CN220790571U - Building construction pouring template - Google Patents

Building construction pouring template Download PDF

Info

Publication number
CN220790571U
CN220790571U CN202321941967.0U CN202321941967U CN220790571U CN 220790571 U CN220790571 U CN 220790571U CN 202321941967 U CN202321941967 U CN 202321941967U CN 220790571 U CN220790571 U CN 220790571U
Authority
CN
China
Prior art keywords
pouring template
template
pouring
column
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321941967.0U
Other languages
Chinese (zh)
Inventor
庞燕丽
周传霞
范敏捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhanjiang Goldman Sachs Construction Engineering Co ltd
Original Assignee
Zhanjiang Goldman Sachs Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhanjiang Goldman Sachs Construction Engineering Co ltd filed Critical Zhanjiang Goldman Sachs Construction Engineering Co ltd
Priority to CN202321941967.0U priority Critical patent/CN220790571U/en
Application granted granted Critical
Publication of CN220790571U publication Critical patent/CN220790571U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a building construction pouring template, which belongs to the technical field of building construction and comprises a first pouring template, wherein a second pouring template is arranged on one side of the first pouring template, and the second pouring template is connected with the first pouring template through a connecting component; according to the utility model, when the first pouring template and the second pouring template are required to be spliced and used, the pull rod is pulled to move upwards in the vertical groove through the pull plate, the pull rod drives the clamping column to move towards the cavity, meanwhile, the spring is compressed, then the inserting column at one end of the second pouring template is inserted into the slot of the first pouring template, the pull plate is loosened, the spring elastically stretches and pushes the clamping column to enter the clamping hole of the inserting column, the effect of fixing the inserting column and the second pouring template is achieved, the first pouring template and the second pouring template are conveniently disassembled and fixed through the arrangement of the connecting assembly, and the practicability of the device is improved.

Description

Building construction pouring template
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a building construction pouring template.
Background
The building template is a temporary supporting structure, and is manufactured according to the design requirement, so that a concrete structure and a component are formed according to the specified position and geometric dimension, the correct position of the concrete structure and the component is kept, the self weight of the building template and the external load acted on the self weight of the building template are borne, when the concrete is poured, the cavity is formed by assembling the template, the concrete is poured into the cavity for pouring, and the template is removed after the concrete is shaped.
Chinese patent application number 202020739867X discloses a building construction pouring template, including first pouring template, first draw-in groove, first standing groove, first fixing bolt, first connecting block, first spacing groove, first stopper, first fixture block, second pouring template, second draw-in groove, second standing groove, second fixing bolt, second connecting block, second spacing groove, second stopper and second fixture block. This kind of building construction pours template simple structure, novel in design, be convenient for pour template and second and carry out zonulae occludens with first pouring template, ensure that first pouring template and second pour the tightness that the template is connected, avoid pouring the template between connect take place not hard up dislocation condition, convenient to use, when using, be convenient for dismantle first pouring template and the second of installation stability, improve the staff and pour the efficiency of dismantling between template and the second pouring template first, save time, the while is convenient for used repeatedly, the practicality value is higher, be fit for using widely.
The above-mentioned disclosed patent is fixed through a plurality of fixing bolt connection between with first template and the second template of pouring, and inconvenient first template and the second are poured between the template quick assembly disassembly fixed, and first template and the second template of pouring are relatively poor when using simultaneously.
Disclosure of Invention
In order to solve the problems in the background art, the utility model provides a building construction pouring template, which has the characteristics that a first pouring template and a second pouring template are convenient and quick to assemble, disassemble and fix.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the building construction pouring template comprises a first pouring template, wherein a second pouring template is arranged on one side of the first pouring template, and the second pouring template is connected with the first pouring template through a connecting component;
the connecting assembly comprises an inserting column, a slot, a pull rod, a vertical groove, a pull plate, a clamping column, a cavity, a spring and a clamping hole, wherein the inserting column is arranged at one end of the first pouring template and one end of the second pouring template, the slot corresponding to the inserting column is arranged at the other end of the first pouring template and the other end of the second pouring template, the clamping column is arranged in the slot, the cavity is arranged at the upper side of the clamping column, the spring is arranged in the cavity, the pull rod is arranged at the upper side of the rear end of the clamping column, the pull plate is arranged at the rear end of the pull rod, the vertical groove corresponding to the pull rod is arranged in the first pouring template and the second pouring template, and the clamping hole corresponding to the clamping column is arranged in the inserting column.
Preferably, the lower end of the clamping column is of an arc-shaped structure, and the side edge of the clamping column is tangent with the inner wall of the cavity.
Preferably, the side edge of the inserted post is clung to the inner wall of the slot after the inserted post enters the slot, and the pull rod and the clamping post are of a welding integrated structure.
Preferably, the first template of pouring and second are pour the template rear end and all have the mounting panel through bolted connection, and mounting panel rear end both sides are provided with the backup pad, and the backup pad other end is provided with the bottom plate, and bottom plate upper end one side is provided with the roof, and roof lower extreme both sides are provided with the toper post.
Preferably, a first connecting column is arranged between the two supporting plates, and a second connecting column is arranged on one side of the first connecting column.
Preferably, the bottom plate is provided with a sliding hole corresponding to the conical column, and the conical column and the top plate are of a welded integrated structure.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, when the first pouring template and the second pouring template are required to be spliced and used, the pull rod is pulled to move upwards in the vertical groove through the pull plate, the clamping column is driven to move towards the cavity by the pull rod, meanwhile, the spring is compressed, then the inserted column at one end of the second pouring template is inserted into the slot of the first pouring template, the pull plate is loosened, the spring elastically stretches to push the clamping column to enter the clamping hole of the inserted column, the effect of fixing the inserted column and the second pouring template is achieved, when the first pouring template and the second pouring template are required to be disassembled, the clamping column is pulled to move out of the clamping hole of the inserted column through the pull plate, the first pouring template and the second pouring template can be disassembled, the first pouring template and the second pouring template are conveniently disassembled and fixed through the arrangement of the connecting assembly, and the practicability of the device is improved.
2. According to the utility model, the bottom plate is arranged, the mounting plate is fixedly connected with the first pouring template and the second pouring template through the bolts, the first pouring template and the second pouring template can strike the top plate when in use, so that the conical columns at the two sides of the lower end of the top plate are inserted into the ground, the bottom plate can play a supporting role on the first pouring template and the second pouring template through the support plate and the mounting plate, the first pouring template and the second pouring template are more firmly used, and meanwhile, the first connecting column and the second connecting column are respectively arranged between the two support plates, so that the two support plates are more firmly used.
Drawings
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a rear perspective view of the present utility model;
FIG. 3 is a cut-away perspective view of a first casting mold plate and a second casting mold plate of the present utility model;
FIG. 4 is a perspective view of a cartridge of the present utility model;
in the figure: 1. a first casting template; 2. a connection assembly; 21. inserting a column; 22. a slot; 23. a pull rod; 24. a vertical groove; 25. pulling a plate; 26. a clamping column; 27. a cavity; 28. a spring; 29. a clamping hole; 3. a second casting template; 4. a bottom plate; 5. a mounting plate; 6. a support plate; 7. a first connecting column; 8. a second connecting column; 9. a top plate; 10. and (5) a conical column.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
Referring to fig. 1-3, the present utility model provides the following technical solutions: the building construction pouring template comprises a first pouring template 1, wherein a second pouring template 3 is arranged on one side of the first pouring template 1, and the second pouring template 3 is connected with the first pouring template 1 through a connecting component 2;
the connecting assembly 2 comprises an inserting column 21, a slot 22, a pull rod 23, a vertical groove 24, a pull plate 25, a clamping column 26, a cavity 27, a spring 28 and a clamping hole 29, wherein the inserting column 21 is arranged at one end of each of the first pouring template 1 and the second pouring template 3, the slot 22 corresponding to the inserting column 21 is arranged at the other end of each of the first pouring template 1 and the second pouring template 3, the clamping column 26 is arranged in the slot 22, the cavity 27 is arranged at the upper side of the clamping column 26, the spring 28 is arranged in the cavity 27, the pull rod 23 is arranged at the upper side of the rear end of the clamping column 26, the pull plate 25 is arranged at the rear end of the pull rod 23, the vertical groove 24 corresponding to the pull rod 23 is arranged in each of the first pouring template 1 and the second pouring template 3, and the clamping hole 29 corresponding to the clamping column 26 is arranged in the inserting column 21.
Specifically, the lower end of the clamping column 26 is in an arc-shaped structure, and the side edge of the clamping column 26 is tangent to the inner wall of the cavity 27.
Through adopting above-mentioned technical scheme, through setting up coupling assembling 2 and conveniently pouring template 1 and second and pouring template 3 and carrying out the dismouting fixedly, improve the device practicality.
Specifically, after the inserting column 21 enters the slot 22, the side edge of the inserting column 21 is clung to the inner wall of the slot 22, and the pull rod 23 and the clamping column 26 are of a welded integrated structure.
Through adopting above-mentioned technical scheme, post 21 gets into slot 22 back post 21 more firm in slot 22, and pull rod 23 and card post 26 are welding integral type structure more firm.
When the construction pouring template is used, the device is installed at a proper position, the construction pouring work is carried out through the first pouring template 1 and the second pouring template 3, through the arrangement of the connecting component 2, when the first pouring template 1 and the second pouring template 3 are required to be spliced and used, the pull rod 23 is pulled by the pull plate 25 to move upwards in the vertical groove 24, the pull rod 23 drives the clamping column 26 to move towards the cavity 27, meanwhile, the spring 28 is compressed, then the inserting column 21 at one end of the second pouring template 3 is inserted into the slot 22 of the first pouring template 1, the pull plate 25 is loosened, the spring 28 stretches and pushes the clamping column 26 to enter the clamping hole 29 of the inserting column 21, the effect of fixing the inserting column 21 and the second pouring template 3 is achieved, when the first pouring template 1 and the second pouring template 3 are required to be disassembled, the clamping column 26 is pulled out of the clamping hole 29 of the inserting column 21 through the pull plate 25, the first pouring template 1 and the second pouring template 3 can be disassembled conveniently, and the connecting component 2 is arranged to fix the first pouring template 1 and the second pouring template 3, and the device is improved in practicability.
Example 2
This embodiment differs from embodiment 1 in that: the rear ends of the first pouring template 1 and the second pouring template 3 are connected with a mounting plate 5 through bolts, two sides of the rear end of the mounting plate 5 are provided with a supporting plate 6, the other end of the supporting plate 6 is provided with a bottom plate 4, one side of the upper end of the bottom plate 4 is provided with a top plate 9, and two sides of the lower end of the top plate 9 are provided with conical columns 10.
Through adopting above-mentioned technical scheme, bottom plate 4 can play the supporting role to first pouring template 1 and second pouring template 3 through backup pad 6 and mounting panel 5, makes first pouring template 1 and second pouring template 3 use more firm.
Specifically, a first connecting column 7 is arranged between the two support plates 6, and a second connecting column 8 is arranged on one side of the first connecting column 7.
Through adopting above-mentioned technical scheme, set up spliced pole one 7 and spliced pole two 8 respectively between two backup pads 6 and make more firm between two backup pads 6.
Specifically, the bottom plate 4 is provided with a sliding hole corresponding to the tapered column 10, and the tapered column 10 and the top plate 9 are of a welded integrated structure.
By adopting the technical scheme, the conical column 10 can slide in the bottom plate 4, and the conical column 10 and the top plate 9 are of a welding integrated structure which is more firm and durable.
When the embodiment is used, through setting up bottom plate 4, it is fixed to pass through the bolt with mounting panel 5 and first template 1 and the second template 3 of pouring are connected, first template 1 and the second template 3 of pouring can strike roof 9 when using, make the toper post 10 of roof 9 lower extreme both sides insert ground, bottom plate 4 can play the supporting role to first template 1 and the second template 3 of pouring through backup pad 6 and mounting panel 5, make first template 1 and the second template 3 of pouring use more firm, set up spliced pole one 7 and spliced pole two 8 respectively between two backup pads 6 simultaneously and make between two backup pads 6 more firm.
The structure and the working principle of the first pouring template 1 and the second pouring template 3 are disclosed in a building construction pouring template disclosed in China patent application No. 202020739867X, and the working principle is that building construction pouring work is carried out through the first pouring template 1 and the second pouring template 3.
The working principle and the using flow of the utility model are as follows: when the building construction pouring template is used, the device is arranged at a proper position, building construction pouring work is carried out through the first pouring template 1 and the second pouring template 3, through the arrangement of the connecting component 2, when the first pouring template 1 and the second pouring template 3 are required to be spliced and used, the pull rod 23 is pulled by the pull plate 25 to move upwards in the vertical groove 24, the pull rod 23 drives the clamping column 26 to move into the cavity 27, meanwhile, the spring 28 is compressed, then the inserting column 21 at one end of the second pouring template 3 is inserted into the slot 22 of the first pouring template 1, the pull plate 25 is loosened, the spring 28 is stretched to push the clamping column 26 to enter the clamping hole 29 of the inserting column 21, the effect of fixing the inserting column 21 and the second pouring template 3 is achieved, and when the first pouring template 1 and the second pouring template 3 are required to be disassembled, the clamping columns 26 are pulled by the pull plates 25 to move out from the clamping holes 29 of the inserting columns 21, the first pouring template 1 and the second pouring template 3 can be detached, the first pouring template 1 and the second pouring template 3 are conveniently detached and fixed by the aid of the connecting assemblies 2, device practicability is improved, the mounting plates 5 are connected and fixed with the first pouring template 1 and the second pouring template 3 through bolts by the aid of the bottom plates 4, the top plates 9 can be knocked by the first pouring template 1 and the second pouring template 3 when the first pouring template 1 and the second pouring template 3 are used, tapered columns 10 on two sides of the lower ends of the top plates 9 are inserted into the ground, the bottom plates 4 can play a supporting role on the first pouring template 1 and the second pouring template 3 through the supporting plates 6 and the mounting plates 5, the first pouring template 1 and the second pouring template 3 are used more firmly, and meanwhile, the connecting columns 7 and the connecting columns 8 are respectively arranged between the two supporting plates 6 to enable the two supporting plates 6 to be more firm.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Building construction pouring template, including first pouring template, its characterized in that: a second pouring template is arranged on one side of the first pouring template, and the second pouring template is connected with the first pouring template through a connecting component;
the connecting assembly comprises an inserting column, a slot, a pull rod, a vertical groove, a pull plate, a clamping column, a cavity, a spring and a clamping hole, wherein the inserting column is arranged at one end of the first pouring template and one end of the second pouring template, the slot corresponding to the inserting column is arranged at the other end of the first pouring template and the other end of the second pouring template, the clamping column is arranged in the slot, the cavity is arranged at the upper side of the clamping column, the spring is arranged in the cavity, the pull rod is arranged at the upper side of the rear end of the clamping column, the pull plate is arranged at the rear end of the pull rod, the vertical groove corresponding to the pull rod is arranged in the first pouring template and the second pouring template, and the clamping hole corresponding to the clamping column is arranged in the inserting column.
2. A construction pouring form according to claim 1, wherein: the lower end of the clamping column is of an arc-shaped structure, and the side edge of the clamping column is tangent with the inner wall of the cavity.
3. A construction pouring form according to claim 1, wherein: the side edge of the inserted post is clung to the inner wall of the slot after the inserted post enters the slot, and the pull rod and the clamping post are of a welding integrated structure.
4. A construction pouring form according to claim 1, wherein: the first template that pours and second are pour the template rear end and are all connected with the mounting panel through the bolt, and mounting panel rear end both sides are provided with the backup pad, and the backup pad other end is provided with the bottom plate, and bottom plate upper end one side is provided with the roof, and roof lower extreme both sides are provided with the toper post.
5. A construction pouring form according to claim 4, wherein: a first connecting column is arranged between the two supporting plates, and a second connecting column is arranged on one side of the first connecting column.
6. A construction pouring form according to claim 4, wherein: and sliding holes corresponding to the conical columns are formed in the bottom plate, and the conical columns and the top plate are of a welded integrated structure.
CN202321941967.0U 2023-07-21 2023-07-21 Building construction pouring template Active CN220790571U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321941967.0U CN220790571U (en) 2023-07-21 2023-07-21 Building construction pouring template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321941967.0U CN220790571U (en) 2023-07-21 2023-07-21 Building construction pouring template

Publications (1)

Publication Number Publication Date
CN220790571U true CN220790571U (en) 2024-04-16

Family

ID=90664431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321941967.0U Active CN220790571U (en) 2023-07-21 2023-07-21 Building construction pouring template

Country Status (1)

Country Link
CN (1) CN220790571U (en)

Similar Documents

Publication Publication Date Title
CN217480405U (en) Assembled steel construction building
CN215564477U (en) Building construction formwork support
CN220790571U (en) Building construction pouring template
CN216974154U (en) Plate buckle frame support
CN214364932U (en) Template is pour to stand for construction
CN214725215U (en) Prefabricated box girder bed-jig
CN214785904U (en) Quick detach template for construction
CN212583226U (en) Building construction template with connect fixed knot to construct
CN111622349A (en) Assembled brace rod connection form suitable for cable support prestressed steel column
CN216553342U (en) A face limit guardrail that is used for subway station deep basal pit quick assembly disassembly
CN112593634A (en) Foldable convenient building steel construction of dismantling
CN220246691U (en) Integral lifting and mold turning device for thin-wall hollow pier
CN216766441U (en) Detachable truss antidetonation building carrier plate structure
CN219910180U (en) Counter type landscape PC component for architectural decoration
CN214738805U (en) Assembled building embedded part
CN215368684U (en) Reinforcement type template based on house building engineering
CN214561746U (en) Precast concrete component convenient to remove
CN219158405U (en) T-shaped beam steel template capable of being quickly installed and detached
CN216042584U (en) Assembled building production mould convenient to open and shut
CN220117518U (en) Assembled shear wall
CN219864467U (en) Construction fence
CN216553024U (en) Concrete formwork for civil engineering
CN219266385U (en) Electric energy meter with stable operation
CN220848969U (en) Adjustable steel diagonal column supporting device
CN220079709U (en) Steel box girder bridge steel frame connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant