CN220704501U - Reinforced concrete pile foundation construction device with half pile on upper part - Google Patents

Reinforced concrete pile foundation construction device with half pile on upper part Download PDF

Info

Publication number
CN220704501U
CN220704501U CN202321657713.6U CN202321657713U CN220704501U CN 220704501 U CN220704501 U CN 220704501U CN 202321657713 U CN202321657713 U CN 202321657713U CN 220704501 U CN220704501 U CN 220704501U
Authority
CN
China
Prior art keywords
pile
steel
reinforcement cage
steel reinforcement
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321657713.6U
Other languages
Chinese (zh)
Inventor
王广建
来守玺
冯玉康
卢锋
闫顺通
吴伯东
乔亚楠
双帅
吴乃天
盛志勇
张天翼
刘甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingyuan County Emergency Management Bureau
China Railway Shanghai Investment Group Co Ltd
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Pingyuan County Emergency Management Bureau
China Railway Shanghai Investment Group Co Ltd
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingyuan County Emergency Management Bureau, China Railway Shanghai Investment Group Co Ltd, First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Pingyuan County Emergency Management Bureau
Priority to CN202321657713.6U priority Critical patent/CN220704501U/en
Application granted granted Critical
Publication of CN220704501U publication Critical patent/CN220704501U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a reinforced concrete pile foundation construction device with a half pile at the upper part, and belongs to the technical field of pile foundation construction. A reinforced concrete pile foundation construction device with a half pile on the upper part is characterized in that: including steel pile casing, set up pile foundation steel reinforcement cage and half pile steel form in steel pile casing, pile foundation steel reinforcement cage includes end section steel reinforcement cage and connects the upper segment steel reinforcement cage on end section steel reinforcement cage upper portion, and upper segment steel reinforcement cage is half pile steel reinforcement cage, half pile steel form is the semi-cylindrical structure, the radius of half pile steel form is unanimous with the radius of pile foundation, half pile steel form with upper segment steel reinforcement cage sets up relatively, just half pile steel form hangs on steel pile casing through the horizontal hanging bar of welding upper portion thereof. The utility model has simple construction, can reduce the concrete waste, can save the later-stage breaking time, can greatly shorten the construction period, can repeatedly and circularly use the steel template, and can greatly save the construction cost.

Description

Reinforced concrete pile foundation construction device with half pile on upper part
Technical Field
The utility model relates to a reinforced concrete pile foundation construction device with a half pile at the upper part, and belongs to the technical field of pile foundation construction.
Background
In urban rail transit engineering construction, most subway stations are uniformly distributed in urban luxury areas, the construction of the luxury areas is not limited by narrow places and road traffic, the influence of the construction on surrounding environments is reduced, the urban railway transit engineering construction is convenient for citizens to travel daily, the subway stations can be constructed by a half-cover-excavation method sometimes, namely, the construction of an enclosure structure is completed, a half-side permanent structure top plate is firstly constructed, and then pipelines on the other side are transferred to the half-side structure top plate to recover roads, so that the daily travel of the citizens is ensured.
The traditional subway station building enclosure is generally an underground continuous wall or a bored pile and a waterproof curtain, the underground continuous wall has good waterproof effect, but the construction site is limited, the construction of the underground continuous wall cannot be met, the cost of the underground continuous wall is high, and the construction period is long. The construction procedures of the drilling grouting pile and the waterproof curtain are more, the requirements on the field civilized construction are higher, and the waterproof effect is not as good as that of the full sleeve occluding pile construction process. The subway station building enclosure adopts the occluding piles as permanent retaining walls, and the construction is superior to other building enclosures. When the subway station adopts the secant pile as the enclosure structure, the permanent structure top plate of the station expands 0.6 m and presses the secant pile half pile, and after the construction of the secant pile is completed, the whole row of secant piles at the half side is broken to 4.2-5.15 m below the ground and to the center of the secant pile so as to meet the construction of the structure top plate. The pile half-pile breaking of the secant pile is affected by the following factors: firstly, pouring concrete underwater by adopting C35P10 piles (reinforced concrete piles with reinforcing steel bars inside) so as to make manual removal difficult; secondly, the concrete of the residual half-side secant pile is easy to damage, the integrity of the pile foundation cannot be ensured, and water leakage is easy to occur; thirdly, wasting concrete materials; fourthly, the breaking time is long, and the construction period cannot be effectively shortened.
Therefore, it is necessary to provide a pile foundation construction device capable of solving the above-mentioned problems.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model provides the reinforced concrete pile foundation construction device which has a simple structure, can ensure the integrity of a pile foundation without breaking concrete and saves concrete materials, and the upper part of the reinforced concrete pile foundation construction device is provided with a half pile.
The utility model is realized by the following technical scheme: a reinforced concrete pile foundation construction device with a half pile on the upper part is characterized in that: including steel pile casing, set up pile foundation steel reinforcement cage and half pile steel form in steel pile casing, pile foundation steel reinforcement cage includes end section steel reinforcement cage and connects the upper segment steel reinforcement cage on end section steel reinforcement cage upper portion, and upper segment steel reinforcement cage is half pile steel reinforcement cage, half pile steel form is the semi-cylindrical structure, the radius of half pile steel form is unanimous with the radius of pile foundation, half pile steel form with upper segment steel reinforcement cage sets up relatively, just half pile steel form hangs on steel pile casing through the horizontal hanging bar of welding upper portion thereof.
When the utility model is used for construction, after pile foundation concrete pouring is completed, before the concrete is initially set, after the concrete can be plastic, the half pile steel template can be pulled out by using a crane, so that a pile foundation with a half pile at the upper part is formed, the pile foundation concrete is not required to be broken in the later stage of the formed pile foundation, and the integrity of the pile foundation can be ensured.
Furthermore, in order to ensure the fixing reliability of the half pile steel template, two transverse hanging ribs are arranged at intervals.
The beneficial effects of the utility model are as follows: the pile foundation pile has the advantages that the structure is ingenious, the structure is simple, after pile foundation concrete pouring is finished, the pile foundation with the half pile at the upper part can be formed after the half pile steel template is pulled out before concrete is initially set, the pile foundation formed is unnecessary to break pile foundation concrete manually in the later period, the integrity of the pile foundation can be ensured, the later period breaking time can be saved, the construction is simple, the construction period can be effectively shortened, concrete materials can be saved, the half pile steel template can be recycled, and the construction cost can be greatly reduced.
Drawings
FIG. 1 is a schematic view in front cross-section of the present utility model;
FIG. 2 is a schematic top view of the present utility model;
in the figure, 1, a half pile steel template, 2, an upper section steel reinforcement cage, 3, a bottom section steel reinforcement cage, 4, a steel pile casing, 5 and a transverse hanging bar.
Detailed Description
The utility model is further illustrated by the following non-limiting examples, in conjunction with the accompanying drawings:
as shown in the attached drawing, the reinforced concrete pile foundation construction device with the half pile at the upper part comprises a steel pile casing 4, a pile foundation reinforcement cage arranged in the steel pile casing 4 and a half pile steel template 1. Pile foundation steel reinforcement cage includes end section steel reinforcement cage 3 and upper segment steel reinforcement cage 2, and upper segment steel reinforcement cage 2 is connected in end section steel reinforcement cage 3 upper portion, and upper segment steel reinforcement cage 2 is half pile steel reinforcement cage. The half pile steel template 1 is of a half-cylinder structure, the half pile steel template 1 can be manufactured by processing steel plates and profile steel, the inside of the template can be manufactured into a half-cylinder profile steel framework by adopting profile steel, and the outer side of the template is welded with the steel plates to form a half cylinder. The radius of the half pile steel template 1 is consistent with the radius of the pile foundation. The half pile steel template 1 is arranged opposite to the upper section steel reinforcement cage 2, and the half pile steel template 1 is hung on the steel casing 4 through a transverse hanging rib 5 welded at the upper part of the half pile steel template. In order to ensure the fixing reliability of the half pile steel template, two transverse hanging ribs 5 are preferably arranged at intervals.
When the pile foundation is constructed by the utility model, after the pile foundation pore-forming acceptance is qualified, the bottom section steel bar cage 3 is fixed on the steel casing 4 by utilizing a steel pipe, then the upper section steel bar cage 2 and the bottom section steel bar cage 3 are mechanically connected, the steel casing is fixed by utilizing a hanging bar, after the whole set of steel bar cage is connected, the whole set of steel bar cage is put into a pore, then the half pile steel template 1 is hoisted into the pore for installation and fixation, after the fixation is finished, a guide pipe is installed, the guide pipe is put to a position 20-40cm away from the bottom of the pore, and then concrete is poured. And (3) lifting the half pile steel template 1 by using a crane before the concrete has plasticity and is initially set, positioning a rotary drilling rig, and pulling out the steel pile casing to form a half pile foundation.
The utility model has simple construction, can reduce the concrete waste, can save the later-stage breaking time, can greatly shorten the construction period, can repeatedly and circularly use the steel template, and can greatly save the construction cost.
Other parts in this embodiment are all of the prior art, and are not described herein.

Claims (2)

1. A reinforced concrete pile foundation construction device with a half pile on the upper part is characterized in that: including steel pile casing (4), set up pile foundation steel reinforcement cage and half pile steel form (1) in steel pile casing (4), pile foundation steel reinforcement cage includes end section steel reinforcement cage (3) and connects on end section steel reinforcement cage (3) upper portion section steel reinforcement cage (2), and upper section steel reinforcement cage (2) are half pile steel reinforcement cage, half pile steel form (1) is half cylinder structure, the radius of half pile steel form (1) is unanimous with the radius of pile foundation, half pile steel form (1) with upper section steel reinforcement cage (2) set up relatively, just half pile steel form (1) hang on steel pile casing (4) through welding transverse hanging muscle (5) on its upper portion.
2. The reinforced concrete pile foundation construction device with a half pile on the upper portion according to claim 1, characterized in that: the number of the transverse hanging ribs (5) is two which are arranged at intervals.
CN202321657713.6U 2023-06-28 2023-06-28 Reinforced concrete pile foundation construction device with half pile on upper part Active CN220704501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321657713.6U CN220704501U (en) 2023-06-28 2023-06-28 Reinforced concrete pile foundation construction device with half pile on upper part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321657713.6U CN220704501U (en) 2023-06-28 2023-06-28 Reinforced concrete pile foundation construction device with half pile on upper part

Publications (1)

Publication Number Publication Date
CN220704501U true CN220704501U (en) 2024-04-02

Family

ID=90442645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321657713.6U Active CN220704501U (en) 2023-06-28 2023-06-28 Reinforced concrete pile foundation construction device with half pile on upper part

Country Status (1)

Country Link
CN (1) CN220704501U (en)

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN101705697B (en) Diaphragm wall joint flexible water stop installing device and method
CN204385634U (en) Railway is not stopped transport the overall jacking mechanism of cross-line box culvert
CN104988915A (en) Prefabrication and installation method of detachable steel protection tube device and underwater connection beam
CN208563380U (en) A kind of self-propelled pipe gallery plate device
CN204825867U (en) As composite pile structure of secretly digging garage stand
CN204825993U (en) Underground continuous wall stagnant water, lap guard stream joint design
CN220704501U (en) Reinforced concrete pile foundation construction device with half pile on upper part
CN103603424B (en) A kind of large glass steel inspection shaft with cat ladder
CN102747725B (en) Bored pile construction method with tiny disturbance
CN207862964U (en) A kind of land bearing platform construction system
CN108547286A (en) A kind of prefabricated guide groove structure of concrete cut and guide groove installation method
CN208455615U (en) A kind of prefabricated guide groove structure of concrete cut
CN105756067B (en) A kind of method of horizontal temporary support support replacement in deep basal pit
CN204780894U (en) Can dismantle steel protects wound packages and puts
CN210263015U (en) Prefabricated wall unit for underground continuous wall
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN107778029B (en) Concrete curing method for buried pipe in structure
CN207619988U (en) The cast-in-place concrete of bar shaped foundation pit is to supportting the connection structure with prefabricated linking beam
CN112012196A (en) Round pile reinforcement cage sleeve with high reinforcement ratio and construction method thereof
CN214695683U (en) Raft board precipitation well structure
CN210658439U (en) Double-wing type anti-floating pipe gallery unit suitable for high-groundwater-level area
CN203022022U (en) Self sedimentation formwork
CN219327004U (en) Cast-in-situ drainage box culvert construction template system
CN213014584U (en) Inspection shaft is reformed transform to pipe jacking construction well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant