CN220645190U - Fast-assembling ancient building component - Google Patents
Fast-assembling ancient building component Download PDFInfo
- Publication number
- CN220645190U CN220645190U CN202322093778.9U CN202322093778U CN220645190U CN 220645190 U CN220645190 U CN 220645190U CN 202322093778 U CN202322093778 U CN 202322093778U CN 220645190 U CN220645190 U CN 220645190U
- Authority
- CN
- China
- Prior art keywords
- fast
- assembling
- component
- ancient
- fixing base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 claims abstract description 11
- 238000007493 shaping process Methods 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 34
- 238000013461 design Methods 0.000 abstract description 11
- 238000000465 moulding Methods 0.000 abstract description 9
- 238000011161 development Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 9
- 240000000233 Melia azedarach Species 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 229920006351 engineering plastic Polymers 0.000 description 3
- 238000001746 injection moulding Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000010422 painting Methods 0.000 description 3
- 229910001220 stainless steel Inorganic materials 0.000 description 3
- 239000010935 stainless steel Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000012994 industrial processing Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a fast-assembled ancient-building component, which comprises a component head combined die and a fixing base, wherein the component head combined die comprises molding plates with parallel left and right sides, the front side parts and the lower parts between the molding plates at the two sides are respectively sealed and fixed by sealing plates, the fixing base is fixed at the corresponding position on a wall body, the inner side buckling edge of the component head combined die is fixedly sleeved with the fixing base, and a pouring opening is arranged at the upper side of the component head combined die and used for pouring concrete. The implementation of the fast-assembling ancient-building component project can improve the construction efficiency, reduce the cost and improve the quality, meets different design requirements, and has positive promotion effect on the development and popularization of the component industry.
Description
Technical Field
The utility model belongs to the technical field of ancient building Lignu, and particularly relates to a quick-mounting ancient building Lignu.
Background
The construction of the Lichi in the prior ancient architecture has the problems of low efficiency, high construction cost, incapability of guaranteeing linear quality and the like. Because the existing construction method requires site construction of a template consistent with the shape of the Living head, the construction method can be very time-consuming and difficult to complete quickly, and the construction complexity and difficulty are increased. The erection of the shape of the inner race of the component part takes a lot of time and labor. The field construction involves a plurality of links including template construction, concrete pouring, line painting and the like, and each step requires a large amount of manual investment, so that the construction time is prolonged. In addition, the line of the outer ring is required to be manually painted after the pouring of the Lichitou is completed, which not only requires extra time and labor, but also can lead to the fact that the line-shaped quality cannot be ensured and influence the beauty and the quality of the Lichitou. A plurality of time-consuming links exist in the whole construction process, so that the construction efficiency is low. Meanwhile, due to the large amount of manual investment and complex construction procedures, the construction cost is relatively high.
Currently, for some parts of the parts marked by the parts, the concealment of the connecting parts is important for the overall stability and the aesthetic property of the parts. When connecting standard chien and wall corresponding position, because the junction is hidden, probably lead to the construction degree of difficulty to increase. Particularly in the field construction, the adjustment of the connection position and fixing manner of the joint and the wall may become complicated because the connection part cannot be directly observed. Moreover, the strength of the connection site is critical to the stability of the component. If the connection is not firm, the component may loose or break during use. Because of the concealment of the connection part, it is difficult to find the problem in time, which may cause a hidden safety hazard in the use process of the component.
Disclosure of Invention
Aiming at the problems that the efficiency is low in the construction process caused by the existing component head mode and the problems that the fixed connection is difficult and the strength is poor due to the fact that the connection part is needed to be hidden when the standard component head is partially connected with the corresponding part of the wall, the utility model provides a quick-mounting ancient building component head which is used for overcoming the problems.
The utility model solves the technical problems as follows: the utility model provides an adopt fast-assembling ancient building first, includes the first sectional mould of a component and fixing base, the first sectional mould of component includes the parallel shaping board of left and right sides, and the preceding lateral part and the lower part between the shaping board of both sides are sealed fixed by the closing plate respectively, the fixing base is fixed in the corresponding position on the wall body, the inboard knot limit of first sectional mould with fixing base seal cover is together, is provided with the filling mouth in the upside of first sectional mould of component for pour into concrete.
Preferably, a support plate is connected between two side walls of the filling port for improving the strength of the filling port.
Preferably, the pouring port located at the upper side of the combined die of the Lifei is an upper inclined plane with the front side lower than the rear side, and at least the bottom of the inclined plane is connected with a sealing plate.
Preferably, the front side of the combined die of the chien is provided with a convergence wall below, the rear side is provided with a strip-shaped body below, and the front side of the strip-shaped body is provided with a modeling cover.
Preferably, the periphery of the fixing seat is provided with a lining edge, and the inner side buckling edge of the combined die of the component is matched and sleeved and fixed on the outer side of the lining edge.
Preferably, a limiting inner frame or a connecting inner frame is respectively fixed on the upper side and the lower side of the inner side buckling edge of the component die.
Preferably, a reinforcing lining plate is additionally arranged on the inner wall of the inner side buckling edge or the inner wall of the pouring opening of the component die.
The utility model has the beneficial effects that: the implementation of the fast-assembling ancient-building component project can improve the construction efficiency, reduce the cost and improve the quality, meets different design requirements, and has positive promotion effect on the development and popularization of the component industry.
1. The construction efficiency is improved: the combined die of the Lichitou is used as an industrial processing part, the size of the combined die is standardized, and modeling and installation can be rapidly realized only by adopting an assembly mode on a construction site. Compared with the traditional method for building templates and painting on site, the construction time is greatly shortened, and the construction efficiency is obviously improved.
2. Labor cost is saved: the fast-assembling ancient building component project reduces the requirements of on-site construction of templates and manual painting, most of manufacturing and pretreatment works are completed in workshops, on-site manpower investment is reduced, and construction cost is reduced.
3. Ensure connection robustness: through the use of industrialization processing parts, the connecting part of the combined die 1 of the component in the Lian can be more accurate and stable, and the problems of difficult fixed connection and poor strength caused by hidden connection in the traditional construction are avoided.
4. The construction quality is improved: the standardized manufacturing and assembling process of the combined die 1 for the Lien's head ensures the overall consistency and accuracy of the Lien's head, is beneficial to keeping the consistency of the shape and quality of the Lien's head and improves the construction quality.
5. Optimizing design requirements: through the design and the manufacturing of the combined die 1 for the Lichitou, the combined die can better adapt to different design requirements, realizes diversified modeling of the Lichitou, and meets the requirements of different building styles and cultural characteristics.
Drawings
Fig. 1 is a schematic diagram of the assembly relationship of a fast-assembling ancient component part;
fig. 2 is a rear side perspective view of the combined die of the component part;
FIG. 3 is a schematic structural view of the fixing base;
FIG. 4 is a schematic front view of a form of the component part mold;
reference numerals in the drawings: 1-a combined die of a Lichitou; 2-an upper inclined plane; 3-a filling port; 4-supporting plates; 5-sealing plate; 6-converging walls; 7-a strip; 8-molding a cover; 9-inner side buckling edges; 10-fixing seats; 11-fixing holes; 12-limiting an inner frame; 13-reinforcing the lining plate; 14-edge.
Description of the embodiments
The utility model will be further described with reference to the drawings and examples.
Example 1: the utility model provides a fast-assembling ancient building front, mainly there is inefficiency and fixed connection difficult problem and improvement to current front work progress, this fast-assembling ancient building front is the front-end combined die 1 of the fixed front-end of the same kind, through the integrated into one piece's front-end structure behind the pouring concrete, have the advantage of job site fast-assembling, front-end combined die 1 is the industrialization processing part, its size is standardized, only adopt the assembly type can realize the molding installation fast during the construction, high in construction efficiency, high quality, save the human cost.
Specifically, as shown in fig. 1 to 4, the fast-assembling ancient building head mainly comprises a combined mold 1 for the Lian head and a fixing seat 10, wherein the combined mold 1 for the Lian head can be formed by adopting stainless steel plates through industrial welding or folding, and can also be formed by adopting engineering plastics through injection molding, and comprises molding plates with parallel left and right sides, the front side part and the lower part between the molding plates at the two sides are respectively sealed and fixed by sealing plates, and the fixing seat 10 is fixed at the corresponding position on a wall body. The inner side buckling edge 9 of the head assembling die 1 and the fixing seat 10 are sealed and fixed together, and the fixing modes of the two can adopt welding, bolt connection or clamping fixing modes and the like. A pouring opening 3 is arranged on the upper side of the combined die 1 for pouring concrete.
As shown in fig. 1, a support plate 4 may be connected between two side walls of the pouring opening 3, so as to improve the strength of the pouring opening 3 and avoid structural deformation at the initial stage of pouring. The support plate 4 is usually welded in a workshop, without excluding the current fixing by welding or by bolting.
The pouring port 3 located at the upper side of the component part die 1 is an upper inclined surface 2 with the front side lower than the rear side. A converging wall 6 is provided under the front side of the front combined mold 1, and has an arc-shaped structure, and a bar-shaped body 7 is provided under the rear side of the front combined mold 1. Therefore, the whole combined die 1 for the Lian head is a structural body with the upper and lower spans of the front side being larger than the upper and lower spans of the rear side, the larger connecting area of the rear side can be fully utilized, the overall connecting strength is improved, and the modeling requirement of the Lian head can be met.
At least the bottom of the inclined plane is connected with a sealing plate 5 to ensure that the concrete cannot overflow during pouring. The sealing plate 5 may be welded and fixed to the lower edge of the pouring opening in advance, or a quick-mounting member, such as a snap-fit connection structure or a bolt connection structure, may be provided between the pouring opening 3 and the sealing plate 5 to meet the sealing assembly requirement during construction, but the possible case of welding the sealing plate 5 on site is not excluded.
A shaping cover 8 (which may be a mere convex shaping structure) is provided on the front side of the strip 7. Or the modeling cover is movably arranged outside the modeling hole. The molding cover 8 not only can meet the molding requirement, but also can be used as a functional hole cover, and the assembly and other operations are completed through perforation in the assembly process.
The expansion wires are arranged in the fixing holes 11 of the fixing base 10 and fixed at corresponding positions on the wall body, the periphery of the fixing base 10 is provided with a lining edge 14, and the inner side buckling edge 9 of the combined die 1 for the component is matched and fixed on the outer side of the lining edge 14.
The limiting inner frame 12 or the connecting inner frame can be respectively fixed on the upper side and the lower side of the inner buckling edge 9 of the component die 1. The inner wall of the inner side buckling edge 9 or the inner wall of the pouring port 3 of the component die 1 can be additionally provided with a reinforcing lining plate 13.
It is not excluded that an inner bracket is added to the middle of the two molding plates of the component part mold 1 to maintain the shape of the component part mold 1.
The detailed implementation process based on the scheme is as follows:
1. design and manufacture of the combined die 1 of the Liu: first, the design of the component mold 1 for the front of the living front is performed according to the design requirements of the living front. The die assembly 1 can be formed by injection molding of stainless steel plates or engineering plastics. In the workshop, the component mold 1 is manufactured by welding or folding (if a stainless steel material is selected) or injection molding (if an engineering plastic material is selected). In order to maintain standardization of dimensions, ensuring that it can be accurately attached to a wall, it is necessary to tightly control the dimensions and quality during manufacturing. According to design requirements, the inner side fastening edge 9 of the combined die 1 of the front and rear parts of the Lian's head can be further considered to be fixed with a limit inner frame 12 or a connecting inner frame. The provision of these internal shelves helps to maintain the shape and stability of the central head set 1.
2. Preparation of the fixing base 10: the fixing base 10 can be a metal base fixed on the wall body by expansion wires, and the periphery of the metal base is also provided with a lining edge 14. The preparation of the holder 10 includes selecting a suitable fixing location, pre-installing an expansion wire, etc.
3. Preparing in the field: in the construction site, the fixing base 10 on the wall needs to be accurately installed according to the position of the computer. At the same time, the position and levelness of the fixing base 10 are checked, so that the fixing base is ensured to be in accordance with the design requirements.
4. Assembling a fast-assembling ancient building component: during site construction, the modeling and installation of the component can be quickly realized in an assembly mode. First, the inner side edge 9 of the combined die 1 is matched and fixed on the outer side of the lining edge 14 of the fixing seat 10.
5. Pouring concrete: the sealing plate 5 needs to be pre-installed at the upper pouring opening 3 of the combined die 1 for the Lichitou to ensure that the concrete cannot overflow during the pouring process. If it is necessary to increase the strength of the pouring spout 3, a support plate 4 may be attached between both side walls of the pouring spout 3.
6. And (3) finishing assembly: after the pouring is finished, after the concrete reaches a certain strength, the assembling of the whole fast-assembled ancient-building component can be finished without dismantling the component die 1.
7. Checking quality: finally, the assembling quality of the component needs to be carefully checked, the firm connection is ensured, and the appearance is attractive. The modeling cover 8 on the component can also be installed as required by design.
Through the scheme of the fast-assembling ancient building component, the construction efficiency can be obviously improved, the labor cost is saved, and the overall quality of the component is ensured. The use of the industrial processing component makes the construction of the component more standardized and simpler, and simultaneously increases the stability of the joint of the component.
The above detailed description of the present utility model is merely illustrative or explanatory of the principles of the utility model and is not necessarily intended to limit the utility model. Accordingly, any modification, equivalent replacement, improvement, etc. made without departing from the spirit and scope of the present utility model should be included in the scope of the present utility model.
Claims (7)
1. The utility model provides a fast-assembling ancient building head, its characterized in that includes first sectional mold (1) of a kind of fast-assembling and fixing base (10), first sectional mold (1) of a kind of a component includes the parallel shaping board of left and right sides, and the anterior part and lower part between the shaping board of both sides are sealed fixed by the closing plate respectively, fixing base (10) are fixed in the corresponding position on the wall body, the inboard knot limit (9) of first sectional mold (1) with fixing base (10) seal cartridge is in the same place, is provided with pouring opening (3) in the upside of first sectional mold (1) of a kind of a component for pouring concrete.
2. The fast-assembling ancient zhen's head according to claim 1, wherein a supporting plate (4) is connected between two side walls of the pouring opening (3) for improving the strength of the pouring opening (3).
3. The fast-assembling ancient-building head according to claim 1, wherein the pouring opening (3) at the upper side of the combined mold (1) for the said component head is an upper inclined plane (2) with the front side lower than the rear side, and a sealing plate (5) is connected at least at the bottom of the inclined plane.
4. The fast-assembling ancient-build-up front of the front part of the front combined mold (1) has a converging wall (6), and a strip-shaped body (7) below the rear part, and a modeling cover (8) is arranged on the front side of the strip-shaped body (7).
5. The fast-assembling ancient-building front of claim 1, wherein the periphery of the fixing seat (10) is provided with a lining (14), and the inner side buckling edge (9) of the front combined die (1) is matched and fixed on the outer side of the lining (14).
6. The fast-assembling ancient building head according to claim 1, wherein the inner side fastening edge (9) of the combined mold (1) for the ancient building head is respectively fixed with a limiting inner frame (12) or a connecting inner frame.
7. The fast-assembling ancient building head according to claim 1, wherein a reinforcing lining plate (13) is additionally arranged on the inner wall of the inner side buckling edge (9) or the inner wall of the pouring opening (3) of the combined die (1) of the ancient building head.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322093778.9U CN220645190U (en) | 2023-08-05 | 2023-08-05 | Fast-assembling ancient building component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322093778.9U CN220645190U (en) | 2023-08-05 | 2023-08-05 | Fast-assembling ancient building component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220645190U true CN220645190U (en) | 2024-03-22 |
Family
ID=90287696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322093778.9U Active CN220645190U (en) | 2023-08-05 | 2023-08-05 | Fast-assembling ancient building component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220645190U (en) |
-
2023
- 2023-08-05 CN CN202322093778.9U patent/CN220645190U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207015442U (en) | A kind of vehicle top side rail configuration | |
CN107774796B (en) | The stretch forming process of copper alloy shock-absorbing sleeve | |
CN220645190U (en) | Fast-assembling ancient building component | |
CN110588795A (en) | New energy automobile packing box roof side rail structure | |
CN103909880A (en) | Automotive radiator grille decorating electroplated bright strip assembling structure | |
CN103551454A (en) | Stamping method for automobile crankshaft signal panel | |
CN203500140U (en) | All aluminum fuel tank | |
CN203819150U (en) | Radiator grille electroplated decorative strip assembly structure for automobile | |
CN216580316U (en) | Headlight switching mounting bracket | |
CN210734298U (en) | Side wall outer covering | |
CN213323353U (en) | B-pillar outer decorative plate assembly | |
CN203819170U (en) | Radiator grille body structure for automobile | |
CN210284136U (en) | Split type skeleton texture of car back of body door plastic decoration board | |
CN202213622U (en) | Part with flanging | |
CN204236374U (en) | A kind of car engine cover decoration strip installing card button modified node method | |
CN220923803U (en) | Double-layer blade and active air inlet grille for vehicle | |
CN204821724U (en) | Car front end supporting structure | |
CN211031201U (en) | Intercooler hydroecium welding plastic frock | |
CN214001546U (en) | Connection structure of automobile decoration and automobile using connection structure | |
CN205836474U (en) | Spending shelf structure in a kind of | |
CN103909890A (en) | Automotive radiator grille body structure | |
CN209002442U (en) | A kind of lateral double clamping sections of aluminium alloy solid flower case | |
CN212453413U (en) | Aluminum alloy framework decorative wall convenient to disassemble and assemble | |
CN210651632U (en) | Car grill injection moulding mould | |
CN209598654U (en) | A kind of sample pipe support fixing tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |