CN220644521U - Butt joint device for installing underground drainage pipeline - Google Patents

Butt joint device for installing underground drainage pipeline Download PDF

Info

Publication number
CN220644521U
CN220644521U CN202322249012.5U CN202322249012U CN220644521U CN 220644521 U CN220644521 U CN 220644521U CN 202322249012 U CN202322249012 U CN 202322249012U CN 220644521 U CN220644521 U CN 220644521U
Authority
CN
China
Prior art keywords
chassis
welded
butt joint
drainage pipeline
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322249012.5U
Other languages
Chinese (zh)
Inventor
杨海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qing'an County Underground Drainage Service Center
Original Assignee
Qing'an County Underground Drainage Service Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qing'an County Underground Drainage Service Center filed Critical Qing'an County Underground Drainage Service Center
Priority to CN202322249012.5U priority Critical patent/CN220644521U/en
Application granted granted Critical
Publication of CN220644521U publication Critical patent/CN220644521U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model discloses a butt joint device for installing an underground drainage pipeline, which belongs to the technical field of underground drainage pipeline installation, and adopts the technical scheme that the butt joint device comprises a chassis, wherein the top of the chassis is provided with a clamping mechanism, the bottom of the chassis is provided with a movable assembly, one side of the chassis is provided with a fixed assembly, the top of the chassis is provided with a protection assembly, and a pipeline to be butt-jointed can be clamped and fixed by arranging the clamping mechanism, so that a constructor can conveniently operate a pipeline opening, and meanwhile, the size and the height of the butt joint device can be adjusted, so that the butt joint device is suitable for butt joint of pipelines with different sizes; by arranging the moving assembly, after the pipeline is in butt joint, the chassis can be conveniently moved for the next butt joint; the chassis can be fixed on the ground by arranging the fixing component, so that the chassis is prevented from being displaced in the butt joint process, and the butt joint is prevented from being influenced; through setting up the protection component, can protect the inside part of fixture, prevent because construction environment is abominable, cause the damage.

Description

Butt joint device for installing underground drainage pipeline
Technical Field
The utility model relates to the technical field of underground drainage pipeline installation, in particular to a butt joint device for underground drainage pipeline installation.
Background
An underground drainage pipe is a pipe system for collecting and draining underground water, waste water or rainwater, and is responsible for guiding water flow from a building, a road, a square, a farmland or other places into the drainage system or a water body so as to maintain the drainage condition of the ground and underground and avoid the problems of water accumulation and water immersion, and is usually composed of a series of connected pipes which are installed under the soil or the ground of the ground, can be arranged along the periphery of the street, the neighborhood or the building, and can have different drainage layout and pipe connection modes according to the specific situation, but when the underground drainage pipe is installed, more auxiliary equipment is usually applied to fix the pipes, so that manpower and material resources are wasted.
The current announcements are: CN219035806U discloses a docking device for installing an underground drainage pipeline, which comprises a door-type vertical frame, a polygonal supporting frame is hung below the vertical frame, a plurality of positioning pieces are uniformly distributed on the circumference of the supporting frame, each positioning piece comprises an adjusting screw and a strip-shaped pressing plate, the adjusting screw is installed on the supporting frame in a threaded manner, the pressing plate is installed at the end part of the adjusting screw and is positioned at the inner side of the supporting frame; the support frame includes two parallel arrangement's regular hexagon frame, installs the connecting plate perpendicularly between the side of two frames, install the sleeve on the connecting plate, processing has the internal thread in the sleeve, adjusting screw installs in the sleeve.
The utility model discloses a pipeline port's butt joint is revised the adjustment, and welding precision is high, also can not cause the destruction to the mouth of pipe side simultaneously, and detachable structure makes the effect that whole device can reuse, but when the butt joint is carried out to the pipeline, supports less, and the pipeline can take place slight skew, still needs the manual work to go to dock at last, extravagant manpower.
Disclosure of Invention
1. Technical problem to be solved
The utility model provides a butt joint device for installing an underground drainage pipeline, and aims to solve the problems that the existing butt joint device for installing the underground drainage pipeline is less in support and slightly deviates from a pipeline when the pipeline is in butt joint, and finally, the pipeline still needs to be manually in butt joint, so that labor is wasted.
2. Technical proposal
The utility model is realized in such a way that the docking device for installing the underground drainage pipeline comprises a chassis, wherein the top of the chassis is provided with a clamping mechanism, the bottom of the chassis is provided with a movable assembly, one side of the chassis is provided with a fixed assembly, and the top of the chassis is provided with a protection assembly;
the clamping mechanism comprises a first hydraulic rod, a second hydraulic rod, a fixed block, a guide frame, a first threaded column, clamping blocks and telescopic rods, wherein the first hydraulic rod is arranged at the top of a chassis, a plurality of second hydraulic rods are arranged at the top of the chassis, the guide frame is arranged at the top of the first hydraulic rod, the guide frame is arranged at the top of the plurality of second hydraulic rods, the plurality of first threaded columns are in threaded connection with the inside of the guide frame, the clamping blocks are respectively welded on one side wall of the plurality of first threaded columns, and the telescopic rods are respectively arranged on one side wall of the plurality of clamping blocks.
In order to achieve the effect of enabling the chassis to move conveniently for next docking, as a docking device for installing an underground drainage pipeline, the utility model is preferable, the moving assembly comprises supporting legs, rotating columns, placing frames and universal wheels, a plurality of the supporting legs are welded at the bottom of the chassis, a plurality of the rotating columns are respectively connected at the bottoms of the supporting legs in a rotating way, a plurality of the placing frames are respectively welded at the bottoms of the rotating columns, and a plurality of the universal wheels are respectively arranged in the placing frames.
In order to achieve the effect of fixing the chassis, as a docking device for installing an underground drainage pipeline, the fixing assembly preferably comprises an extension plate and a second threaded column, wherein a plurality of extension plates are welded on one side wall of the chassis, and the second threaded columns are respectively connected with the interiors of the extension plates in a threaded manner.
In order to achieve the effect of protecting the second hydraulic rod, as a docking device for installing an underground drainage pipeline, the protection assembly preferably comprises a sliding cabin and a sliding plate, wherein the sliding cabin is welded on the top of the chassis, and the sliding plate is welded on the bottom of the placement frame and is in sliding connection with the sliding cabin.
In order to achieve the effect of conveniently pulling or pushing the chassis, the butt joint device for installing the underground drainage pipeline is preferably adopted, one side wall of the placement frame is welded with a handrail convenient to push and pull, and one side wall of the handrail is welded with a rubber pad for preventing hand sliding.
In order to achieve the effect of preventing the first threaded column from falling off the guide frame in the process of rotation, as a butt joint device for installing an underground drainage pipeline, preferably, a limiting plate is welded on one side wall of each of the plurality of first threaded columns.
In order to achieve the effect of facilitating the constructor to rotate the first threaded column, as one butt joint device for installing the underground drainage pipeline, preferably, a plurality of rotating handles are welded on one side wall of the first threaded column respectively.
In order to achieve the effect of preventing damage to the fixed block, the butt joint device for installing the underground drainage pipeline is preferable in the utility model, and a protection pad is welded at the top of the fixed block.
3. Advantageous effects
Compared with the prior art, the utility model has the beneficial effects that:
according to the butt joint device for installing the underground drainage pipeline, the clamping mechanism is arranged, so that the pipeline to be butted can be clamped and fixed, construction staff can conveniently operate the pipeline opening, meanwhile, the size and the height can be adjusted, and the butt joint device is suitable for butt joint of pipelines with different sizes; by arranging the moving assembly, after the pipeline is in butt joint, the chassis can be conveniently moved for the next butt joint; the chassis can be fixed on the ground by arranging the fixing component, so that the chassis is prevented from being displaced in the butt joint process, and the butt joint is prevented from being influenced; through setting up the protection component, can protect the inside part of fixture, prevent because construction environment is abominable, cause the damage.
Drawings
FIG. 1 is an overall block diagram of the present utility model;
FIG. 2 is a right side view of the present utility model;
FIG. 3 is a schematic perspective view of the cross-section of FIG. 2 at A-A in accordance with the present utility model;
FIG. 4 is a schematic view of a clamping mechanism according to the present utility model;
fig. 5 is a schematic structural view of the fixing assembly of the present utility model.
The reference numerals in the figures illustrate:
1. a chassis; 2. a clamping mechanism; 3. a moving assembly; 4. a fixing assembly; 5. a protective assembly; 201. a first hydraulic lever; 202. a second hydraulic lever; 203. a fixed block; 204. a guide frame; 205. a first threaded post; 206. a clamping block; 207. a telescopic rod; 301. support legs; 302. rotating the column; 303. placing a frame; 304. a universal wheel; 401. an extension plate; 402. a second threaded post; 501. a sliding cabin; 502. a sliding plate; 6. an armrest; 7. a rubber pad; 8. a limiting plate; 9. rotating the handle; 10. and a protective pad.
Detailed Description
The present utility model will be further described in detail with reference to the drawings and examples, in order to achieve the objects, technical solutions and advantages of the present utility model. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
In the description of the present utility model, it should be understood that the terms "length," "width," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, merely to facilitate describing the present utility model and simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present utility model. Furthermore, in the description of the present utility model, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
Referring to fig. 1-5, the present utility model provides the following technical solutions: the butt joint device for installing the underground drainage pipeline comprises a chassis 1, wherein a clamping mechanism 2 is arranged at the top of the chassis 1, a moving assembly 3 is arranged at the bottom of the chassis 1, a fixed assembly 4 is arranged at one side of the chassis 1, and a protection assembly 5 is arranged at the top of the chassis 1;
the clamping mechanism 2 comprises a first hydraulic rod 201, a second hydraulic rod 202, a fixed block 203, a guide frame 204, a first threaded column 205, clamping blocks 206 and telescopic rods 207, wherein the first hydraulic rod 201 is arranged at the top of the chassis 1, a plurality of second hydraulic rods 202 are arranged at the top of the chassis 1, the guide frame 204 is arranged at the top of the first hydraulic rod 201, the guide frame 204 is arranged at the top of the plurality of second hydraulic rods 202, the plurality of first threaded columns 205 are in threaded connection with the inside of the guide frame 204, the plurality of clamping blocks 206 are respectively welded on one side wall of the plurality of first threaded columns 205, and the plurality of telescopic rods 207 are respectively arranged on one side wall of the plurality of clamping blocks 206.
In this embodiment: through the arrangement of the clamping mechanism 2, the pipelines to be butted can be clamped and fixed, so that construction staff can conveniently operate the pipeline ports, and meanwhile, the size and the height can be adjusted, so that the pipeline butt joint device is suitable for the butt joint of pipelines with different sizes; by arranging the moving assembly 3, after the pipeline is in butt joint, the chassis 1 can be conveniently moved for the next butt joint; the chassis 1 can be fixed on the ground by arranging the fixing component 4, so that the chassis 1 is prevented from being displaced in the butt joint process, and the butt joint is prevented from being influenced; by arranging the protection component 5, the parts inside the clamping mechanism 2 can be protected, and damage caused by severe construction environment is prevented; through setting up first hydraulic stem 201, second hydraulic stem 202, fixed block 203, guide frame 204, first screw thread post 205, grip block 206 and telescopic link 207, place the pipeline on fixed block 203, rotate first screw thread post 205, can promote telescopic link 207, and then make grip block 206 press close to the pipeline outer wall, just can fix the pipeline, the height of fixed block 203 can be raised to first hydraulic stem 201, the convenience is fixed not unidimensional pipeline, the height of guide frame 204 can be adjusted to second hydraulic stem 202, make things convenient for constructor to accomplish the butt joint to the pipeline.
As a technical optimization scheme of the present utility model, the moving assembly 3 includes supporting legs 301, rotating columns 302, placing frames 303 and universal wheels 304, wherein the supporting legs 301 are welded to the bottom of the chassis 1, the rotating columns 302 are respectively connected to the bottoms of the supporting legs 301 in a rotating manner, the placing frames 303 are respectively welded to the bottoms of the rotating columns 302, and the universal wheels 304 are respectively arranged in the placing frames 303.
In this embodiment: through setting up supporting leg 301, pivoted post 302, place frame 303 and universal wheel 304, after the pipeline butt joint finishes, pivoted post 302, place frame 303 and universal wheel 304 cooperation use, can conveniently remove chassis 1 for the butt joint of next time.
As a technical optimization scheme of the utility model, the fixing assembly 4 comprises an extension plate 401 and a second threaded column 402, wherein the extension plates 401 are welded on one side wall of the chassis 1, and the second threaded columns 402 are respectively connected with the interiors of the extension plates 401 in a threaded manner.
In this embodiment: through setting up extension board 401 and second screw thread post 402, rotate second screw thread post 402, make its one end deep into ground, accomplish the fixed to chassis 1, prevent that chassis 1 from taking place the displacement at the in-process of docking, influence the docking.
As a technical optimization scheme of the utility model, the protection assembly 5 comprises a sliding cabin 501 and a sliding plate 502, wherein the sliding cabin 501 is welded on the top of the chassis 1, and the sliding plate 502 is welded on the bottom of the placement frame 303 and is in sliding connection with the sliding cabin 501.
In this embodiment: through setting up sliding cabin 501 and sliding plate 502, when second hydraulic stem 202 goes up and down, can drive sliding plate 502 and slide in sliding cabin 501, can prevent that outside rubble from touching second hydraulic stem 202, causes the damage to it.
As a technical optimization scheme of the utility model, a side wall of the placement frame 303 is welded with a handrail 6 which is convenient to push and pull, and a side wall of the handrail 6 is welded with a rubber pad 7 which prevents hands from sliding.
In this embodiment: by arranging the armrests 6 and the rubber pads 7, a user can conveniently move the chassis 1, and meanwhile, the rubber pads 7 can prevent constructors from not holding the armrests 6 because of hand sliding.
As a technical optimization scheme of the present utility model, a limiting plate 8 is welded on one side wall of each of the plurality of first threaded columns 205.
In this embodiment: by providing the limiting plate 8, the first screw column 205 can be prevented from falling off the guide frame 204 during rotation.
As a technical optimization scheme of the present utility model, a rotation handle 8 is welded to one side wall of each of the plurality of first screw columns 205.
In this embodiment: by providing the rotation handle 8, it is possible to facilitate the constructor to rotate the first screw column 205.
As a technical optimization scheme of the utility model, the top of the fixed block 203 is welded with the protection pad 9.
In this embodiment: by providing the protection pad 9, damage to the fixing block 203 can be prevented in the process of placing the pipe.
Working principle: firstly, place the pipeline on fixed block 203, rotate first screw thread post 205, can promote telescopic link 207, and then make grip block 206 press close to the pipeline outer wall, just can fix the pipeline, first hydraulic stem 201 can raise the height of fixed block 203, conveniently fix the pipeline of equidimension, the height of guide frame 204 can be adjusted to second hydraulic stem 202, make things convenient for constructor to accomplish the butt joint to the pipeline, rotate second screw thread post 402, make its one end go deep into ground, accomplish the fixing to chassis 1, prevent that the in-process chassis 1 of butt joint from taking place the displacement, influence the butt joint, when second hydraulic stem 202 goes up and down, can drive sliding plate 502 and slide in sliding compartment 501, can prevent that outside rubble from touching second hydraulic stem 202, cause the damage to it, after the pipeline butt joint is accomplished, rotate post 302, place frame 303 and universal wheel 304 cooperate and use, can conveniently remove chassis 1, be used for the butt joint next time when second hydraulic stem 202 goes up and down, can drive sliding plate 502 in sliding compartment, can prevent that outside contact 202 from causing the damage to second hydraulic stem 202.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.

Claims (8)

1. The utility model provides a interfacing apparatus is used in installation of secret drainage pipe, includes chassis (1), its characterized in that: the top of the chassis (1) is provided with a clamping mechanism (2), the bottom of the chassis (1) is provided with a moving assembly (3), one side of the chassis (1) is provided with a fixed assembly (4), and the top of the chassis (1) is provided with a protection assembly (5);
the clamping mechanism (2) comprises a first hydraulic rod (201), a second hydraulic rod (202), a fixed block (203), a guide frame (204), a first threaded column (205), clamping blocks (206) and a telescopic rod (207), wherein the first hydraulic rod (201) is arranged at the top of the chassis (1), the second hydraulic rods (202) are arranged at the top of the chassis (1), the guide frame (204) is arranged at the top of the first hydraulic rod (201), the guide frame (204) is arranged at the top of the second hydraulic rods (202), the first threaded columns (205) are in threaded connection with the inside of the guide frame (204), the clamping blocks (206) are welded on one side wall of the first threaded columns (205) respectively, and the telescopic rods (207) are arranged on one side wall of the clamping blocks (206) respectively.
2. The docking device for installing an underground drainage pipeline according to claim 1, wherein: the movable assembly (3) comprises supporting legs (301), rotating columns (302), placing frames (303) and universal wheels (304), wherein a plurality of supporting legs (301) are welded to the bottom of the chassis (1), the rotating columns (302) are respectively connected to the bottoms of the supporting legs (301) in a rotating mode, the placing frames (303) are respectively welded to the bottoms of the rotating columns (302), and the universal wheels (304) are respectively arranged in the placing frames (303).
3. The docking device for installing an underground drainage pipeline according to claim 1, wherein: the fixing assembly (4) comprises an extension plate (401) and a second threaded column (402), a plurality of extension plates (401) are welded on one side wall of the chassis (1), and the second threaded columns (402) are respectively connected with the interiors of the extension plates (401) in a threaded mode.
4. The docking device for installing an underground drainage pipeline according to claim 1, wherein: the protection assembly (5) comprises a sliding cabin (501) and a sliding plate (502), wherein the sliding cabin (501) is welded at the top of the chassis (1), and the sliding plate (502) is welded at the bottom of the placement frame (303) and is in sliding connection with the sliding cabin (501).
5. The docking device for installing an underground drainage pipeline according to claim 2, wherein: an armrest (6) convenient to push and pull is welded on one side wall of the placement frame (303), and a rubber pad (7) for preventing hand sliding is welded on one side wall of the armrest (6).
6. The docking device for installing an underground drainage pipeline according to claim 1, wherein: and a limiting plate (8) is welded on one side wall of each of the plurality of first threaded columns (205).
7. The docking device for installing an underground drainage pipeline according to claim 1, wherein: a rotating handle (9) is welded on one side wall of each of the plurality of first threaded columns (205).
8. The docking device for installing an underground drainage pipeline according to claim 1, wherein: the top of the fixed block (203) is welded with a protective pad (10).
CN202322249012.5U 2023-08-21 2023-08-21 Butt joint device for installing underground drainage pipeline Active CN220644521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322249012.5U CN220644521U (en) 2023-08-21 2023-08-21 Butt joint device for installing underground drainage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322249012.5U CN220644521U (en) 2023-08-21 2023-08-21 Butt joint device for installing underground drainage pipeline

Publications (1)

Publication Number Publication Date
CN220644521U true CN220644521U (en) 2024-03-22

Family

ID=90267294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322249012.5U Active CN220644521U (en) 2023-08-21 2023-08-21 Butt joint device for installing underground drainage pipeline

Country Status (1)

Country Link
CN (1) CN220644521U (en)

Similar Documents

Publication Publication Date Title
CN210318826U (en) Natural gas line construction strutting arrangement
CN201192761Y (en) Follow-up fixture
CN220644521U (en) Butt joint device for installing underground drainage pipeline
CN213479768U (en) Follow-on microwave radar device that is used for water quality control unmanned aerial vehicle
CN212893618U (en) Tower crane steel platform support structure with adjustable
CN209839348U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN211769859U (en) Steel construction adjustable push-and-pull frock
CN211466142U (en) Municipal works pipeline quick connect device
CN210306465U (en) Main steam joint places frock
CN208450962U (en) A kind of contra-aperture device for pipeline welding
CN209671247U (en) A kind of easy to disassemble and maintenance electronics station-service high-efficiency and energy-saving type exhaust fan
CN217084168U (en) Drainage pipe detection device convenient to operation
CN220330458U (en) Heightening, welding and fixing device for backwash drain pipe
CN204677138U (en) A kind of mobile hydraulic pincers support
CN210689943U (en) Tunnel pipe wall waterproof detection device convenient to adjust
CN212101133U (en) Fixing mechanism for cloth lifting machine
CN114603606B (en) Maintainable financial robot information system terminal device
CN218208707U (en) Portable construction engineering quality detector
CN209774352U (en) Workpiece clamping and fixing device for grinding machine
CN213814603U (en) Input device for software development
CN216593506U (en) Device for overhauling electric instrument
CN216588628U (en) Tunnel country rock slip casting device
CN214192387U (en) Sewer handling device that municipal works were used
CN113714715B (en) Welding device for post-pouring strip closing-in net construction
CN216883257U (en) Cleaning device is used in municipal works guardrail welding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant