CN220686236U - Brush ring waterway device of closestool and closestool - Google Patents

Brush ring waterway device of closestool and closestool Download PDF

Info

Publication number
CN220686236U
CN220686236U CN202322180683.0U CN202322180683U CN220686236U CN 220686236 U CN220686236 U CN 220686236U CN 202322180683 U CN202322180683 U CN 202322180683U CN 220686236 U CN220686236 U CN 220686236U
Authority
CN
China
Prior art keywords
water
inlet end
water inlet
brush ring
toilet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322180683.0U
Other languages
Chinese (zh)
Inventor
林孝发
林孝山
林山
徐衍新
郑金阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUANZHOU KEMU INTELLIGENT KITCHEN AND TOILET CO Ltd
Original Assignee
QUANZHOU KEMU INTELLIGENT KITCHEN AND TOILET CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUANZHOU KEMU INTELLIGENT KITCHEN AND TOILET CO Ltd filed Critical QUANZHOU KEMU INTELLIGENT KITCHEN AND TOILET CO Ltd
Priority to CN202322180683.0U priority Critical patent/CN220686236U/en
Application granted granted Critical
Publication of CN220686236U publication Critical patent/CN220686236U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The water path device of the brush ring of the closestool and the closestool comprise a brush ring spray head, a connecting piece, a pump body and a control valve, wherein the connecting piece is provided with a first water inlet end, a second water inlet end and a water outlet end which are mutually communicated, and the water outlet end is connected with the brush ring spray head; the water inlet end of the pump body is communicated with the water tank of the toilet, and the water outlet end of the pump body is connected with the first water inlet end; the water inlet end of the control valve is connected with tap water, and the water outlet end of the control valve is connected with the second water inlet end; the brush ring is realized by controlling the pump body and the control valve to act to drive the first water inlet end to inlet water and/or the second water inlet end to inlet water, so that different design requirements can be met, and the flushing effect is improved.

Description

Brush ring waterway device of closestool and closestool
Technical Field
The utility model relates to the field of bathroom, in particular to a toilet bowl and a water path device of a brush ring of the toilet bowl.
Background
Currently, existing intelligent toilet flushing logic is generally: firstly, the brush ring is opened to clean dirt on the surface of the inner cavity of the toilet, then the spraying is controlled to be opened to push the dirt in the toilet cavity into the sewage discharge pipe to be discharged, and then the brush ring is opened again to supplement the water cover in the toilet cavity.
In general, the brush ring nozzle with the brush ring structure only has one water supply, and is generally connected with a water tank for supplying water or connected with tap water for supplying water, and meanwhile, the brush ring and the spray share one water source, such as a toilet without a water tank or a low water tank for flushing by the water pump. For the water tank-free closestool, when running water is adopted for flushing, the brush ring and the spraying need to work intermittently in order to ensure the low flushing effect; when the low water tank water pump is adopted for flushing, the brush ring and the injection are intermittently operated due to the limitation of the power of the water pump, namely, the brush ring and the injection cannot be simultaneously carried out, the flushing mode is single, and the cleaning effect is influenced.
Disclosure of Invention
The utility model aims to overcome the defect that the existing brush ring structure is single in water supply and intermittent work is needed for brushing and spraying, and provides a brush ring waterway device of a toilet and the toilet.
The utility model adopts the following technical scheme:
the utility model provides a brush circle water route device of closestool, includes brush circle shower nozzle, its characterized in that: the brush ring spray head comprises a brush ring spray head, a brush ring spray head and a connecting piece, wherein the brush ring spray head is provided with a brush ring spray head, and the brush ring spray head is provided with a brush ring spray head; the water inlet end of the pump body is communicated with the water tank of the toilet, and the water outlet end of the pump body is connected with the first water inlet end; the water inlet end of the control valve is connected with tap water, and the water outlet end of the control valve is connected with the second water inlet end; the brush ring is realized by controlling the pump body and the control valve to act so as to drive the first water inlet end to inlet water and/or the second water inlet end to inlet water.
Preferably, a first one-way valve is arranged in the first water inlet end, and the first one-way valve is arranged to allow water flow to enter from the first water inlet end and inhibit water flow from the first water inlet end.
Preferably, a second one-way valve is arranged in the second water inlet end, and the second one-way valve is arranged to allow water flow to enter from the second water inlet end and inhibit water flow from the second water inlet end.
Preferably, a valve core is disposed in the connecting piece, and the valve core is located between the first water inlet end and the second water inlet end, so as to open the first water inlet end and close the second water inlet end, or open the second water inlet end and close the first water inlet end.
Preferably, the valve core comprises a rod body and an elastic piece, the rod body is movably arranged between the first water inlet end and the second water inlet end, and the two ends of the rod body are respectively provided with a first sealing piece and a second sealing piece; the elastic piece is sleeved on the rod body to drive the rod body to move so that the second sealing piece closes the second water inlet end and the first sealing piece opens the first water inlet end, and the rod body can move under the action of water pressure of the second water inlet end so that the second sealing piece opens the second water inlet end and the first sealing piece closes the first water inlet end.
The utility model provides a closestool, includes staving and water tank, the staving is provided with brush circle mouth and erodees the passageway, its characterized in that: the water path device of the toilet brush ring is characterized by further comprising a control device and the water path device of the toilet brush ring of the toilet, wherein the spray head of the toilet brush ring is arranged at the opening of the toilet brush ring, and the control device is connected with the pump body and the control valve.
Preferably, a water inlet valve is arranged in the water tank, and the other water outlet end of the control valve is connected with the water inlet end of the water inlet valve.
Preferably, the flushing device further comprises a drainage valve set, wherein the drainage valve set is positioned in the water tank to open or close the flushing channel.
As can be seen from the above description of the present utility model, compared with the prior art, the present utility model has the following advantages:
1. the utility model is provided with the connecting piece, the pump body and the control valve, the water outlet end of the connecting piece is connected with the brush ring spray head, the first water inlet end and the second water inlet end of the connecting piece are respectively connected with the pump body and the control valve, the action of the pump body and the control valve is controlled to drive the first water inlet end to inlet water or the second water inlet end to inlet water so as to realize the brush ring, and the brush ring can be realized through combination of different water supply modes so as to meet different design requirements.
2. In the utility model, the first water inlet end and the second water inlet end of the connecting piece are respectively provided with the one-way valve, so that water flow can be prevented from flowing to the pump body and the control valve, and the first water inlet end and the second water inlet end of the connecting piece can be driven to simultaneously enter water by controlling the action of the pump body and the control valve, thereby meeting the cleaning requirement of a big pot surface.
3. According to the utility model, two different water supply modes are arranged to realize the brush ring, so that when the flushing channel is started to perform a flushing function, the water flow of the brush ring can be controlled not to stop, the consistency of the brush ring effect is ensured, and meanwhile, the water of the brush ring covers the flushing water flow, so that the noise is reduced.
4. According to the utility model, the water in the water tank is obtained by adopting the pump body to brush the ring, so that the accurate control of the water quantity of the brush ring can be realized, and the control valve is adopted to control tap water as a water source of the brush ring water, so that the volume requirement of the water tank can be reduced, and the electronic cover layout is facilitated.
Drawings
FIG. 1 is a block diagram of the present utility model;
FIG. 2 is a block diagram of a connector employing a one-way valve;
FIG. 3 is a diagram of a connector structure employing a valve cartridge (first inlet port open);
FIG. 4 is a diagram of a connector structure employing a valve cartridge (second inlet port open);
FIG. 5 is a main construction view of the toilet bowl according to the present utility model;
FIG. 6 is a timing diagram of the operation of the present utility model (scheme one);
FIG. 7 is a second timing diagram (scheme II) of the present utility model;
FIG. 8 is a timing diagram of the operation of the present utility model (scheme III);
FIG. 9 is a timing diagram of the operation of the present utility model (scheme IV);
FIG. 10 is a diagram showing the operation sequence (scheme five) of the present utility model;
wherein:
10. the brush ring shower nozzle, 20, connecting piece, 21, first water inlet end, 22, second water inlet end, 23, water outlet end, 24, first check valve, 25, second check valve, 26, case, 27, the body of rod, 27a, first sealing piece, 27b, second sealing piece, 28, elastic component, 29, guide piece, 30, pump body, 40, control valve, 50, staving, 51, urinal, 52, flushing channel, 53, water intaking valve.
Detailed Description
The utility model is further described below by means of specific embodiments.
The terms "first," "second," and the like in the present utility model are merely for convenience of description to distinguish between different constituent components having the same name, and do not denote a sequential or primary or secondary relationship.
In the description of the present utility model, the directions or positional relationships indicated by "upper", "lower", "left", "right", "front" and "rear", etc. are used for convenience of description of the present utility model based on the directions or positional relationships shown in the drawings, and are not intended to indicate or imply that the apparatus referred to must have a specific direction, be constructed and operated in a specific direction, and thus should not be construed as limiting the scope of protection of the present utility model.
Example 1
Referring to fig. 1 and 2, a brush ring waterway device of a toilet includes a brush ring spray head 10, a connection member 20, a pump body 30, a control valve 40, and the like. The brush ring spray head 10 is mountable to a toilet bowl for spraying a brush ring water stream. The connecting piece 20 is used for connecting the brush ring spray head 10, the pump body 30 and the control valve 40, and is provided with a first water inlet end 21, a second water inlet end 22 and a water outlet end 23 which are mutually communicated, wherein the first water inlet end 21 and the second water inlet end 22 can be respectively used for connecting different water supply waterways, and the water outlet end 23 is connected with the brush ring spray head 10.
The water inlet end of the pump body 30 is communicated with the water tank of the toilet, and the water outlet end of the pump body 30 is connected with the first water inlet end 21, namely, the water outlet end of the pump body 30 is used as one of water supply waterways of the brush ring spray head 10. The water inlet end of the control valve 40 is connected with tap water, and the water outlet end of the control valve 40 is connected with the second water inlet end 22, namely, the control valve is used as another water supply waterway of the brush ring spray head 10. The brush ring can be realized by controlling the pump body 30 and the control valve 40 to actuate the first water inlet end 21 to inlet water and/or the second water inlet end 22 to inlet water, or the second water inlet end 22 to inlet water or both the first water inlet end 21 and the second water inlet end 22 can be included.
Further, a first check valve 24 is disposed in the first water inlet end 21, and the first check valve 24 is configured to allow water flow from the first water inlet end 21 and inhibit water flow from the first water inlet end 21, i.e. prevent water flow from flowing toward the pump body 30. The second water inlet end 22 is provided with a second one-way valve 25, and the second one-way valve 25 is arranged to allow water flow from the second water inlet end 22 and inhibit water flow from the second water inlet end 22, so as to prevent water flow in the direction of the control valve 40. The check valve can be realized by adopting a common check valve structure.
Based on this, referring to fig. 5, the utility model further provides a toilet, which comprises a toilet body 50, a water tank and a brush ring waterway device of the toilet, wherein the toilet body 50 is provided with a toilet bowl 51, a brush ring opening, a flushing channel 52, a drain outlet and other conventional structures, the brush ring opening is used for installing the brush ring spray head 10, the brush ring spray head 10 sprays brush ring water flow to clean the wall surface of the toilet bowl 51, and the flushing channel 52 is used for spraying flushing water flow to push dirt in the toilet bowl 51 to drain. The toilet is also provided with a control device which is connected with the pump body 30 and the control valve 40, and the working states of the pump body 30 and the control valve 40 are controlled by the control device, including controlling the opening or closing of the pump body 30, controlling the opening or closing of the control valve 40, and the like.
The toilet of the present utility model may further include a water inlet valve 53, a water discharge valve assembly, and the like, the water inlet valve 53 being used to feed water into the water tank, and the water discharge valve assembly being located in the water tank to open or close the flushing passage 52. The other water outlet end of the control valve 40 is connected to the water inlet end of the water inlet valve 53, i.e. the control valve 40 is arranged to switch the water to the connector 20 or the water inlet valve 53.
The brush ring waterway and the toilet bowl of the embodiment can be provided with a plurality of flushing schemes, and specifically can comprise the following steps:
scheme one
Referring to fig. 6, it is arranged that: when the toilet is started to have a flushing function, the first brushing ring is performed in the period of 0-t1, the pump body 30 is controlled to be started, the pump body 30 pumps water from the water tank to the connecting piece 20, and water flow is sprayed out from the brushing ring spray head 10 to clean the wall surface of the urinal 51; in the time period of t1-t2, controlling the drainage valve group to work to start a flushing function, and flushing water in the water tank through the flushing channel 52 to push dirt into the sewage outlet; in the period of t2-t3, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, so that tap water is fed into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to realize water seal and water supplement.
By adopting the scheme, water is supplied in different modes in two brushing ring stages, so that the volume requirement of the water tank can be reduced, and the electronic cover layout is facilitated.
Scheme II
Referring to fig. 7, it is arranged that: when the toilet is started to have a flushing function, the first brushing ring is performed in the period of 0-t2, the pump body 30 is controlled to be started, the pump body 30 pumps water from the water tank to the connecting piece 20, and water flow is sprayed out from the brushing ring spray head 10 to clean the wall surface of the urinal 51; meanwhile, in the time period of t1-t2, the water discharge valve group is controlled to work to start a flushing function, and water in the water tank is flushed out through the flushing channel 52 to push dirt into the sewage outlet; in the period of t2-t3, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, so that tap water is fed into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to realize water seal and water supplement.
By adopting the scheme, the water flow of the brush ring is not stopped in the flushing process of the injection channel, so that the consistency of the brush ring effect can be ensured, and meanwhile, the water of the brush ring covers the flushing water flow, so that the noise is reduced. The second stage brush ring adopts tap water to supply water, so that the volume requirement of the water tank can be reduced, and the electronic cover layout is facilitated.
Scheme III
Referring to fig. 8, it is arranged that: when the toilet is started to have a flushing function, the first brushing is performed in the period of 0-t1, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, and tap water is fed into the connecting piece 20 and sprayed out through the brushing nozzle 10 to clean the wall surface of the urinal 51; in the period of t1-t2, controlling the drainage valve group to work to start a flushing function, and flushing water in the water tank through the flushing channel 52 to push dirt into the sewage outlet; in the period of t2-t3, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, so that tap water is fed into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to realize water seal and water supplement.
By adopting the scheme, as the first section brush ring and the second section brush ring both adopt tap water for supplying water, the super capacitor can be adopted to realize the stop of the brush ring when power is cut off.
Scheme IV
Referring to fig. 9, it is arranged that: when the toilet is started to have a flushing function, the first brushing is performed in the period of 0-t1, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, meanwhile, the pump body 30 is controlled to be started to pump water, tap water and water in the water tank are both sent into the connecting piece 20 and then sprayed out through the brushing ring spray head 10, the wall surface of the urinal 51 is cleaned, and the large-area cleaning requirement of the urinal 51 can be met; in the period of t1-t2, controlling the drainage valve group to work to start a flushing function, and flushing water in the water tank through the flushing channel 52 to push dirt into the sewage outlet; in the period of t2-t3, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, so that tap water is fed into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to realize water seal and water supplement.
Scheme five
Referring to fig. 10, it is arranged that: when the toilet is started to have a flushing function, the brush ring is carried out in a period of 0-t3, the pump body 30 is controlled to start pumping water, and then water in the water tank is pumped into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to clean the wall surface of the urinal 51; in the time period of t1-t2, the water discharge valve group is controlled to work to start the flushing function, and water in the water tank is flushed out through the flushing channel 52 to push dirt into the sewage outlet.
By adopting the scheme, the first section brush ring and the second section brush ring both adopt the pump body 30 to supply water, so that the accurate control of the water quantity of the brush ring can be realized, the brush ring water is not stopped when the jet flushing water flows, the consistency of the brush ring effect is ensured, and meanwhile, the brush ring water covers the flushing water flow to reduce noise.
Example two
Referring to fig. 3 and 4, a brush ring waterway device of a toilet and a toilet, the main structure is the same as that of the first embodiment, except that: a valve core 26 is disposed in the connecting member 20, and the valve core 26 is located between the first water inlet end 21 and the second water inlet end 22 to open the first water inlet end 21 and close the second water inlet end 22, or to open the second water inlet end 22 and close the first water inlet end 21. In this embodiment, two water supply ways supply water in an alternative mode.
The valve core 26 includes a rod 27 and an elastic member 28, the rod 27 is movably disposed between the first water inlet end 21 and the second water inlet end 22, the first water inlet end 21 and the second water inlet end 22 may be located on a same straight line, the rod 27 may move along the straight line, and a guiding member 29 may be disposed in the connecting member 20 to guide and limit movement of the rod 27. The rod body 27 is provided at both ends thereof with a first sealing member 27a and a second sealing member 27b, the first sealing member 27a being opposite to the first water inlet end 21 to open or close the first water inlet end 21, and the second sealing member 27b being opposite to the second water inlet end 22 to open or close the second water inlet end 22, respectively.
The elastic member 28 is sleeved on the rod body 27, one end of the elastic member abuts against the guide member 29, the other end of the elastic member abuts against the end of the second sealing member 27b of the rod body 27, the elastic member 28 can drive the rod body 27 to move so that the second sealing member 27b closes the second water inlet end 22 and the first sealing member 27a opens the first water inlet end 21, and the rod body 27 can move under the hydraulic pressure of the second water inlet end 22 so that the second sealing member 27b opens the second water inlet end 22 and the first sealing member 27a closes the first water inlet end 21.
In this embodiment, the brush ring waterway and the toilet bowl may be provided with a variety of flushing schemes, which may include the following:
scheme one
Referring to fig. 6, it is arranged that: when the toilet is started to have a flushing function, the first brushing ring is performed in the period of 0-t1, the pump body 30 is controlled to be started, the pump body 30 pumps water from the water tank to the connecting piece 20, and water flow is sprayed out from the brushing ring spray head 10 to clean the wall surface of the urinal 51; in the time period of t1-t2, controlling the drainage valve group to work to start a flushing function, and flushing water in the water tank through the flushing channel 52 to push dirt into the sewage outlet; in the period of t2-t3, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, so that tap water is fed into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to realize water seal and water supplement.
By adopting the scheme, water is supplied in different modes in two brushing ring stages, so that the volume requirement of the water tank can be reduced, and the electronic cover layout is facilitated.
Scheme II
Referring to fig. 7, it is arranged that: when the toilet is started to have a flushing function, the first brushing ring is performed in the period of 0-t2, the pump body 30 is controlled to be started, the pump body 30 pumps water from the water tank to the connecting piece 20, and water flow is sprayed out from the brushing ring spray head 10 to clean the wall surface of the urinal 51; meanwhile, in the time period of t1-t2, the water discharge valve group is controlled to work to start a flushing function, and water in the water tank is flushed out through the flushing channel 52 to push dirt into the sewage outlet; in the period of t2-t3, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, so that tap water is fed into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to realize water seal and water supplement.
By adopting the scheme, the water flow of the brush ring is not stopped in the flushing process of the injection channel, so that the consistency of the brush ring effect can be ensured, and meanwhile, the water of the brush ring covers the flushing water flow, so that the noise is reduced. The second stage brush ring adopts tap water to supply water, so that the volume requirement of the water tank can be reduced, and the electronic cover layout is facilitated.
Scheme III
Referring to fig. 8, it is arranged that: when the toilet is started to have a flushing function, the first brushing is performed in the period of 0-t1, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, and tap water is fed into the connecting piece 20 and sprayed out through the brushing nozzle 10 to clean the wall surface of the urinal 51; in the period of t1-t2, controlling the drainage valve group to work to start a flushing function, and flushing water in the water tank through the flushing channel 52 to push dirt into the sewage outlet; in the period of t2-t3, the water outlet end of the control valve 40 is controlled to be communicated with the connecting piece 20, so that tap water is fed into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to realize water seal and water supplement.
By adopting the scheme, as the first section brush ring and the second section brush ring both adopt tap water for supplying water, the super capacitor can be adopted to realize the stop of the brush ring when power is cut off.
Scheme IV
Referring to fig. 10, it is arranged that: when the toilet is started to have a flushing function, the brush ring is carried out in a period of 0-t3, the pump body 30 is controlled to start pumping water, and then water in the water tank is pumped into the connecting piece 20 and then sprayed out through the brush ring spray head 10 to clean the wall surface of the urinal 51; in the time period of t1-t2, the water discharge valve group is controlled to work to start the flushing function, and water in the water tank is flushed out through the flushing channel 52 to push dirt into the sewage outlet.
By adopting the scheme, the first section brush ring and the second section brush ring both adopt the pump body 30 to supply water, so that the accurate control of the water quantity of the brush ring can be realized, the brush ring water is not stopped when the jet flushing water flows, the consistency of the brush ring effect is ensured, and meanwhile, the brush ring water covers the flushing water flow to reduce noise.
The foregoing is merely illustrative of specific embodiments of the present utility model, but the design concept of the present utility model is not limited thereto, and any insubstantial modification of the present utility model by using the design concept shall fall within the scope of the present utility model.

Claims (8)

1. The utility model provides a brush circle water route device of closestool, includes brush circle shower nozzle, its characterized in that: the brush ring spray head comprises a brush ring spray head, a brush ring spray head and a connecting piece, wherein the brush ring spray head is provided with a brush ring spray head, and the brush ring spray head is provided with a brush ring spray head; the water inlet end of the pump body is communicated with the water tank of the toilet, and the water outlet end of the pump body is connected with the first water inlet end; the water inlet end of the control valve is connected with tap water, and the water outlet end of the control valve is connected with the second water inlet end; the brush ring is realized by controlling the pump body and the control valve to act to drive the first water inlet end to inlet water and/or the second water inlet end to inlet water.
2. The toilet brush ring waterway device of claim 1, wherein: a first one-way valve is arranged in the first water inlet end, and the first one-way valve is arranged to allow water flow to enter from the first water inlet end and inhibit water flow from flowing out from the first water inlet end.
3. The toilet brush ring waterway device of claim 1, wherein: the second water inlet end is internally provided with a second one-way valve, and the second one-way valve is arranged to allow water flow to enter from the second water inlet end and inhibit water flow from exiting from the second water inlet end.
4. The toilet brush ring waterway device of claim 1, wherein: the connecting piece is internally provided with a valve core, and the valve core is positioned between the first water inlet end and the second water inlet end so as to open the first water inlet end and close the second water inlet end, or open the second water inlet end and close the first water inlet end.
5. The toilet brush ring waterway device of claim 4, wherein: the valve core comprises a rod body and an elastic piece, the rod body is movably arranged between the first water inlet end and the second water inlet end, and a first sealing piece and a second sealing piece are respectively arranged at two ends of the rod body; the elastic piece is sleeved on the rod body to drive the rod body to move so that the second sealing piece closes the second water inlet end and the first sealing piece opens the first water inlet end, and the rod body can move under the action of water pressure of the second water inlet end so that the second sealing piece opens the second water inlet end and the first sealing piece closes the first water inlet end.
6. The utility model provides a closestool, includes staving and water tank, the staving is provided with brush circle mouth and erodees the passageway, its characterized in that: the water path device of the toilet bowl brush ring comprises a control device and the water path device of the toilet bowl brush ring, wherein the brush ring nozzle is arranged at the brush ring opening, and the control device is connected with the pump body and the control valve.
7. A toilet according to claim 6, wherein: the water tank is internally provided with a water inlet valve, and the other water outlet end of the control valve is connected with the water inlet end of the water inlet valve.
8. A toilet according to claim 6, wherein: the flushing device also comprises a drainage valve set, wherein the drainage valve set is positioned in the water tank to open or close the flushing channel.
CN202322180683.0U 2023-08-14 2023-08-14 Brush ring waterway device of closestool and closestool Active CN220686236U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322180683.0U CN220686236U (en) 2023-08-14 2023-08-14 Brush ring waterway device of closestool and closestool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322180683.0U CN220686236U (en) 2023-08-14 2023-08-14 Brush ring waterway device of closestool and closestool

Publications (1)

Publication Number Publication Date
CN220686236U true CN220686236U (en) 2024-03-29

Family

ID=90372714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322180683.0U Active CN220686236U (en) 2023-08-14 2023-08-14 Brush ring waterway device of closestool and closestool

Country Status (1)

Country Link
CN (1) CN220686236U (en)

Similar Documents

Publication Publication Date Title
CN209924058U (en) Toilet flushing system based on pump device
CN109518775B (en) Toilet bowl
CN104988972A (en) Method for flushing toilet by stages
TW201706478A (en) Hybrid flushing system and a method for cleaning a hybrid flushing system
CN220686236U (en) Brush ring waterway device of closestool and closestool
CN114457885A (en) Flushing system, flushing control method and toilet bowl thereof
CN212358502U (en) Comprehensive flushing closestool
CN217974639U (en) Closestool flushing system and closestool
CN217267862U (en) Closestool scouring system
CN113846727B (en) Space-saving flushing device and toilet
CN211596969U (en) Multi-power low-pressure flushing closestool
CN215253262U (en) Flushing toilet
CN214833220U (en) Toilet bowl capable of efficiently flushing
CN207700304U (en) A kind of flusher of toilet
CN207760963U (en) A kind of flushing control mechanism of toilet
CN218597290U (en) High-efficient toilet bowl that erodees
CN220580130U (en) Jet head, flushing system and toilet
CN219100237U (en) Toilet bowl and flushing system thereof
CN214116854U (en) Wall-hung pedestal pan without water tank
CN219081833U (en) Waterway system for cleaning system and cleaning system
CN215253263U (en) Flushing toilet
CN216379826U (en) Toilet seat
CN2778909Y (en) Toilet seat bedpan with water jet
CN2440861Y (en) Water saving toilet
CN216379825U (en) Flushing toilet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant