CN220620998U - Hanging basket for house building construction - Google Patents

Hanging basket for house building construction Download PDF

Info

Publication number
CN220620998U
CN220620998U CN202322001238.3U CN202322001238U CN220620998U CN 220620998 U CN220620998 U CN 220620998U CN 202322001238 U CN202322001238 U CN 202322001238U CN 220620998 U CN220620998 U CN 220620998U
Authority
CN
China
Prior art keywords
groove
hanging basket
fixing
building construction
construction according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322001238.3U
Other languages
Chinese (zh)
Inventor
崔佳佳
柳墨涵
金熠旭
黄林超
林黎衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Senhe Construction Co ltd
Original Assignee
Zhejiang Senhe Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Senhe Construction Co ltd filed Critical Zhejiang Senhe Construction Co ltd
Priority to CN202322001238.3U priority Critical patent/CN220620998U/en
Application granted granted Critical
Publication of CN220620998U publication Critical patent/CN220620998U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports Or Holders For Household Use (AREA)

Abstract

The utility model relates to a technical field who hangs the basket discloses a hanging basket is used in construction is built in room, and it includes the framework, the framework includes and has offered the fixed slot that is used for depositing article on the bottom plate, the storage tank that is used for depositing article has been offered to the diapire of fixed slot, the fixed slot internal rotation is connected with the fixed lid that covers the storage tank, be provided with the locking structure of connecting both between fixed lid and the bottom plate, this application has the effect that promotes staff's efficiency of construction.

Description

Hanging basket for house building construction
Technical Field
The application relates to the technical field of hanging baskets, in particular to a hanging basket for building construction.
Background
Hanging baskets are one of the devices commonly used in building construction, often used for building facade construction.
The basket for house construction in the related art comprises a frame body, wherein the frame body comprises a bottom plate and guardrails arranged on the bottom plate.
When the existing staff works on the hanging basket, more tools such as screws, wrenches, hammers and the like are used, and the tools are generally stored in tool bags carried by the staff. But because of the limited tool bags, the number of tools and parts carried is small. When the parts are used, the hanging basket can only be lowered onto the ground to supplement the parts, so that the operation is very inconvenient, and the construction efficiency is affected.
Disclosure of Invention
In order to improve staff's efficiency of construction, this application provides a house is built construction and is used basket.
The application provides a hanging basket for construction is built in room adopts following technical scheme:
the utility model provides a construction is built with hanging basket in room, includes the framework, the framework includes and has offered the fixed slot that is used for depositing article on the bottom plate, the storage tank that is used for depositing article has been offered to the diapire in fixed slot, fixed slot swivelling joint has the fixed lid that covers the storage tank, be provided with the locking structure of connecting both between fixed lid and the bottom plate.
By adopting the technical scheme, the articles are stored in the fixing groove, and when a worker needs to use, the fixing cover can be rotated to be opened after the locking between the fixing cover and the bottom is released, so that the articles can be conveniently stored and taken; set up the storage tank on hanging the basket, compare in staff's instrument bag, the space of storing is bigger, need not the staff in addition and bear instrument bag always, makes the staff construction lighter.
Optionally, the fixed slot is including first fixed surface, the mounting groove has been seted up to the terminal surface that the fixed lid is close to first fixed surface, locking structure is including setting up fixture block and the spring in the mounting groove, the both ends of spring are connected with the diapire and the fixture block of mounting groove respectively, the spring is in compression state, set up the draw-in groove that supplies the fixture block male on the first fixed surface.
By adopting the technical scheme, when articles are required to be stored and taken out, the clamping block is driven to enter the mounting groove, and then the fixed cover is driven to rotate, so that the storage groove is opened; otherwise, the driving clamping block enters the mounting groove, and meanwhile, the spring is compressed and deformed to rotate the fixed cover, so that the fixed cover seals the storage groove, and when the mounting groove is aligned with the clamping groove, the spring is reset to enable the clamping block to be reinserted into the clamping groove, so that the fixed cover is not easy to rotate.
Optionally, the chamfer has been seted up to the terminal surface that the spring was kept away from to the fixture block, the chamfer sets up in the juncture that the spring was kept away from to the fixture block one side and fixture block orientation storage tank one side.
By adopting the technical scheme, when the storage groove is sealed, the fixed cover is rotated to enable the chamfer inclined surface to be in contact with the bottom plate, the clamping block slides into the mounting groove along with the continuous rotation of the fixed cover, meanwhile, the spring is compressed and deformed, and when the mounting groove is aligned with the clamping groove, the spring is reset to enable the clamping block to be reinserted into the clamping groove; the clamping block does not need to be manually driven to enter the mounting groove, so that the operation steps of workers are reduced, and the labor-saving effect is achieved.
Optionally, the fixed cover is kept away from the smooth hole of intercommunication draw-in groove has been seted up to the terminal surface of storage tank, the smooth hole is rectangular hole form, the length of smooth hole is the same with the direction of mounting groove, the terminal surface that the storage tank was kept away from to the fixture block is provided with the operation piece of inserting in the smooth hole, the operation piece slides and sets up in the smooth hole, the operation piece is used for driving the fixture block and removes along the axis direction of mounting groove.
By adopting the technical scheme, the operating block is applied with the acting force along the axis direction of the mounting groove, so that the operating block can move along the axis direction of the mounting groove, even if the clamping block moves along the direction of the mounting groove, the clamping block completely enters the mounting groove or extends out of the mounting groove; in addition, the arrangement of the operation block has a limiting effect, and when the operation block is abutted against the inner wall of the sliding hole far away from the rotating part, the clamping block cannot extend out of the mounting groove continuously.
Optionally, an operation handle is rotatably connected to the operation block; when the operating handle is not used, the operating handle is positioned in the sliding hole.
Through adopting above-mentioned technical scheme, with the help of the operation handle, make the staff more convenient drive operation piece and fixture block remove, have the effect of province.
Optionally, an operation box is arranged in the storage groove, and an operation groove for storing articles is formed above the operation box.
Through adopting above-mentioned technical scheme, set up the operation box, can deposit the operation box with the article in, when the staff clearance storage tank, can once only take out all article through the operation box, need not the staff and take out article one by one, have the effect of convenient operation.
Optionally, a partition plate for dividing the operation slot into a plurality of storage spaces is arranged in the operation slot.
Through adopting above-mentioned technical scheme, separate into a plurality of storage spaces with the operating tank, make the staff can be according to the function difference or the size difference of article, with in the different storage spaces of article storage tank, deposit article classification, when the staff need use specific article, can be quick accurate find corresponding article, save the staff and seek the time of article, reduce engineering time, promoted work efficiency.
Optionally, a fixed handle is arranged on the operation box.
Through adopting above-mentioned technical scheme, set up fixed handle, the staff of being convenient for takes out the operation box from the storage tank.
Optionally, a guardrail is arranged on the bottom plate.
Through adopting above-mentioned technical scheme, set up the guardrail, protect constructor, make the staff be difficult for falling from hanging on the basket, promote the security of staff on hanging the basket.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the fixed cover is unlocked, the fixed cover can be rotated to be opened, so that articles can be conveniently stored and taken out; the storage groove is formed in the hanging basket, so that compared with a tool bag of a worker, the storage space is larger, and the worker does not need to bear the tool bag all the time, so that the worker can construct more easily;
2. by means of the operating handle, the staff can rapidly open or close the fixed cover.
Drawings
FIG. 1 is a schematic diagram of an embodiment of the present application;
FIG. 2 is a schematic view showing a partial structure of a base plate;
FIG. 3 is a partial cross-sectional view highlighting the construction of the cartridge;
fig. 4 is an enlarged schematic view of the portion a in fig. 3.
Reference numerals: 1. a frame; 2. a bottom plate; 21. a fixing groove; 211. a first fixing surface; 212. a third fixing surface; 213. a circular groove; 214. a round bar; 215. a clamping groove; 22. a storage tank; 23. sealing ring grooves; 24. a sealing ring block; 3. guard bars; 31. fixing the railing; 32. operating the railing; 4. an operation box; 41. an operation groove; 42. a partition plate; 43. a fixed handle; 5. a fixed cover; 51. a mounting groove; 52. a slide hole; 6. a locking structure; 61. a clamping block; 611. chamfering; 62. a spring; 7. an operation block; 71. a round hole; 72. a rotating shaft; 73. the handle is operated.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-4.
The embodiment discloses a hanging basket for building construction. Referring to fig. 1, a hanging basket for building construction comprises a frame body 1, wherein the frame body 1 comprises a bottom plate 2 and a guardrail 3.
Referring to fig. 2, the upper end surface of the base plate 2 is provided with a fixing groove 21, and the inner wall of the fixing groove 21 includes a first fixing surface 211, a second fixing surface and two third fixing surfaces 212, the third fixing surfaces 212 are parallel to each other, and the first fixing surface 211 is parallel to the second fixing surface.
Referring to fig. 2 and 3, a storage groove 22 is formed in the bottom wall of the fixing groove 21, and the storage groove 22 can directly store articles. A sealing ring groove 23 is formed in the bottom wall of the fixing groove 21, the sealing ring groove 23 surrounds the storage groove 22, and a sealing ring block 24 is arranged in the sealing ring groove 23.
Referring to fig. 2 and 3, in the present embodiment, the storage tank 22 is further provided with an operation box 4, and an upper end surface of the operation box 4 is fixedly connected with a fixing handle 43. The highest point of the fixing knob 43 is lower than the bottom wall of the fixing groove 21. The operation groove 41 has been seted up to the up end of operation box 4, fixedly connected with baffle 42 on the operation groove 41 diapire, and the baffle 42 cuts apart the space of operation groove 41, makes it form a plurality of storage spaces, is convenient for classify the depositing to different articles, also is convenient for the staff access article fast.
Referring to fig. 2 and 3, the third fixing surface 212 is provided with a circular groove 213, the circular groove 213 is located at one side of the storage groove 22 near the second fixing surface, and a circular rod 214 is rotatably connected to the circular groove 213. The round rod 214 is sleeved with a fixed cover 5. When the fixed cover 5 is turned to be horizontal, the fixed cover 5 is completely positioned in the fixed groove 21, and the fixed cover 5 seals the storage groove 22. When the fixed cover 5 contacts with the bottom wall of the fixed groove 21, the sealing ring block 24 contacts with the fixed cover 5, further improving the sealability between the fixed cover 5 and the bottom plate 2.
Referring to fig. 2 and 4, a locking structure 6 connecting the fixed cover 5 and the base plate 2 is provided therebetween. The end surface of the fixed cover 5 facing the first fixing surface 211 is provided with a mounting groove 51. The locking structure 6 includes a latch 61 and a spring 62, both of the latch 61 and the spring 62 being disposed in the mounting groove 51.
Referring to fig. 2 and 4, two springs 62 are provided, and both springs 62 are located at one side of the latch 61 near the bottom wall of the mounting groove 51. One end of the spring 62 is fixedly connected with the bottom wall of the mounting groove 51, and the other end of the spring 62 is fixedly connected with the clamping block 61. The spring 62 is in a compressed state. The clamping block 61 is provided with a chamfer 611, and the chamfer 611 is arranged at the junction of the end surface of the clamping block 61 facing the storage groove 22 and one side of the clamping block 61 away from the spring 62. The first fixing surface 211 is provided with a clamping groove 215, and the clamping groove 215 can be used for inserting the clamping block 61.
Referring to fig. 2 and 4, the end surface of the fixed cover 5, which is far from the storage groove 22, is provided with a sliding hole 52, the sliding hole 52 is communicated with the mounting groove 51, the sliding hole 52 is in a long strip shape, and the length of the sliding hole 52 is the same as the direction of the mounting groove 51. An operation block 7 is arranged in the slide hole 52, and the lower end surface of the operation block 7 is fixedly connected with the upper end surface of the clamping block 61. When the operation block 7 moves in the axial direction of the mounting groove 51, the latch 61 also moves in the axial direction of the mounting groove 51.
Referring to fig. 2 and 4, when the operation block 7 collides with the inner wall of the slide hole 52 near the first fixing surface 211, the latch 61 protrudes out of the mounting groove 51. When the operating block 7 abuts against the inner wall of the sliding hole 52 away from the first fixing surface 211, the clamping block 61 is completely located in the mounting groove 51.
Referring to fig. 2 and 4, a circular hole 71 is formed in the end face of the operation block 7 facing the third fixing surface 212, a rotating shaft 72 is arranged in the circular hole 71 in a penetrating manner, and an operation handle 73 is sleeved outside the rotating shaft 72. When the operating handle 73 is not in use, the operating handle 73 may be completely disposed within the slide hole 52. When the operation handle 73 is required, the operation handle 73 can be rotated along the axis of the rotation shaft 72, and the operation handle 73 can be rotated out of the chute.
Referring to fig. 3 and 4, after the operation handle 73 is rotated out of the slide hole 52, there are two ways to drive the latch 61 to move. First, the operating handle 73 is biased toward the round bar 214, so that the operating handle 73 moves the operating block 7 and the latch 61 together, and the latch 61 is completely inserted into the mounting groove 51. Secondly, an acting force in a direction away from the round rod 214 is applied to the operating handle 73, so that the operating handle 73 firstly abuts against the inner wall of the sliding hole 52, then the inner wall of the sliding hole 52 is used as a fulcrum, and the operating handle 73 drives the operating block 7 and the clamping block 61 to move through the lever principle, so that the clamping block 61 completely enters the mounting groove 51.
Referring to fig. 1, the guardrail 3 is fixedly connected to the bottom plate 2, the guardrail 3 comprises a fixed guardrail 31 and an operation guardrail 32, the fixed guardrail 31 surrounds the bottom plate 2, three horizontal directions above the bottom plate 2 are protected, and a hinge for connecting the fixed guardrail 31 and the operation guardrail 32 is arranged between the operation guardrail 32 and the fixed guardrail 31, so that the operation guardrail 32 can rotate relative to the fixed guardrail 31, and workers cannot enter or leave the hanging basket easily. A fixing ring is fixedly connected to the fixing rail 31.
The implementation principle of the hanging basket for building construction is as follows: when the fixed cover 5 needs to be opened, the operation handle 73 is driven to rotate, then the operation handle 73 drives the clamping block 61 to move towards the bottom wall direction of the mounting groove 51, so that the clamping block 61 is separated from the clamping groove 215, and then the fixed cover 5 can be driven to rotate, so that the storage groove 22 can be opened; conversely, the fixed cover 5 is sealed to the storage groove 22.
The foregoing description of the preferred embodiments of the present application is not intended to limit the utility model, but is intended to cover any modifications, equivalents, improvements, etc. that fall within the spirit and scope of the present application.

Claims (9)

1. Hanging basket for house construction, including framework (1), its characterized in that: the frame body (1) comprises a bottom plate (2) provided with a fixing groove (21) for storing articles, the bottom wall of the fixing groove (21) is provided with a storage groove (22) for storing articles, the fixing groove (21) is rotationally connected with a fixing cover (5) for covering the storage groove (22), and a locking structure (6) for connecting the fixing cover (5) with the bottom plate (2) is arranged between the fixing cover and the bottom plate.
2. The hanging basket for building construction according to claim 1, wherein: the fixing groove (21) comprises a first fixing surface (211), the end face, close to the first fixing surface (211), of the fixing cover (5) is provided with a mounting groove (51), the locking structure (6) comprises a clamping block (61) and a spring (62) which are arranged in the mounting groove (51), two ends of the spring (62) are respectively connected with the bottom wall of the mounting groove (51) and the clamping block (61), the spring (62) is in a compressed state, and the first fixing surface (211) is provided with a clamping groove (215) for the clamping block (61) to be inserted.
3. The hanging basket for building construction according to claim 2, wherein: the end face, far away from the spring (62), of the clamping block (61) is provided with a chamfer (611), and the chamfer (611) is arranged at the junction of one side, far away from the spring (62), of the clamping block (61) and one side, facing the storage groove (22), of the clamping block (61).
4. The hanging basket for building construction according to claim 2, wherein: the utility model discloses a fixed lid, fixed lid is (5) keep away from the holding tank (22), fixed lid is (52) are offered in holding tank (22) terminal surface and are offered slide hole (52) of intercommunication draw-in groove (215), slide hole (52) are rectangular hole form, the length of slide hole (52) is the same with the direction of mounting groove (51), the terminal surface that holding tank (22) was kept away from to fixture block (61) is provided with operation piece (7) in inserting slide hole (52), operation piece (7) slip sets up in slide hole (52), operation piece (7) are used for driving fixture block (61) and remove along the axis direction of mounting groove (51).
5. The hanging basket for building construction according to claim 4, wherein: an operation handle (73) is rotatably connected to the operation block (7); when the operating handle (73) is not used, the operating handle (73) is positioned in the slide hole (52).
6. The hanging basket for building construction according to claim 1, wherein: an operation box (4) is arranged in the storage groove (22), and an operation groove (41) for storing articles is formed above the operation box (4).
7. The hanging basket for building construction according to claim 6, wherein: a partition plate (42) for partitioning the operation groove (41) into a plurality of storage spaces is provided in the operation groove (41).
8. The hanging basket for building construction according to claim 6, wherein: the operation box (4) is provided with a fixed handle (43).
9. The hanging basket for building construction according to claim 1, wherein: the bottom plate (2) is provided with a guardrail (3).
CN202322001238.3U 2023-07-27 2023-07-27 Hanging basket for house building construction Active CN220620998U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322001238.3U CN220620998U (en) 2023-07-27 2023-07-27 Hanging basket for house building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322001238.3U CN220620998U (en) 2023-07-27 2023-07-27 Hanging basket for house building construction

Publications (1)

Publication Number Publication Date
CN220620998U true CN220620998U (en) 2024-03-19

Family

ID=90225902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322001238.3U Active CN220620998U (en) 2023-07-27 2023-07-27 Hanging basket for house building construction

Country Status (1)

Country Link
CN (1) CN220620998U (en)

Similar Documents

Publication Publication Date Title
US11981019B2 (en) Tool container storage system
CN101321483B (en) Perpendicular upright shaft column suitable for multiple containing boxes
EP2749382B1 (en) Tool housing case and subcase
CA2425087C (en) Double stack rack
US9452524B1 (en) Composite tool holder
EP3492226B1 (en) Tool container system
EP4183528A1 (en) Storage system
US20080223091A1 (en) Cabinet-style lock box having a locking mechanism
CN220620998U (en) Hanging basket for house building construction
US20080296187A1 (en) Tool bit caddy and method of operating the same
CN108044585A (en) The tool box of movable type storage building implement
CN210642943U (en) List accommodating and managing device for civil engineering cost
US20130043201A1 (en) Hand tool display box
CN213381474U (en) Toolbox is used in computer maintenance
CN212096297U (en) Wall-hanging portable theftproof type three-class toolbox in colliery
CN210622499U (en) Door lock
CN217865335U (en) Tool box
CN212421224U (en) Storage device is used in maintenance of fire-fighting electromechanical device convenient to instrument is taken
CN220481688U (en) Tobacco safety inspection tool box
CN209807327U (en) Hand-drawing tool box for landscape design
CN214525270U (en) Storage device is used in research and development of handing
CN215362736U (en) Electrician is with having instrument containing box of preventing mistake opening mechanism
CN212654831U (en) Special storage and transportation box for breakdown rush repair of low-voltage metering box
CN220534185U (en) Antistatic combined tool box
CN218457975U (en) Rotation locking mechanism and folding tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant