CN220645140U - Building climbing frame net member capable of being fast fixed - Google Patents

Building climbing frame net member capable of being fast fixed Download PDF

Info

Publication number
CN220645140U
CN220645140U CN202321626196.6U CN202321626196U CN220645140U CN 220645140 U CN220645140 U CN 220645140U CN 202321626196 U CN202321626196 U CN 202321626196U CN 220645140 U CN220645140 U CN 220645140U
Authority
CN
China
Prior art keywords
arc
fixedly connected
component body
frame net
climbing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321626196.6U
Other languages
Chinese (zh)
Inventor
孙景仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321626196.6U priority Critical patent/CN220645140U/en
Application granted granted Critical
Publication of CN220645140U publication Critical patent/CN220645140U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to the technical field of building climbing frame net members, in particular to a building climbing frame net member capable of being quickly fixed. The utility model comprises a component body, wherein the front surface of the component body is provided with a mounting device and a fixing device, the mounting device comprises four identical first arc blocks fixedly connected to the front surface of the component body, the lower surface of each first arc block is provided with a second arc block, the second arc blocks are dragged, the rectangular blocks are clamped into rectangular grooves, the first arc blocks are further subjected to auxiliary limiting, the rapid fixing of the component body is not required by a scaffold, the effect of rapidly fixing the component body is achieved, the problem that the whole mounting process takes long time because the mounting of the building climbing net component is required by connecting pieces is solved, and meanwhile, a worker needs to mount a plurality of connecting pieces to mount a plurality of component bodies, so that one connecting piece is not completely fixed, and the problem of potential safety hazard exists.

Description

Building climbing frame net member capable of being fast fixed
Technical Field
The utility model relates to the technical field of building climbing frame net members, in particular to a building climbing frame net member capable of being quickly fixed.
Background
The building climbing frame net member is generally used on a scaffold on a building of an installation site, so that the functions of anti-seismic, decompression, wind prevention and dust prevention are achieved, when the building climbing frame net member is required to be installed, a member body is dragged to the scaffold, the member body and a connecting piece are assembled, and then the other end of the connecting piece is fixedly installed on the scaffold.
The inventors found in daily work that: because the installation building climbs frame net component and need install through the connecting piece for the flow spends time very much of whole installation, the workman need install a plurality of connecting pieces just can install a plurality of component bodies simultaneously, probably makes a certain connecting piece not fixed completely, and then has the potential safety hazard.
Disclosure of Invention
The utility model aims to solve the problems that in the actual use process, as the installation of the building climbing frame net member is carried out through the connecting pieces, the whole installation process takes a long time, and meanwhile, workers can install a plurality of connecting pieces to install a plurality of member bodies, so that one connecting piece is not completely fixed, and further potential safety hazards exist.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a frame net component is climbed to building that can fix fast, includes the component body, the front of the component body is provided with installation device and fixing device, installation device includes four same first arc pieces of fixed connection in the component body front, the lower surface of first arc piece is provided with the second arc piece, the last fixed surface of second arc piece is connected with the rectangle piece, rectangular channel has been seted up to the lower surface of first arc piece.
The effects achieved by the components are as follows: when the component body needs to be fixed fast, because the first arc-shaped blocks are fixedly connected with the component body, workers drag the component body, the first arc-shaped blocks on the upper side and the lower side of the component body are respectively clamped on the upper scaffold and the lower scaffold, the component body is further fixed, the second arc-shaped blocks are dragged, the rectangular blocks are clamped into the rectangular grooves, and the first arc-shaped blocks are further limited in an auxiliary mode, so that the quick fixation through the scaffold is not needed, and the effect of fixing the component body fast is achieved.
Preferably, a positioning block is fixedly connected to one side of the outer surface of the first arc-shaped block, a bolt is inserted into the upper surface of the positioning block in a threaded manner, a U-shaped rod is arranged on the lower surface of the second arc-shaped block, and a threaded hole is formed in one side of the outer surface of the U-shaped rod.
The effects achieved by the components are as follows: dragging the U-shaped pole for the U-shaped pole card is on the second arc piece, drags the bolt, makes the bolt screw up the screw hole, makes U-shaped pole and locating piece fixed connection, and then further fixes the second arc piece.
Preferably, one side of the outer surface of the U-shaped rod is fixedly connected with an anti-slip pad.
The effects achieved by the components are as follows: when the U-shaped rod is fixedly connected with the positioning block, the anti-slip pad can increase friction force between the second arc-shaped block and the U-shaped rod.
Preferably, the upper surface of the bolt is fixedly connected with a convenient rod.
The effects achieved by the components are as follows: dragging the convenient rod to drive the bolt to move, and then facilitating the workers to drag the bolt.
Preferably, the fixing device comprises fixing plates fixedly connected to two sides of the front face of the component body, a threaded rod is inserted into left side threads of the fixing plates, threads at two ends of the threaded rod are opposite, and a hexagonal block is fixedly connected to the arc surface of the threaded rod.
The effects achieved by the components are as follows: when a plurality of component bodies need to be fixed, after the component bodies are mounted on the scaffold, the fixed plate is fixedly connected with the component bodies, and meanwhile, the hexagonal blocks are fixedly connected with the threaded rods to drag the threaded rods, so that the component bodies on two sides are close to each other, and then the plurality of component bodies are fixed in the same way, and the effect of fixing the plurality of component bodies is achieved.
Preferably, a triangular groove is formed in one side of the outer surface of the fixing plate, and a triangular tube is arranged on one side of the outer surface of the triangular groove.
The effects achieved by the components are as follows: before dragging the threaded rod, dragging the triangle pipe for triangle pipe card goes into the triangle inslot, then dragging the threaded rod, make the triangle pipe can card go into the triangle inslot on the both sides fixed plate, and then carry out spacingly to the component body of both sides.
Preferably, the bottom of the inner wall of the triangular groove is fixedly connected with an auxiliary block.
The effects achieved by the components are as follows: when the triangular pipe is clamped into the triangular grooves on the fixing plates at the two sides, the auxiliary block is clamped into the triangular pipe, and then the member bodies at the two sides are subjected to auxiliary limiting.
Preferably, the outer surface of the triangular tube is fixedly connected with a round sponge.
The effects achieved by the components are as follows: under the action of the circular sponge, when the triangular tube is dragged, the triangular tube is prevented from scratching fingers.
In summary, the beneficial effects of the utility model are as follows:
according to the utility model, when the component body is required to be fixed rapidly, as the first arc-shaped blocks are fixedly connected with the component body, a worker drags the component body, so that the first arc-shaped blocks at the upper side and the lower side of the component body are respectively clamped on the upper scaffold and the lower scaffold, the component body is further fixed, and the second arc-shaped blocks are dragged, so that the rectangular blocks are clamped into the rectangular grooves, and further the first arc-shaped blocks are subjected to auxiliary limiting, so that the rapid fixing of the component body is not required by the scaffold, the effect of rapidly fixing the component body is achieved, the problem that the whole installation process takes long because the installation of the building climbing net component is required by the connecting pieces is solved, and meanwhile, the worker needs to install a plurality of connecting pieces to install the component bodies, so that one connecting piece is not completely fixed, and the problem of potential safety hazards exists is solved.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic perspective view of a first arc block of the present utility model;
FIG. 3 is a schematic perspective view of a second arc block of the present utility model;
fig. 4 is a schematic perspective view of a fixing plate according to the present utility model.
Legend description: 1. a member body; 2. a mounting device; 201. a first arc block; 202. a second arc block; 203. rectangular blocks; 204. rectangular grooves; 205. a positioning block; 206. a bolt; 207. a U-shaped rod; 208. a threaded hole; 209. an anti-slip pad; 210. a convenience rod; 3. a fixing device; 301. a fixing plate; 302. a threaded rod; 303. hexagonal blocks; 304. triangular grooves; 305. a triangular tube; 306. an auxiliary block; 307. a round sponge.
Detailed Description
Referring to fig. 1, the present utility model provides a technical solution: the utility model provides a but quick fixed building climbs frame net component includes component body 1, and the front of component body 1 is provided with installation device 2 and fixing device 3.
The specific arrangement and function of the mounting means 2 and the fixing means 3 will be described in detail below.
Referring to fig. 2 and 3, in the present embodiment: the installation device 2 includes four same first arc pieces 201 in the front of component body 1 fixedly connected, the lower surface of first arc pieces 201 is provided with second arc pieces 202, the last fixed surface of second arc pieces 202 is connected with rectangular piece 203, rectangular slot 204 has been seted up to the lower surface of first arc pieces 201, when the quick fixed component body 1 of needs, because first arc pieces 201 and component body 1 fixed connection, the workman drags component body 1, make the first arc pieces 201 of the upper and lower both sides of component body 1 block respectively on the upper and lower scaffold frame, and then fix component body 1, drag second arc pieces 202, make rectangular piece 203 card go into rectangular slot 204, and then carry out the auxiliary spacing to first arc pieces 201, make do not need to carry out quick fixed through the scaffold frame, the effect of quick fixed component body 1 has been reached, the surface one side fixed connection of first arc pieces 201 has locating piece 205, the upper surface screw thread of locating piece 205 inserts and is equipped with bolt 206, the lower surface of second arc pieces 202 is provided with U-shaped rod 207, surface one side of U-shaped rod 207 drags 208, make U-shaped rod 207 has been seted up threaded hole 208, make U-shaped rod 207 and the second arc pieces 205 card into the rectangular piece 202, the second arc pieces 206 draw the surface of U-shaped rod 206, and the second arc pieces 206 draw the surface of the tie up 206, and the second arc pieces 206 have a pair of bolt 206, and the surface is connected with the bolt 206, and the convenient to draw the surface is connected with the bolt 206, and the bolt is connected with the bolt 206, and the surface is convenient to the bolt is fixed.
Referring to fig. 4, in this embodiment: the fixing device 3 comprises fixing plates 301 fixedly connected to two sides of the front face of the member body 1, a threaded rod 302 is inserted into threads on the left side of the fixing plates 301, threads on two ends of the threaded rod 302 are opposite, a hexagonal block 303 is fixedly connected to the circular arc face of the threaded rod 302, when the plurality of member bodies 1 are required to be fixed, after the member bodies 1 are mounted to a scaffold, due to the fact that the fixing plates 301 are fixedly connected with the member bodies 1, the hexagonal block 303 and the threaded rod 302 are fixedly connected, the threaded rod 302 is dragged, the member bodies 1 on two sides are enabled to be close to each other, the plurality of member bodies 1 are fixed in the same mode, the effect of fixing the plurality of member bodies 1 is achieved, a triangular groove 304 is formed in one side of the outer surface of the fixing plate 301, a triangular pipe 305 is arranged on one side of the outer surface of the triangular groove 304, before dragging the triangular pipe 305, the triangular pipe 305 is enabled to be clamped into the triangular groove 304, then the triangular pipe 305 can be clamped into the triangular groove 304 on the fixing plates 301 on two sides, the member bodies 1 on two sides are limited, an auxiliary block 306 is fixedly connected to the inner wall bottom of the triangular pipe 304, when the triangular pipe 305 is clamped into the triangular pipe 305, and the circular sponge 305 is enabled to be clamped into the triangular pipe 307 on the two sides, and the circular sponge 305 is enabled to be prevented from being scratched by the circular pipe 307.
Working principle:
when the building climbing frame net member is required to be installed, the member body 1 is dragged to the scaffold, the member body 1 and the connecting piece are assembled, then the other end of the connecting piece is installed and fixed with the scaffold, when the member body 1 is required to be quickly fixed, as the first arc-shaped blocks 201 and the member body 1 are fixedly connected, workers drag the member body 1, the first arc-shaped blocks 201 on the upper side and the lower side of the member body 1 are respectively clamped on the upper scaffold and the lower scaffold, the member body 1 is further fixed, the second arc-shaped blocks 202 are dragged, the rectangular blocks 203 are clamped in the rectangular grooves 204, the first arc-shaped blocks 201 are further subjected to auxiliary limiting, the quick fixing of the member body 1 is achieved without the need of being quickly fixed by the scaffold, the U-shaped rods 207 are dragged, the U-shaped rods 207 are clamped on the second arc-shaped blocks 202, the bolts 206 are screwed into the threaded holes 208, the U-shaped rod 207 is fixedly connected with the positioning block 205, the second arc-shaped block 202 is further fixed, when the U-shaped rod 207 is fixedly connected with the positioning block 205, the anti-skid pad 209 can increase the friction force between the second arc-shaped block 202 and the U-shaped rod 207, drag the convenient rod 210, drive the bolt 206 to move, and further facilitate workers to drag the bolt 206, when a plurality of component bodies 1 need to be fixed, after the component bodies 1 are installed on a scaffold, as the fixing plate 301 is fixedly connected with the component bodies 1, the hexagonal block 303 is fixedly connected with the threaded rod 302, the threaded rod 302 is dragged, the component bodies 1 at two sides are close to each other, a plurality of component bodies 1 are further fixed in the same way, the effect of fixing a plurality of component bodies 1 is achieved, before dragging the threaded rod 302, the triangular pipe 305 is dragged into the triangular groove 304, and then the triangular pipe 305 is clamped into the triangular groove 304, so that triangular tube 305 can be clamped into triangular grooves 304 on two side fixing plates 301, and then limiting member bodies 1 on two sides, when triangular tube 305 is clamped into triangular grooves 304 on two side fixing plates 301, auxiliary block 306 is clamped into triangular tube 305, and then auxiliary limiting is performed on member bodies 1 on two sides, and under the action of circular sponge 307, when triangular tube 305 is dragged, finger scratch of triangular tube 305 is avoided.
While the utility model has been described in terms of what are presently considered to be the most practical and preferred embodiments, it is to be understood that the utility model is not limited to the disclosed embodiments, but is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the utility model, as defined by the appended claims, as long as the scope of the utility model is defined by the following claims, and by the following claims, unless otherwise specified and limited by the context of the utility model; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art in a specific case.

Claims (8)

1. The utility model provides a but quick fixed building climbs frame net component, includes component body (1), its characterized in that: the front of component body (1) is provided with installation device (2) and fixing device (3), installation device (2) are including four same first arc piece (201) in front of fixed connection at component body (1), the lower surface of first arc piece (201) is provided with second arc piece (202), the last fixed surface of second arc piece (202) is connected with rectangle piece (203), rectangular channel (204) have been seted up to the lower surface of first arc piece (201).
2. A quick-fixable building climbing frame net member according to claim 1, wherein: the novel arc-shaped welding fixture is characterized in that a positioning block (205) is fixedly connected to one side of the outer surface of the first arc-shaped block (201), a bolt (206) is inserted into the upper surface of the positioning block (205) in a threaded mode, a U-shaped rod (207) is arranged on the lower surface of the second arc-shaped block (202), and a threaded hole (208) is formed in one side of the outer surface of the U-shaped rod (207).
3. A quick-fixable building climbing frame net member according to claim 2, wherein: an anti-slip pad (209) is fixedly connected to one side of the outer surface of the U-shaped rod (207).
4. A quick-fixable building climbing frame net member according to claim 3, wherein: the upper surface of the bolt (206) is fixedly connected with a convenient rod (210).
5. A quick-fixable building climbing frame net member according to claim 4, wherein: the fixing device (3) comprises fixing plates (301) fixedly connected to two sides of the front face of the component body (1), threaded rods (302) are inserted into left side threads of the fixing plates (301), threads at two ends of the threaded rods (302) are opposite, and hexagonal blocks (303) are fixedly connected to the arc surfaces of the threaded rods (302).
6. A quick-fixable building climbing frame net member according to claim 5, wherein: a triangular groove (304) is formed in one side of the outer surface of the fixing plate (301), and a triangular tube (305) is arranged on one side of the outer surface of the triangular groove (304).
7. A quick fixable building climbing frame net member according to claim 6, wherein: an auxiliary block (306) is fixedly connected to the bottom of the inner wall of the triangular groove (304).
8. A quick-fixable building climbing frame net member according to claim 7, wherein: the outer surface of the triangular pipe (305) is fixedly connected with a circular sponge (307).
CN202321626196.6U 2023-06-26 2023-06-26 Building climbing frame net member capable of being fast fixed Active CN220645140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321626196.6U CN220645140U (en) 2023-06-26 2023-06-26 Building climbing frame net member capable of being fast fixed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321626196.6U CN220645140U (en) 2023-06-26 2023-06-26 Building climbing frame net member capable of being fast fixed

Publications (1)

Publication Number Publication Date
CN220645140U true CN220645140U (en) 2024-03-22

Family

ID=90261498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321626196.6U Active CN220645140U (en) 2023-06-26 2023-06-26 Building climbing frame net member capable of being fast fixed

Country Status (1)

Country Link
CN (1) CN220645140U (en)

Similar Documents

Publication Publication Date Title
CN220645140U (en) Building climbing frame net member capable of being fast fixed
CN208528930U (en) A kind of Work fixing device
CN202076285U (en) Guide rail for fixedly mounting solar photovoltaic subassembly
CN218061306U (en) Construction frame reinforcing apparatus
CN111365583A (en) Multifunctional communication equipment supporting device
CN114301018B (en) Cable fixing clamp special for hanging basket
CN216343826U (en) Suspension type speed reducer capable of being installed quickly
CN207470926U (en) Para-seismic support
CN113931468B (en) Super high-rise round steel column overhanging plate can be dismantled and is faced limit protector
CN215168196U (en) Front glass temporary fixing device for mounting ultra-high large plate glass
CN109216109B (en) PTC power-off resets crashproof shell for temperature control device
CN210326167U (en) Parallel groove clamp
CN209248937U (en) A kind of Sign Board holding clamp
CN206873909U (en) A kind of construction steel pipe combining mechanism
CN208900369U (en) A kind of water pump of the convenient movement of security against fire
CN213539783U (en) Steel plate mesh outer frame connecting tool
CN214402505U (en) Quick fixing device of balcony guardrail
CN215167777U (en) Scaffold fixing structure for construction
CN219819658U (en) Pipeline anti-corrosion construction device
CN213602378U (en) Novel electric power fitting strain clamp
CN203846758U (en) Putlog fixing device
CN219874093U (en) Wire clamp for connecting with ground
CN215173544U (en) Mechanical equipment supporting device convenient to disassemble
CN219808684U (en) Telescopic rapid protection support
CN218284360U (en) Pipeline welding fixing device for efficient work welding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant