CN220645328U - A kind of building reinforced steel structure - Google Patents
A kind of building reinforced steel structure Download PDFInfo
- Publication number
- CN220645328U CN220645328U CN202321561905.7U CN202321561905U CN220645328U CN 220645328 U CN220645328 U CN 220645328U CN 202321561905 U CN202321561905 U CN 202321561905U CN 220645328 U CN220645328 U CN 220645328U
- Authority
- CN
- China
- Prior art keywords
- threaded
- reinforcement plate
- steel structure
- shaped reinforcement
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 34
- 239000010959 steel Substances 0.000 title claims abstract description 34
- 230000002787 reinforcement Effects 0.000 claims abstract description 48
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims abstract description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 239000011150 reinforced concrete Substances 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 5
- 238000012423 maintenance Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种建筑加固型钢结构,包括第一L型加固板、第二L型加固板,所述第一L型加固板一侧固定安装有支撑块,所述支撑块下面固定安装有螺纹柱,所述螺纹柱上螺纹连接有螺纹套管,所述第二L型加固板上面固定安装有螺纹套环块,所述螺纹套环块内螺纹安装有螺纹丝杠,所述第一L型加固板上面开设有螺纹连接孔,所述螺纹套管上固定安装有螺帽。通过将连接螺栓穿过固定通孔旋入螺纹连接孔内部,从而可以将第二L型加固板与第一L型加固板连接在一起,组成一个加固装置,采用拼接式的连接方式,便于直接将装置安装至钢构件的连接处。
The utility model discloses a building reinforcement steel structure, which includes a first L-shaped reinforcement plate and a second L-shaped reinforcement plate. A support block is fixedly installed on one side of the first L-shaped reinforcement plate, and a support block is fixedly installed below the support block. There is a threaded column, a threaded sleeve is threadedly connected to the threaded column, a threaded collar block is fixedly installed on the second L-shaped reinforcement plate, and a threaded screw is installed in the internal thread of the threaded collar block. An L-shaped reinforcement plate is provided with threaded connection holes, and a nut is fixedly installed on the threaded sleeve. By screwing the connecting bolt through the fixing through hole into the threaded connection hole, the second L-shaped reinforcement plate and the first L-shaped reinforcement plate can be connected together to form a reinforcement device. The spliced connection method is used to facilitate direct Install the device at the joint of the steel member.
Description
技术领域Technical field
本实用新型涉及一种钢结构,尤其涉及一种建筑加固型钢结构。The utility model relates to a steel structure, in particular to a building reinforced steel structure.
背景技术Background technique
钢结构是由钢制材料组成的结构,是主要的建筑结构类型之一,各构件或部件之间通常采用焊缝、螺栓或铆钉连接,钢结构容易锈蚀,一般钢结构要除锈、镀锌或涂料,且要定期维护,在钢结构维护过程中需要使用加固装置来加固钢结构,避免维护人员对钢结构维护时坍塌。Steel structure is a structure composed of steel materials. It is one of the main types of building structures. Each component or component is usually connected by welds, bolts or rivets. Steel structures are easy to rust. Generally, steel structures need to be rust-free and galvanized. Or coating, and must be maintained regularly. During the maintenance of the steel structure, reinforcement devices need to be used to reinforce the steel structure to prevent maintenance personnel from collapsing during maintenance of the steel structure.
如中国专利公开的公开号为CN213034560U的一种建筑用工型加固型钢结构,涉及钢结构技术领域,具体为一种建筑用工型加固型钢结构,包括连接板,所述连接板上表面的左右两侧均开设有滑动槽,所述滑动槽的内部设置有连接圈,所述连接圈的底部固定连接有紧固杆,所述连接圈的表面套接有旋转圈,所述旋转圈的表面固定连接有转动板,所述连接圈的顶部固定连接有把手,所述连接板上表面的中部由前至后依次设置有检修盒与紧固螺栓,所述检修盒的表面活动连接有盒盖,所述盒盖上表面的中部固定连接有按压把手。该一种建筑用工型加固型钢结构,便于人员节省准备检修工具的时间,增加了检修的便利性以及便于人员在检修钢结构时移动。For example, the Chinese Patent Publication No. CN213034560U relates to the technical field of steel structures, which relates to a construction-type reinforced steel structure. Specifically, it is a construction-type reinforced steel structure, including connecting plates. The left and right sides of the upper surface of the connecting plates Both have sliding grooves, a connecting ring is provided inside the sliding groove, a fastening rod is fixedly connected to the bottom of the connecting ring, a rotating ring is sleeved on the surface of the connecting ring, and the surface of the rotating ring is fixedly connected. There is a rotating plate, a handle is fixedly connected to the top of the connecting ring, an inspection box and a fastening bolt are arranged in the middle of the upper surface of the connecting plate from front to back, and a lid is movably connected to the surface of the inspection box. The middle part of the upper surface of the box cover is fixedly connected with a pressing handle. This kind of construction-type reinforced steel structure facilitates personnel to save time in preparing maintenance tools, increases the convenience of maintenance, and facilitates personnel to move when inspecting the steel structure.
上述现有的一种建筑用工型加固型钢结构使用时发现一些问题,首先钢结构建筑如钢梁连接处焊接在一起,两端均与其余构件焊接在一起,无法便捷从一端套接在焊接处进行加固,使用时需要将装置拆分开才能进行安装加固的问题。Some problems were discovered during the use of the above-mentioned existing reinforced steel structure for construction work. First, the steel structure buildings such as steel beams are welded together at the joints, and both ends are welded together with other components. It cannot be conveniently connected to the welded joint from one end. For reinforcement, the device needs to be disassembled before use for installation and reinforcement.
实用新型内容Utility model content
本实用新型的目的在于提供一种建筑加固型钢结构,以解决上述背景技术中提出现有的问题。The purpose of this utility model is to provide a building reinforced steel structure to solve the existing problems raised in the above background technology.
为实现上述目的,本实用新型提供如下技术方案:一种建筑加固型钢结构,包括第一L型加固板、第二L型加固板,所述第一L型加固板一侧固定安装有支撑块,所述支撑块下面固定安装有螺纹柱,所述螺纹柱上螺纹连接有螺纹套管,所述第二L型加固板上面固定安装有螺纹套环块,所述螺纹套环块内螺纹安装有螺纹丝杠。To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a building reinforcement steel structure, comprising a first L-shaped reinforcement plate and a second L-shaped reinforcement plate, wherein a support block is fixedly installed on one side of the first L-shaped reinforcement plate, a threaded column is fixedly installed under the support block, a threaded sleeve is threadedly connected to the threaded column, and a threaded collar block is fixedly installed on the second L-shaped reinforcement plate, and a threaded screw is installed on the inner thread of the threaded collar block.
优选的,所述第一L型加固板上面开设有螺纹连接孔。Preferably, a threaded connection hole is provided on the first L-shaped reinforcement plate.
优选的,所述螺纹套管上固定安装有螺帽。Preferably, a nut is fixedly installed on the threaded sleeve.
优选的,所述第二L型加固板内开设有固定通孔。Preferably, a fixing through hole is opened in the second L-shaped reinforcement plate.
优选的,所述固定通孔内设置有连接螺栓,所述连接螺栓与螺纹连接孔螺纹配合。Preferably, a connecting bolt is provided in the fixing through hole, and the connecting bolt is threadedly matched with the threaded connecting hole.
优选的,所述螺纹丝杠两端固定安装有旋钮。Preferably, knobs are fixedly installed at both ends of the threaded screw.
与现有技术相比,本实用新型的有益效果是:Compared with the existing technology, the beneficial effects of this utility model are:
1、将连接螺栓穿过固定通孔旋入螺纹连接孔内部,从而可以将第二L型加固板与第一L型加固板连接在一起,组成一个加固装置,采用拼接式的连接方式,便于直接将装置安装至钢构件的连接处。1. Screw the connecting bolt through the fixed through hole into the threaded connection hole, so that the second L-shaped reinforcement plate and the first L-shaped reinforcement plate can be connected together to form a reinforcement device, using a spliced connection method for convenience Mount the unit directly to the joint of the steel member.
2、通过旋转螺纹套管可以调整两个第一L型加固板之间的间距,旋转螺纹丝杠可以调整两个第二L型加固板之间的间距,可以使装置适应不同尺寸大小的钢结构。2. The distance between the two first L-shaped reinforcement plates can be adjusted by rotating the threaded sleeve, and the spacing between the two second L-shaped reinforcement plates can be adjusted by rotating the threaded screw, making the device adaptable to steel of different sizes. structure.
附图说明Description of drawings
图1为本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;
图2为本实用新型的第一L型加固板结构示意图;Figure 2 is a schematic structural diagram of the first L-shaped reinforcement plate of the present utility model;
图3为本实用新型的第二L型加固板结构示意图;Figure 3 is a schematic structural diagram of the second L-shaped reinforcement plate of the present utility model;
图4为本实用新型的加固时状态结构示意图。Figure 4 is a schematic structural diagram of the utility model during reinforcement.
图中:1、第一L型加固板;101、螺纹连接孔;2、支撑块;201、螺纹柱;3、螺纹套管;301、螺帽;4、第二L型加固板;401、螺纹套环块;402、固定通孔;403、螺纹丝杠;404、旋钮;405、连接螺栓。In the picture: 1. The first L-shaped reinforcement plate; 101. Threaded connection hole; 2. Support block; 201. Threaded column; 3. Threaded sleeve; 301. Nut; 4. The second L-shaped reinforcement plate; 401. Threaded collar block; 402, fixed through hole; 403, threaded screw; 404, knob; 405, connecting bolt.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.
请参阅图1-4,本实用新型提供一种技术方案:一种建筑加固型钢结构,包括第一L型加固板1、第二L型加固板4,第一L型加固板1一侧固定安装有支撑块2,支撑块2下面固定安装有螺纹柱201,螺纹柱201上螺纹连接有螺纹套管3,第二L型加固板4上面固定安装有螺纹套环块401,螺纹套环块401内螺纹安装有螺纹丝杠403。Please refer to Figures 1-4. The present utility model provides a technical solution: a building reinforced steel structure, including a first L-shaped reinforcement plate 1 and a second L-shaped reinforcement plate 4. The first L-shaped reinforcement plate 1 is fixed on one side. A support block 2 is installed, a threaded column 201 is fixedly installed below the support block 2, a threaded sleeve 3 is threadedly connected to the threaded column 201, and a threaded collar block 401 is fixedly installed above the second L-shaped reinforcement plate 4. The threaded collar block The 401 internal thread is equipped with a threaded screw 403.
本实施方案中,通过将螺纹套管3两端螺纹分别连接一个螺纹柱201,旋转螺纹套管3可以调节两个螺纹柱201之间的间距,从而带动第一L型加固板1夹持在工型钢连接处,随后再旋转螺纹丝杠403可以带动两个螺纹套环块401相互靠近或者远离,螺纹套环块401可以带动第二L型加固板4移动,从而从工型钢上下面夹持在其连接处,随后在通过连接螺栓405可以将第二L型加固板4与第一L型加固板1连接在一起,形成一个稳定的加固装置,采用拼接式的连接方式,便于直接对钢构件连接处进行加固,同时能够适应不同尺寸大小的钢结构。In this embodiment, by threading the two ends of the threaded sleeve 3 to a threaded column 201 respectively, the spacing between the two threaded columns 201 can be adjusted by rotating the threaded sleeve 3, thereby driving the first L-shaped reinforcing plate 1 to be clamped on At the I-shaped steel connection, then rotating the threaded screw 403 can drive the two threaded collar blocks 401 to move closer to or away from each other. The threaded collar block 401 can drive the second L-shaped reinforcing plate 4 to move, thereby clamping the I-shaped steel from the top and bottom. At their connection, the second L-shaped reinforcement plate 4 and the first L-shaped reinforcement plate 1 can then be connected together through the connecting bolts 405 to form a stable reinforcement device. The spliced connection method is used to facilitate direct connection of the steel. The joints of the components are reinforced and can be adapted to steel structures of different sizes.
其中,为了实现旋转螺纹套管3的目的,本装置采用如下技术方案实现的:第一L型加固板1上面开设有螺纹连接孔101,螺纹套管3上固定安装有螺帽301。Among them, in order to realize the purpose of rotating the threaded casing 3, this device is implemented by using the following technical solution: a threaded connection hole 101 is opened on the first L-shaped reinforcement plate 1, and a nut 301 is fixedly installed on the threaded casing 3.
通过螺帽301便于使用扳手等工具带动螺纹套管3旋转,螺纹套管3旋转可以调整两个第一L型加固板1之间的间距。The nut 301 facilitates the use of tools such as a wrench to drive the threaded sleeve 3 to rotate, and the rotation of the threaded sleeve 3 can adjust the distance between the two first L-shaped reinforcement plates 1 .
其中,为了实现连接第一L型加固板1与第二L型加固板4的目的,本装置采用如下技术方案实现的:第二L型加固板4内开设有固定通孔402,固定通孔402内设置有连接螺栓405,连接螺栓405与螺纹连接孔101螺纹配合,螺纹丝杠403两端固定安装有旋钮404。Among them, in order to achieve the purpose of connecting the first L-shaped reinforcement plate 1 and the second L-shaped reinforcement plate 4, this device adopts the following technical solution: a fixed through hole 402 is opened in the second L-shaped reinforced plate 4, and the fixed through hole is Connecting bolts 405 are provided in 402, and the connecting bolts 405 are threadedly matched with the threaded connecting holes 101. Knobs 404 are fixedly installed at both ends of the threaded screw 403.
通过将连接螺栓405穿过固定通孔402旋入螺纹连接孔101内部,从而可以将第二L型加固板4与第一L型加固板1连接在一起,使第一L型加固板1与第二L型加固板4夹持在工型钢两侧,旋钮404可以带动螺纹丝杠403旋转。By screwing the connecting bolt 405 through the fixing through hole 402 into the threaded connection hole 101, the second L-shaped reinforcement plate 4 and the first L-shaped reinforcement plate 1 can be connected together, so that the first L-shaped reinforcement plate 1 and The second L-shaped reinforcing plate 4 is clamped on both sides of the I-shaped steel, and the knob 404 can drive the threaded screw 403 to rotate.
本实用新型的工作原理及使用流程:在使用时需要将装置放置在合适的位置,首先将第一L型加固板1卡在工型钢构件连接处的两侧凹槽内部,随后旋转螺纹套管3可以带动两个第一L型加固板1相互远离,从而挤压固定安装工型钢构件凹槽内部,随后将第二L型加固板4卡在工型钢构件上下面,通过旋钮404带动螺纹丝杠403旋转,螺纹丝杠403旋转会带动第二L型加固板4相互靠近,从工型钢构件上下面夹持在其两侧,最后将连接螺栓405穿过固定通孔402旋入螺纹连接孔101内部,从而可以将第二L型加固板4与第一L型加固板1连接在一起,组成一个加固装置,对工型钢连接处进行加固。The working principle and usage process of the utility model: When using, the device needs to be placed in a suitable position. First, the first L-shaped reinforcement plate 1 is stuck inside the grooves on both sides of the connection between the I-shaped steel components, and then the threaded casing is rotated. 3. The two first L-shaped reinforcement plates 1 can be driven away from each other, thereby squeezing and fixing the inside of the groove of the I-shaped steel component. Then the second L-shaped reinforcement plate 4 is stuck on the upper and lower sides of the I-shaped steel component, and the threaded wire is driven through the knob 404. When the lever 403 rotates, the rotation of the threaded screw 403 will drive the second L-shaped reinforcing plates 4 to approach each other, clamping the I-shaped steel member on both sides from the upper and lower sides, and finally screw the connecting bolt 405 through the fixed through hole 402 into the threaded connecting hole. 101 inside, so that the second L-shaped reinforcement plate 4 and the first L-shaped reinforcement plate 1 can be connected together to form a reinforcement device to reinforce the I-shaped steel connection.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention. , substitutions and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321561905.7U CN220645328U (en) | 2023-06-19 | 2023-06-19 | A kind of building reinforced steel structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321561905.7U CN220645328U (en) | 2023-06-19 | 2023-06-19 | A kind of building reinforced steel structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220645328U true CN220645328U (en) | 2024-03-22 |
Family
ID=90286665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321561905.7U Active CN220645328U (en) | 2023-06-19 | 2023-06-19 | A kind of building reinforced steel structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220645328U (en) |
-
2023
- 2023-06-19 CN CN202321561905.7U patent/CN220645328U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205604725U (en) | Hand for building is twisted card and is connected aluminum alloy template | |
CN211465332U (en) | Rotary clamping device for pipe fitting welding | |
CN220645328U (en) | A kind of building reinforced steel structure | |
CN214925589U (en) | Be used for prefabricated building PC wall conversion layer to reserve joint bar positioner | |
CN206233615U (en) | It is a kind of to pour support frame for concrete folding plate | |
CN211850805U (en) | Novel concrete embedded bolt mechanism | |
CN209854739U (en) | Adjustable shoring device | |
CN222701552U (en) | Can have enough to meet need first integrated unloading device of I-steel sleeve | |
CN212170189U (en) | Steel construction fastening processing frock | |
CN206971775U (en) | Masonry mortar pointer | |
CN111021713A (en) | Novel concrete embedded bolt mechanism and use method thereof | |
CN220416434U (en) | Butt joint device | |
CN208105049U (en) | A kind of carrier setting bolt hole precision positioning model | |
CN206000167U (en) | Adjustable Alminum Project slab form support meanss | |
CN218668521U (en) | Ring beam template reinforcing device for building construction | |
CN219649051U (en) | Building construction reinforcing bar positioner | |
CN218932917U (en) | Road and bridge crack repair fixing structure | |
CN205804630U (en) | A kind of attachment means for prefabricated buildings | |
CN221919761U (en) | A building steel structure connection device | |
CN215562774U (en) | Large-scale movable rag bolt construction equipment | |
CN216239897U (en) | A hole repairing device suitable for side walls of flat concrete structures | |
CN222971375U (en) | Precast concrete pavement slab angle steel welding auxiliary device | |
CN214272406U (en) | Energy-saving steel structure unit | |
CN104389269B (en) | Bridge pad preformed hole four hole positioning device and method | |
CN213562328U (en) | Fastening tool for lead screw expansion bolt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20241029 Address after: Room 204, Building 1, No. 55 Zongze Road, Jingkou District, Zhenjiang City, Jiangsu Province, China 212000 Patentee after: Dong Sijun Country or region after: China Address before: 106-39, Libao Industrial Building, No. 36 Lishan Road, Lixia District, Jinan City, Shandong Province, 250000 Patentee before: Antai Meike (Shandong) Engineering Technology Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20241122 Address after: 212000, 3rd Floor, No. 88 Xuefu Road, Jingkou District, Zhenjiang City, Jiangsu Province, China Patentee after: Zhenjiang Mingyu Construction Engineering Co.,Ltd. Country or region after: China Address before: Room 204, Building 1, No. 55 Zongze Road, Jingkou District, Zhenjiang City, Jiangsu Province, China 212000 Patentee before: Dong Sijun Country or region before: China |