CN220704501U - Reinforced concrete pile foundation construction device with half pile on upper part - Google Patents
Reinforced concrete pile foundation construction device with half pile on upper part Download PDFInfo
- Publication number
- CN220704501U CN220704501U CN202321657713.6U CN202321657713U CN220704501U CN 220704501 U CN220704501 U CN 220704501U CN 202321657713 U CN202321657713 U CN 202321657713U CN 220704501 U CN220704501 U CN 220704501U
- Authority
- CN
- China
- Prior art keywords
- pile
- steel
- reinforcement cage
- steel reinforcement
- pile foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 93
- 239000010959 steel Substances 0.000 claims abstract description 93
- 230000002787 reinforcement Effects 0.000 claims abstract description 35
- 238000003466 welding Methods 0.000 claims abstract description 3
- 210000003205 muscle Anatomy 0.000 claims 1
- 239000004567 concrete Substances 0.000 abstract description 17
- 239000002699 waste material Substances 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000011148 porous material Substances 0.000 description 3
- 238000005553 drilling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a reinforced concrete pile foundation construction device with a half pile at the upper part, and belongs to the technical field of pile foundation construction. A reinforced concrete pile foundation construction device with a half pile on the upper part is characterized in that: including steel pile casing, set up pile foundation steel reinforcement cage and half pile steel form in steel pile casing, pile foundation steel reinforcement cage includes end section steel reinforcement cage and connects the upper segment steel reinforcement cage on end section steel reinforcement cage upper portion, and upper segment steel reinforcement cage is half pile steel reinforcement cage, half pile steel form is the semi-cylindrical structure, the radius of half pile steel form is unanimous with the radius of pile foundation, half pile steel form with upper segment steel reinforcement cage sets up relatively, just half pile steel form hangs on steel pile casing through the horizontal hanging bar of welding upper portion thereof. The utility model has simple construction, can reduce the concrete waste, can save the later-stage breaking time, can greatly shorten the construction period, can repeatedly and circularly use the steel template, and can greatly save the construction cost.
Description
Technical Field
The utility model relates to a reinforced concrete pile foundation construction device with a half pile at the upper part, and belongs to the technical field of pile foundation construction.
Background
In urban rail transit engineering construction, most subway stations are uniformly distributed in urban luxury areas, the construction of the luxury areas is not limited by narrow places and road traffic, the influence of the construction on surrounding environments is reduced, the urban railway transit engineering construction is convenient for citizens to travel daily, the subway stations can be constructed by a half-cover-excavation method sometimes, namely, the construction of an enclosure structure is completed, a half-side permanent structure top plate is firstly constructed, and then pipelines on the other side are transferred to the half-side structure top plate to recover roads, so that the daily travel of the citizens is ensured.
The traditional subway station building enclosure is generally an underground continuous wall or a bored pile and a waterproof curtain, the underground continuous wall has good waterproof effect, but the construction site is limited, the construction of the underground continuous wall cannot be met, the cost of the underground continuous wall is high, and the construction period is long. The construction procedures of the drilling grouting pile and the waterproof curtain are more, the requirements on the field civilized construction are higher, and the waterproof effect is not as good as that of the full sleeve occluding pile construction process. The subway station building enclosure adopts the occluding piles as permanent retaining walls, and the construction is superior to other building enclosures. When the subway station adopts the secant pile as the enclosure structure, the permanent structure top plate of the station expands 0.6 m and presses the secant pile half pile, and after the construction of the secant pile is completed, the whole row of secant piles at the half side is broken to 4.2-5.15 m below the ground and to the center of the secant pile so as to meet the construction of the structure top plate. The pile half-pile breaking of the secant pile is affected by the following factors: firstly, pouring concrete underwater by adopting C35P10 piles (reinforced concrete piles with reinforcing steel bars inside) so as to make manual removal difficult; secondly, the concrete of the residual half-side secant pile is easy to damage, the integrity of the pile foundation cannot be ensured, and water leakage is easy to occur; thirdly, wasting concrete materials; fourthly, the breaking time is long, and the construction period cannot be effectively shortened.
Therefore, it is necessary to provide a pile foundation construction device capable of solving the above-mentioned problems.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model provides the reinforced concrete pile foundation construction device which has a simple structure, can ensure the integrity of a pile foundation without breaking concrete and saves concrete materials, and the upper part of the reinforced concrete pile foundation construction device is provided with a half pile.
The utility model is realized by the following technical scheme: a reinforced concrete pile foundation construction device with a half pile on the upper part is characterized in that: including steel pile casing, set up pile foundation steel reinforcement cage and half pile steel form in steel pile casing, pile foundation steel reinforcement cage includes end section steel reinforcement cage and connects the upper segment steel reinforcement cage on end section steel reinforcement cage upper portion, and upper segment steel reinforcement cage is half pile steel reinforcement cage, half pile steel form is the semi-cylindrical structure, the radius of half pile steel form is unanimous with the radius of pile foundation, half pile steel form with upper segment steel reinforcement cage sets up relatively, just half pile steel form hangs on steel pile casing through the horizontal hanging bar of welding upper portion thereof.
When the utility model is used for construction, after pile foundation concrete pouring is completed, before the concrete is initially set, after the concrete can be plastic, the half pile steel template can be pulled out by using a crane, so that a pile foundation with a half pile at the upper part is formed, the pile foundation concrete is not required to be broken in the later stage of the formed pile foundation, and the integrity of the pile foundation can be ensured.
Furthermore, in order to ensure the fixing reliability of the half pile steel template, two transverse hanging ribs are arranged at intervals.
The beneficial effects of the utility model are as follows: the pile foundation pile has the advantages that the structure is ingenious, the structure is simple, after pile foundation concrete pouring is finished, the pile foundation with the half pile at the upper part can be formed after the half pile steel template is pulled out before concrete is initially set, the pile foundation formed is unnecessary to break pile foundation concrete manually in the later period, the integrity of the pile foundation can be ensured, the later period breaking time can be saved, the construction is simple, the construction period can be effectively shortened, concrete materials can be saved, the half pile steel template can be recycled, and the construction cost can be greatly reduced.
Drawings
FIG. 1 is a schematic view in front cross-section of the present utility model;
FIG. 2 is a schematic top view of the present utility model;
in the figure, 1, a half pile steel template, 2, an upper section steel reinforcement cage, 3, a bottom section steel reinforcement cage, 4, a steel pile casing, 5 and a transverse hanging bar.
Detailed Description
The utility model is further illustrated by the following non-limiting examples, in conjunction with the accompanying drawings:
as shown in the attached drawing, the reinforced concrete pile foundation construction device with the half pile at the upper part comprises a steel pile casing 4, a pile foundation reinforcement cage arranged in the steel pile casing 4 and a half pile steel template 1. Pile foundation steel reinforcement cage includes end section steel reinforcement cage 3 and upper segment steel reinforcement cage 2, and upper segment steel reinforcement cage 2 is connected in end section steel reinforcement cage 3 upper portion, and upper segment steel reinforcement cage 2 is half pile steel reinforcement cage. The half pile steel template 1 is of a half-cylinder structure, the half pile steel template 1 can be manufactured by processing steel plates and profile steel, the inside of the template can be manufactured into a half-cylinder profile steel framework by adopting profile steel, and the outer side of the template is welded with the steel plates to form a half cylinder. The radius of the half pile steel template 1 is consistent with the radius of the pile foundation. The half pile steel template 1 is arranged opposite to the upper section steel reinforcement cage 2, and the half pile steel template 1 is hung on the steel casing 4 through a transverse hanging rib 5 welded at the upper part of the half pile steel template. In order to ensure the fixing reliability of the half pile steel template, two transverse hanging ribs 5 are preferably arranged at intervals.
When the pile foundation is constructed by the utility model, after the pile foundation pore-forming acceptance is qualified, the bottom section steel bar cage 3 is fixed on the steel casing 4 by utilizing a steel pipe, then the upper section steel bar cage 2 and the bottom section steel bar cage 3 are mechanically connected, the steel casing is fixed by utilizing a hanging bar, after the whole set of steel bar cage is connected, the whole set of steel bar cage is put into a pore, then the half pile steel template 1 is hoisted into the pore for installation and fixation, after the fixation is finished, a guide pipe is installed, the guide pipe is put to a position 20-40cm away from the bottom of the pore, and then concrete is poured. And (3) lifting the half pile steel template 1 by using a crane before the concrete has plasticity and is initially set, positioning a rotary drilling rig, and pulling out the steel pile casing to form a half pile foundation.
The utility model has simple construction, can reduce the concrete waste, can save the later-stage breaking time, can greatly shorten the construction period, can repeatedly and circularly use the steel template, and can greatly save the construction cost.
Other parts in this embodiment are all of the prior art, and are not described herein.
Claims (2)
1. A reinforced concrete pile foundation construction device with a half pile on the upper part is characterized in that: including steel pile casing (4), set up pile foundation steel reinforcement cage and half pile steel form (1) in steel pile casing (4), pile foundation steel reinforcement cage includes end section steel reinforcement cage (3) and connects on end section steel reinforcement cage (3) upper portion section steel reinforcement cage (2), and upper section steel reinforcement cage (2) are half pile steel reinforcement cage, half pile steel form (1) is half cylinder structure, the radius of half pile steel form (1) is unanimous with the radius of pile foundation, half pile steel form (1) with upper section steel reinforcement cage (2) set up relatively, just half pile steel form (1) hang on steel pile casing (4) through welding transverse hanging muscle (5) on its upper portion.
2. The reinforced concrete pile foundation construction device with a half pile on the upper portion according to claim 1, characterized in that: the number of the transverse hanging ribs (5) is two which are arranged at intervals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321657713.6U CN220704501U (en) | 2023-06-28 | 2023-06-28 | Reinforced concrete pile foundation construction device with half pile on upper part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321657713.6U CN220704501U (en) | 2023-06-28 | 2023-06-28 | Reinforced concrete pile foundation construction device with half pile on upper part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220704501U true CN220704501U (en) | 2024-04-02 |
Family
ID=90442645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321657713.6U Active CN220704501U (en) | 2023-06-28 | 2023-06-28 | Reinforced concrete pile foundation construction device with half pile on upper part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220704501U (en) |
-
2023
- 2023-06-28 CN CN202321657713.6U patent/CN220704501U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN101705697B (en) | Diaphragm wall joint flexible water stop installing device and method | |
CN204385634U (en) | Railway is not stopped transport the overall jacking mechanism of cross-line box culvert | |
CN104988915A (en) | Prefabrication and installation method of detachable steel protection tube device and underwater connection beam | |
CN208563380U (en) | A kind of self-propelled pipe gallery plate device | |
CN204825867U (en) | As composite pile structure of secretly digging garage stand | |
CN204825993U (en) | Underground continuous wall stagnant water, lap guard stream joint design | |
CN220704501U (en) | Reinforced concrete pile foundation construction device with half pile on upper part | |
CN103603424B (en) | A kind of large glass steel inspection shaft with cat ladder | |
CN102747725B (en) | Bored pile construction method with tiny disturbance | |
CN207862964U (en) | A kind of land bearing platform construction system | |
CN108547286A (en) | A kind of prefabricated guide groove structure of concrete cut and guide groove installation method | |
CN208455615U (en) | A kind of prefabricated guide groove structure of concrete cut | |
CN105756067B (en) | A kind of method of horizontal temporary support support replacement in deep basal pit | |
CN204780894U (en) | Can dismantle steel protects wound packages and puts | |
CN210263015U (en) | Prefabricated wall unit for underground continuous wall | |
CN109778806B (en) | Construction method for integrally sliding and lifting pier wall with connecting beam | |
CN107778029B (en) | Concrete curing method for buried pipe in structure | |
CN207619988U (en) | The cast-in-place concrete of bar shaped foundation pit is to supportting the connection structure with prefabricated linking beam | |
CN112012196A (en) | Round pile reinforcement cage sleeve with high reinforcement ratio and construction method thereof | |
CN214695683U (en) | Raft board precipitation well structure | |
CN210658439U (en) | Double-wing type anti-floating pipe gallery unit suitable for high-groundwater-level area | |
CN203022022U (en) | Self sedimentation formwork | |
CN219327004U (en) | Cast-in-situ drainage box culvert construction template system | |
CN213014584U (en) | Inspection shaft is reformed transform to pipe jacking construction well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |