CN220704379U - Firmly-supported warning device for intelligent building site - Google Patents

Firmly-supported warning device for intelligent building site Download PDF

Info

Publication number
CN220704379U
CN220704379U CN202322448719.9U CN202322448719U CN220704379U CN 220704379 U CN220704379 U CN 220704379U CN 202322448719 U CN202322448719 U CN 202322448719U CN 220704379 U CN220704379 U CN 220704379U
Authority
CN
China
Prior art keywords
ground
warning device
side wing
spiral sheet
upright rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322448719.9U
Other languages
Chinese (zh)
Inventor
潘林林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongke Aijian Shandong Technology Co ltd
Original Assignee
Zhongke Aijian Shandong Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongke Aijian Shandong Technology Co ltd filed Critical Zhongke Aijian Shandong Technology Co ltd
Priority to CN202322448719.9U priority Critical patent/CN220704379U/en
Application granted granted Critical
Publication of CN220704379U publication Critical patent/CN220704379U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses a warning device for a firmly supported intelligent building site, which relates to the technical field of intelligent building sites and comprises an alarm, wherein an installation seat is arranged on the lower side of the alarm, a ground inserting upright rod which is vertically arranged is rotatably arranged at the center point position of the lower surface of the installation seat, and a thread part and a first spiral sheet are respectively arranged on the ground inserting upright rod along the direction from top to bottom. The utility model mainly aims at the fixing mode of the warning device, adopts the ground-inserted upright rod as a main body structure in the fixing process, when the ground-inserted upright rod is inserted into the ground, the first spiral sheet is utilized to increase the ground-grabbing force, and the four side-direction supporting force is formed by matching with four side wing arc plates and triangular support rods, on the basis, the second spiral sheet on the side wing arc plates is utilized again to increase the ground-grabbing force of the side wing arc plates and the ground, and the purpose is that: the warning device is ensured to be capable of coping with stress generated when the warning device is inclined in multiple aspects in the installation process, and the stable arrangement of the warning device is maintained.

Description

Firmly-supported warning device for intelligent building site
Technical Field
The utility model relates to the technical field of intelligent construction sites, in particular to a warning device for a firmly supported intelligent construction site.
Background
For intelligent construction sites, the whole construction process is mainly monitored by an informatization means, and the warning devices are mainly arranged in places with potential safety hazards for warning construction staff for the intelligent construction sites, and mainly used for warning construction staff by voice report warning devices or obvious warning marks with obvious colors.
When such a warning device is fixed, it should be noted that: if the fixing mode of directly fastening to the ground is adopted, such as heavy object binding, the base of the warning device is fixed on the ground through a pin and other modes, the follow-up warning device is not beneficial to the positioning process, if the fixing mode of matching a plurality of support legs with a similar pile is adopted, in the use process, vibration is indirectly or directly acted on the warning device because the vibration is influenced by the construction environment (the starting process of the vehicle running and engineering equipment), and the better fixing requirement cannot be met by a single fixing mode, so that the gravity center position of the warning device is irregularly changed, and the problem that the warning device is inclined or even directly toppled is directly caused.
Disclosure of Invention
The utility model aims to provide a stably-supported warning device for an intelligent building site, which aims at the problem that the fixing mode of the warning device in the intelligent building site has the accident that the follow-up warning device is not utilized in the positioning process and the warning device is inclined or even toppled.
The aim of the utility model can be achieved by the following technical scheme: the utility model provides a warning device for intelligent building site of firm support, includes the alarm, the alarm downside is provided with the mount pad, mount pad lower surface central point position rotation is installed and is the vertical pole setting of inserting that sets up, it is provided with screw thread portion and first flight respectively to insert the pole setting along from the top down's direction, and inserts the pole setting and have the hexagonal swivel nut through screw thread portion threaded connection, first flight is installed on inserting the circumference outer wall of ground pole setting, four flank arc boards are installed in hexagonal swivel nut downside position rotation, four flank arc boards are the annular array setting along inserting the central point of ground pole setting.
Further provided is that: a strut groove is formed in the position, away from the outer wall of the ground-inserted upright rod, of the side wing arc plate, and a triangular strut is rotatably arranged at the position, close to the hexagonal screw sleeve, of one end inside the strut groove.
Further provided is that: the hexagonal threaded sleeve is provided with a triangular socket corresponding to the circumferential outer wall of the triangular support rod, and one end of the triangular support rod is matched with the triangular socket.
Further provided is that: the center point of the inner curved surface of the side wing arc plate and the center point of the ground inserting upright rod are positioned on the same vertical axis, and the diameter of the inner curved surface of the side wing arc plate is larger than the outer diameter of the ground inserting upright rod.
Further provided is that: the second spiral sheet is arranged at the inner curved surface of the flank arc plate, the spiral diameter of the second spiral sheet is equal to that of the first spiral sheet, and the second spiral sheet and the first spiral sheet are arranged in a staggered mode.
The utility model has the following beneficial effects:
1. the utility model is mainly applied to the fixing mode of the warning device used in the intelligent construction site, and mainly adopts the ground inserting upright rod as a direct fixing structure, the ground inserting upright rod can utilize the first spiral piece therein, when pressure and rotation force are applied simultaneously, the ground inserting upright rod is convenient to be directly inserted into the ground, the ground grabbing force between the ground inserting upright rod and the ground is increased by utilizing the first spiral piece, four flank arc plates are additionally arranged, the four flank arc plates can be contained and 'wrapped' at the external position of the ground inserting upright rod, the flank arc plates can be parallel to the ground and combined with the triangular support rod at the corresponding position, and four lateral supporting forces are formed in the whole ground inserting upright rod and are used for transmitting the force generated by inclination in the fixing process into the hexagonal screw sleeve, and the hexagonal screw sleeve is used for transmitting the force into the ground inserting upright rod, so that the whole warning device is stabilized;
2. on the basis, the second spiral sheet is additionally arranged on the inner curved surface of the side wing arc plate, when the side wing arc plate is wrapped on the ground-inserting upright rod, the second spiral sheet cannot interfere with the first spiral sheet, and when the side wing arc plate is tiled on the bottom surface, the second spiral sheet is matched with the rotation action of the four side wing arc plates, so that the second spiral sheet penetrates into the ground, the ground grabbing force of the whole device is further increased, and the fixing stability of the whole structure is improved.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of a stably supported warning device for smart construction sites according to the present utility model;
FIG. 2 is an expanded view of FIG. 1 in a firmly supported intelligent building site warning apparatus according to the present utility model;
FIG. 3 is a disassembled view of FIG. 2 in a firmly supported warning device for smart worksites according to the present utility model;
FIG. 4 is a schematic diagram of a side arc plate component of a stably supported warning device for smart sites according to the present utility model;
FIG. 5 is a top view of a side wing arc panel assembly of a stabilized intelligent building site warning apparatus according to the present utility model.
In the figure: 1. an alarm; 2. a mounting base; 3. inserting a ground upright rod; 301. a threaded portion; 302. a first flight; 4. a hexagonal screw sleeve; 5. a flank arc plate; 6. a triangular support rod; 7. triangular jack; 8. a strut groove; 9. and a second flight.
Detailed Description
The technical solutions of the present utility model will be clearly and completely described in connection with the embodiments, and it is obvious that the described embodiments are only some embodiments of the present utility model, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
For the warning device used in the intelligent construction site, the designated position in the construction site is required to be fixed, if a fixing mode of directly fastening to the ground is adopted, the subsequent positioning process of the warning device is not facilitated; if a fixing mode of matching a plurality of support legs with a similar pile is adopted, in the using process, vibration is indirectly or directly affected on the warning device due to the influence of construction environment (vehicle running and starting process of engineering equipment), and a single fixing mode cannot meet better fixing requirements, so that the gravity center position of the warning device is irregularly changed, and the following technical scheme is provided for the method:
referring to fig. 1-5, a warning device for a firmly supported smart site in this embodiment, including alarm 1, alarm 1 downside is provided with mount pad 2, mount pad 2 lower surface central point position rotates installs and is vertical setting insert ground pole setting 3, insert ground pole setting 3 is provided with screw thread portion 301 and first flight 302 respectively along from the top down's direction, and insert ground pole setting 3 has hexagonal swivel nut 4 through screw thread portion 301 threaded connection, first flight 302 is installed on inserting the circumference outer wall of ground pole setting 3, four flank arc boards 5 are installed in rotation of hexagonal swivel nut 4 downside position, four flank arc boards 5 are the annular array setting along inserting the central point of ground pole setting 3, flank arc boards 5 are kept away from and have seted up a pole groove 8 on inserting the outer wall position of ground pole setting 3, the inside triangle pole setting 6 that is close to of hexagonal swivel nut 4 of rotating on the one end position of pole groove 8, triangle pole setting 6 has been seted up triangle socket 7 on the circumference outer wall position of triangle pole setting 6 that hexagonal swivel nut 4 corresponds, phase-match between the one end position of triangle pole setting 6 and triangle socket 7.
The use principle is as follows: firstly, it is to be noted that: the alarm 1 in this embodiment is used as a warning device in an intelligent construction site, the use principle of the alarm 1 is not described here, and is mainly used for describing the fixing mode of the alarm 1, please refer to fig. 1 and 2, in which, four side wing arc plates 5 can be directly wrapped on a ground inserting upright 3, when the fixing is required, the four side wing arc plates 5 are turned over by 90 ° outwards, so that the original vertical direction of the side wing arc plates 5 is changed into the horizontal direction, then downward pressure is applied to the ground inserting upright 3, so that the ground inserting upright 3 can be drilled into the ground, and in addition, in the drilling process, a rotating force is applied to the ground inserting upright 3, and the ground inserting upright 3 is convenient to drill into the ground in cooperation with the first spiral piece 302;
in the above process, when the side wing arc plate 5 can contact the ground, the drilling process of the ground inserting upright 3 is stopped, and it is to be explained that: the side wing arc plates 5 can be driven to adjust up and down by screwing the hexagonal screw sleeve 4, so that after the side wing arc plates 5 contact the ground, the triangular support rods 6 are turned over from the support rod grooves 8, one ends of the triangular support rods 6 are clamped in the triangular sockets 7, and the whole fixing process is completed;
in the actual operation process, in theory, if the ground inserting upright 3 tilts, the triangular support rods 6 on the side wing arc plates 5 corresponding to the tilting direction serve as stress structures, and the force generated by tilting is dispersed to the side wing arc plates 5 and the ground inserting upright 3, so that the indirect description is that: the ground-inserted upright 3 is supported by the four triangular struts 6 and acts on the ground by means of the flank arches 5 with possible forces on the triangular struts 6, in such a way that the structural stability in the overall fixing process is improved.
Example two
In combination with the technical content of the first embodiment, the following optimization and improvement scheme is performed on the side wing arc plates:
the center point of the inner curved surface of the flank arc plate 5 and the center point of the ground inserting vertical rod 3 are positioned on the same vertical axis, the diameter of the inner curved surface of the flank arc plate 5 is larger than the outer diameter of the ground inserting vertical rod 3, the second spiral sheet 9 is arranged at the position of the inner curved surface of the flank arc plate 5, the spiral diameter of the second spiral sheet 9 is equal to that of the first spiral sheet 302, and the second spiral sheet 9 and the first spiral sheet 302 are arranged in a staggered mode.
The scheme has the advantages that: as shown in fig. 5, the second spiral piece 9 is added with the spiral diameter and the spiral moment of the first spiral piece 302, and when the side arc plate 5 is contained and "wrapped", the second spiral piece 9 can be "clamped in" the spiral moment in the first spiral piece 302;
however, as shown in the first embodiment, when the side wing arc plates 5 contact the ground, the side wing arc plates 5 are driven to move downwards again by the rotation process of the hexagonal screw sleeve 4, and in the moving process, the four side wing arc plates 5 are in a rotating state, so that the second spiral pieces 9 on the side wing arc plates 5 also slowly drill into the ground, the ground grabbing force of the side wing arc plates 5 and the ground is further improved by the second spiral pieces 9, and then as shown in the first embodiment, when the triangular support rods 6 transmit the force to the side wing arc plates 5, the ground grabbing force of the second spiral pieces 9 and the ground is utilized, the problem that the side wing arc plates 5 deviate is avoided, and the fixing stability of the whole structure is further improved.
The foregoing is merely illustrative and explanatory of the utility model, as it is well within the scope of the utility model as claimed, as it relates to various modifications, additions and substitutions for those skilled in the art, without departing from the inventive concept and without departing from the scope of the utility model as defined in the accompanying claims.
In the description of the present specification, the descriptions of the terms "one embodiment," "example," "specific example," and the like, mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present utility model. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the utility model disclosed above are intended only to assist in the explanation of the utility model. The preferred embodiments are not intended to be exhaustive or to limit the utility model to the precise form disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, to thereby enable others skilled in the art to best understand and utilize the utility model. The utility model is limited only by the claims and the full scope and equivalents thereof.

Claims (5)

1. The utility model provides a warning device for intelligent building site of firm support, includes alarm (1), its characterized in that, alarm (1) downside is provided with mount pad (2), mount pad (2) lower surface central point position rotation is installed and is vertical setting insert ground pole setting (3), insert ground pole setting (3) are provided with screw thread portion (301) and first flight (302) respectively along the direction from the top down, and insert ground pole setting (3) have hexagonal swivel nut (4) through screw thread portion (301) threaded connection, first flight (302) are installed on the circumference outer wall of inserting ground pole setting (3), four flank arc boards (5) are installed in rotation of hexagonal swivel nut (4) downside position, four flank arc boards (5) are annular array setting along the central point of inserting ground pole setting (3).
2. The warning device for the intelligent construction site with the stable support according to claim 1, wherein a support rod groove (8) is formed in the position, away from the outer wall of the ground inserting upright rod (3), of the side wing arc plate (5), and a triangular support rod (6) is rotatably arranged at the position, close to the hexagonal screw sleeve (4), of one end inside the support rod groove (8).
3. The warning device for the intelligent construction site with the stable support according to claim 2, wherein the hexagonal turnbuckle (4) is provided with a triangular socket (7) corresponding to the circumferential outer wall position of the triangular support rod (6), and one end position of the triangular support rod (6) is matched with the triangular socket (7).
4. The warning device for the intelligent construction site with stable support according to claim 1, wherein the center point of the inner curved surface of the side wing arc plate (5) and the center point of the ground inserting upright rod (3) are positioned on the same vertical axis, and the diameter of the inner curved surface of the side wing arc plate (5) is larger than the outer diameter of the ground inserting upright rod (3).
5. The warning device for the intelligent construction site with stable support according to claim 4, wherein the second spiral sheet (9) is installed on the inner curved surface position of the side wing arc plate (5), the spiral diameter of the second spiral sheet (9) is equal to that of the first spiral sheet (302), and the second spiral sheet (9) and the first spiral sheet (302) are arranged in a staggered mode.
CN202322448719.9U 2023-09-11 2023-09-11 Firmly-supported warning device for intelligent building site Active CN220704379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322448719.9U CN220704379U (en) 2023-09-11 2023-09-11 Firmly-supported warning device for intelligent building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322448719.9U CN220704379U (en) 2023-09-11 2023-09-11 Firmly-supported warning device for intelligent building site

Publications (1)

Publication Number Publication Date
CN220704379U true CN220704379U (en) 2024-04-02

Family

ID=90441936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322448719.9U Active CN220704379U (en) 2023-09-11 2023-09-11 Firmly-supported warning device for intelligent building site

Country Status (1)

Country Link
CN (1) CN220704379U (en)

Similar Documents

Publication Publication Date Title
CN214696316U (en) Stone curtain wall hanging piece
CN212002599U (en) Electric power iron tower consolidates support with diversified fixed base
CN220704379U (en) Firmly-supported warning device for intelligent building site
CN204174958U (en) A kind of steel pipe scaffold early tears component and early-dismantling device open
CN105947900A (en) Energy-saving hoisting construction device
CN209856175U (en) Adjustable anchor bolt
CN208697300U (en) A kind of car floor vibration-proof rubber replacement tooling
CN104790530B (en) Vertical adjustment device of structural support
CN215394921U (en) Electric wrench with auxiliary positioning device
CN105650077A (en) Building anchor bolt
CN213806333U (en) Adjustable wallboard hanging device
CN211775428U (en) Height-adjustable's high bearing capacity support
CN203701278U (en) Structural support vertical adjusting device
CN202323596U (en) Trestle support system with adjustable angle
CN2506733Y (en) YY shape strong adjustable steel shore
CN207004158U (en) A kind of outdoor generating blower fan pylon stands up device
CN215281729U (en) Top plate expansion bolt spanner
CN217925068U (en) Construction formwork supporting construction
CN218346530U (en) Simple hoop system suitable for large suspended ceiling
CN203703539U (en) Adjustable support special for decentralized wellhead
CN214224176U (en) Monitoring devices that building engineering is supervised with structure is firm
CN214330658U (en) Novel anchor rod and anchor cable supporting device
CN105019648A (en) Socket-type keyway-type early dismounting device for building template
CN219364366U (en) Movable sound insulation screen
CN220412646U (en) High-stability lifting portal frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant