upper surface of the supporting plate 44, green planting pots 46 are placed in the clamping cups 45 in a clamping mode, a traffic guiding mark 2 is respectively inserted and installed on the base posts 1 at two ends of the guardrail, the guardrail for traffic guiding consists of a plurality of base posts 1 connected with the rail 3, each base post 1 is formed by the base 11 and the industrial post 12, two ends of the rail 3 can be connected with the two base posts 1 in a matching mode, the greening mechanism 4 is installed at the upper end of the rail 3, two ends of the water collecting box 41 can be connected with the base posts 1 in a clamping mode, the green planting pots 46 are installed in the clamping boxes 44, the green planting pots 46 on the supporting plate 44 can be realized in the water collecting box 41, and the green planting function of the green planting pots 46 can be realized simultaneously, and the purpose of beautifying the urban environment can be realized.
Referring to fig. 1 and 2, two U-shaped sleeves 13 are fixedly arranged at two sides of an i-shaped column 12, the i-shaped column 12 is connected with a transverse rail 3 and a traffic guiding sign 2 in a plugging manner through the U-shaped sleeves 13, positioning holes 131 are formed in the U-shaped sleeves 13, positioning bolts 14 are arranged in the positioning holes 131 in a threaded manner, four L-shaped grooves 121 are formed in two sides of the i-shaped column 12, two convex grooves 122 are formed in the upper end of the i-shaped column 12, the i-shaped column 12 is connected with a water collecting box 41 in a clamping manner through the convex grooves 122, two ends of the transverse rail 3 are connected with the U-shaped sleeves 13 on the i-shaped column 12 in a plugging manner in a matching manner, the transverse rail 3 can be quickly installed, fastening purposes can be achieved through the positioning bolts 14, the stability of the structure is improved, two ends of the water collecting box 41 can be clamped and installed in the convex grooves 122 of the i-shaped column 12, and the water collecting box 41 is convenient to install.
Referring to fig. 1 and 3, the traffic guiding sign 2 includes a sign 21, the sign 21 is fixedly connected with a vertical rod 22, the vertical rod 22 is inserted and installed in the U-shaped sleeve 13, two through holes 23 are formed in the vertical rod 22, positioning bolts 14 are inserted and installed in the through holes 23, the positioning bolts are located at the positions of the i-shaped posts 12 at two ends of the guardrail, the vertical rod 22 can be inserted and installed in the U-shaped sleeve 13 respectively, and the positioning bolts 14 are used for realizing the fixed connection treatment of the vertical rod 22 and the i-shaped posts 12.
Referring to fig. 1 and 4, the rail 3 includes a rail 31, two U-shaped rods 32 are fixedly connected to two ends of the rail 31, through holes 321 are formed in the U-shaped rods 32, the U-shaped rods 32 are inserted and installed in the U-shaped sleeves 13, clamping rings 33 are fixedly sleeved on the U-shaped rods 32, the bottom surfaces of the clamping rings 33 are attached to the upper surfaces of the U-shaped sleeves 13, guide bars 331 are fixedly arranged on the clamping rings 33, the guide bars 331 are slidably installed in the L-shaped grooves 121, two ends of the rail 31 are respectively inserted and installed in the U-shaped sleeves 13 through the U-shaped rods 32, and the guide bars 331 on the clamping rings 33 are slidably installed along the L-shaped grooves 121 during installation until the bottom surfaces of the clamping rings 33 are attached to the upper surfaces of the U-shaped sleeves 13, and then the guide bars 33 penetrate through the through holes 321 of the U-shaped rods 32 through threads of the positioning bolts 14, so that the rail 3 is fixedly connected with the work columns 12.
Referring to fig. 1 and 5, guide blocks 42 are fixedly arranged at two ends of the water collecting box 41, the guide blocks 42 are slidably clamped in the convex grooves 122, a plurality of overflow holes 411 are formed in the surfaces of two sides of the water collecting box 41, a plurality of base plates 43 are fixedly arranged on the bottom surface of the water collecting box 41, the bottom surfaces of the base plates 43 are attached to the connecting rail 3, water such as rainwater can be collected in the water collecting box 41, water is effectively saved, and then water can be supplied to green plants planted in the green plant pot 46.
Working principle: the guardrail for traffic guidance consists of a plurality of base posts 1 connected with a rail 3, each base post 1 consists of a base 11 and a work post 12, two ends of the guardrail 31 are respectively inserted and installed in a U-shaped sleeve 13 through a U-shaped rod 32, guide bars 331 on a clamping ring 33 are slidably installed along an L-shaped groove 121 until the bottom surface of the clamping ring 33 is attached to the upper surface of the U-shaped sleeve 13, then the positioning bolts 14 penetrate through holes 321 of the U-shaped rod 32 through threads, the fixed connection of the rail 3 and the work post 12 is realized, the rail 3 can be quickly installed, two ends of a water collecting box 41 can be fixedly installed in convex grooves 122 of the work post 12, green planting basins 46 can be planted in the water collecting box 41 through a plurality of clamping cups 45 on the water collecting box 41, water and the like can be effectively saved, then the green planting in the green planting basins 46 can be supplied with water, the guardrail is further realized, the urban environment of the guardrail is beautified, the urban guardrail is realized, the urban guardrail is positioned at two ends of the vertical posts 12 and is fixedly connected with the work post 12 through the positioning bolts 22, and the purpose of fixing the work post 12 is realized, and the purpose of fixing is realized.

Claims (5)

1. A traffic guidance barrier, characterized by: comprising: the guardrail comprises a plurality of base columns, the base columns are including base and worker's post, base and worker's post fixed connection, two peg graft between the base column and install the rail, two the joint is installed afforestation mechanism between the base column, afforestation mechanism is including the box that catchments, the box internal fixation that catchments is equipped with the layer board, layer board upper surface fixation is equipped with a plurality of card cups, green planting basin has been placed to the joint in the card cup, is located peg graft respectively on the base column at guardrail both ends and install a traffic guidance mark.
2. A traffic guidance barrier according to claim 1 wherein: two U-shaped sleeves are fixedly arranged at two sides of the industrial column, the industrial column is inserted into the mounting transverse bar and the traffic guiding mark through the U-shaped sleeves, positioning holes are formed in the U-shaped sleeves, positioning bolts are installed in the positioning holes in a threaded mode, four L-shaped grooves are formed in two sides of the industrial column, two convex grooves are formed in the upper end of the industrial column, and the industrial column is connected with the water collecting box through the convex grooves in a clamping mode.
3. A traffic guidance barrier according to claim 2, wherein: the traffic guidance mark comprises a mark plate, wherein the mark plate is fixedly connected with a vertical rod, the vertical rod is inserted and installed in a U-shaped sleeve, two through holes are formed in the vertical rod, and a positioning bolt is inserted and installed in the through holes.
4. A traffic guidance barrier according to claim 2, wherein: the rail comprises a rail, two ends of the rail are respectively fixedly connected with two U-shaped rods, through holes are formed in the U-shaped rods, the U-shaped rods are inserted and installed in U-shaped sleeves, clamping rings are fixedly sleeved on the U-shaped rods, the bottom surfaces of the clamping rings are attached to the upper surfaces of the U-shaped sleeves, guide bars are fixedly arranged on the clamping rings, and the guide bars are slidably installed in the L-shaped grooves.
5. A traffic guidance barrier according to claim 2, wherein: guide blocks are fixedly arranged at two ends of the water collecting box and are connected in the convex grooves in a sliding and clamping mode, a plurality of overflow holes are formed in the surfaces of two sides of the water collecting box, a plurality of base plates are fixedly arranged on the bottom surface of the water collecting box, and the base plates are attached to the bottom surface of the base plates and connected with transverse bars.
CN202322350960.8U 2023-08-30 2023-08-30 Traffic guiding guardrail Active CN220813575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322350960.8U CN220813575U (en) 2023-08-30 2023-08-30 Traffic guiding guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322350960.8U CN220813575U (en) 2023-08-30 2023-08-30 Traffic guiding guardrail

Publications (1)

Publication Number Publication Date
CN220813575U true CN220813575U (en) 2024-04-19

Family

ID=90707045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322350960.8U Active CN220813575U (en) 2023-08-30 2023-08-30 Traffic guiding guardrail

Country Status (1)

Country Link
CN (1) CN220813575U (en)

Similar Documents

Publication Publication Date Title
CN220813575U (en) Traffic guiding guardrail
ATE107983T1 (en) DEVICE SYSTEM FOR COVERING TRACK INSTALLATIONS.
CN102363950A (en) Greenable isolation guard rail and manufacturing method thereof
CN210342897U (en) Roadbed protection device
CN204898567U (en) Central rail guard of municipal administration afforestation
CN109056594B (en) Be applied to pavement landscape design protecting band
KR101700500B1 (en) Device for supporting roadside tree
CN213774784U (en) Handrail convenient to splice for greening
CN214401261U (en) Tree pool protection mechanism
CN211776445U (en) Road surface that municipal construction used encloses fender device
CN214246904U (en) Rail guard for building engineering
CN211900005U (en) Building engineering warning fence that stability is strong and be convenient for remove
CN204753449U (en) Municipal administration rail guard
CN211621087U (en) Urban and rural landscape footpath capable of preventing water accumulation
CN212837109U (en) Building construction warning rail guard
CN203034406U (en) Movable road greening isolation fence
DK0830480T3 (en) Guide rail for groove rails
CN215888035U (en) Combined traffic pedestrian guardrail
CN219508446U (en) Guardrail connecting piece for expressway
CN220767847U (en) Three-dimensional greening landscape railing
CN214330192U (en) Rail guard is used in road bridge construction
CN213806686U (en) Counter weight safety device and counter weight safety device system
CN215530453U (en) Afforestation view tree fixing device
CN214246913U (en) Building construction safety control rail
CN219118028U (en) Road bridge rail guard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant