CN220688255U - Finished product C shaped steel gallows structure - Google Patents
Finished product C shaped steel gallows structure Download PDFInfo
- Publication number
- CN220688255U CN220688255U CN202322255530.8U CN202322255530U CN220688255U CN 220688255 U CN220688255 U CN 220688255U CN 202322255530 U CN202322255530 U CN 202322255530U CN 220688255 U CN220688255 U CN 220688255U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- supporting body
- groups
- piece
- finished product
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 30
- 239000010959 steel Substances 0.000 title claims abstract description 30
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 5
- 238000009434 installation Methods 0.000 claims description 8
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a finished product C-shaped steel support and hanger structure, and belongs to the technical field of pipeline support and hanger systems. The embedded part comprises an embedded part, wherein a notch is arranged at the bottom of the embedded part and is abutted with the lap joint reinforcing bars; the connecting pieces are arranged below the embedded pieces, two groups of the embedded pieces are arranged, and two groups of the corresponding connecting pieces are arranged; a supporting body is arranged on one side, away from the embedded part, of the connecting piece; the bottom of the supporting body is provided with a C-shaped steel frame, a fixing support piece is detachably arranged on the C-shaped steel frame, and a first hoop is arranged at the top of the fixing support piece. The utility model solves the technical problems of complex pipeline and single fixing mode in the prior art.
Description
Technical Field
The utility model belongs to the technical field of pipeline support and hanger systems, and particularly relates to a finished product C-shaped steel support and hanger structure.
Background
With the development of social economy, various pipelines are spread in modern industrial engineering and building underground buildings, the supporting and hanging frame plays roles of supporting weight, balancing counter force, proper displacement, noise reduction and the like, the design and the form of the pipeline supporting and hanging frame pipe support structure are selected as an important component in the pipeline system design, the pipe support can balance the acting force of a pipe system except for supporting the weight of the pipeline, the displacement of the pipeline is limited, the shock is absorbed, the pipe support with reasonable structure is properly selected and arranged when the pipeline system is designed, the stress distribution of the pipeline and the acting force on the pipe support can be improved, the safe operation of the pipeline system is ensured, different types of supporting and hanging frames can be selected according to different use conditions in life, the service life of the supporting and hanging frame is prolonged, and the use of the supporting and hanging frame brings great convenience to the life of people, so that the pipeline function is fully used.
In the use of pipeline, the overall arrangement of pipeline often is more complicated, and when multiunit pipeline parallel arrangement, every group pipeline all need fix it through the gallows rather than supporting, causes installation intensity of labour great, and the operation difficulty.
The present utility model has been made in view of this.
Disclosure of Invention
In order to solve the technical problems, the utility model adopts the basic conception of the technical scheme that:
the finished product C-shaped steel support and hanger structure comprises an embedded part, wherein a notch is arranged at the bottom of the embedded part and is abutted with a lap joint reinforcement;
the connecting pieces are arranged below the embedded pieces, two groups of the embedded pieces are arranged, and two groups of the corresponding connecting pieces are arranged; a supporting body is arranged on one side, away from the embedded part, of the connecting piece;
the bottom of the supporting body is provided with a C-shaped steel frame, a fixing support piece is detachably arranged on the C-shaped steel frame, and a first hoop is arranged at the top of the fixing support piece.
In a further technical scheme, the embedded part is a T-shaped rod piece I, continuous notches are formed in the bottoms of two ends of the rod piece I, and the notches correspond to the lap joint reinforcing bars one by one;
the bottom of member one is provided with the connecting hole, the connecting hole is connected with the connecting piece.
In a further technical scheme, the connecting piece comprises a connecting screw rod and positioning nuts, the connecting hole is a threaded hole, the top end of the connecting screw rod is arranged in the connecting hole, the connecting screw rod is suitable for penetrating through the upper end of the supporting body, and the positioning nuts are provided with two groups and are respectively positioned on two sides of the upper end of the supporting body;
and a buffer gasket is sleeved between the positioning nut and the supporting body.
In a further technical scheme, the section of the supporting body is T-shaped, a positioning support plate is arranged at the top of the C-shaped steel frame, and the positioning support plate is connected with the supporting body through an installation positioning bolt.
In a further technical scheme, the fixed support comprises a lower plate, the lower plate is detachably connected with the C-shaped steel frame, a mounting groove is formed in the upper end of the lower plate, and a first hoop is mounted on the mounting groove and is suitable for being connected to a pipeline.
In a further technical scheme, an upper plate is arranged between two groups of connecting screws, and two ends of the upper plate are provided with strip holes and are sleeved on the connecting screws;
the bottom of the upper plate is detachably provided with a plurality of groups of corner brackets, the bottom of each corner bracket is provided with a pull rod, the bottom of each pull rod is provided with an annular frame, and the bottom of each annular frame is provided with a second hoop; the second ferrule is adapted to be attached to a conduit.
In a further technical scheme, the pull rod comprises an upper connecting part, a connecting spring and a lower connecting part, and two ends of the connecting spring are fixedly connected with the upper connecting part and the lower connecting part respectively.
The beneficial effects are that:
the finished C-shaped steel support and hanger structure is free from welding and drilling, can be conveniently disassembled, changed and adjusted, and the disassembled accessories and channel steel can be reused, so that material waste is avoided. The installation speed is 6-8 times that of the traditional method, the manufacturing and installation cost is one half of that of the traditional method, the labor loss is reduced, the cost is saved, the construction period is shortened, the construction efficiency and the safety are improved, and diversified choices are provided for the research of the refined project management lifting direction.
According to the utility model, a connecting structure with good shock resistance is additionally arranged on the existing connecting mode, namely, the connecting mode of the second hoop is realized at multiple angles by installing the pull rod with the connecting spring, and the second hoop is sleeved on the pipeline.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described, and it will be obvious to those skilled in the art that other drawings can be obtained according to these drawings without inventive effort.
In the drawings:
FIG. 1 is a schematic view of an installation section of embodiment 1 of the present utility model;
FIG. 2 is a block diagram of a first lever of the present utility model;
FIG. 3 is a schematic view of an installation section of embodiment 2 of the present utility model;
fig. 4 is an enlarged view of a portion a of fig. 3;
FIG. 5 is a schematic diagram showing the connection between the upper plate and the second ferrule in embodiment 2 of the present utility model.
In the figure: 1. a first rod piece; 2. a connecting screw; 3. a buffer pad; 4. a carrier; 5. c-shaped steel frame; 6. a lower plate; 7. a first hoop; 8. overlap joint reinforcement; 9. positioning a nut; 10. a connection hole; 11. positioning a support plate; 12. a pipe; 13. an upper plate; 14. an angle code; 15. an annular frame; 16. a second hoop; 17. an upper joint; 18. a connecting spring; 19. and a lower joint.
Detailed Description
The present utility model will be described in further detail with reference to the following examples in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
The principles of the utility model will be further described with reference to the drawings and specific examples.
Example 1
As shown in fig. 1-2, is an embodiment of the present utility model. The finished product C-shaped steel support and hanger structure comprises an embedded part, wherein a notch 20 is arranged at the bottom of the embedded part, and the notch 20 is abutted with a lap joint reinforcement 8;
the connecting pieces are arranged below the embedded pieces, two groups of the embedded pieces are arranged, and two groups of the corresponding connecting pieces are arranged; a supporting body 4 is arranged on one side of the connecting piece far away from the embedded piece;
the bottom of the supporting body 4 is provided with a C-shaped steel frame 5, the C-shaped steel frame 5 is detachably provided with a fixing support, and the top of the fixing support is provided with a first hoop 7.
As shown in fig. 2, the embedded part is a T-shaped rod piece 1, the bottoms of two ends of the rod piece 1 are provided with continuous notches 20, and the notches 20 are in one-to-one correspondence with the lap joint reinforcing bars 8;
the bottom of the first rod member 1 is provided with a connecting hole 10, and the connecting hole 10 is connected with a connecting piece.
The connecting piece comprises a connecting screw rod 2 and positioning nuts 9, wherein the connecting hole 10 is a threaded hole, the top end of the connecting screw rod 2 is arranged in the connecting hole 10, the connecting screw rod 2 is suitable for penetrating through the upper end of the supporting body 4, and the positioning nuts 9 are provided with two groups and are respectively positioned on two sides of the upper end of the supporting body 4; a buffer gasket 3 is sleeved between the positioning nut 9 and the supporting body 4.
The section of the supporting body 4 is T-shaped, a positioning support plate 11 is arranged at the top of the C-shaped steel frame 5, and the positioning support plate 11 is connected with the supporting body 4 through an installation positioning bolt.
The fixing support comprises a lower plate 6, the lower plate 6 is detachably connected with the C-shaped steel frame 5, a mounting groove is formed in the upper end of the lower plate 6, and a first hoop 7 is mounted on the mounting groove and is suitable for being connected to the pipeline 12. The first hoop 7 can be partially detachably connected with the lower plate 6, and the first hoop 7 can be partially bent, so that the first hoop 7 is matched with the pipeline 12, and a locking effect can be realized.
Example 2
As shown in fig. 3 to 5, according to another embodiment of the present utility model, in order to achieve the enhancement of the anti-seismic effect by the relatively fixed manner of installing the pipe 12 on the basis of example 1, a better anti-seismic connection manner needs to be added to the pipe 12. In a further technical scheme, an upper plate 13 is arranged between two groups of connecting screws 2, and two ends of the upper plate 13 are provided with strip holes and are sleeved on the connecting screws 2;
the bottom of the upper plate 13 is detachably provided with a plurality of groups of corner brackets 14, the bottom of each corner bracket 14 is provided with a pull rod, the bottom of each pull rod is provided with an annular frame 15, and the bottom of each annular frame 15 is provided with a hoop II 16; the second ferrule 16 is adapted to be attached to the tube 12.
In a further technical solution, as shown in fig. 4, the pull rod includes an upper connecting portion 17, a connecting spring 18 and a lower connecting portion 19, and two ends of the connecting spring 18 are fixedly connected with the upper connecting portion 17 and the lower connecting portion 19 respectively.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.
Claims (7)
1. The utility model provides a finished product C shaped steel gallows structure, includes built-in fitting, its characterized in that: a notch (20) is formed in the bottom of the embedded part, and the notch (20) is abutted with the lap joint reinforcing bar (8);
the connecting pieces are arranged below the embedded pieces, two groups of the embedded pieces are arranged, and two groups of the corresponding connecting pieces are arranged; a supporting body (4) is arranged on one side of the connecting piece far away from the embedded piece;
the bottom of the supporting body (4) is provided with a C-shaped steel frame (5), a fixed supporting piece is detachably arranged on the C-shaped steel frame (5), and a first hoop (7) is arranged at the top of the fixed supporting piece.
2. The finished product C-shaped steel support and hanger structure according to claim 1, wherein the embedded part is a T-shaped first rod member (1), a plurality of groups of notches (20) are formed in the bottoms of two ends of the first rod member (1), and the notches (20) are in one-to-one correspondence with the lap joint reinforcing bars (8);
the bottom of the first rod piece (1) is provided with a connecting hole (10), and the connecting hole (10) is connected with a connecting piece.
3. The finished product C-shaped steel support and hanger structure according to claim 2, wherein the connecting piece comprises a connecting screw rod (2) and positioning nuts (9), the connecting hole (10) is a threaded hole, the top end of the connecting screw rod (2) is arranged in the connecting hole (10), the connecting screw rod (2) is suitable for penetrating through the upper end of the supporting body (4), and the positioning nuts (9) are provided with two groups and are respectively positioned on two sides of the upper end of the supporting body (4);
a buffer gasket (3) is sleeved between the positioning nut (9) and the supporting body (4).
4. A finished C-shaped steel support and hanger structure according to claim 3, characterized in that the section of the supporting body (4) is T-shaped, a positioning support plate (11) is installed at the top of the C-shaped steel frame (5), and the positioning support plate (11) is connected with the supporting body (4) through an installation positioning bolt.
5. A finished C-section steel hanger structure according to claim 3, characterized in that the fixing support comprises a lower plate (6), the lower plate (6) is detachably connected with the C-section steel frame (5), the upper end of the lower plate (6) is provided with a mounting groove, and the mounting groove is provided with a first hoop (7) and is suitable for being connected to a pipeline (12).
6. The finished product C-shaped steel support and hanger structure according to claim 5 is characterized in that an upper plate (13) is arranged between two groups of connecting screws (2), and two ends of the upper plate (13) are arranged on the connecting screws (2);
the bottom of the upper plate (13) is detachably provided with a plurality of groups of corner brackets (14), the bottom of each corner bracket (14) is provided with a pull rod, the bottom of each pull rod is provided with an annular frame (15), and the bottom of each annular frame (15) is provided with a hoop II (16); the second cuff (16) is adapted to be attached to the conduit (12).
7. The finished product C-shaped steel support and hanger structure according to claim 6, wherein the pull rod comprises an upper connecting part (17), a connecting spring (18) and a lower connecting part (19), and two ends of the connecting spring (18) are fixedly connected with the upper connecting part (17) and the lower connecting part (19) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322255530.8U CN220688255U (en) | 2023-08-22 | 2023-08-22 | Finished product C shaped steel gallows structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322255530.8U CN220688255U (en) | 2023-08-22 | 2023-08-22 | Finished product C shaped steel gallows structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220688255U true CN220688255U (en) | 2024-03-29 |
Family
ID=90371501
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322255530.8U Active CN220688255U (en) | 2023-08-22 | 2023-08-22 | Finished product C shaped steel gallows structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220688255U (en) |
-
2023
- 2023-08-22 CN CN202322255530.8U patent/CN220688255U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204901062U (en) | A three -dimensional antidetonation gallows | |
CN220688255U (en) | Finished product C shaped steel gallows structure | |
CN215981218U (en) | Pipeline installation gallows under L shaped steel roof beam | |
CN109577530A (en) | The adjustable connecting node construction of curtain wall and construction method based on conversion angle steel | |
CN216009976U (en) | Electromechanical pipeline antidetonation suspends bracket component in midair | |
CN216952016U (en) | Assembled comprehensive support and hanger | |
CN212478737U (en) | Cross arm fixing structure for supporting and hanging system | |
CN205446925U (en) | Swift formula crane span structure hanger device | |
CN217683569U (en) | Light-duty piece prevents weighing down support | |
CN220910685U (en) | Pipeline support and hanger | |
CN111960250A (en) | Steel wire rope rigging with accessory convenient to replace | |
CN219755545U (en) | Multi-water pipe combined lateral anti-seismic bracket | |
CN217130524U (en) | Hanging and mounting device suitable for industrial factory building | |
CN219755572U (en) | Combined water pipe side longitudinal anti-seismic support and hanger capable of being supported by multiple pipes | |
CN221747893U (en) | Combined cable support | |
CN111412330B (en) | Hoisting piece and hanging bracket at pipeline connecting position | |
CN220059000U (en) | Steel construction is consolidated based on building | |
CN212297950U (en) | Novel hoisting piece and hanging bracket | |
CN220889405U (en) | Concrete vertical member hanging basket | |
CN221857757U (en) | Anti-fatigue finished product supporting and hanging frame | |
CN216590313U (en) | Lateral anti-seismic support and hanger for combined installation of multiple water pipes | |
CN218510334U (en) | Bridge lateral anti-seismic support hanger | |
CN221880444U (en) | Comprehensive supporting and hanging frame for electromechanical installation on large-span steel structure | |
CN219005099U (en) | Bent pipe clamping device for prolonging nuclear grade valve pipeline | |
CN203022332U (en) | Connecting member between scaffold for construction and wall |