CN220648396U - Heating pipe capable of being quickly abutted - Google Patents

Heating pipe capable of being quickly abutted Download PDF

Info

Publication number
CN220648396U
CN220648396U CN202322186344.3U CN202322186344U CN220648396U CN 220648396 U CN220648396 U CN 220648396U CN 202322186344 U CN202322186344 U CN 202322186344U CN 220648396 U CN220648396 U CN 220648396U
Authority
CN
China
Prior art keywords
slide rail
limiting
supply pipe
temperature sensing
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322186344.3U
Other languages
Chinese (zh)
Inventor
吴铁海
陈相璟
吴玉峰
牛新海
安宁
司嘉
张之纯
田诚
胡志全
陈立涛
朱洪帅
李建政
杜海建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Huiheng Municipal Engineering Co ltd
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
Weifang Huiheng Municipal Engineering Co ltd
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Huiheng Municipal Engineering Co ltd, China Railway No 3 Engineering Group Co Ltd, Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical Weifang Huiheng Municipal Engineering Co ltd
Priority to CN202322186344.3U priority Critical patent/CN220648396U/en
Application granted granted Critical
Publication of CN220648396U publication Critical patent/CN220648396U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses a heating pipe capable of being quickly abutted, which relates to the technical field of heating pipes. This but quick heat supply pipe of butt joint can place between two grip blocks with temperature sensing probe earlier, then through rotatory adjusting bolt, make adjusting bolt at the inside rotation of screw thread dish, then adjusting bolt moves to one side in the built-in groove of slider and slider No. two, and then promote the grip block to one side removal, drive reset spring shrink, reset spring supports the grip block, make the grip block can install the outside of delivery pipe with temperature sensing probe, then temperature sensing probe carries out sensing to the temperature of delivery pipe, temperature sensing probe and heat supply pipe's butt joint installation effectiveness has been accelerated, the electric preheating work efficiency of follow-up heat supply pipe has been improved, make the heat supply pipe operation stable.

Description

Heating pipe capable of being quickly abutted
Technical Field
The utility model relates to the technical field of heating pipes, in particular to a heating pipe capable of being quickly connected.
Background
The urban heat supply pipe network is one of urban infrastructure, is closely related to the life of people, and the heat supply pipe is a pipeline for transmitting a heat source to a building heat inlet from a boiler room, a direct-fired machine room, a heat supply center and the like. The heat supply system is used as a necessary device in winter in northern areas, and the heat supply pipe is used for conveying hot water of the heat supply station to each household, so that the winter cold protection of residents is realized.
However, the existing heating pipe has the disadvantages that when the heating pipe is subjected to electric heating uncompensated operation, a temperature sensor needs to be placed on the outer side of the pipeline for detecting temperature, most of temperature sensing probes are tightly attached to the outer wall of the measured pipeline, and then the temperature sensing probes are mounted on the outer wall of the pipeline by using an aluminum foil adhesive tape or a heat-resistant pressure-sensitive adhesive tape, so that the temperature sensing probes are inconvenient to rapidly mount, the electric preheating working efficiency of the heating pipe is reduced, and the existing heating pipe needs to be improved.
Disclosure of Invention
The utility model aims to provide a heating pipe capable of being quickly abutted, so as to solve the problems that in the prior market, when the electric heating uncompensated operation work is carried out on the heating pipe, a temperature sensor is required to be placed on the outer side of a pipeline for detecting temperature, most of temperature sensing probes are tightly attached to the outer wall of the pipeline to be measured, and then the temperature sensing probes are mounted on the outer wall of the pipeline by using an aluminum foil adhesive tape or a heat-resistant pressure-sensitive adhesive tape, so that the quick mounting of the temperature sensing probes is inconvenient, and the electric preheating work efficiency of the heating pipe is reduced.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a but quick butt joint's heating tube, includes delivery pipe, connecting cable and temperature sensing probe, the both ends of delivery pipe are equipped with the end cap, the one end of delivery pipe is connected with connecting cable through the end cap, the other end of delivery pipe is connected with the short circuit cable through the end cap, connecting cable's one end is connected with electric preheating equipment, the one end of short circuit cable is connected with the wet return through the end cap, slide rail and No. two slide rails are installed to one side of delivery pipe, one side sliding connection of slide rail has slide block and No. two slide blocks, be sliding connection between slide block and No. two slide blocks and No. two slide rails, the inside of slide block and No. two slide blocks all is equipped with fixture, be equipped with the connecting rod between slide block and No. two slide blocks, temperature sensing probe sets up one side at fixture, one side of temperature sensing probe is equipped with the connecting wire, the one end of connecting wire is connected with electric preheating equipment, no. two slide blocks are close to one side of slide rail and are equipped with stop gear.
Preferably, the clamping mechanism comprises an adjusting bolt, a thread disc, a reset spring and a clamping plate, and one sides of the first sliding block and the second sliding block are welded with the thread disc.
Preferably, the inside of the thread disc is penetrated with an adjusting bolt, the built-in grooves of the first sliding block and the second sliding block are provided with clamping plates, and one ends of the clamping plates, which are close to the adjusting bolt, are sleeved with reset springs.
Preferably, the limiting mechanism comprises a limiting groove, a limiting pin, a sliding groove and a limiting spring, and the sliding groove is formed in the second sliding block.
Preferably, a limiting spring is arranged in the sliding groove, and a limiting pin is arranged on one side of the limiting spring.
Preferably, a limit groove is formed in one side, close to the second sliding block, of the first sliding rail, and a clamping structure is arranged between the limit pin and the limit groove.
Compared with the prior art, the utility model has the beneficial effects that: this but heating tube of quick butt joint:
1. be provided with fixture, before carrying out the electricity to the heating pipeline and preheating the work, need install temperature sensing probe to the heating pipe earlier, can place temperature sensing probe between two grip blocks earlier, afterwards through rotatory adjusting bolt, make adjusting bolt at the inside rotation of screw thread dish, afterwards adjusting bolt is in the built-in groove of slider and slider No. two to one side, and then promote the grip block to one side removal, drive reset spring and shrink, reset spring supports the grip block, make the grip block can install the outside of delivery pipe with temperature sensing probe, then temperature sensing probe carries out the response to the temperature of delivery pipe and detects, the butt joint installation effectiveness of temperature sensing probe and heating pipeline has been accelerated, follow-up heating pipeline's electricity preheats work efficiency, make the heating pipe operation stable.
2. Be provided with stop gear, when the position of temperature sensing probe is adjusted according to temperature detection's needs, can make the stop pin remove to one side in the spout through pulling the spacer pin, drive spacing spring shrink, make the spacer pin break away from the spacing groove, promote slider and No. two sliders later and slide to one side between slider and No. two sliders, after adjusting suitable testing position, can loosen the spacer pin, make spacing spring rebound drive spacer pin and spacing groove carry out the block, and then the position of slider and No. two sliders is restricted, the temperature sensing probe of being convenient for is responded to the temperature of the different positions of delivery pipe, the staff of being convenient for judges, the going on of follow-up electric preheating work, make electric preheating equipment preheat evenly to the temperature in the delivery pipe, the life of extension heat supply pipe.
Drawings
FIG. 1 is a schematic view of a front view in cross section;
FIG. 2 is a schematic side sectional view of the present utility model;
fig. 3 is an enlarged schematic view of the structure of the present utility model at a.
In the figure: 1. a water supply pipe; 2. an electric preheating device; 3. a water return pipe; 4. an end cap; 5. a short-circuited cable; 6. a connecting cable; 7. a first slide rail; 8. a second slide rail; 9. a clamping mechanism; 91. an adjusting bolt; 92. a threaded disc; 93. a return spring; 94. a clamping plate; 10. a first sliding block; 11. a second slide block; 12. a temperature sensing probe; 13. a connecting wire; 14. a limiting mechanism; 141. a limit groove; 142. a limiting pin; 143. a chute; 144. a limit spring; 15. and (5) connecting a rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: the utility model provides a but quick butt joint's heating tube, includes delivery pipe 1, connecting cable 6 and temperature sensing probe 12, the both ends of delivery pipe 1 are equipped with end cap 4, the one end of delivery pipe 1 is connected with connecting cable 6 through end cap 4, the other end of delivery pipe 1 is connected with short circuit cable 5 through end cap 4, the one end of connecting cable 6 is connected with electric preheating equipment 2, the one end of short circuit cable 5 is connected with wet return 3 through end cap 4, slide rail 7 and No. two slide rails 8 are installed to one side of delivery pipe 1, one side sliding connection of slide rail 7 has slide block 10 and No. two slide blocks 11, be sliding connection between slide block 10 and No. two slide blocks 11 and No. two slide rails 8, slide block 10 and No. two slide blocks 11's inside all is equipped with fixture 9, be equipped with connecting rod 15 between slide block 10 and No. two slide blocks 11, temperature sensing probe 12 sets up one side at fixture 9, one side of temperature sensing probe 12 is equipped with connecting wire 13, one end of connecting wire 13 is connected with electric preheating equipment 2, no. two slide blocks 11 are close to one side of 7 and are equipped with spacing mechanism 14.
According to the illustration in fig. 2 and 3, the clamping mechanism 9 comprises an adjusting bolt 91, a threaded disc 92, a return spring 93 and a clamping plate 94, the threaded disc 92 is welded on one side of the first slider 10 and the second slider 11, the adjusting bolt 91 is penetrated in the threaded disc 92, the clamping plate 94 is arranged in the built-in groove of the first slider 10 and the second slider 11, the return spring 93 is sleeved at one end of the clamping plate 94 close to the adjusting bolt 91, and the adjusting bolt 91 is in threaded connection with the threaded disc 92.
During implementation, the temperature sensing probe 12 can be placed between the two clamping plates 94 firstly, then the adjusting bolt 91 is rotated in the threaded disc 92 through rotating the adjusting bolt 91, then the adjusting bolt 91 moves to one side in the built-in grooves of the first sliding block 10 and the second sliding block 11, the clamping plates 94 are pushed to move to one side, the reset spring 93 is driven to shrink, the reset spring 93 supports the clamping plates 94, the temperature sensing probe 12 can be installed on the outer side of the water supply pipe 1 through the clamping plates 94, then the temperature sensing probe 12 senses and detects the temperature of the water supply pipe 1, the butt joint installation efficiency of the temperature sensing probe 12 and a heat supply pipeline is quickened, the electric preheating working efficiency of the follow-up heat supply pipeline is improved, and the heat supply pipe is stable in operation.
According to the illustration shown in fig. 2 and 3, the limiting mechanism 14 comprises a limiting groove 141, a limiting pin 142, a sliding groove 143 and a limiting spring 144, the sliding groove 143 is formed in the second sliding block 11, the limiting spring 144 is arranged in the sliding groove 143, the limiting pin 142 is arranged on one side of the limiting spring 144, the limiting groove 141 is formed in one side, close to the second sliding block 11, of the first sliding rail 7, a clamping structure is arranged between the limiting pin 142 and the limiting groove 141, and the limiting grooves 141 are distributed at intervals on one side of the first sliding rail 7.
During the implementation, the limiting pin 142 can be moved to one side in the sliding groove 143 by pulling the limiting pin 142, the limiting spring 144 is driven to shrink, the limiting pin 142 is separated from the limiting groove 141, the first sliding block 10 and the second sliding block 11 are then pushed to slide between the first sliding rail 7 and the second sliding rail 8 to one side, after being regulated to a proper detection position, the limiting pin 142 can be loosened, the limiting spring 144 can rebound to drive the limiting pin 142 to be clamped with the limiting groove 141, the positions of the first sliding block 10 and the second sliding block 11 are further limited, the temperature sensing probe 12 is convenient to sense the temperature of different positions of the water supply pipe 1, the judgment of workers is convenient, the follow-up electric preheating work is convenient, the electric preheating equipment 2 is enabled to preheat the temperature in the water supply pipe 1 uniformly, and the service life of a heat supply pipeline is prolonged.
Working principle: when the heating pipe capable of being quickly abutted is used, firstly, the electric preheating device 2 is connected with the water supply pipe 1 and the water return pipe 3 through the connecting cable 6 and the short-circuit cable 5 to form a loop, then the temperature sensing probe 12 is installed on the outer side of the water supply pipe 1 through the clamping mechanism 9, the position of the temperature sensing probe 12 can be adjusted through the limiting mechanism 14, the temperature sensing probe 12 can detect the temperature of different positions of the water supply pipe 1, and then the water supply pipe 1 is preheated according to the temperature of the water supply pipe 1, so that the installation of a subsequent heating pipeline is facilitated, the heat preservation effect of the heating pipeline is improved, the service life of the heating pipeline is prolonged, and the content which is not described in detail in the description belongs to the prior art known to the person skilled in the art.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.

Claims (6)

1. The utility model provides a but heating tube of quick butt joint, includes delivery pipe (1), connecting cable (6) and temperature sensing probe (12), its characterized in that: the utility model discloses a preheating device for a water supply pipe, including a water supply pipe (1), a connecting cable (6) is connected with one end of the water supply pipe (1) through end cap (4), the other end of the water supply pipe (1) is connected with a short circuit cable (5) through end cap (4), one end of the connecting cable (6) is connected with an electric preheating device (2), one end of the short circuit cable (5) is connected with a return pipe (3) through end cap (4), slide rail (7) and slide rail (8) are installed to one side of the water supply pipe (1), slide rail (7) and slide rail (11) are connected with one side sliding connection of slide rail (7), slide rail (10) and slide rail (11) are connected with one another for sliding between slide rail (8), slide rail (10) and slide rail (11) are all equipped with fixture (9) with the inside of slide rail (11), be equipped with connecting rod (15) between slide rail (10) and slide rail (11), temperature sensing probe (12) set up in one side of fixture (9), one side of connecting wire (13) is equipped with electric preheating device (13), and a limiting mechanism (14) is arranged on one side of the second sliding block (11) close to the first sliding rail (7).
2. A quick dockable heating pipe according to claim 1, wherein: the clamping mechanism (9) comprises an adjusting bolt (91), a threaded disc (92), a reset spring (93) and a clamping plate (94), and the threaded disc (92) is welded on one side of the first sliding block (10) and one side of the second sliding block (11).
3. A quick dockable heating pipe according to claim 2, characterized in that: the inside of screw thread dish (92) is run through has adjusting bolt (91), be equipped with grip block (94) in the built-in groove of No. one slider (10) and No. two sliders (11), reset spring (93) have been cup jointed to the one end that grip block (94) is close to adjusting bolt (91).
4. A quick dockable heating pipe according to claim 1, wherein: the limiting mechanism (14) comprises a limiting groove (141), a limiting pin (142), a sliding groove (143) and a limiting spring (144), and the sliding groove (143) is formed in the second sliding block (11).
5. A quick dockable heating pipe according to claim 4, wherein: a limiting spring (144) is arranged in the sliding groove (143), and a limiting pin (142) is arranged on one side of the limiting spring (144).
6. A quick dockable heating pipe according to claim 5, wherein: a limiting groove (141) is formed in one side, close to the second sliding block (11), of the first sliding rail (7), and a clamping structure is arranged between the limiting pin (142) and the limiting groove (141).
CN202322186344.3U 2023-08-14 2023-08-14 Heating pipe capable of being quickly abutted Active CN220648396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322186344.3U CN220648396U (en) 2023-08-14 2023-08-14 Heating pipe capable of being quickly abutted

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322186344.3U CN220648396U (en) 2023-08-14 2023-08-14 Heating pipe capable of being quickly abutted

Publications (1)

Publication Number Publication Date
CN220648396U true CN220648396U (en) 2024-03-22

Family

ID=90294510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322186344.3U Active CN220648396U (en) 2023-08-14 2023-08-14 Heating pipe capable of being quickly abutted

Country Status (1)

Country Link
CN (1) CN220648396U (en)

Similar Documents

Publication Publication Date Title
CN108487117B (en) Intelligent traffic monitor
CN220648396U (en) Heating pipe capable of being quickly abutted
CN210173550U (en) Piping lane power cable inspection robot
CN211542362U (en) Flaring device is used in production of PPR pipe fitting
CN216116386U (en) Temperature rise partial discharge impact detection device for residential transformer
CN210240223U (en) Seat ring film sticking machine
CN212568299U (en) CPVC power protection pipe bending strength test mechanism
CN210323252U (en) Railway power supply insulator contamination online monitoring device
CN204265805U (en) U-shaped bend pipe destressing machine
CN212428187U (en) Temporary protection device for ancient architecture
CN211991187U (en) Pipe orifice chamfering device for copper pipe production
CN111502329A (en) Temporary protection device for ancient architecture
CN214667612U (en) High-temperature-resistant detection device for tee joint
CN210014690U (en) Fused salt tank device that thermal insulation performance is good
CN213661062U (en) Distance measuring device for cable construction
CN216190031U (en) Power transmission and transformation engineering is with circuit conveyor of detectable cable length
CN113483852B (en) River management heat collection imaging detection method
CN111060550A (en) Internal heating type detection device for high-temperature valve
CN215598876U (en) Aluminum alloy strength detection device for building engineering
CN216694047U (en) Split type wall-mounted solar water heater
CN215724229U (en) Solar heat collecting device
CN220356519U (en) Infrared temperature measuring device for equipment operation
CN215765327U (en) Multifunctional water dividing and collecting device based on hollow filling heat insulation modularization
CN211652626U (en) Internal heating type detection device for high-temperature valve
CN215891386U (en) Convenient interface of registering one's residence of heat supply pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant