CN220809310U - Ceiling pre-hanging structure - Google Patents

Ceiling pre-hanging structure Download PDF

Info

Publication number
CN220809310U
CN220809310U CN202322632286.2U CN202322632286U CN220809310U CN 220809310 U CN220809310 U CN 220809310U CN 202322632286 U CN202322632286 U CN 202322632286U CN 220809310 U CN220809310 U CN 220809310U
Authority
CN
China
Prior art keywords
ceiling
connecting plate
section
mounting bracket
connecting part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322632286.2U
Other languages
Chinese (zh)
Inventor
杨建�
彭水德
陈良
张宗韬
郭峰
张五凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Liuhuan Information Technology Co ltd
Original Assignee
Guangzhou Liuhuan Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Liuhuan Information Technology Co ltd filed Critical Guangzhou Liuhuan Information Technology Co ltd
Priority to CN202322632286.2U priority Critical patent/CN220809310U/en
Application granted granted Critical
Publication of CN220809310U publication Critical patent/CN220809310U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Hooks, Suction Cups, And Attachment By Adhesive Means (AREA)

Abstract

The embodiment of the utility model relates to a ceiling pre-hanging structure. The ceiling pre-hanging structure comprises a first mounting bracket fixedly arranged at the bottom of a ceiling and a ceiling host; the first mounting bracket comprises a first connecting part and a second connecting part; the first connecting part and the second connecting part are spaced from the bottom of the ceiling; the first connecting part is positioned at one end of the first mounting bracket, and a bending part which bends upwards is arranged at the edge of the end part of the first connecting part; the second connecting part is provided with a clamping hole; the ceiling main machine is respectively provided with a hook and a buckle; the hook is hung on the first mounting bracket and is abutted with the bending part; the buckle is matched and fixed with the buckle hole. The ceiling pre-hanging structure is simple in structure and convenient to install, and has the advantage of preventing the ceiling host from falling off in the installation process.

Description

Ceiling pre-hanging structure
Technical Field
The embodiment of the utility model relates to the technical field of automobiles, in particular to a ceiling pre-hanging structure.
Background
With the increasing update of automobile technology, ceiling mounted hosts (e.g., ceiling mounted televisions) mounted to the ceilings of automobiles are becoming increasingly popular with vast owners. Because the structural specificity of the ceiling main machine, and along with the demands of market environment, the demands of the ceiling main machine for large-size display screens are larger and larger, the size and the weight of the ceiling main machine are larger and heavier, so that the installation is more and more troublesome, the installation operation steps are required to be completed, and the popularization and the use of products are limited.
Disclosure of utility model
Based on the above, the embodiment of the utility model aims to provide a ceiling pre-hanging structure which has the advantages of simple structure, convenient installation and capability of preventing a ceiling host from falling off in the installation process.
In order to achieve the technical purpose of the embodiment of the utility model, the embodiment of the utility model is realized by adopting the following technical scheme:
A ceiling pre-hanging structure comprises a first mounting bracket fixedly arranged at the bottom of a ceiling and a ceiling host;
The first mounting bracket comprises a first connecting part and a second connecting part; the first connecting part and the second connecting part are spaced from the bottom of the ceiling; the first connecting part is positioned at one end of the first mounting bracket, and a bending part which bends upwards is arranged at the edge of the end part of the first connecting part; the second connecting part is provided with a clamping hole;
The ceiling main machine is respectively provided with a hook and a buckle hole; the hook is hung on the first mounting bracket and is abutted with the bending part; the buckle is matched and fixed with the buckle hole.
According to the ceiling pre-hanging structure, the first mounting bracket is fixedly arranged at the bottom of the ceiling, a first connecting part and a second connecting part which are spaced from the bottom of the ceiling are designed on the first mounting bracket, and a bending part which bends upwards is arranged at the edge of the end part of the first connecting part; when in installation, the hook designed on the ceiling main machine is hung on the first installation bracket and is abutted against the bending part, so that the falling off from the first installation bracket due to the heavy weight of the ceiling main machine can be prevented; in addition, through design the buckle hole on the second connecting portion, will the buckle of ceiling host computer design is aimed at the buckle hole block is fixed, forms ceiling pre-hanging structure, the ceiling host computer is hung in advance and preliminary fixed on the first installing support and do not drop like this, has stopped the risk that the ceiling host computer leads to dropping in the installation because of heavy weight. After the pre-hanging is completed, the ceiling host is fixedly connected with the first connecting part and the second connecting part of the first mounting bracket respectively, and then the ceiling host can be further fixedly arranged on the first mounting bracket.
According to the ceiling pre-hanging structure provided by the embodiment of the utility model, the ceiling main machine can be pre-hung and preliminarily fixed on the first mounting bracket, and after the pre-hanging is finished, the ceiling main machine is prevented from falling off from the first mounting bracket due to the heavy weight of the ceiling main machine when the ceiling main machine and the first mounting bracket are further fixedly mounted (such as mounting bolts).
Further, the first mounting bracket further comprises a third connecting portion; the first connecting part, the third connecting part and the second connecting part are sequentially connected; the third connecting portion is arched upwards relative to the first connecting portion and the second connecting portion, and the third connecting portion is fixedly connected with the bottom of the ceiling. Through the design third connecting portion that arches upwards for all have the interval between first connecting portion and second connecting portion with the bottom of ceiling, so that can install the couple on first installing support, and with the kink butt of the tip edge department of first connecting portion. The first mounting bracket is fixed at the bottom of the ceiling through the third connecting part, and the first connecting part and the second connecting part are respectively positioned at two ends of the third connecting part, so that the mechanical property of the ceiling pre-hanging structure is better.
As a specific embodiment, the first connection portion includes a first connection plate; the second connecting part comprises a second connecting plate; the third connecting part comprises a third connecting plate first section, a third connecting plate second section and a third connecting plate third section; the height position of the second section of the third connecting plate in the vertical direction is higher than that of the first connecting plate and the second connecting plate; the first connecting plate and the second section of the third connecting plate are fixedly connected through the first section of the third connecting plate, one end of the first connecting plate, which is far away from the second section of the third connecting plate, is provided with the bending part which bends upwards, and the height of the bending part in the vertical direction is lower than that of the second section of the third connecting plate; the second section of the third connecting plate is fixedly connected with the second connecting plate through the third section of the third connecting plate; the second section of the third connecting plate is fixedly connected with the bottom of the ceiling.
Further, the first mounting bracket further includes a fourth connection portion; the fourth connecting part is fixedly connected with one end, far away from the third connecting part, of the second connecting part; the fourth connecting portion is arched upwards relative to the second connecting portion, and the fourth connecting portion is fixedly connected with the bottom of the ceiling. In order to further enhance the stability of the ceiling pre-hanging structure, through designing the fourth connecting part, the fourth connecting part is fixedly connected with the bottom of the ceiling, the mounting stress points of the first mounting bracket and the ceiling are increased, and after the ceiling host is pre-hung on the first mounting bracket, the whole structure is more stable.
As a specific embodiment, the fourth connecting portion includes a fourth connecting plate first segment and a fourth connecting plate second segment; the height position of the second section of the fourth connecting plate in the vertical direction is higher than that of the second connecting plate, and the second connecting plate and the second section of the fourth connecting plate are fixedly connected through the first section of the fourth connecting plate; the second section of the fourth connecting plate is fixedly connected with the bottom of the ceiling.
Further, the first mounting bracket is integrally formed.
Further, the first connecting plate and the second connecting plate are respectively provided with a plurality of first screw holes, and the ceiling main machine is respectively provided with a second screw hole; the ceiling host can pass through the second screw hole and the first screw hole respectively through a plurality of bolts to be fixed with the first mounting bracket. After the pre-hanging is completed, the ceiling host is required to be fixedly connected with the first connecting part and the second connecting part of the first mounting bracket respectively, so that the pre-hanging ceiling host is firmly fixed on the first mounting bracket.
Further, the ceiling is fixedly provided with a second mounting bracket, and the second section of the third connecting plate and the second section of the fourth connecting plate are fixedly connected with the bottom of the second mounting bracket. In order to be convenient for with the fixed bottom that sets up at the ceiling of first installing support, install the second installing support at the ceiling, through third connecting plate second segmentation with fourth connecting plate second segmentation all with the bottom fixed connection of second installing support, thereby will first installing support is fixed in the bottom of ceiling.
Further, the third connecting plate second section and the fourth connecting plate second section are respectively provided with a plurality of third screw holes, the second mounting bracket is respectively provided with a plurality of fourth screw holes, and the first mounting bracket is fixed with the second mounting bracket by respectively penetrating through the third screw holes and the fourth screw holes through a plurality of bolts. In order to facilitate the mounting of the first mounting bracket on the second mounting bracket, the embodiment of the utility model designs a third screw hole in the second section of the third connecting plate and the second section of the fourth connecting plate, designs a fourth screw hole in the second mounting bracket, and passes through the fourth screw hole and the third screw hole from bottom to top to be fixed through bolts, so that the first mounting bracket is fixed on the second mounting bracket.
Further, in the ceiling pre-hanging structure according to the embodiment of the present utility model, the first mounting brackets are provided in a plurality of numbers and are respectively and fixedly provided at the bottom of the ceiling; the ceiling host is provided with a plurality of hooks and a plurality of buckles. Through setting up a plurality of first installing support to be in the ceiling host computer is provided with a plurality of couple and a plurality of buckle makes the ceiling host computer is more firm to be pre-hung on the first installing support.
For a better understanding and implementation, embodiments of the present utility model are described in detail below with reference to the drawings.
Drawings
FIG. 1 is a schematic view of a first mounting bracket mounted to a ceiling;
FIG. 2 is a schematic view of a hook of the ceiling host hanging on the first mounting bracket of FIG. 1;
FIG. 3 is a schematic view of a construction in which a ceiling mounted host is mounted to a first mounting bracket;
FIG. 4 is an enlarged schematic view of FIG. 3 at A;
FIG. 5 is a schematic view of the structure of the first mounting bracket;
FIG. 6 is a front view of FIG. 5;
FIG. 7 is a top view of FIG. 5;
FIG. 8 is a schematic diagram of a construction of a ceiling mounted host;
FIG. 9 is an enlarged schematic view at B in FIG. 8;
In the figure: 10. a first mounting bracket; 11. a first connection portion; 111. a bending part; 112. a first connection plate; 12. a second connecting portion; 121. a snap hole; 122. a second connecting plate; 13. a third connecting portion; 131. a third connecting plate first segment; 132. a third connecting plate second segment; 133. a third connecting plate third segment; 14. a fourth connecting portion; 141. a fourth connecting plate first segment; 142. a fourth connecting plate second segment; 15. a first screw hole; 16. a third screw hole; 17. a bolt; 20. a ceiling main machine; 21. a hook; 22. a buckle; 23. a second screw hole; 24 bolts; 30. a second mounting bracket; 31. a fourth screw hole; a ceiling 200.
Detailed Description
In the description of the embodiments of the present utility model, it should be understood that the terms "center," "longitudinal," "transverse," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate or are based on the orientation or positional relationship shown in the drawings, merely to facilitate description of the embodiments of the present utility model and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be configured and operated in a particular orientation, and thus should not be construed as limiting the embodiments of the present utility model.
Furthermore, the terms first, second, third and the like in the description and in the claims, are used for descriptive purposes only and are not necessarily for describing relative importance or to indicate the number of features indicated or the order or timing of the description. The terms are interchangeable where appropriate. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature.
Similarly, the term "coupled" is used throughout the specification and claims to mean coupled, and should not be taken as limited to a direct coupling. Thus, the expression "device a is connected to device B" should not be limited to devices or systems in which device a is directly connected to device B, meaning that there is a path between device a and device B, which may be a path that includes other devices or tools.
Example 1
Referring to fig. 1-4, a ceiling pre-hanging structure includes a first mounting bracket 10 fixedly disposed at a bottom of a ceiling 200, and a ceiling host 20.
Referring to fig. 5 to 7, the first mounting bracket 10 includes a first connection portion 11 and a second connection portion 12; the first connection part 11 and the second connection part 12 are spaced from the bottom of the ceiling 200 such that the first connection part 11 and the second connection part 12 respectively form a spaced space with the bottom of the ceiling 200 in the vertical direction, so that the ceiling main unit 20 is pre-hung and primarily mounted on the first mounting bracket 10. (in the present embodiment) in which the first connecting portion 11 is located at one end of the first mounting bracket 10, and a bent portion 111 bent upward is provided at an end edge of the first connecting portion 11; the second connecting portion 12 is provided with a snap hole 121.
Referring to fig. 8-9, a hook 21 and a buckle 22 are respectively disposed on the ceiling main unit 20; the hook 21 is hung on the first mounting bracket 10 and is abutted against the bending part 111; the buckle 22 penetrates into the buckle hole from bottom to top and is matched and fixed with the buckle hole 121, so that the ceiling main unit 20 is pre-hung on the first mounting bracket 10. Thus, the ceiling main unit 20 is pre-hung and primarily fixed on the first mounting bracket 10 without falling, and the risk that the ceiling main unit 20 falls in the mounting process due to heavy weight is avoided.
In the drawings of the present embodiment, a schematic view that the hook 21 abuts against the bending portion 111 and the buckle 22 is matched and fixed with the buckle hole 121 is not shown, and it can be understood that the buckle 22 in fig. 2 is inserted into the buckle hole 121 to form a ceiling pre-hanging structure.
In one embodiment, referring to fig. 3-6, the first mounting bracket 10 further includes a third connecting portion 13; the first connecting part 11, the third connecting part 13 and the second connecting part 12 are connected in sequence; the third connecting portion 13 is upwardly arched with respect to the first and second connecting portions 11 and 12, and the third connecting portion 13 is fixedly connected with the bottom of the ceiling 200 such that there is a space between the first and second connecting portions 11 and 12 and the bottom of the ceiling 200. The first mounting bracket 10 is fixed at the bottom of the ceiling 200 through the third connecting portion 13, and the first connecting portion 11 and the second connecting portion 12 are respectively located at two ends of the third connecting portion 13, so that the mechanical property of the ceiling pre-hanging structure is better.
As a specific aspect of the present embodiment, referring to fig. 5 to 6, the first connection portion 11 includes a first connection plate 112; the second connection portion 12 includes a second connection plate 122; the third connecting part 13 comprises a third connecting plate first section 131, a third connecting plate second section 132 and a third connecting plate third section 133; the third connecting plate second section 132 is higher than the first connecting plate 112 and the second connecting plate 122 in the vertical height position, in some embodiments, the first connecting plate 112 and the second connecting plate 122 are located on the same plane, and in other embodiments, the first connecting plate 112 and the second connecting plate 122 may be lower than the third connecting plate second section 132 according to the shape of the connection with the ceiling-mounted main machine 20. The first connecting plate 112 and the third connecting plate second section 132 are fixedly connected through the third connecting plate first section 131, one end of the first connecting plate 112, which is far away from the third connecting plate first section 131, is provided with an upward bent part 111, and the height of the bent part 111 in the vertical direction is lower than that of the third connecting plate second section 132; the third connecting plate second section 132 is fixedly connected with the second connecting plate 122 through a third connecting plate third section 133; the third connecting plate second section 132 is fixedly connected to the bottom of the ceiling 200.
In this embodiment, to further enhance the stability of the ceiling pre-hanging structure, the first mounting bracket 10 further includes a fourth connection portion 14; the fourth connecting part 14 is fixedly connected with one end of the second connecting part 12 far away from the third connecting part 13; the fourth connecting portion 14 is upwardly arched with respect to the second connecting portion 12, and the fourth connecting portion 14 is fixedly connected with the bottom of the ceiling 200. As a specific aspect of the present embodiment, the fourth connecting portion 14 includes a fourth connecting plate first section 141, a fourth connecting plate second section 142; the height of the fourth connecting plate second section 142 in the vertical direction is higher than that of the second connecting plate 122, in some embodiments, the fourth connecting plate second section 142 and the third connecting plate second section 132 are located on the same horizontal plane, and in other embodiments, the fourth connecting plate second section 142 and the third connecting plate second section 132 may be located higher than the second connecting plate 122 according to the shape of the connection with the ceiling 200. The second connecting plate 122 and the fourth connecting plate second section 142 are fixedly connected through a fourth connecting plate first section 141; the fourth connecting plate second section 142 is fixedly connected to the bottom of the ceiling 200. Through designing fourth connecting portion 14, make fourth connecting portion 14 and the bottom fixed connection of ceiling 200, increase the installation stress point of first installing support 10 and ceiling 200, after ceiling host computer 20 hangs on first installing support 10 in advance, overall structure is more stable.
The first mounting bracket 10 of the present embodiment is integrally formed.
When the pre-hanging is completed, namely, the hanging hook 21 is hung on the first mounting bracket 10 and is abutted with the bending part 111; after the buckle 22 is matched and fixed with the buckle hole 121, the ceiling host 20 is required to be fixedly connected with the first connecting part 11 and the second connecting part 12 of the first mounting bracket respectively, so that the pre-hung ceiling host is firmly fixed on the first mounting bracket 10. In this embodiment, the first connecting plate 112 and the second connecting plate 122 are respectively provided with a plurality of first screw holes 15, and the ceiling main machine is respectively provided with a second screw hole 23; the ceiling main unit 20 can pass through the second screw hole 23 and the first screw hole 15 from bottom to top through a plurality of bolts respectively, thereby being fixedly connected with the first connecting plate 112 and the second connecting plate 122, and finishing the fixation with the first mounting bracket 10.
In this embodiment, in order to facilitate the fixing of the first mounting bracket 10 to the bottom of the ceiling 200, the bottom of the ceiling is fixedly provided with the second mounting bracket 30, and the third connecting plate second segment 132 and the fourth connecting plate second segment 142 are fixedly connected to the second mounting bracket 30. In this embodiment, the second mounting bracket 30 is mounted on the bottom of the ceiling 200, and the second segment 132 and the second segment 142 of the fourth connecting plate are fixedly connected to the second mounting bracket 30 through the third connecting plate, so that the first mounting bracket 10 is fixed on the bottom of the ceiling 200. As a mounting manner, the third connecting plate second section 132 and the fourth connecting plate second section 142 are respectively provided with a plurality of third screw holes 16, the second mounting bracket 30 is respectively provided with a plurality of fourth screw holes 31, and the first mounting bracket 10 is fixed with the second mounting bracket 30 by passing through the third screw holes 16 and the fourth screw holes 31 from bottom to top through a plurality of bolts 17, so that the first mounting bracket 10 is fixed on the second mounting bracket 30.
In this embodiment, two first mounting brackets 10 are provided, and are respectively and fixedly arranged at the bottom of the ceiling 200 at intervals, specifically, the bottom of a second mounting bracket 30 is fixedly arranged at the bottom of the ceiling 200 at intervals; the ceiling host 20 is correspondingly provided with two hooks 21 and two buckles 22. By arranging two first mounting brackets 10 and arranging two hooks 21 and two buckles 22 on the ceiling main unit 20, the ceiling main unit 20 is firmly pre-hung on the first mounting brackets 10, and is firmly fixed on the ceiling 200.
In the ceiling pre-hanging structure of the present embodiment, by fixedly arranging the first mounting bracket 10 at the bottom of the ceiling 200, and designing the first connecting portion 100 and the second connecting portion 200 spaced from the bottom of the ceiling 20 on the first mounting bracket 10, a bending portion 111 bending upwards is provided at the end edge of the first connecting portion 11; when in installation, the hanging hook 21 designed on the ceiling main machine 20 is hung on the first installation bracket 10 and is abutted with the bending part 111, so that the falling off from the first installation bracket 10 caused by the heavy weight of the ceiling main machine 20 can be prevented; in addition, through design buckle hole 121 on second connecting portion 12, aim at buckle hole 121 block fixed with the buckle 21 that ceiling host computer 20 designed, form the ceiling and hang the structure in advance, ceiling host computer 20 hangs in advance and preliminarily fixes on first installing support 10 and not drops like this, has stopped ceiling host computer 20 because of the heavy risk that leads to dropping in the installation of weight. After the pre-hanging is completed, the ceiling host 20 is fixedly connected with the first connecting portion 11 and the second connecting portion 12 of the first mounting bracket 10 respectively, so that the ceiling host 20 can be further firmly fixed on the first mounting bracket 10.
The structure of pre-hanging on a ceiling in this embodiment can pre-hang and primarily fix the ceiling host 20 on the first mounting bracket 10, and after pre-hanging, when the following ceiling host 20 and the first mounting bracket 10 are further fixedly mounted (for example, mounting bolts), the ceiling host is prevented from falling off from the first mounting bracket due to heavy weight.
In the pre-hanging structure for ceiling in this embodiment, the hook 21 of the ceiling main unit 20 is placed on the first connecting plate 112 or the bending portion 111 through the gap of the ceiling, so that the hook 21 abuts against the bending portion 112; then connect the power cord of ceiling host computer 200, make again that the buckle 22 of ceiling host computer 20 aims at buckle hole 121 and detain, so, ceiling host computer 200 can be relatively preliminary fixed on the ceiling and not drop, avoided because of the too big risk that drops in the installation of ceiling host computer 20 weight, use manpower sparingly, convenient operation. After the pre-hanging is finished, the bolts respectively pass through the second screw holes 23 and the first screw holes 15 from bottom to top, so that the ceiling main machine 30 is firmly connected with the first mounting bracket 10, and the mounting of the ceiling main machine 20 is finished.
The above examples merely represent a few implementations of the present examples, which are described in more detail and are not to be construed as limiting the scope of the utility model. It should be noted that it will be apparent to those skilled in the art that various modifications and improvements can be made to the embodiments of the present utility model without departing from the spirit of the embodiments of the utility model, and it is intended that the embodiments of the utility model also include such modifications and improvements.

Claims (10)

1. A ceiling pre-hanging structure, which is characterized in that: the ceiling comprises a first mounting bracket fixedly arranged at the bottom of a ceiling and a ceiling main machine;
The first mounting bracket comprises a first connecting part and a second connecting part; the first connecting part and the second connecting part are spaced from the bottom of the ceiling; the first connecting part is positioned at one end of the first mounting bracket, and a bending part which bends upwards is arranged at the edge of the end part of the first connecting part; the second connecting part is provided with a clamping hole;
The ceiling main machine is respectively provided with a hook and a buckle; the hook is hung on the first mounting bracket and is abutted with the bending part; the buckle is matched and fixed with the buckle hole.
2. The ceiling pre-hanging structure according to claim 1, wherein: the first mounting bracket further comprises a third connecting part; the first connecting part, the third connecting part and the second connecting part are sequentially connected; the third connecting portion is arched upwards relative to the first connecting portion and the second connecting portion, and the third connecting portion is fixedly connected with the bottom of the ceiling.
3. The ceiling pre-hanging structure according to claim 2, wherein: the first connecting part comprises a first connecting plate; the second connecting part comprises a second connecting plate; the third connecting part comprises a third connecting plate first section, a third connecting plate second section and a third connecting plate third section; the height position of the second section of the third connecting plate in the vertical direction is higher than that of the first connecting plate and the second connecting plate; the first connecting plate and the second section of the third connecting plate are fixedly connected through the first section of the third connecting plate, one end of the first connecting plate, which is far away from the first section of the third connecting plate, is provided with the bending part which bends upwards, and the height of the bending part in the vertical direction is lower than that of the second section of the third connecting plate; the second section of the third connecting plate is fixedly connected with the second connecting plate through the third section of the third connecting plate; the second section of the third connecting plate is fixedly connected with the bottom of the ceiling.
4. A ceiling pre-hang structure according to claim 3, wherein: the first mounting bracket further comprises a fourth connecting part; the fourth connecting part is fixedly connected with one end, far away from the third connecting part, of the second connecting part; the fourth connecting portion is arched upwards relative to the second connecting portion, and the fourth connecting portion is fixedly connected with the bottom of the ceiling.
5. The ceiling pre-hanging structure according to claim 4, wherein: the fourth connecting part comprises a first section of a fourth connecting plate and a second section of the fourth connecting plate; the height position of the second section of the fourth connecting plate in the vertical direction is higher than that of the second connecting plate, and the second connecting plate and the second section of the fourth connecting plate are fixedly connected through the first section of the fourth connecting plate; the second section of the fourth connecting plate is fixedly connected with the bottom of the ceiling.
6. The ceiling pre-hanging structure according to claim 1, wherein: the first mounting bracket is integrally formed.
7. A ceiling pre-hang structure according to claim 3, wherein: the first connecting plate and the second connecting plate are respectively provided with a plurality of first screw holes, and the ceiling main machine is respectively provided with a second screw hole; the ceiling host can pass through the second screw hole and the first screw hole respectively through a plurality of bolts to be fixed with the first mounting bracket.
8. The ceiling pre-hanging structure according to claim 5, wherein: the ceiling is fixedly provided with a second mounting bracket, and the second section of the third connecting plate and the second section of the fourth connecting plate are fixedly connected with the bottom of the second mounting bracket.
9. The ceiling pre-hanging structure according to claim 8, wherein: the second section of the third connecting plate and the second section of the fourth connecting plate are respectively provided with a plurality of third screw holes, the second mounting bracket is respectively provided with a plurality of fourth screw holes, and the first mounting bracket is fixed with the second mounting bracket by respectively penetrating through the third screw holes and the fourth screw holes through a plurality of bolts.
10. The ceiling pre-hanging structure according to claim 1, wherein: the first mounting brackets are provided with a plurality of first mounting brackets and are respectively and fixedly arranged at the bottom of the ceiling; the ceiling host is provided with a plurality of hooks and a plurality of buckles.
CN202322632286.2U 2023-09-26 2023-09-26 Ceiling pre-hanging structure Active CN220809310U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322632286.2U CN220809310U (en) 2023-09-26 2023-09-26 Ceiling pre-hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322632286.2U CN220809310U (en) 2023-09-26 2023-09-26 Ceiling pre-hanging structure

Publications (1)

Publication Number Publication Date
CN220809310U true CN220809310U (en) 2024-04-19

Family

ID=90701845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322632286.2U Active CN220809310U (en) 2023-09-26 2023-09-26 Ceiling pre-hanging structure

Country Status (1)

Country Link
CN (1) CN220809310U (en)

Similar Documents

Publication Publication Date Title
CN105546655A (en) Air-conditioner wall hanging piece, air-conditioner wall hanging plate and air conditioner
CN214696609U (en) Wallboard connecting buckle
CN203454040U (en) Lamp mounting structure
CN201646606U (en) Bunch connector fixing bracket and side inner coaming for the vehicle body
CN220809310U (en) Ceiling pre-hanging structure
CN113513873B (en) A kind of refrigerator
KR102195113B1 (en) Bracket for structure installation
CN204611102U (en) A kind of combined type fixing device
CN108035464A (en) A kind of curtain wall decorative strip connector and curtain wall system
KR100988611B1 (en) Hanger for ceiling frames
CN220470388U (en) Connecting piece
CN210508181U (en) Assembly structure of wall and decorative board
CN210945356U (en) Assembled fan is to keeping out wind mechanism for convection type glass tempering furnace
CN211239265U (en) Buried cable bridge
CN214249489U (en) Lamp mounting structure with longitudinal and transverse pressing plates
CN220061389U (en) Hanging plate mounting structure and photovoltaic inverter
CN211976952U (en) Range hood convenient to install
CN212204774U (en) Wall-mounted support and air conditioner
CN210241483U (en) Novel baffle installation lamps and lanterns rack
CN219228111U (en) Cabinet support
CN219673880U (en) Display support
CN214664828U (en) Ceiling machine panel and embedded air conditioning device
CN219867669U (en) Antitheft fixing bracket
CN220225825U (en) Building curtain wall convenient to dismantle
CN213576721U (en) Video gathering equipment with multi-angle video collecting head

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant