CN220628532U - Standardized electric energy metering box - Google Patents

Standardized electric energy metering box Download PDF

Info

Publication number
CN220628532U
CN220628532U CN202322043185.1U CN202322043185U CN220628532U CN 220628532 U CN220628532 U CN 220628532U CN 202322043185 U CN202322043185 U CN 202322043185U CN 220628532 U CN220628532 U CN 220628532U
Authority
CN
China
Prior art keywords
electric energy
energy metering
box
plate
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322043185.1U
Other languages
Chinese (zh)
Inventor
王如杰
赵旭杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhangkai Electric Appliance Co ltd
Original Assignee
Zhejiang Zhangkai Electric Appliance Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhangkai Electric Appliance Co ltd filed Critical Zhejiang Zhangkai Electric Appliance Co ltd
Priority to CN202322043185.1U priority Critical patent/CN220628532U/en
Application granted granted Critical
Publication of CN220628532U publication Critical patent/CN220628532U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model discloses a standardized electric energy metering box, which comprises an electric energy metering main box and a cleaning assembly, wherein an adjusting assembly is arranged at the top of the front of the electric energy metering main box and comprises a sliding rail and a connecting plate, one end of the front of the sliding rail is connected with the connecting plate in a sliding manner, the cleaning assembly is arranged below the rear side of the connecting plate and comprises a cleaning brush and quick-release screws, the cleaning brush is arranged at one end of the front of the electric energy metering main box, and the quick-release screws are connected with the upper side and the lower side of the front of the connecting plate in a threaded manner. This standardized electric energy metering box is favorable to operating personnel to clear up the transparent guard plate dust in electric energy metering main tank place ahead comparatively conveniently, and the operating personnel of being convenient for looks over the inside element condition of electric energy metering main tank, and this operating mode is comparatively convenient, has shortened operating time, improves operating personnel's work efficiency to be favorable to the device can the classified storage different grade type article, make the device application range more extensive.

Description

Standardized electric energy metering box
Technical Field
The utility model relates to the technical field of standardized electric energy metering boxes, in particular to a standardized electric energy metering box.
Background
The standardized electric energy metering box is the totality of the metering device and auxiliary equipment necessary for metering electric energy, and comprises an electric energy meter, a voltage and current transformer for metering, a secondary circuit thereof, an electric energy metering screen, a cabinet, a box and the like, wherein the standardized electric energy metering box can be installed in a hanging type or a floor type manner, expansion bolts are arranged in silkworm chrysalis for ensuring the installation quality, and the size of the bolts meets the requirements of safety and firmness and outdoor installation conditions.
The prior publication number CN217720378U is named as a standardized power metering box, the device is characterized in that a box body is provided with a partition plate in the box body, a placing box is arranged on one side of the partition plate, an ammeter is arranged in the placing box, a wiring board is arranged below the placing box, a wiring assembly is arranged in the wiring board, a limit assembly is arranged above the top of the ammeter, a box door is arranged on one side of the box body, and the limit assembly consists of a fixed seat, a tension spring, a sliding block, a B spring, an A rotating block, a clamping block, a B rotating block, a handle and a contact block; this application can realize installing the ammeter fast, has avoided the staff to need fix the condition of ammeter with the screw, can also realize that the staff is to its advantage of circular telegram when installing the ammeter.
The transparent protection board is arranged on one side of the box body of the device, the transparent protection board is arranged on the right side of the box door, so that operators can check the internal condition of the device conveniently, but in the long-term use process, the surface of the transparent protection board arranged on the right side of the box door can be adhered with a lot of dust, so that the operators cannot check the internal condition of the device through the transparent protection board, at the moment, the operators need to carry paper towels to wipe the right side of the box door, and then check the internal condition of the device, and therefore, the device is complicated and inconvenient.
Disclosure of Invention
The present utility model is directed to a standardized electric energy meter box to solve the above-mentioned problems set forth in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: standardized electric energy metering box, including electric energy metering main tank and clean subassembly, the place ahead top of electric energy metering main tank is provided with adjusting part, and adjusting part includes smooth track and connecting plate, the place ahead one end sliding connection of smooth track has the connecting plate, clean subassembly installs in the rear side below of connecting plate, and clean subassembly includes cleaning brush and quick detach screw, the place ahead one end of electric energy metering main tank is provided with the cleaning brush, the equal threaded connection of both sides has the quick detach screw about the place ahead of connecting plate, and the one end middle part of connecting plate is provided with the utensil.
Furthermore, the box body is arranged on one side below the electric energy metering main box, and the electric energy metering main box is integrally connected with the box body.
Further, the inside upper wall fixedly connected with fixed block of box, and fixed block below fixedly connected with silica gel pad.
Further, the inside of silica gel pad is provided with the iron wire, and silica gel pad and iron wire are the bonding.
Further, the front bottom of the box body is fixedly connected with a groove long plate, and a baffle is connected with the upper part of the groove long plate in a clamping way.
The clamping connection part of the groove long plate and the baffle is tight, and the baffle is made of hard acrylic materials, so that the phenomenon that the baffle is shifted and falls off due to the gravity of the baffle in the using process of the groove long plate is avoided.
Further, the left and right sides of the top of the electric energy metering main box are provided with vertical rods, and the top of the vertical rods is provided with a transverse plate.
Further, the left and right sides of diaphragm all is provided with the drainage board, and diaphragm and drainage board are connected for rotating.
The utility model provides a standardized electric energy metering box, which has the following beneficial effects: the transparent protection plate dust in front of the electric energy metering main box can be cleaned conveniently by operators, the operators can check the conditions of the internal elements of the electric energy metering main box conveniently, the operation mode is convenient, the operation time is shortened, the working efficiency of the operators is improved, and the device is convenient for storing different types of articles in a classified mode, so that the application range of the device is wider.
1. According to the utility model, an operator firstly places the cleaning brush on the rear side of the connecting plate, at the moment, threaded holes formed in the upper and lower sides of the front of the cleaning brush are automatically aligned with threaded holes formed in the upper and lower sides of the front of the connecting plate, then another operator holds the two groups of quick-release screws to rotate until the two groups of quick-release screws penetrate through the threaded holes formed in the upper and lower sides of the front of the cleaning brush respectively and penetrate into the threaded holes formed in the upper and lower sides of the front of the connecting plate, so that the cleaning brush can be limited and fixed on the rear side of the connecting plate, the operator drives the connecting plate and the cleaning assembly to move left and right through the sliding rail handle, at the moment, the rear side of the cleaning brush can automatically clean dust in front of the electric energy metering main box, the operator can conveniently clean transparent dust in front of the electric energy metering main box, the operator can conveniently check the conditions of internal elements of the electric energy metering main box, the operation mode is convenient, the operation time is shortened, and the work efficiency of the operator is improved.
2. According to the utility model, an operator firstly holds the iron wires by the silica gel pad to adjust the silica gel pad until the silica gel pad is adjusted to a proper angle, at this time, the space in the box body is divided by the silica gel pad and the three groups of iron wires, then the operator places different types of objects in different areas in the box body, and then the operator clamps the baffle plate in the groove formed above the groove long plate, so that the baffle plate can be firmly limited and fixed in front of the box body as shown in fig. 1, and the device is favorable for storing different types of objects in a classified way, so that the application range of the device is wider.
Drawings
FIG. 1 is a schematic elevational cross-sectional view of a standardized electrical energy metering tank of the present utility model;
FIG. 2 is an enlarged schematic view of the structure of the normalized power-meter box of the present utility model at A in FIG. 1;
fig. 3 is a schematic diagram of a three-dimensional structure of a box body, a groove long plate and a baffle plate of the standardized electric energy metering box.
In the figure: 1. an electric energy metering main box; 2. an adjustment assembly; 201. a slide rail; 202. a connecting plate; 3. a cleaning assembly; 301. a cleaning brush; 302. quick-release screws; 4. a handle; 5. a case; 6. a fixed block; 7. a silica gel pad; 8. an iron wire; 9. a groove long plate; 10. a baffle; 11. a vertical rod; 12. a cross plate; 13. and a drainage plate.
Detailed Description
As shown in fig. 1, the standardized electric energy metering box comprises an electric energy metering main box 1 and a cleaning component 3, wherein an adjusting component 2 is arranged at the top of the front of the electric energy metering main box 1, the adjusting component 2 comprises a sliding rail 201 and a connecting plate 202, one front end of the sliding rail 201 is slidably connected with the connecting plate 202, the cleaning component 3 is arranged below the rear side of the connecting plate 202, the cleaning component 3 comprises a cleaning brush 301 and quick-dismantling screws 302, one front end of the electric energy metering main box 1 is provided with the cleaning brush 301, the upper side and the lower side of the front of the connecting plate 202 are both in threaded connection with the quick-dismantling screws 302, a handle 4 is arranged in the middle of one end of the connecting plate 202, an operator firstly places the cleaning brush 301 at the rear side of the connecting plate 202, at this time, threaded holes formed in the upper side and the lower side of the front of the cleaning brush 301 can be automatically aligned with threaded holes formed in the upper side and the lower side of the front of the connecting plate 202, then the other operator holds two groups of quick-dismantling screws 302 for rotation, until two groups of quick-release screws 302 respectively penetrate through threaded holes formed in the upper and lower sides in front of the cleaning brush 301 and penetrate into threaded holes formed in the upper and lower sides in front of the connecting plate 202, so that the cleaning brush 301 can be limited and fixed on the rear side of the connecting plate 202, an operator drives the connecting plate 202 and the cleaning assembly 3 to move left and right through the handle tool 4 of the sliding rail 201, at this time, the rear side of the cleaning brush 301 can automatically clean dust on the transparent protection plate in front of the main electric energy metering box 1, the operator can conveniently check the conditions of the internal elements of the main electric energy metering box 1, the operation mode is convenient, the operation time is shortened, the working efficiency of the operator is improved, the two groups of quick-release screws 302 facilitate the operator to conveniently disassemble the cleaning brush 301, need not to resort to the screwdriver, the inside foam-rubber cushion that is provided with of cleaning brush 301 simultaneously, the outside is provided with the flannelette to can carry out the dust clearance to the transparent guard plate in electric energy measurement main tank 1 the place ahead.
As shown in fig. 1-3, box 5 has been seted up to the below one side of electric energy measurement main tank 1, and electric energy measurement main tank 1 is connected as an organic whole with box 5, the inside upper wall fixedly connected with fixed block 6 of box 5, and fixed block 6 below fixedly connected with silica gel pad 7, the inside of silica gel pad 7 is provided with iron wire 8, and silica gel pad 7 and iron wire 8 are bonding, the place ahead bottom fixedly connected with recess longplate 9 of box 5, and the top block of recess longplate 9 is connected with baffle 10, operating personnel passes through silica gel pad 7 silica gel material earlier, hold iron wire 8 and adjust the adjustment, until adjust suitable angle, at this moment the inside space of box 5 then can be divided by silica gel pad 7 and three iron wires 8 of group, then operating personnel places the article of different grade type in the inside different region of box 5, then operating personnel is with baffle 10 block in the recess that recess longplate 9 top was seted up, make baffle 10 can firmly spacing fix in box 5 the place ahead as shown in figure, be favorable to the device, the top of the device can be in a left side wall, the left side plate 12 is favorable to the left side plate 12 and right side plate 13, the left side plate 12 is convenient for the two sides is convenient for the drainage plate 13, the drainage plate is set up through the two sides 11, the top is convenient for the two sets of the drainage plate 13, the drainage plate is set up to the top is 11, the drainage plate 13 is convenient for the two sides, the top is set up to the top is 13, the drainage plate 13, the top is set up to the top 13, the drainage plate 13 is easy to the top is set up to the top 13, the top is 13, the top plate 13, the top is 13 and can be set up to the top 13, and can be convenient to the top 13.
In summary, when the standardized electric energy metering box is used, firstly, the transverse plate 12 and the two groups of drainage plates 13 are limited and supported through the two groups of vertical rods 11, then an operator holds the drainage plates 13 through the two groups of the drainage plates 13, which are close to the rotating shafts arranged on one side of the central axis of the vertical rods 11, and carries out angle rotation until the drainage plates rotate to a proper angle, then the operator holds the iron wires 8 through the silica gel materials of the silica gel pad 7 to adjust and regulate until the angle is regulated to a proper angle, at this time, the space inside the box 5 is divided by the silica gel pad 7 and the three groups of the iron wires 8, then the operator places different types of objects in different areas inside the box 5, then the operator clamps the baffle 10 in the grooves formed above the groove long plates 9, so that the baffle 10 can be firmly limited and fixed in front of the box 5 as shown in fig. 1, then the operator places the cleaning brush 301 on the rear side of the connecting plate 202, at this time, the threaded holes formed on the upper and lower sides in front of the cleaning brush 301 will be automatically aligned with the threaded holes formed on the upper and lower sides in front of the connection plate 202, then another operator holds the two sets of quick-release screws 302 to rotate until the two sets of quick-release screws 302 penetrate the threaded holes formed on the upper and lower sides in front of the cleaning brush 301, and penetrate into the threaded holes formed on the upper and lower sides in front of the connection plate 202, so that the cleaning brush 301 can be limited and fixed on the rear side of the connection plate 202, the operator drives the connection plate 202 and the cleaning assembly 3 to move left and right through the handle 4 of the sliding rail 201, at this time, the rear side of the cleaning brush 301 will automatically clean dust in front of the main electric energy metering box 1, the main electric energy metering box 1 is provided with a sealing box on one side of the oil tank of the combined transformer, wherein measuring instruments and meters are installed, and secondary outgoing lines of the combined transformer and these instruments are respectively, the wiring terminals of the instrument are connected in a specified mode, and the outside of the sealing box is provided with a door so as to check and test the instrument and the instrument therein, and a protection element can be arranged for protection according to the requirement, which is the working principle of the standardized electric energy metering box.

Claims (7)

1. Standardized electric energy metering box, including electric energy metering main tank (1) and clean subassembly (3), its characterized in that, the place ahead top of electric energy metering main tank (1) is provided with adjusting part (2), and adjusting part (2) are including smooth track (201) and connecting plate (202), the place ahead one end sliding connection of smooth track (201) has connecting plate (202), clean subassembly (3) are installed in the rear side below of connecting plate (202), and clean subassembly (3) include cleaning brush (301) and quick detach screw (302), the place ahead one end of electric energy metering main tank (1) is provided with cleaning brush (301), equal threaded connection in both sides has quick detach screw (302) about the place ahead of connecting plate (202), and the one end middle part of connecting plate (202) is provided with possesses (4).
2. The standardized electric energy metering box according to claim 1, characterized in that a box body (5) is provided on one side below the main electric energy metering box (1), and the main electric energy metering box (1) is integrally connected with the box body (5).
3. The standardized electric energy metering box according to claim 2, characterized in that the inner upper wall of the box body (5) is fixedly connected with a fixed block (6), and a silica gel pad (7) is fixedly connected below the fixed block (6).
4. The standardized electric energy metering box of claim 3 wherein an iron wire (8) is arranged inside the silica gel pad (7), and the silica gel pad (7) is bonded with the iron wire (8).
5. The standardized electric energy metering box according to claim 2, characterized in that the front bottom of the box body (5) is fixedly connected with a groove long plate (9), and a baffle plate (10) is clamped and connected above the groove long plate (9).
6. The standardized electric energy metering box according to claim 1, characterized in that the top left and right sides of the main electric energy metering box (1) are provided with vertical rods (11), and the top of the vertical rods (11) is provided with a transverse plate (12).
7. The standardized electric energy metering box of claim 6, wherein the left and right sides of the cross plate (12) are provided with a drainage plate (13), and the cross plate (12) is rotatably connected with the drainage plate (13).
CN202322043185.1U 2023-08-01 2023-08-01 Standardized electric energy metering box Active CN220628532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322043185.1U CN220628532U (en) 2023-08-01 2023-08-01 Standardized electric energy metering box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322043185.1U CN220628532U (en) 2023-08-01 2023-08-01 Standardized electric energy metering box

Publications (1)

Publication Number Publication Date
CN220628532U true CN220628532U (en) 2024-03-19

Family

ID=90221370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322043185.1U Active CN220628532U (en) 2023-08-01 2023-08-01 Standardized electric energy metering box

Country Status (1)

Country Link
CN (1) CN220628532U (en)

Similar Documents

Publication Publication Date Title
CN220628532U (en) Standardized electric energy metering box
CN210071872U (en) Electric power instrument fixing device convenient to dismantle
CN208209283U (en) A kind of microcomputer protective relay cabinet convenient for connecing electricity installation
CN207717962U (en) A kind of electric energy meter testing cassete
CN214793568U (en) Motor torque test tool
CN211528467U (en) New energy automobile power assembly testing arrangement
CN211565828U (en) Live working tool for high-voltage transmission line
CN201897635U (en) Mobile measuring and detecting station for detecting site electric energy meter and transformer
CN215076401U (en) Relay protection test bench
CN220290272U (en) Floor type prepayment metering box
CN212516897U (en) Outdoor antimagnetic antistatic voltage transformer
CN219695423U (en) Take isolator's single-phase voltage transformer to use experimental frock
CN212364455U (en) Relay protection test bench
CN214622869U (en) SVG power unit test platform
CN216912919U (en) X-axis module convenient to overhaul
CN214427500U (en) New forms of energy are incorporated into power networks electric power electric quantity recorder of operation
CN221446209U (en) Measuring device suitable for AC/DC power distribution network state estimation
CN220128777U (en) Refractory material rack convenient to adjust
CN214777513U (en) Technical detection instrument placing box
CN220128720U (en) Debugging platform convenient to remove electrical equipment
CN221351648U (en) Low-voltage test fixture
CN212011809U (en) Automatic compensation device
CN219143071U (en) Fault indicator test fixture
CN214473559U (en) Three-phase multifunctional electric meter convenient to install
CN213437325U (en) Fixing device for drilling of right-angle hanging plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant