CN220790730U - Assembled integral bathroom - Google Patents

Assembled integral bathroom Download PDF

Info

Publication number
CN220790730U
CN220790730U CN202321955323.7U CN202321955323U CN220790730U CN 220790730 U CN220790730 U CN 220790730U CN 202321955323 U CN202321955323 U CN 202321955323U CN 220790730 U CN220790730 U CN 220790730U
Authority
CN
China
Prior art keywords
section bar
buckle
waterproof
stainless steel
wallboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321955323.7U
Other languages
Chinese (zh)
Inventor
卢均汉
卢碧琪
李国忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Houliyi High Technology Co ltd
Original Assignee
Guangxi Houliyi High Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Houliyi High Technology Co ltd filed Critical Guangxi Houliyi High Technology Co ltd
Priority to CN202321955323.7U priority Critical patent/CN220790730U/en
Application granted granted Critical
Publication of CN220790730U publication Critical patent/CN220790730U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an assembled integral bathroom which comprises a waterproof chassis, a wallboard and a ceiling which are assembled together. According to the assembled integral bathroom, the male buckle, the female buckle, the upper buckle, the lower buckle and the glue injection channel are arranged, when the assembled integral bathroom is spliced, the upper buckle and the lower buckle are staggered, then the male buckle is buckled into the female buckle, the adjacent wallboard is loosened, the first section bar and the second section bar can be fastened under the action of the gravity of the adjacent wallboard, and the assembled integral bathroom is more convenient and faster to assemble; moreover, after two adjacent wallboards are assembled, the waterproof glue can be injected into the glue injection channel to achieve the waterproof effect between the adjacent wallboards, the glue consumption is small, the first section bar and the second section bar can be effectively prevented from being shifted due to external force, the waterproof glue layer between the abutting faces of the first section bar and the second section bar is effectively prevented from being damaged, and the waterproof glue between the adjacent wallboards after assembly is more stable and reliable, and the waterproof effect is better.

Description

Assembled integral bathroom
Technical Field
The utility model relates to the technical field of building finishing engineering, in particular to an assembled integral bathroom.
Background
The traditional bathroom is formed by casting cast-in-place concrete, and meanwhile, the cast-in-place caisson structure is adopted. Compared with the traditional bathroom, the assembled integral bathroom has the advantages of high installation speed, less site construction waste, short construction period and the like, and is widely and widely applied.
Fabricated integrated toilets typically consist of a chassis, wall panels and ceilings. Wherein, the chassis is usually formed by SMC (sheet molding compound), aluminum honeycomb composite material, PU (polyurethane) foaming piece and glass fiber reinforced plastic; wallboard and ceilings are commonly made of color steel or aluminum honeycomb composite trim panels. The existing assembled integral bathroom has the following defects: 1) The chassis of the composite structure needs to be subjected to compression molding technology, the production technology is relatively complex, and the compression molding technology has large industrialization limitation. 2) The composite chassis is difficult to composite the surface decorative layers of ceramic tiles and the like, and meanwhile, the wallboard is not beneficial to pasting the surface decorative layers of ceramic tiles and the like, so that the defect that the surface decorative layers are easy to fall off exists.
The Chinese patent application with publication number of CN110528912A discloses a construction method of an integral bathroom, wherein a prefabricated chassis is arranged on a surface layer of a floor slab, an integrally formed reverse ridge is arranged on the edge of the chassis, a plurality of wallboards with stepped parts at the bottom are fixed on the chassis along the edge of the chassis, adjacent wallboards are connected with each other, ceramic tiles are respectively stuck on the inner side of the wallboards and the bottom surface of the chassis, and the chassis and the wallboards are foaming ceramic components. The ceramic tile comprises a wall ceramic tile and a bottom ceramic tile, longitudinal grooves are prefabricated on the wall board, and one side of the wall ceramic tile extends out of the side face of the wall board and is inserted into the groove of the adjacent other wall board to be fixed.
The concrete construction steps are as follows: 1) The surface layer of the floor slab is coated with ceramic tile glue, and a prefabricated chassis is arranged on the surface layer through the ceramic tile glue; 2) Coating waterproof glue on the splicing surface of the reverse ridge, coating waterproof glue on one side of all wallboards, sequentially mounting wallboards on the reverse ridge, and fixedly connecting adjacent wallboards; 3) After all the wallboards are installed, waterproof glue is coated on the inner side surfaces and the grooves of all the wallboards; 4) Attaching a wall tile to the inner side surface of one of the wallboards, wherein one side of the wall tile is flush with one side of the groove, and the other side of the wall tile is inserted into the groove of the adjacent other wallboard to be fixedly connected; 5) Repeating the step 4) until the inner side of the wallboard is fully covered with the wall tiles, then coating the tile glue on the top surface of the chassis, and attaching the bottom tiles.
Although the utility model can well prevent the falling of wall bricks and floor tiles and does not need a chassis with a composite structure, a large amount of waterproof glue is needed in the construction process, such as the step 1) needs to be used for leveling the ground and preventing water, the step 3) needs to coat waterproof glue on the inner side surfaces and grooves of all the wallboards, the construction cost is very high, and the next working procedure is generally needed after the waterproof glue is completely solidified, thus influencing the construction period. In addition, because the adjacent wallboards are fixedly connected through waterproof glue, when the two adjacent wallboards are of a butt joint structure, the wallboards are very easy to be influenced by external force due to the limit of the grooves, so that the waterproof failure of the butt joint gap is caused, and the waterproof effect is further influenced.
Disclosure of Invention
Aiming at the problems in the prior art, the utility model aims to provide the assembled integral bathroom which is more convenient to assemble, more stable and reliable in waterproof glue between adjacent wallboards after assembly and better in waterproof effect.
In order to achieve the above purpose, the utility model adopts the following technical scheme.
The assembled integral bathroom comprises a waterproof chassis, a plurality of wallboards and a ceiling board which are assembled together, wherein the waterproof chassis comprises a stainless steel tray body and a first waterproof base material plate arranged in the stainless steel tray body; the wallboard comprises a second waterproof substrate board and a surface decorative layer arranged on the second waterproof substrate board; the first waterproof base material plate and the second waterproof base material plate adopt XPS foaming plates as core layers, and glass fiber nets and cement mortar coatings are covered on the surfaces of the core layers.
Wallboard installation spaces are reserved on the inner periphery of the stainless steel tray body, each wallboard is sequentially installed on the wallboard installation spaces, and two adjacent wallboards are fixedly connected through a first section bar and a second section bar; the first section bar and the second section bar are respectively fixed with two adjacent second waterproof base material plates through corresponding fixing legs, and the first section bar and the second section bar are fastened through fasteners; the fastener consists of an upper buckle and a lower buckle which are mutually overlapped and fixed, the upper buckle and the lower buckle are respectively fixed with the first section bar and the second section bar, and the upper buckle and the lower buckle are mutually matched through inclined planes.
The first section bar and the second section bar are respectively provided with a pin buckle and a box buckle which are matched with each other, and the pin buckle and the box buckle are bar buckles in vertical trend and are hidden in the abutting surfaces of the first section bar and the second section bar; and a glue injection channel which is communicated in the vertical direction is further arranged in the abutting surface of the first section bar and the second section bar.
The method comprises the following steps of: 1) The stainless steel tray body is installed and fixed on a building main body; 2) The stainless steel plate body is internally provided with waterproof glue, and the first waterproof base material plate is installed and fixed; 3) Mounting the first profile and/or the second profile on the second waterproof substrate board; 4) The waterproof glue is sprayed in the wallboard installation space, and the second waterproof base material plate with the first section bar and/or the second section bar is sequentially installed in the wallboard installation space and fastened through the corresponding upper buckle and the lower buckle; 5) Filling waterproof glue into the glue injection channel; 6) And the surface decorative layer is adhered on the first waterproof base material plate and the second waterproof base material plate.
More preferably, the glue injection channel is formed by matching two open grooves respectively arranged on the abutting surfaces of the first section bar and the second section bar.
More preferably, the male buckle and the female buckle are both vertically-oriented bar-shaped buckles.
More preferably, the male buckle and the female buckle are respectively provided with mutually matched abutting parts, and the abutting parts extend towards one side of the surface decoration layer, and the extending height is lower than the thickness of the surface decoration layer. Because gaps exist between the abutting parts, waterproof glue can be further filled, and therefore waterproof effect is improved.
More preferably, the stainless steel tray body is formed by stamping a stainless steel plate, a drain pipe connecting port is reserved on the stainless steel tray body, and laser welding or argon arc welding treatment is performed on the periphery of the stainless steel tray body and the drain pipe connecting port.
More preferably, a stepped portion is provided on an inner peripheral edge of the stainless steel tray body, and the stepped portion forms a bottom of the wall plate installation space.
More preferably, a ceiling mounting section is fastened to the top of the wallboard, a bonding edge extending towards the inner side of the bathroom is formed on the ceiling mounting section, and the ceiling is supported by the bonding edge.
During construction, after the second waterproof base material plate is fully adhered with the surface decoration layer, the ceiling mounting section bar is fastened and fixed at the top of the wallboard.
More preferably, a buckling groove is formed in the lower side of the ceiling mounting section bar, and one side of the buckling groove is inclined inwards and is in interference fit with the top of the wallboard; a fixing groove is provided at an upper side of the ceiling mounting profile for fixing the wall panel to the building body.
More preferably, the surface decorative layer is a ceramic tile, a stone slab, a metal plate or a painted decorative plate.
More preferably, the ceiling is an aluminum honeycomb panel, a cement fiber board, a glass magnesium board or a PVC decorative board, and a decorative surface layer is compounded on the surface of the ceiling.
The beneficial effects of the utility model are as follows.
1. By arranging the male buckle, the female buckle, the upper buckle, the lower buckle and the glue injection channel, when splicing is carried out, the upper buckle and the lower buckle are staggered, then the male buckle is buckled into the female buckle, then the adjacent wallboard is loosened, the fastening of the first section bar and the second section bar can be realized under the self gravity action of the adjacent wallboard, and the assembly is more convenient and quicker; moreover, after two adjacent wallboards are assembled, the waterproof glue can be injected into the glue injection channel to achieve the waterproof effect between the adjacent wallboards, the glue consumption is small, the first section bar and the second section bar can be effectively prevented from being shifted due to external force, the waterproof glue layer between the abutting faces of the first section bar and the second section bar is effectively prevented from being damaged, and the waterproof glue between the adjacent wallboards after assembly is more stable and reliable, and the waterproof effect is better.
2. The male buckle and the female buckle are respectively provided with mutually matched abutting parts, and the abutting parts extend towards one side of the surface decoration layer and extend to a height lower than the thickness of the surface decoration layer; therefore, after the adjacent surface decorative layers are adhered to the corresponding second waterproof base material plates, gaps are reserved between the adjacent surface decorative layers, so that waterproof glue can be conveniently further supplemented, and a better waterproof effect is achieved.
3. The stainless steel tray body and the specific waterproof base material plate are combined, and the design of the step part is combined, so that waterproof glue is not required to be filled at the bottom of the whole stainless steel tray body during construction, and the wallboard is not required to be installed after the waterproof glue is solidified, thereby effectively shortening the construction period and saving manpower and material resources.
4. The ceiling mounting section bar with the specific structure is not only convenient for mounting the ceiling, but also can serve as a top fixing piece of the wallboard, and can assist in fixing the top position of the wallboard, so that the mounting stability of the wallboard is effectively improved.
Drawings
Fig. 1 is a schematic structural view of an assembled integral bathroom provided by the utility model.
Fig. 2 is a schematic structural view of the waterproof chassis.
Fig. 3 shows a partial cross-sectional view of the waterproof chassis.
Fig. 4 is a schematic view of the assembly of the wall panel and the waterproof chassis.
Fig. 5 is a schematic view of the structure of the panel splice formed by adjacent wall panels.
Fig. 6 is a schematic view of the structure of the inside corner splice formed by adjacent wall panels.
Fig. 7 is a schematic view of the structure of the corner splice formed by adjacent wall panels.
Fig. 8 is a schematic view showing the connection of the upper and lower buckles.
Fig. 9 is a schematic view showing the connection of the ceiling to the wall panels.
Reference numerals illustrate.
1: waterproof chassis, 2: wallboard, 3: first section bar, 4: second section bar, 5: fastener, 6: glue injection channel, 7: ceiling mounting section bar, 8: and a ceiling.
1-1: stainless steel plate, 1-2: first waterproof substrate board, 1-3: drain pipe connector, 1-4: step part, 1-5: dry zone, 1-6: wet zone, 1-7: and the adhesive tape is clamped.
2-1: second waterproof substrate board, 2-2: and a surface decorative layer.
3-1/4-1: fixed foot, 3-2: pin, 4-2: female buckle, 3-3/4-3: and an abutting portion.
5-1/5-2: a hasp.
7-1: edging, 7-2: buckling groove, 7-3: a fixing groove.
Detailed Description
In the description of the present utility model, it should be noted that, for the azimuth words such as "center", "lateral", "longitudinal", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc., the azimuth and positional relationships are based on the azimuth or positional relationships shown in the drawings, it is merely for convenience of describing the present utility model and simplifying the description, and it is not to be construed as limiting the specific scope of protection of the present utility model that the device or element referred to must have a specific azimuth configuration and operation.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features. Thus, the definition of "a first", "a second" feature may explicitly or implicitly include one or more of such features, and in the description of the utility model, "at least" means one or more, unless clearly specifically defined otherwise.
In the present utility model, unless explicitly stated and limited otherwise, the terms "assembled," "connected," and "connected" are to be construed broadly, e.g., as being either fixedly connected, detachably connected, or integrally connected; or may be a mechanical connection; can be directly connected or connected through an intermediate medium, and can be communicated with the inside of the two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
In the present utility model, unless specified and limited otherwise, a first feature "above" or "below" a second feature may include both the first and second features being in direct contact, as well as the first and second features not being in direct contact but being in contact with each other through additional features therebetween. Moreover, a first feature being "above," "below," and "above" a second feature includes the first feature being directly above and obliquely above the second feature, or simply representing the first feature as having a higher level than the second feature. The first feature being "above," "below," and "beneath" the second feature includes the first feature being directly below or obliquely below the second feature, or simply indicating that the first feature is level below the second feature.
The following description of the specific embodiments of the present utility model is further provided with reference to the accompanying drawings, so that the technical scheme and the beneficial effects of the present utility model are more clear and definite. The embodiments described below are exemplary by referring to the drawings for the purpose of illustrating the utility model and are not to be construed as limiting the utility model.
Additional aspects and advantages of the utility model will be set forth in part in the description which follows, or may be learned by practice of the utility model.
As shown in fig. 1, a fabricated integrated bathroom comprises a waterproof chassis 1, a wallboard 2 and a ceiling which are assembled together.
Referring to fig. 2 and 3, the waterproof chassis 1 includes a stainless steel tray 1-1, and a first waterproof base plate 1-2 installed in the stainless steel tray 1-1; and wallboard installation space is reserved on the inner periphery of the stainless steel tray body 1-1. After the first waterproof substrate plate 1-2 is installed in the stainless steel tray body 1-1, the inner area of the stainless steel tray body 1-1 is divided into a dry area 1-5 and a wet area 1-6, and the dry area 1-5 and the wet area 1-6 are separated by an adhesive tape clamping code 1-7. Obviously, in some integral bathrooms which do not need to be partitioned, the adhesive tape clamping codes 1-7 can be omitted; the present embodiment is not limited.
In this embodiment, it is preferable that the stainless steel tray body 1-1 is formed by stamping a stainless steel plate, a drain pipe connection port 1-3 is left on the stainless steel tray body 1-1, and laser welding or argon arc welding treatment is performed on the periphery of the stainless steel tray body 1-1 and the drain pipe connection port 1-3 so as to improve the waterproof performance of these parts.
In this embodiment, it is preferable that a step portion 1-4 is further provided on the inner peripheral edge of the stainless steel tray 1-1, the step portion 1-4 forms the bottom of the wall board installation space, and the area surrounded by the step portion 1-4 forms the installation area of the first waterproof base material board 1-2. Here, the provision of the stepped portions 1 to 4 has the advantage that the wall panel installation space can be better distinguished from the first waterproof substrate board installation area, facilitating the installation of the wall panel and the first waterproof substrate board.
In this embodiment, the step portion 1-4 is preferably formed of an aluminum alloy material provided in the stainless steel plate body 1-1. In other embodiments, the step portion may be made of other rigid materials or integrally formed with the stainless steel plate body 1-1, not limited to the present embodiment.
Referring to fig. 4, the wall panel 2 includes a second waterproof substrate board 2-1, and a surface decorative layer 2-2 mounted on the second waterproof substrate board 2-1. The first waterproof base material plate 1-2 and the second waterproof base material plate 2-1 adopt XPS (extruded polystyrene board, extruded polystyrene foam board) foaming boards as core layers, and the surfaces of the core layers are covered with glass fiber nets and cement mortar coatings. The arrangement has the advantages that the whole substrate plate has the characteristics of water resistance, heat preservation, mildew resistance, sound insulation, high strength, light weight and the like; and can be adhered to surface decorative layers such as ceramic, stone, paint coating, metal decorative surface layer, etc., and has strong adhesive force, and the adhered surface decorative layer is not easy to fall off.
When the wallboard 2 is specifically installed, the adjacent wallboards are connected through the first section bar 3 and the second section bar 4, and the first section bar 3 and the second section bar 4 are both preferably aluminum alloy section bars, as shown in fig. 5-7. The first section bar 3 and the second section bar 4 are respectively fixed with the second waterproof base material plates 2-1 of the two adjacent wall boards through corresponding fixing feet 3-1/4-1, the first section bar 3 is provided with a male buckle 3-2, the second section bar 4 is provided with a female buckle 4-2 matched with the male buckle 3-2, and the male buckle 3-2 and the female buckle 4-2 are vertically-oriented strip-shaped buckles and are hidden in the abutting surfaces of the first section bar 3 and the second section bar 4.
An abutting part 3-3/4-3 which extends outwards and abuts against each other is arranged on one side of the first section bar 3 and one side of the second section bar 4, and the abutting part 3-3/4-3 extends towards one side where a surface decorative layer is required to be attached; on the other side of the first profile 3 and the second profile 4, a fastening element 5 is provided for fastening the two.
The extending height of the abutting portion 3-3/4-3 is lower than the thickness of the surface decoration layer. Therefore, the appearance is ensured, and after the surface decorative layer is adhered, the abutting part 3-3/4-3 is further sealed by waterproof glue, so that the waterproof effect of the joint is improved.
Referring to fig. 8, the fastening member 5 is formed by two upper and lower buckles 5-1/5-2 that are fixedly connected to each other in a lap joint manner, and the upper and lower buckles 5-1/5-2 are mutually matched through inclined surfaces. In some embodiments, the fastener 5 may also be a hinge.
In this embodiment, when the adjacent wall panels are flat panel splice (as shown in fig. 5) or inside corner splice (as shown in fig. 6), it is preferable that the first profile 3 and the second profile 4 are fastened by up-and-down snap fasteners, and when the adjacent wall panels are outside corner splice (as shown in fig. 7), it is preferable that the first profile 3 and the second profile 4 are fastened by hinges. In other embodiments, all can be designed for snap fastening, depending on the actual requirements.
The advantage of adopting the hasp fastening is that when the splicing is carried out, the upper hasp 5-1/5-2 and the lower hasp 5-1/5-2 are staggered, the male buckle 3-2 is buckled into the female buckle 4-2, then the adjacent wallboard is loosened, the fastening of the first section bar 3 and the second section bar 4 can be realized under the self gravity action of the adjacent wallboard, and the assembly is more convenient and quicker. Particularly, by combining the arrangement of the abutting parts 3-3/4-3, the displacement of the first section bar 3 and the second section bar 4 caused by external force can be effectively avoided in the assembly process and after the assembly is completed, so that the damage to the waterproof adhesive layer between the abutting surfaces of the first section bar 3 and the second section bar 4 is effectively avoided, and the waterproof effect is ensured.
Further, a glue injection channel 6 is further provided on the abutting surface of the first section bar 3 and the second section bar 4, and the glue injection channel 6 is vertically oriented and penetrates through the upper end and the lower end of the first section bar 3 and the second section bar 4. Here, the provision of the glue injection channel 6 has the advantage that it is not only convenient to inject a water-proof glue on the abutment surfaces of the first and second profiles 3, 4, but also it is possible to achieve a better water-proof effect on the abutment seams of the first and second profiles 3, 4.
In this embodiment, the glue injection channel 6 is preferably formed by two strip-shaped grooves formed on the first section bar 3 and the second section bar 4 respectively, so that the glue injection and waterproof effects are optimal.
As shown in fig. 9, a ceiling mounting section 7 is fastened to the top of the wall plate 2, a flange 7-1 extending toward the inside of the bathroom is formed on the ceiling mounting section 7, and the ceiling 8 is supported by the flange 7-1. During construction, after the second waterproof base material plate 2-1 is fully adhered with the surface decoration layer 2-2, the ceiling mounting section bar 7 is fastened and fixed on the top of the wallboard 2.
In this embodiment, a fastening groove 7-2 is preferably provided on the lower side of the ceiling mounting section bar 7, and one side of the fastening groove 7-2 is inclined inwards and is in interference fit with the top of the wallboard 2; the upper side of the ceiling mounting section bar 7 is provided with a fixing groove 7-3, and the fixing groove 7-3 is used for fixing the wallboard 2 to a building main body, so as to assist in fixing the top position of the wallboard 2, and further improve the mounting stability of the wallboard 2.
The assembled integral bathroom provided by the embodiment comprises the following steps in specific construction.
1) The stainless steel tray body 1-1 is installed and fixed on the building main body.
2) And (3) applying waterproof glue in the stainless steel tray body 1-1, and installing and fixing the first waterproof base material plate 1-2.
3) The first profile and/or the second profile is/are mounted on the second waterproof substrate board 2-1. In the specific installation process, the first section bar and the second section bar can be respectively installed on two sides of the second waterproof substrate plate 2-1 according to different actual requirements; the first or second profile may be installed on both sides of the second waterproof base material plate 2-1, and thus, when the waterproof base material plate is assembled, two adjacent second waterproof base material plates 2-1 may have different profiles.
4) Applying waterproof glue in the wallboard installation space, and sequentially installing the second waterproof base material plates 2-1 with the first section bar and/or the second section bar into the wallboard installation space and fastening the second waterproof base material plates by corresponding fasteners 5; when the second waterproof base material plate 2-1 is installed, the pin 3-2 and the box 4-2 are well buckled, and the two abutting parts 3-3/4-3 are abutted against each other.
5) And waterproof glue is sprayed between the abutting surfaces (in the glue injection channel) of the first section bar 3 and the second section bar 4 which are matched with each other.
6) And (3) attaching surface decorative layers on the first waterproof base material plate 1-2 and the second waterproof base material plate 2-1. The surface decorative layer is a ceramic tile, a stone plate, a metal plate or a paint decorative plate.
7) The ceiling mounting profile 7 is installed on top of the wall panel 2, the ceiling mounting profile 7 is fixed to the building body, and then the ceiling 8 is mounted to the ceiling mounting profile 7.
The ceiling 8 may be any of various aluminum honeycomb panels, cement fiber panels, glass magnesium panels or PVC decorative panels that are known in the prior art or that can be realized in the future, and a decorative surface layer is composited on the surface of the ceiling 8, wherein the decorative surface layer may be any of various paint decorative surface layers, metal panel decorative surface layers, non-metal panel device surface layers or the like that are known in the prior art or that can be realized in the future.
It will be understood by those skilled in the art from the foregoing description of the structure and principles that the present utility model is not limited to the specific embodiments described above, but is intended to cover modifications and alternatives falling within the spirit and scope of the utility model as defined by the appended claims and their equivalents. The portions of the detailed description that are not presented are all prior art or common general knowledge.

Claims (10)

1. An assembled integral bathroom comprises a waterproof chassis, a plurality of wallboards and a ceiling which are assembled together, and is characterized in that;
the waterproof chassis comprises a stainless steel tray body and a first waterproof base material plate arranged in the stainless steel tray body; the wallboard comprises a second waterproof substrate board and a surface decorative layer arranged on the second waterproof substrate board; the first waterproof base material plate and the second waterproof base material plate adopt XPS foaming plates as core layers, and glass fiber nets and cement mortar coatings are covered on the surfaces of the core layers;
wallboard installation spaces are reserved on the inner periphery of the stainless steel tray body, each wallboard is sequentially installed on the wallboard installation spaces, and two adjacent wallboards are fixedly connected through a first section bar and a second section bar; the first section bar and the second section bar are respectively fixed with two adjacent second waterproof base material plates through corresponding fixing legs, and the first section bar and the second section bar are fastened through fasteners; the fastener consists of an upper buckle and a lower buckle which are mutually overlapped and fixed, the upper buckle and the lower buckle are respectively fixed with the first section bar and the second section bar, and the upper buckle and the lower buckle are mutually matched through inclined planes;
the first section bar and the second section bar are respectively provided with a pin buckle and a box buckle which are matched with each other, and the pin buckle and the box buckle are bar buckles in vertical trend and are hidden in the abutting surfaces of the first section bar and the second section bar; and a glue injection channel which is communicated in the vertical direction is further arranged in the abutting surface of the first section bar and the second section bar.
2. The assembled integrated bathroom according to claim 1, wherein the glue injection channel is formed by matching two open grooves respectively arranged on the abutting surfaces of the first section bar and the second section bar.
3. The assembled integrated bathroom according to claim 1, wherein the male buckle and the female buckle are vertically oriented bar-shaped buckles.
4. The assembled integrated bathroom according to claim 1, wherein the male buckle and the female buckle are respectively provided with mutually matched abutting parts, and the abutting parts extend towards one side of the surface decoration layer, and the extending height is lower than the thickness of the surface decoration layer.
5. The assembled integral bathroom according to claim 1, wherein the stainless steel plate body is formed by stamping a stainless steel plate, a drain pipe connecting port is reserved on the stainless steel plate body, and laser welding or argon arc welding treatment is performed on the periphery of the stainless steel plate body and the drain pipe connecting port.
6. The assembled integrated bathroom according to claim 1, wherein a step portion is provided on an inner peripheral edge of the stainless steel plate body, and the step portion constitutes a bottom of the wall plate installation space.
7. A fabricated integrated bathroom according to claim 1, wherein a ceiling mounting profile is fastened to the top of the wall panel, and wherein a flange extending inward of the bathroom is formed on the ceiling mounting profile, the ceiling being supported by the flange.
8. The assembled integrated bathroom according to claim 7, wherein a buckling groove is formed in the lower side of the ceiling mounting section, and one side of the buckling groove is inclined inwards and is in interference fit with the top of the wallboard; a fixing groove is provided at an upper side of the ceiling mounting profile for fixing the wall panel to the building body.
9. The fabricated integrated bathroom according to claim 1, wherein the surface decorative layer is a tile, a slate, a metal plate or a painted decorative plate.
10. The assembled integral bathroom according to claim 1, wherein the ceiling is an aluminum honeycomb plate, a cement fiber plate, a glass magnesium plate or a PVC decorative plate, and a decorative surface layer is compounded on the surface of the ceiling.
CN202321955323.7U 2023-07-24 2023-07-24 Assembled integral bathroom Active CN220790730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321955323.7U CN220790730U (en) 2023-07-24 2023-07-24 Assembled integral bathroom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321955323.7U CN220790730U (en) 2023-07-24 2023-07-24 Assembled integral bathroom

Publications (1)

Publication Number Publication Date
CN220790730U true CN220790730U (en) 2024-04-16

Family

ID=90634488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321955323.7U Active CN220790730U (en) 2023-07-24 2023-07-24 Assembled integral bathroom

Country Status (1)

Country Link
CN (1) CN220790730U (en)

Similar Documents

Publication Publication Date Title
US6729094B1 (en) Pre-fabricated building panels and method of manufacturing
KR100274218B1 (en) Color rock insulating board for inter or exterior of building and method for fabricating and constructing the same
CN216713468U (en) Building template and wall body adopting same
KR100512119B1 (en) the construction method of outer wall insulating with insulation board
CN220790730U (en) Assembled integral bathroom
CN110714532A (en) Assembly structure and installation method of wallboard and steel beam
CN103452209B (en) Double-layer composite slat cast-in-situ internal partition wall structure
KR100468460B1 (en) assembly type siding for exterior work
KR20050073708A (en) Monolithic stratiform composite pannel for a wall of building and method for constructing the wall with it
CN212743117U (en) Assembled building is with fluting block structure
CN114411987A (en) Light concrete insulation board embedded and installed and installation method thereof
CN114182851A (en) Aerated concrete heat-insulation external wall panel system and construction method thereof
EA015214B1 (en) Elongate abutment member of plaster
CN114351905A (en) Building template and wall body adopting same
CN112252489A (en) Building wall surface energy waterproof system
CN111155792A (en) Prefabricated house and construction method thereof
CN219451106U (en) Portable construction drip of assembled stairwell
CN219100418U (en) Decorate assembled partition wall system of integration that gives sound insulation
KR100463025B1 (en) Reinforcement-Plate of Marble for a Structure
KR200290838Y1 (en) Reinforcement-Plate of Marble for a Structure
CN220620833U (en) Integral bathroom decorative wallboard
CN211899837U (en) Assembled house
CN219431080U (en) ALC wallboard right angle connection structure
CN218814376U (en) Assembly type steel structure external wall panel and steel side column joint internal corner connected node
CN212801999U (en) Dry method floor connecting structure

Legal Events

Date Code Title Description
GR01 Patent grant