CN220687355U - Tunnel arch foot drainage stainless steel flower pipe structure - Google Patents
Tunnel arch foot drainage stainless steel flower pipe structure Download PDFInfo
- Publication number
- CN220687355U CN220687355U CN202322424621.XU CN202322424621U CN220687355U CN 220687355 U CN220687355 U CN 220687355U CN 202322424621 U CN202322424621 U CN 202322424621U CN 220687355 U CN220687355 U CN 220687355U
- Authority
- CN
- China
- Prior art keywords
- floral tube
- stainless steel
- main part
- support base
- tunnel arch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910001220 stainless steel Inorganic materials 0.000 title claims abstract description 24
- 239000010935 stainless steel Substances 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 claims abstract description 20
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 14
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 14
- 241001330002 Bambuseae Species 0.000 claims abstract description 14
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 14
- 239000011425 bamboo Substances 0.000 claims abstract description 14
- 230000000694 effects Effects 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 abstract description 8
- 239000002689 soil Substances 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 244000269722 Thea sinensis Species 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Supports For Plants (AREA)
Abstract
The utility model discloses a tunnel arch foot drainage stainless steel flower pipe structure, and relates to the field of stainless steel flower pipe devices. This stainless steel floral tube structure of tunnel arch bar drainage includes the floral tube main part, and the bottom of floral tube main part is provided with the support base, and the support base has the effect of carrying out stable support to the floral tube main part, and the top of support base is provided with screw thread section of thick bamboo and screw thread post, and screw thread section of thick bamboo and screw thread post have the effect of installing the floral tube main part with support base. This tunnel arch bar drainage stainless steel floral tube structural support base can increase the area of contact of floral tube main part and base installation, the condition that the floral tube main part is difficult for appearing empting in the in-process of use to can improve the stability in the floral tube main part use.
Description
Technical Field
The utility model relates to the technical field of stainless steel floral tubes, in particular to a tunnel arch foot drainage stainless steel floral tube structure.
Background
During tunnel construction, the tunnel lining is required to be fixed through a perforated steel perforated pipe, the perforated steel perforated pipe is used for driving or drilling holes into soil, the slurry is injected into the perforated pipe by pressure, the slurry is injected into a soil layer from the holes, then the perforated pipe is lifted or sunk and is continuously injected, reinforced soil is formed in the soil, and the foundation strength is improved;
the existing tunnel arch foot drainage stainless steel flower pipe structure is extremely easy to have the problem of poor stability in the use process;
the reason that appears such problem is that current floral tube structure generally only includes floral tube main part and the inserted bar of bottom constitutes, inserts the inside of base with the inserted bar when using to accomplish the installation work to the floral tube, because the length of floral tube is longer, supports the floral tube through the inserted bar of bottom only, and the contact area of inserted bar and base is less, and the inserted bar inserts inside limited simultaneously, can not support the floral tube effectively, leads to the floral tube to appear the condition of empting very easily under the touching of external force, thereby reduces the stability of supporting the floral tube.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a tunnel arch foot drainage stainless steel flower pipe structure, which solves the problem that the prior tunnel arch foot drainage stainless steel flower pipe structure is very easy to have poor stability in the use process.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a stainless steel floral tube structure of tunnel arch foot drainage, includes the floral tube main part, the bottom of floral tube main part is provided with the support base, the support base has the effect of carrying out stable support to the floral tube main part, the top of support base is provided with screw thread section of thick bamboo and screw thread post, screw thread section of thick bamboo and screw thread post have the effect of installing floral tube main part and support base.
Preferably, the threaded column is fixedly connected to the bottom end of the flower pipe main body, and the threaded column is in threaded connection with the inside of the threaded cylinder.
Preferably, the bottom end of the support base is fixedly connected with a plurality of groups of installation inserted bars, and the installation inserted bars have the function of installing the support base.
Preferably, the top end of the supporting base is fixedly connected with a mounting seat, and a mounting groove is formed in the mounting seat.
Preferably, the inside grafting of mounting groove has the installed part, the top fixedly connected with connecting plate of installed part.
Preferably, the connecting plate is clamped at the top end of the mounting seat, and the mounting seat and the connecting plate are fixed through the fixing bolts.
Preferably, the top end of the connecting plate is fixedly connected with a connecting column, and the top end of the connecting column is fixedly connected with a threaded cylinder.
The utility model discloses a tunnel arch foot drainage stainless steel flower pipe structure, which has the following beneficial effects: this stainless steel floral tube structure of tunnel arch foot drainage through the support base that sets up in floral tube main part bottom and installation inserted bar, can install the floral tube main part, makes support base and installation inserted bar peg graft in the inside of base, and screw thread post can realize the stable installation to the floral tube main part, support the area of contact that the base can increase floral tube main part and base installation, the condition of empting is difficult for appearing in the in-process floral tube main part of using to can improve the stability in the floral tube main part use.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of an explosion structure of the mounting base and the connecting plate of the present utility model;
FIG. 3 is a schematic view of the bottom end structure of the connecting plate of the present utility model;
FIG. 4 is a schematic view of the explosive structure of the screw barrel and the screw column of the present utility model.
In the figure: 1. a floral tube body; 2. a support base; 201. a thread cylinder; 202. a threaded column; 203. a mounting base; 204. a connecting plate; 205. a mounting member; 206. a fixing bolt; 207. a connecting column; 208. a mounting groove; 3. and installing a plug rod.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more clear, the technical solutions in the embodiments of the present utility model are clearly and completely described, and it is obvious that the described embodiments are some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The tunnel arch foot drainage stainless steel flower pipe structure solves the problem that the stability performance is poor in the use process of the existing tunnel arch foot drainage stainless steel flower pipe structure in the year very easily, and stability in the use process of the flower pipe main body can be improved.
In order to better understand the above technical solutions, the following description will refer to the drawings and specific embodiments.
The embodiment of the utility model discloses a tunnel arch foot drainage stainless steel flower pipe structure.
According to the drawings 1-4, the flower tube comprises a flower tube main body 1, a support base 2 is arranged at the bottom end of the flower tube main body 1, the support base 2 has the function of stably supporting the flower tube main body 1, a thread cylinder 201 and a thread column 202 are arranged at the top end of the support base 2, the thread cylinder 201 and the thread column 202 have the function of installing the flower tube main body 1 and the support base 2, before use, the flower tube main body 1 and the support base 2 need to be installed, firstly, the flower tube main body 1 needs to be lifted, the thread column 202 installed at the bottom end of the flower tube main body 1 is aligned with the inside of the thread cylinder 201, and the thread column 202 is screwed in the inside of the thread cylinder 201 by rotating the flower tube main body 1, so that the flower tube main body 1 and the support base 2 can be installed and fixed.
The screw thread post 202 fixed connection is in the bottom of flowers pipe main part 1, and screw thread post 202 threaded connection is in the inside of screw thread section of thick bamboo 201, and the bottom fixedly connected with multiunit installation inserted bar 3 of supporting base 2, multiunit installation inserted bar 3 have the effect of installing supporting base 2, and after the fixed, through taking flowers pipe main part 1, will support the installation inserted bar 3 of the installation of base 2 bottom to insert the inside of base and install flowers pipe main part 1 and use can.
The top fixedly connected with mount pad 203 of supporting base 2, the mounting groove 208 has been seted up to the inside of mount pad 203, peg graft in the inside of mounting groove 208 has installed part 205, the top fixedly connected with connecting plate 204 of installed part 205, when needs change screw thread section of thick bamboo 201, through rotating multiunit fixing bolt 206, make multiunit fixing bolt 206 screw thread rotate in the inside of connecting plate 204 and mount pad 203 and break away from, then upwards lift spliced pole 207, make the installed part 205 of bottom break away from the inside of mount pad 203, carry out tea intermittent type with screw thread section of thick bamboo 201 and supporting base 2 and change, make the screw thread section of thick bamboo 201 and the screw thread post 202 assorted of installation, make supporting base 2 can satisfy the floral tube main part 1 of more different diameters.
Connecting plate 204 joint is fixed on the top of mount pad 203 through the fixing bolt 206 that sets up between mount pad 203 and the connecting plate 204, and the top fixedly connected with spliced pole 207 of connecting plate 204, the top fixedly connected with screw thread section of thick bamboo 201 of spliced pole 207, with multiunit fixing bolt 206 threaded connection in the inside of connecting plate 204 and mount pad 203, can be to the purpose of screw thread section of thick bamboo 201 and support base 2 connection fixation, convenient to detach installs the screw thread section of thick bamboo 201 of different models simultaneously to satisfy the installation of screw thread post 202 and the floral tube main part 1 of different models.
In summary, compared with the prior art, the method has the following beneficial effects: through support base 2 and installation inserted bar 3 that set up in flowers pipe main part 1 bottom, can install flowers pipe main part 1, make support base 2 and installation inserted bar 3 peg graft in the inside of base, screw thread section of thick bamboo 201 and screw thread post 202 can realize the stable installation to flowers pipe main part 1, support base 2 can increase flowers pipe main part 1 and the area of contact of base installation, the condition that topples over is difficult for appearing in flowers pipe main part 1 in the in-process of use to can improve the stability in the use of flowers pipe main part 1.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a tunnel arch springing drainage stainless steel floral tube structure, includes floral tube main part (1), its characterized in that: the utility model discloses a flowerpot, including flowerpot main part (1), flowerpot main part (1) and support base (2), the bottom of flowerpot main part (1) is provided with support base (2), support base (2)'s top is provided with screw thread section of thick bamboo (201) and screw thread post (202), screw thread section of thick bamboo (201) and screw thread post (202) have the effect of installing flowerpot main part (1) and support base (2).
2. A tunnel arch foot drainage stainless steel floral tube structure as claimed in claim 1, wherein: the threaded column (202) is fixedly connected to the bottom end of the flower pipe main body (1), and the threaded column (202) is in threaded connection with the inside of the threaded cylinder (201).
3. A tunnel arch foot drainage stainless steel floral tube structure as claimed in claim 1, wherein: the bottom end fixedly connected with multiunit installation inserted bar (3) of support base (2), multiunit installation inserted bar (3) have the effect of installing support base (2).
4. A tunnel arch foot drainage stainless steel floral tube as claimed in claim 3, wherein: the top of the supporting base (2) is fixedly connected with a mounting seat (203), and a mounting groove (208) is formed in the mounting seat (203).
5. A tunnel arch foot drainage stainless steel floral tube structure as claimed in claim 4, wherein: the inside of mounting groove (208) is pegged graft and is had installed piece (205), the top fixedly connected with connecting plate (204) of installed piece (205).
6. A tunnel arch foot drainage stainless steel floral tube structure as claimed in claim 5, wherein: the connecting plate (204) is clamped at the top end of the mounting seat (203), and the mounting seat (203) and the connecting plate (204) are fixed through fixing bolts (206) arranged.
7. A tunnel arch foot drainage stainless steel floral tube structure as claimed in claim 6, wherein: the top end of the connecting plate (204) is fixedly connected with a connecting column (207), and the top end of the connecting column (207) is fixedly connected with a threaded cylinder (201).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322424621.XU CN220687355U (en) | 2023-09-07 | 2023-09-07 | Tunnel arch foot drainage stainless steel flower pipe structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322424621.XU CN220687355U (en) | 2023-09-07 | 2023-09-07 | Tunnel arch foot drainage stainless steel flower pipe structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220687355U true CN220687355U (en) | 2024-03-29 |
Family
ID=90407148
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322424621.XU Active CN220687355U (en) | 2023-09-07 | 2023-09-07 | Tunnel arch foot drainage stainless steel flower pipe structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220687355U (en) |
-
2023
- 2023-09-07 CN CN202322424621.XU patent/CN220687355U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220687355U (en) | Tunnel arch foot drainage stainless steel flower pipe structure | |
CN208328919U (en) | A kind of pile for prestressed pipe stake bottom floating sealing device | |
CN204201279U (en) | Pipeline suspension rod between a kind of rack and steel grating | |
CN212107205U (en) | Water conservancy pipeline supports connection structure | |
CN211773577U (en) | Pile head structure of prefabricated tubular pile | |
CN212900121U (en) | Support arrangement for water supply and drainage engineering | |
CN218911479U (en) | Foundation pit drainage device | |
CN202417330U (en) | Drilling anti-collapse device suitable for embedding pore pressure gauge in different depths | |
CN201473954U (en) | Device for mounting large-scale concrete cylinder structure for construction | |
CN209892972U (en) | Sewage treatment pond device | |
CN206140151U (en) | Tubular part boring grab with elongated slot | |
CN214328937U (en) | A downcomer centralizer for foundation ditch downcomer well | |
CN207935067U (en) | A kind of irrigation and water conservancy irrigation pump device | |
CN220352831U (en) | Post grouting auxiliary reinforcement cage under super-long empty pile working condition | |
CN211472471U (en) | Drainage structure that soft foundation was handled | |
CN212338776U (en) | Exploration device for hydrogeology | |
CN108076954A (en) | A kind of transplanting tree fixing device and its fixing means | |
CN219240514U (en) | Grouting device for foundation and foundation engineering | |
CN216566731U (en) | Pipeline reinforcing apparatus for hydraulic engineering | |
CN217272361U (en) | High-strength stainless steel pipe fitting with supporting function | |
CN212334773U (en) | Novel corrosion-resistant spiral aeration supports device | |
CN219280726U (en) | Simple assembly support plate for pipeline groove | |
CN218608731U (en) | Carbon molecular sieve air separation plant for nitrogen making machine | |
CN218527032U (en) | Greening anti-roll device | |
CN213333129U (en) | Inclined supporting device of large incubator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |