CN220706626U - Water pipe hanging bracket - Google Patents

Water pipe hanging bracket Download PDF

Info

Publication number
CN220706626U
CN220706626U CN202322496037.5U CN202322496037U CN220706626U CN 220706626 U CN220706626 U CN 220706626U CN 202322496037 U CN202322496037 U CN 202322496037U CN 220706626 U CN220706626 U CN 220706626U
Authority
CN
China
Prior art keywords
water pipe
bottom plate
water
hanger
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322496037.5U
Other languages
Chinese (zh)
Inventor
魏成权
叶进强
周秘
刘全社
曾若琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Mechanical & Electrical Installation Co ltd
Original Assignee
Guangzhou Mechanical & Electrical Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Mechanical & Electrical Installation Co ltd filed Critical Guangzhou Mechanical & Electrical Installation Co ltd
Priority to CN202322496037.5U priority Critical patent/CN220706626U/en
Application granted granted Critical
Publication of CN220706626U publication Critical patent/CN220706626U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of hanging frames, and discloses a water pipe hanging frame, which comprises a hoop and two groups of frame bodies which are distributed at intervals, wherein the frame bodies comprise: the cross beam is used for bearing the water pipe; the mounting units are symmetrically arranged above two ends of the cross beam, each mounting unit comprises a suspender and a support, and the bottom of each suspender is connected with the end part of the cross beam; the support comprises an upper bottom plate, a lower bottom plate and a screw rod, the top end of the screw rod is connected with the upper bottom plate, a nut is sleeved at the bottom end of the screw rod after penetrating through the lower bottom plate, and the top of the suspender is connected with the lower bottom plate; the water pipe is characterized in that the plurality of hoops are arranged, two ends of each hoop are respectively arranged on the cross beams of the two groups of frame bodies, the hoops are used for limiting the position of the water pipe on the cross beams, and the radial direction of each hoop is perpendicular to the axial direction of the water pipe. The water pipe hanging bracket has a regular and attractive installation structure, and can effectively prevent the water pipe from shaking.

Description

Water pipe hanging bracket
Technical Field
The utility model relates to the technical field of hanging frames, in particular to a water pipe hanging frame.
Background
The main pipe of the basement fire water supply is provided with a support and hanging bracket at the elbow for supporting the main pipe at the basement ceiling, and the main pipe is generally arranged side by side with multi-loop water pipes. The current hanging bracket adopts a horizontal and horizontal vertical supporting and hanging bracket setting method, namely, a single beam is adopted to install the anchor ear to fix the main pipe, when a plurality of water pipes are arranged side by side, the distances between the anchor ear and the elbow corresponding to the main pipe are inconsistent, so that the standard and beautiful appearance is not enough after installation, if the standard and beautiful effect is achieved, the beam is required to be obliquely arranged, the radial direction of the anchor ear is not perpendicular to the axial direction of the main pipe at the moment, the main pipe cannot be hooped, and shaking can be generated after the main pipe is installed.
Disclosure of Invention
The utility model aims to provide a water pipe hanging bracket, which has a regular and attractive mounting structure and can effectively prevent a water pipe from shaking.
In order to achieve the above purpose, the utility model provides a water pipe hanger, which is installed at an elbow of a group of water pipes and comprises a hoop and two groups of frame bodies which are distributed at intervals, wherein the frame bodies comprise:
the cross beam is used for bearing the water pipe;
the mounting units are symmetrically arranged above two ends of the cross beam, each mounting unit comprises a suspender and a support, and the bottom of each suspender is connected with the end part of the cross beam; the support comprises an upper bottom plate, a lower bottom plate and a screw rod, the top end of the screw rod is connected with the upper bottom plate, a nut is sleeved at the bottom end of the screw rod after penetrating through the lower bottom plate, and the top of the suspender is connected with the lower bottom plate;
the water pipe is characterized in that the plurality of hoops are arranged, two ends of each hoop are respectively arranged on the cross beams of the two groups of frame bodies, the hoops are used for limiting the position of the water pipe on the cross beams, and the radial direction of each hoop is perpendicular to the axial direction of the water pipe;
the upper bottom plate is arranged on the upper surface of the floor slab, the lower bottom plate is arranged on the lower surface of the floor slab, and the screw rod penetrates through the floor slab.
In some embodiments, a reinforcement glue layer is filled between the periphery of the screw and the hole wall of the floor slab.
In some embodiments, the bead bond layer is one of a polyurethane bead bond layer, an epoxy bead bond layer, an acrylic bead bond layer, a gypsum bead bond layer, and an inorganic bond layer.
In some embodiments, two screws are provided for each of the upper base plate and the lower base plate.
In some embodiments, the top end of the screw is welded to the upper base plate.
In some embodiments, the screw is perpendicular to the upper and lower base plates, respectively.
In some embodiments, a gasket is arranged between the nut and the lower bottom plate, and the gasket is sleeved on the periphery of the screw rod.
In some embodiments, the frame further comprises a lacing plate, wherein two ends of the lacing plate are respectively connected to the bottoms of the cross beams of the two groups of frame bodies.
In some embodiments, the upper and lower floors are equal in thickness and are each less than the thickness of the decorative layer of the floor slab.
In some embodiments, the upper plate has a thickness of 5-7mm.
Compared with the prior art, the utility model provides the water pipe hanging bracket which has the beneficial effects that:
the upper surface of floor is located to the upper plate of the support that sets up, the lower surface of floor is located to the lower plate, the top and the upper plate of screw rod are connected, the screw rod runs through the floor for the support structure atress on two faces about the floor, the top and the lower plate of jib are connected, the bottom and the crossbeam of jib are connected, thereby make the mounting structure of crossbeam firm, the difficult situation that takes off appears, and the staple bolt is equipped with a plurality of, install respectively on the crossbeam of two sets of support bodies at the both ends of each staple bolt, and the radial of staple bolt is perpendicular with the axial of water pipe, realize that the distance of each staple bolt and the elbow department of water pipe equals, thereby make whole mounting structure regular pleasing to the eye, and can effectually prevent that the water pipe from rocking.
Drawings
Fig. 1 is an enlarged schematic view of a radial section of a water pipe hanger according to an embodiment of the present utility model.
Fig. 2 is a partially enlarged structural schematic view of the mounting unit of fig. 1.
Fig. 3 is a schematic top view of a detachable installation unit of a water pipe hanger according to an embodiment of the present utility model.
Fig. 4 is a schematic view of a partially enlarged structure of fig. 3 with the water pipe removed.
In the figure: 100. a frame body; 1. a cross beam; 2. a water pipe; 3. an installation unit; 31. a boom; 32. a support; 321. an upper base plate; 322. a lower base plate; 323. a screw; 324. a nut; 325. a reinforcement glue layer is planted; 326. a gasket; 4. a floor slab; 5. a lacing plate; 6. and (5) hooping.
Detailed Description
The following description of the embodiments of the present application will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all, of the embodiments of the present application.
It should be understood that in the description of the present application, the terms "upper," "lower," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate an orientation or positional relationship based on that shown in the drawings, merely for convenience of description and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present application. The terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, i.e., features defining "first," "second," may explicitly or implicitly include one or more such features. Furthermore, unless otherwise indicated, the meaning of "a plurality" is two or more.
As shown in fig. 1-4, the water pipe hanger of the embodiment of the utility model is installed at the elbow of a group of water pipes and comprises a hoop 6 and two groups of frame bodies 100 which are distributed at intervals, wherein the frame bodies 100 comprise a cross beam 1 and an installation unit 3. A cross beam 1 for carrying the water pipe 2; the mounting units 3 are symmetrically arranged above two ends of the cross beam 1, the mounting units 3 comprise a suspender 31 and a support 32, and the bottom of the suspender 31 is connected with the end part of the cross beam 1; the support 32 comprises an upper bottom plate 321, a lower bottom plate 322 and a screw 323, wherein the top end of the screw 323 is connected with the upper bottom plate 321, the bottom end of the screw 323 penetrates through the lower bottom plate 322 and is sleeved with a nut 324, and the top of the suspender 31 is connected with the lower bottom plate 322; the anchor ear 6 is provided with a plurality of anchor ears 6, two ends of each anchor ear 6 are respectively arranged on the cross beams 1 of the two groups of frame bodies 100, the anchor ear 6 is used for limiting the position of the water pipe 2 on the cross beams 1, and the radial direction of the anchor ear 6 is vertical to the axial direction of the water pipe 2; wherein, upper plate 321 locates the upper surface of floor 4, and lower plate 322 locates the lower surface of floor 4, and screw 323 runs through floor 4.
During installation, holes are drilled in the floor slab 4, then the support 32, the suspender 31 and the cross beam 1 are sequentially installed, and finally the water pipe 2 is installed in the anchor ear 6 for positioning.
Based on the above-mentioned setting, through locating the upper surface of floor 4 with the upper plate 321 of support 32, the lower surface of floor 4 is located to lower plate 322, screw 323 runs through floor 4, the top and the upper plate 321 of screw 323 are connected, make the support 32 structure atress on floor 4 upper and lower two faces, the top and the lower plate 322 of jib 31 are connected, the bottom and the crossbeam 1 of jib 31 are connected, thereby make the mounting structure of crossbeam 1 firm, the condition of difficult pine takes off appears, and staple bolt 6 is equipped with a plurality of, install respectively on the crossbeam 1 of two sets of support bodies 100 at the both ends of staple bolt 6, and the radial and the axial of water pipe 2 of staple bolt 6 are perpendicular, realize that the distance of each staple bolt 6 and the elbow department of water pipe 2 equals, thereby make the whole mounting structure regular pleasing to the eye, and can effectually prevent that the water pipe from rocking.
In one embodiment, a layer of rebar glue 325 is filled between the periphery of the screw 323 and the wall of the hole of the floor 4. During installation, holes are drilled on the floor slab 4, the inside of the drilled holes is cleaned by adopting a hairbrush and an air cylinder, then the embedded rib adhesive layer 325 is injected into the drilled holes, then the screw 323 is inserted into the embedded rib adhesive layer 325 and penetrates through the floor slab 4 for installation, and subsequent assembly is carried out after the floor slab 4 is solidified for 1-2 days at room temperature.
Specifically, the reinforcement adhesive layer 325 is one of a polyurethane reinforcement adhesive layer, an epoxy reinforcement adhesive layer, an acrylic reinforcement adhesive layer, a gypsum reinforcement adhesive layer, and an inorganic adhesive layer. The concrete reinforcement glue layer 325 is selected according to the actual installation conditions so as to keep the structure of the screw 323 after being installed in the drilled hole stable and reliable without shaking.
In one embodiment, each of the upper base plate 321 and the lower base plate 322 is provided with two screws 323. The two screws 323 can keep the mounting structure of the upper plate 321 and the lower plate 322 more stable.
In one embodiment, the top end of the screw 323 is welded to the upper base plate 321. In the installation, the screw 323 and the upper plate 321 may be welded and fixed, and then installed on the floor 4.
In one embodiment, the screw 323 is perpendicular to the upper plate 321 and the lower plate 322, respectively. When the screw 323 passes through the floor 4 to be installed with the lower plate 322, the screw 323 is perpendicular to each other, so that the installation is more convenient, and it should be noted that the lower plate 322 is perforated in advance so that the screw 323 can pass through the installation.
In one embodiment, a spacer 326 is disposed between the nut 324 and the lower plate 322, and the spacer 326 is disposed around the screw 323. The provision of the spacer 326 facilitates the handling of the nut 324 during tightening, which facilitates locking of the lower plate 322.
In one embodiment, the water pipe hanger further comprises a lacing plate 5, and two ends of the lacing plate 5 are respectively connected to the bottoms of the cross beams 1 of the two sets of frame bodies 100. The lacing plate 5 is welded and fixed with the cross beam 1, so that the structural strength of the cross beam 1 can be improved, the bearing capacity of the cross beam 1 is improved, and more water pipes 2 can be installed.
In one embodiment, the upper 321 and lower 322 floors are of equal thickness and are each less than the thickness of the decorative layer of the floor slab 4. The thicknesses of the upper bottom plate 321 and the lower bottom plate 322 are the same and can be used interchangeably, so that the manufacturing cost is reduced, the thicknesses of the upper bottom plate 321 and the lower bottom plate 322 are both smaller than the thickness of the decorative layer of the floor slab 4, and after the whole structure is installed, the floor slab is smeared with the decorative layer, so that the appearance of the installation structure is attractive.
Specifically, the thickness of the upper base plate 321 is 5-7mm. The specific value of the upper base plate 321 is determined according to the actual requirement to keep the structural strength stable.
The foregoing is merely a preferred embodiment of the present utility model, and it should be noted that modifications and substitutions can be made by those skilled in the art without departing from the technical principles of the present utility model, and these modifications and substitutions should also be considered as being within the scope of the present utility model.

Claims (10)

1. The utility model provides a water pipe gallows installs in the elbow department of water pipe in groups, its characterized in that includes staple bolt and two sets of interval distribution's support body, the support body includes:
the cross beam is used for bearing the water pipe;
the mounting units are symmetrically arranged above two ends of the cross beam, each mounting unit comprises a suspender and a support, and the bottom of each suspender is connected with the end part of the cross beam; the support comprises an upper bottom plate, a lower bottom plate and a screw rod, the top end of the screw rod is connected with the upper bottom plate, a nut is sleeved at the bottom end of the screw rod after penetrating through the lower bottom plate, and the top of the suspender is connected with the lower bottom plate;
the water pipe is characterized in that the plurality of hoops are arranged, two ends of each hoop are respectively arranged on the cross beams of the two groups of frame bodies, the hoops are used for limiting the position of the water pipe on the cross beams, and the radial direction of each hoop is perpendicular to the axial direction of the water pipe;
the upper bottom plate is arranged on the upper surface of the floor slab, the lower bottom plate is arranged on the lower surface of the floor slab, and the screw rod penetrates through the floor slab.
2. The water hanger of claim 1, wherein a bead bond line is filled between the periphery of the screw and the wall of the floor.
3. The water pipe hanger of claim 2, wherein the tendon placement adhesive layer is one of a polyurethane tendon placement adhesive layer, an epoxy tendon placement adhesive layer, an acrylic tendon placement adhesive layer, a gypsum tendon placement adhesive layer, and an inorganic adhesive layer.
4. The water hanger of claim 1, wherein each of said upper and lower base plates is provided with two of said screws.
5. The water hanger of claim 1, wherein the top end of the screw is welded to the upper base plate.
6. The water hanger of claim 1, wherein said screw is perpendicular to said upper and lower base plates, respectively.
7. The water hanger of claim 1, wherein a spacer is disposed between the nut and the lower plate, the spacer being disposed around the outer circumference of the screw.
8. The water hanger of claim 1, further comprising a gusset plate, wherein two ends of the gusset plate are respectively connected to bottoms of the cross beams of the two sets of the frame bodies.
9. The water hanger of claim 1, wherein the upper and lower base plates are of equal thickness and are each less than the thickness of the decorative layer of the floor slab.
10. The water hanger of claim 9, wherein the upper floor has a thickness of 5-7mm.
CN202322496037.5U 2023-09-14 2023-09-14 Water pipe hanging bracket Active CN220706626U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322496037.5U CN220706626U (en) 2023-09-14 2023-09-14 Water pipe hanging bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322496037.5U CN220706626U (en) 2023-09-14 2023-09-14 Water pipe hanging bracket

Publications (1)

Publication Number Publication Date
CN220706626U true CN220706626U (en) 2024-04-02

Family

ID=90445147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322496037.5U Active CN220706626U (en) 2023-09-14 2023-09-14 Water pipe hanging bracket

Country Status (1)

Country Link
CN (1) CN220706626U (en)

Similar Documents

Publication Publication Date Title
JP6748470B2 (en) A suspending structure for mounting an insert on a deck plate with a reinforcing bar truss and suspending and supporting ceiling equipment on a lower floor under the deck, and a method for mounting ceiling equipment on a lower portion of a deck plate with a reinforcing bar truss using the insert.
CN108589975A (en) Assembling cladding and construction technology
CN220706626U (en) Water pipe hanging bracket
WO1995012726A1 (en) A flexible formwork assembly
CN215760161U (en) Environment-friendly energy-saving building outer wall decorative plate structure
JPH07317188A (en) Constructing method of reinforced concrete structure
CN114045979B (en) Preparation method of self-bearing heat-preservation fireproof sound-insulation polyphenyl particle cement light steel keel plate
CN116084616B (en) Decorative board installation suspension frame combined with electromechanical pipeline
CN220337656U (en) A gallows for truss lower chord fixed shower
JPH0884783A (en) Method for construction of sprinkler
CN220540467U (en) Fire control pipe installation device
CN216108608U (en) Embedded part fixing and combining device
CN218264949U (en) Concrete cantilever member support system
CN211850182U (en) Vertical keel hanging and partition wall fixing and mounting structure
JPH1061090A (en) Construction mechanism of ceiling member in building
CN215595081U (en) Anti-typhoon reinforcing device for container with suspended curtain wall
CN210421504U (en) Outer wall structure of sheet steel bone plate
JPH0547813Y2 (en)
CN207582947U (en) The plate face drop readily removable combined type of plate difference of height hangs die body system
CN205875471U (en) Steel wire fossil fragments partition wall fixing device
CN111101648A (en) Embedded structure function integrated plate and mounting method thereof
JP2001271599A (en) Renewal method for interior wall surface of tunnel
WO2019144571A1 (en) Hoop-type connecting device for cylindrical stone dry hanging
JPH0412296Y2 (en)
JPS6133174Y2 (en)

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant