CN220758211U - Green building sewage treatment structure - Google Patents

Green building sewage treatment structure Download PDF

Info

Publication number
CN220758211U
CN220758211U CN202321936995.3U CN202321936995U CN220758211U CN 220758211 U CN220758211 U CN 220758211U CN 202321936995 U CN202321936995 U CN 202321936995U CN 220758211 U CN220758211 U CN 220758211U
Authority
CN
China
Prior art keywords
fixedly connected
box body
box
filter screen
treatment structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321936995.3U
Other languages
Chinese (zh)
Inventor
张晓波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xinguang Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321936995.3U priority Critical patent/CN220758211U/en
Application granted granted Critical
Publication of CN220758211U publication Critical patent/CN220758211U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model relates to the technical field of sewage treatment, in particular to a green building sewage treatment structure, which comprises a treatment box body and a filtration box body, wherein the inside of the treatment box body is connected with the filtration box body in a sliding way, three groups of second positioning sliding grooves are formed in the inner walls of the left side and the right side of the filtration box body, the inside of each second positioning sliding groove is connected with a connecting bracket in a sliding way, the inner side of each connecting bracket is fixedly connected with a filter screen, and a positioning sliding block is pulled outwards through a second sealing plate to enable the filtration box body to be pulled to the outer side of the treatment box body, so that the filter screen is conveniently cleaned, the cleaning efficiency is improved, the positioning sliding block slides inwards in the first positioning sliding groove and is just clamped in the connecting clamping groove when sliding to the innermost end, the filter screen is conveniently installed and disassembled, the installation efficiency of the filter screen is improved, and the problems of complicated cleaning process, low cleaning speed and low installation efficiency of the filter screen are solved.

Description

Green building sewage treatment structure
Technical Field
The utility model relates to the technical field of sewage treatment, in particular to a green building sewage treatment structure.
Background
The water recycling device is industrial equipment which can effectively treat domestic sewage, industrial wastewater and the like in urban areas, prevents sewage and pollutants from directly flowing into water areas, has important significance for improving ecological environment, improving urban grade and promoting economic development, and mainly aims to treat the domestic sewage and similar industrial organic wastewater to meet the requirement of recycling water quality and recycle the treated wastewater;
the in-process of sewage treatment filters the impurity of clear away inside sewage through the filter screen, impurity after clear away can remain on the surface of filter screen, need carry out periodic clearance to the filter screen and change, current filter screen is mainly installed in the inside of equipment, need dismantle equipment at the in-process of wasing the change, the clearance process is comparatively loaded down with trivial details, the clearance speed is slower, and traditional filter screen mainly relies on the screw fixation in the inside of equipment, the in-process of ann changes need be with every group wire hole alignment and install, the speed of installation is slower, the installation effectiveness is lower.
In view of this, we propose a green building sewage treatment structure.
Disclosure of Invention
In order to make up for the defects, the utility model provides a green building sewage treatment structure.
The technical scheme of the utility model is as follows:
the utility model provides a green building sewage treatment structure, includes treatment box and filtration box, the inside sliding connection of treatment box has the filtration box, three second location spouts of group have been seted up to the left and right sides inner wall of filtration box, the inside equal sliding connection of second location spout has the linking bridge, the inboard fixedly connected with filter screen of linking bridge, the first closing plate of front side fixedly connected with of linking bridge, the first location spout has been seted up to the inner wall of treatment box, the inside sliding connection of first location spout has the location slider, the inboard surface of location slider with filtration box fixed connection.
As an optimal technical scheme, the three groups of filter screens have different apertures, and sewage is subjected to graded filtration.
As the preferable technical scheme, the right side surface fixedly connected with second closing plate of location slider, the front and back both sides surface of second closing plate is all fixedly connected with two sets of second connecting blocks, the surface fixedly connected with pull rod of second closing plate.
As the preferable technical scheme, the right side surface of processing box has seted up the maintenance through-hole, two sets of connection draw-in grooves have all been seted up to the front and back both sides of maintenance through-hole, the front and back both sides surface of processing box all fixedly connected with two sets of first connecting blocks, first connecting block with connect the draw-in groove the position of second connecting block is corresponding.
As the preferable technical scheme, the upper side surface fixedly connected with inlet channel of processing box, the below fixedly connected with drainage pipe of processing box, inlet channel with the equal fixedly connected with flange of one end of drainage pipe.
As the preferable technical proposal, the upper parts of the inner walls of the left side and the right side are fixedly connected with guide plates.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the first positioning sliding groove is formed in the inner wall of the treatment box body, the positioning sliding block is connected in a sliding manner in the first positioning sliding groove, the inner side surface of the positioning sliding block is fixedly connected with the filtering box body, and the positioning sliding block is pulled outwards through the second sealing plate in the cleaning process, so that the filtering box body is pulled to the outer side of the treatment box body, the purposes of facilitating cleaning of the filter screen and improving the cleaning efficiency are achieved, and the problems that the existing filter screen is mainly installed in equipment, the equipment needs to be disassembled in the cleaning and replacing process, the cleaning process is complicated and the cleaning speed is low are solved.
2. According to the utility model, when the filter screen is installed, the connecting brackets at two sides of the filter screen are directly inserted into the second positioning sliding groove and slide inwards, then the positioning sliding block slides inwards in the first positioning sliding groove, and when the positioning sliding block slides to the innermost end, the second connecting block is just clamped in the connecting clamping groove, so that the beneficial effects of facilitating the installation and the disassembly of the filter screen and improving the installation efficiency are achieved, and the problems that the traditional filter screen is mainly fixed in equipment by means of screws, each group of wire holes needs to be aligned in the installation process, the installation speed is low and the installation efficiency is low are solved.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic cross-sectional view of the present utility model;
FIG. 3 is a schematic view of a processing chamber according to the present utility model;
fig. 4 is a schematic diagram of the structure of the filtering box body of the present utility model.
In the figure: 1. a treatment box body; 11. a water inlet pipe; 12. a drainage pipe; 13. a connecting flange; 14. overhauling the through hole; 15. a connecting clamping groove; 16. a first connection block; 17. a first positioning chute; 18. positioning a sliding block; 19. a deflector; 2. a filter box; 21. a second positioning chute; 22. a connecting bracket; 23. a first sealing plate; 24. a filter screen; 25. a second sealing plate; 26. a pull rod; 27. and a second connecting block.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "configured to," "engaged with," "connected to," and the like are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be the communication between the two elements; the specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1 to 4, the present utility model provides a technical solution:
the utility model provides a green building sewage treatment structure, including handling box 1 and filtration box 2, the inside sliding connection of handling box 1 has filtration box 2, three second location spouts 21 of group have been seted up to the left and right sides inner wall of filtration box 2, the inside of second location spout 21 is all sliding connection has linking bridge 22, the inboard fixedly connected with filter screen 24 of linking bridge 22, the first closing plate 23 of front side fixedly connected with of linking bridge 22, the first location spout 17 has been seted up to the inner wall of handling box 1, the inside sliding connection of first location spout 17 has location slider 18, the inboard surface of location slider 18 and filtration box 2 fixed connection, the aperture of three filter screens 24 is different, carry out hierarchical filtration to sewage.
The pore diameter of the upper filter screen 24 is the largest, which is used for filtering large-scale impurities, the middle filter screen 24 is the smallest, which is used for filtering small-volume impurities, and the pore diameter of the lower filter screen 24 is the smallest, which is used for filtering small particles in sewage, and classifying the sewage, so that the speed of filtering water is improved;
in the installation process, the connecting bracket 22 is inserted into the second positioning sliding groove 21, meanwhile, the connecting bracket 22 slides inwards, the filter screen 24 slides to the temporal part of the filter box body 2, then the positioning sliding block 18 is clamped into the first positioning sliding groove 17, slides inwards, and the filter box body 2 slides into the processing box body 1.
As a preference of this embodiment, the right side surface of the positioning slider 18 is fixedly connected with a second sealing plate 25, the front and rear side surfaces of the second sealing plate 25 are fixedly connected with two groups of second connecting blocks 27, the surface of the second sealing plate 25 is fixedly connected with a pull rod 26, the right side surface of the treatment box 1 is provided with an overhaul through hole 14, the front and rear sides of the overhaul through hole 14 are provided with two groups of connecting clamping grooves 15, the front and rear side surfaces of the treatment box 1 are fixedly connected with two groups of first connecting blocks 16, and the positions of the first connecting blocks 16 and the connecting clamping grooves 15 and the second connecting blocks 27 correspond.
It should be noted that, after the filter box 2 slides to the inside of the processing box 1, the second sealing plate 25 just blocks the inside of the overhaul through hole 14 to seal the overhaul through hole 14, and meanwhile, the second connecting block 27 just blocks the inside of the connecting slot 15 and aligns with the first connecting block 16, and fixes the second connecting block by a screw, so as to improve the installation speed.
As a preference of this embodiment, the upper side surface of the treatment tank 1 is fixedly connected with a water inlet pipe 11, the lower side of the treatment tank 1 is fixedly connected with a water drain pipe 12, one ends of the water inlet pipe 11 and the water drain pipe 12 are fixedly connected with a connecting flange 13, and the upper sides of the inner walls of the left and right sides of the treatment tank 1 are fixedly connected with a guide plate 19.
Further, the guide plate 19 is used for guiding the entering water flow to avoid splashing on the surface of the filter screen 24, sewage enters the inside of the treatment box body 1 through the water inlet pipeline 11, meanwhile, the guide plate 19 guides the sewage to the upper part of the filter screen 24, three groups of filter screens 24 are used for carrying out graded filtration on the sewage, and the filtered sewage is discharged through the water discharge pipeline 12.
When the green building sewage treatment structure is used, the screws for fixing the first connecting block 16 and the second connecting block 27 are taken down during maintenance, so that the filter box body 2 can be directly pulled to the outer side of the treatment box body 1, and the filter screen 24 is convenient to clean;
in the process of installation, the connecting bracket 22 is inserted into the second positioning sliding groove 21, meanwhile, the connecting bracket 22 slides inwards, the filter screen 24 slides to the temporal part of the filter box body 2, then the positioning sliding block 18 is clamped into the first positioning sliding groove 17 and slides inwards, the filter box body 2 slides into the processing box body 1, then the filter box body 2 slides into the processing box body 1, the second sealing plate 25 is just clamped in the overhaul through hole 14 to seal the overhaul through hole 14, and meanwhile, the second connecting block 27 is just clamped in the connecting clamping groove 15 and aligned with the first connecting block 16 to fix the filter screen through a screw, so that the installation speed is improved.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the above-described embodiments, and that the above-described embodiments and descriptions are only preferred embodiments of the present utility model, and are not intended to limit the utility model, and that various changes and modifications may be made therein without departing from the spirit and scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. A green building sewage treatment structure, its characterized in that: including handling box (1) and rose box (2), the inside sliding connection of handling box (1) has rose box (2), three second location spouts (21) of group have been seted up to the left and right sides inner wall of rose box (2), the inside of second location spout (21) is all sliding connection has linking bridge (22), the inboard fixedly connected with filter screen (24) of linking bridge (22), the front side surface fixedly connected with first closing plate (23) of linking bridge (22), first location spout (17) have been seted up to the inner wall of handling box (1), the inside sliding connection of first location spout (17) has location slider (18), the inboard surface of location slider (18) with rose box (2) fixedly connected with.
2. A green construction wastewater treatment structure according to claim 1, wherein: the three groups of filter screens (24) have different pore diameters, and sewage is subjected to graded filtration.
3. A green construction wastewater treatment structure according to claim 1, wherein: the right side surface fixedly connected with second closing plate (25) of location slider (18), both sides surface all fixedly connected with two sets of second connecting blocks (27) around second closing plate (25), the surface fixedly connected with pull rod (26) of second closing plate (25).
4. A green construction wastewater treatment structure according to claim 3, wherein: the right side surface of handling box (1) has seted up maintenance through-hole (14), two sets of connection draw-in groove (15) have all been seted up to both sides around maintenance through-hole (14), the both sides surface is two sets of first connecting blocks (16) of fixedly connected with around handling box (1), first connecting block (16) with connect draw-in groove (15) the position of second connecting block (27) is corresponding.
5. A green construction wastewater treatment structure according to claim 1, wherein: the treatment box is characterized in that a water inlet pipeline (11) is fixedly connected to the upper side surface of the treatment box body (1), a water discharge pipeline (12) is fixedly connected to the lower side of the treatment box body (1), and a connecting flange (13) is fixedly connected to one end of each water inlet pipeline (11) and one end of each water discharge pipeline (12).
6. A green construction wastewater treatment structure according to claim 1, wherein: guide plates (19) are fixedly connected above the inner walls of the left side and the right side of the treatment box body (1).
CN202321936995.3U 2023-07-22 2023-07-22 Green building sewage treatment structure Active CN220758211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321936995.3U CN220758211U (en) 2023-07-22 2023-07-22 Green building sewage treatment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321936995.3U CN220758211U (en) 2023-07-22 2023-07-22 Green building sewage treatment structure

Publications (1)

Publication Number Publication Date
CN220758211U true CN220758211U (en) 2024-04-12

Family

ID=90619036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321936995.3U Active CN220758211U (en) 2023-07-22 2023-07-22 Green building sewage treatment structure

Country Status (1)

Country Link
CN (1) CN220758211U (en)

Similar Documents

Publication Publication Date Title
CN220758211U (en) Green building sewage treatment structure
CN216445108U (en) Water supply and drainage pipeline is with purifier who just tears open
CN212039201U (en) Sewage filtering device
CN112408613B (en) Wastewater treatment system and method
CN210699050U (en) Waste liquid recovery processing device
CN210674364U (en) Novel high-efficient water treatment solid-liquid separation device
CN211394203U (en) Car washing water filtering and circulating system
CN219929725U (en) Reverse osmosis water purifier
CN208927721U (en) A kind of dyeing waste water discharge management control system
CN111013217A (en) Intelligent backwashing sewage purification treatment device
CN212575812U (en) Unit precipitation type filter
CN220618461U (en) Sewage pretreatment device for automobile production
CN211158816U (en) Sewage treatment equipment
CN220513555U (en) Sewage filtering mechanism
CN218393112U (en) Novel vertical STRO integrated equipment
CN214714796U (en) Quick water quality filtering device
CN217724873U (en) Copper strips processing apparatus for waste water
CN218345309U (en) Tail end non-point source pollution treatment device
CN220537653U (en) Rural sewage treatment plant
CN218372040U (en) Spiral-flow type sand removing device
CN219663009U (en) Water supply and drainage filtering structure
CN221309825U (en) Multitube distributing type water purification cabinet
CN211284008U (en) River course black foul sewage treatment device
CN218076657U (en) Recovery processing system of printing waste water
CN219044872U (en) High-density sedimentation tank device based on novel microfiltration membrane improvement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240424

Address after: No. 31 Tonghua North Road, Yangtan Town, Guangde City, Xuancheng City, Anhui Province, 242200

Patentee after: Anhui Xinguang Construction Engineering Co.,Ltd.

Country or region after: China

Address before: Unit 902, Building 6, Dongshan Huafu, No. 299 Minyi Road, Xuecheng District, Zaozhuang City, Shandong Province, 277000

Patentee before: Zhang Xiaobo

Country or region before: China