CN220618471U - Sewage treatment device - Google Patents
Sewage treatment device Download PDFInfo
- Publication number
- CN220618471U CN220618471U CN202322076055.8U CN202322076055U CN220618471U CN 220618471 U CN220618471 U CN 220618471U CN 202322076055 U CN202322076055 U CN 202322076055U CN 220618471 U CN220618471 U CN 220618471U
- Authority
- CN
- China
- Prior art keywords
- filter screen
- filter
- frame
- limiting
- sewage treatment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000010865 sewage Substances 0.000 title claims abstract description 43
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 18
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 claims description 26
- 238000001179 sorption measurement Methods 0.000 claims description 26
- 238000007789 sealing Methods 0.000 claims description 25
- 230000007246 mechanism Effects 0.000 claims description 6
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000001914 filtration Methods 0.000 abstract description 12
- 239000012535 impurity Substances 0.000 abstract description 9
- 238000000746 purification Methods 0.000 description 31
- 238000010586 diagram Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 5
- 238000004140 cleaning Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 2
- 244000043261 Hevea brasiliensis Species 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 229920003052 natural elastomer Polymers 0.000 description 1
- 229920001194 natural rubber Polymers 0.000 description 1
- 235000019645 odor Nutrition 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000008399 tap water Substances 0.000 description 1
- 235000020679 tap water Nutrition 0.000 description 1
Landscapes
- Water Treatment By Sorption (AREA)
Abstract
Description
技术领域Technical field
本实用新型属于污水处理设备领域,尤其涉及一种污水处理装置。The utility model belongs to the field of sewage treatment equipment, and particularly relates to a sewage treatment device.
背景技术Background technique
中国水资源人均占有量少,空间分布不平衡;随着中国城市化、工业化的加速,水资源的需求缺口也日益增大,在这样的背景下,污水处理行业成为新兴产业,与自来水生产、供水、排水、中水回用行业处于同等重要地位,虽然由于国家和各级政府对环境保护重视程度的不断提高,中国污水处理行业正在快速增长,污水处理总量逐年增加,城镇污水处理率不断提高,但是同样的污水处理过程中会耗费大量的资源,现在人们需要一种节能环保的污水处理装置,在现有技术中,现有的大多数污水处理装置,为了追求污水的过滤效率,和过滤性能,通常会把污水处理装置中的滤网或者滤纱、滤纸等放置在装置的内部,然后在滤网位置设置排污口,比如公告号为CN212504392U的中国实用新型专利文献中公开了一种节能环保多级过滤水处理设备,其就是采用在过滤网的最低点与沉淀过滤箱的连接处开设有排污口,实现排出过滤网上的杂质,在大量的污水处理后,装置内部的滤网上通常堆积较多的杂质,由于滤网等设置在装置的内部,虽然能通过排污口清理,但是还是存在局限性,比如过滤网网孔堵塞后会增加清理难度,因此在清理或者更换时较为麻烦,而且更换需要进行对装置的内部拆卸,存在便捷性不足的问题。China has a small amount of water resources per capita and uneven spatial distribution. With the acceleration of urbanization and industrialization in China, the demand gap for water resources is also increasing. Against this background, the sewage treatment industry has become an emerging industry, closely related to tap water production, The water supply, drainage, and reclaimed water reuse industries are in an equally important position. Although the country and governments at all levels are paying more attention to environmental protection, China's sewage treatment industry is growing rapidly. The total amount of sewage treatment is increasing year by year, and the urban sewage treatment rate continues to increase. Improvement, but the same sewage treatment process will consume a lot of resources. Now people need an energy-saving and environmentally friendly sewage treatment device. In the existing technology, most existing sewage treatment devices, in order to pursue the filtration efficiency of sewage, and For filtration performance, the filter screen, filter yarn, filter paper, etc. in the sewage treatment device are usually placed inside the device, and then a sewage outlet is set at the position of the filter screen. For example, the Chinese utility model patent document with announcement number CN212504392U discloses a Energy-saving and environmentally friendly multi-stage filtration water treatment equipment uses a sewage outlet at the connection between the lowest point of the filter and the sedimentation filter box to discharge impurities on the filter. After a large amount of sewage is treated, the filter inside the device usually If a large amount of impurities accumulates, since the filter screen is installed inside the device, although it can be cleaned through the sewage outlet, there are still limitations. For example, if the filter mesh is blocked, it will increase the difficulty of cleaning, so it will be more troublesome to clean or replace. Moreover, replacement requires internal disassembly of the device, which poses a problem of insufficient convenience.
实用新型内容Utility model content
本实用新型的目的在于:提供一种便于更换清理滤网和滤纱的污水处理装置。The purpose of this utility model is to provide a sewage treatment device that is easy to replace and clean the filter screen and filter yarn.
本实用新型采用的技术方案如下:The technical solutions adopted by this utility model are as follows:
一种污水处理装置,包括净化箱,净化箱的顶部设置进水口,净化箱内部从上至下依次设置过滤网、第一滤纱与第二滤纱,过滤网具有外框架,外框架两侧均设置有卡板,净化箱顶部两侧均开设有卡槽,卡板卡接在对应位置的卡槽内部,净化箱上开设有两个密封滑槽,第一滤纱具有第一外框,第一外框滑动安装在其中一个密封滑槽内部,第一外框与密封滑槽内壁之间密封,第二滤纱具有第二外框,第二外框滑动安装在另一个密封滑槽内部,第二外框与密封滑槽内壁之间密封,第一外框与第二外框上均设置拉把。A sewage treatment device includes a purification box. A water inlet is provided on the top of the purification box. A filter net, a first filter gauze and a second filter gauze are arranged inside the purification box from top to bottom. The filter net has an outer frame, and both sides of the outer frame Both are provided with card plates, and card slots are provided on both sides of the top of the purification box. The card plates are clamped inside the card slots at corresponding positions. Two sealing chutes are provided on the purification box. The first filter yarn has a first outer frame. The first outer frame is slidably installed inside one of the sealing chute, and the first outer frame is sealed with the inner wall of the sealing chute. The second filter gauze has a second outer frame, and the second outer frame is slidably installed inside the other sealing chute. , there is a seal between the second outer frame and the inner wall of the sealing chute, and handles are provided on both the first outer frame and the second outer frame.
进一步的技术方案在于,所述净化箱底部连接有吸附箱,吸附箱的内部和净化箱的内部相连通,吸附箱内部设置活性炭板,排水口设置吸附箱下部。A further technical solution is that an adsorption box is connected to the bottom of the purification box, the inside of the adsorption box is connected with the inside of the purification box, an activated carbon plate is provided inside the adsorption box, and a drainage outlet is provided at the lower part of the adsorption box.
进一步的技术方案在于,所述吸附箱的上表面开设有若干贯穿其内部的插槽,活性炭板的数量和位置与插槽数量和位置相匹配,活性炭板插接在对应的插槽内部,插槽侧壁上开设有过水孔,吸附箱顶部设置有盖板,盖板与吸附箱之间密封。A further technical solution is that the upper surface of the adsorption box is provided with a number of slots running through its interior, the number and position of the activated carbon plates match the number and position of the slots, the activated carbon plates are plugged into the corresponding slots, and the activated carbon plates are inserted into the corresponding slots. A water hole is provided on the side wall of the tank, a cover plate is provided on the top of the adsorption box, and the cover plate and the adsorption box are sealed.
进一步的技术方案在于,所述密封滑槽的内壁上胶粘连接有密封垫,所述密封垫的与对应位置的第一外框和第二外框相接触。A further technical solution is that a sealing gasket is adhesively connected to the inner wall of the sealing chute, and the sealing gasket is in contact with the first outer frame and the second outer frame at corresponding positions.
进一步的技术方案在于,过滤网的滤网孔直径大于第一滤纱的滤网孔直径,第一滤纱的滤网孔直径大于第二滤纱的滤网孔直径。A further technical solution is that the filter mesh hole diameter of the filter screen is larger than the filter mesh hole diameter of the first filter yarn, and the filter mesh hole diameter of the first filter yarn is larger than the filter mesh hole diameter of the second filter yarn.
进一步的技术方案在于,所述净化箱的底部设置移动轮组。A further technical solution is that a moving wheel set is provided at the bottom of the purification box.
进一步的技术方案在于,所述净化箱的上表面两侧还开着有限位槽,且所述限位槽和卡槽相连通并相互垂直,所述限位槽的内部设置有限位机构,限位机构包括限位螺母、螺杆、限位板与弹簧,所述螺杆固定安装限位槽的底部,所述弹簧套接在螺杆的底部,且所述弹簧的下端与限位槽底部固定连接,所述弹簧的上端与限位板固定连接,所述限位板活动套接在螺杆的外侧,所述限位螺母旋合安装在螺杆的外表面,且所述限位螺母的底部与限位板相接触,所述限位板的下表面与卡板的上表面相接触。A further technical solution is that there are limit slots on both sides of the upper surface of the purification box, and the limit slot and the clamping slot are connected and perpendicular to each other, and a limit mechanism is provided inside the limit slot to limit the The positioning mechanism includes a limit nut, a screw rod, a limit plate and a spring. The screw rod is fixedly installed at the bottom of the limit groove, the spring is sleeved at the bottom of the screw rod, and the lower end of the spring is fixedly connected to the bottom of the limit groove. The upper end of the spring is fixedly connected to the limit plate, the limit plate is movablely sleeved on the outside of the screw, the limit nut is screwed and installed on the outer surface of the screw, and the bottom of the limit nut is in contact with the limit The plates are in contact with each other, and the lower surface of the limiting plate is in contact with the upper surface of the clamping plate.
综上所述,由于采用了上述技术方案,本实用新型的有益效果是:To sum up, due to the adoption of the above technical solution, the beneficial effects of the present utility model are:
通过在净化箱的内部由上向下依次设置过滤网、第一滤纱、第二滤纱,污水经过过滤网的第一次过滤,能够去除大型水中杂物,然后再经过第一滤纱和第二滤纱的二次过滤,去除污水中的细微杂物,在实现污水过滤处理的同时,第一滤纱、第二滤纱通过抽拉的方式安装在净化箱内部,过滤网的卡板卡设在净化箱顶部的卡槽内,相比传统方式本方案可以实现便于更换和清理净化箱的内部滤网和滤纱。By arranging the filter net, the first filter gauze, and the second filter gauze in sequence from top to bottom inside the purification box, the sewage is first filtered by the filter net, which can remove large impurities in the water, and then passes through the first filter gauze and the second filter gauze. The secondary filtration of the second filter yarn removes fine impurities in the sewage. While filtering the sewage, the first filter yarn and the second filter yarn are installed inside the purification box by pulling. The card plate of the filter screen The card is installed in the slot on the top of the purification box. Compared with the traditional method, this solution can facilitate the replacement and cleaning of the internal filter screen and filter yarn of the purification box.
附图说明Description of the drawings
图1为本实用新型的立体结构示意图;Figure 1 is a schematic diagram of the three-dimensional structure of the utility model;
图2为本实用新型图1中A处的放大结构示意图;Figure 2 is an enlarged structural schematic diagram of position A in Figure 1 of the present utility model;
图3为本实用新型图1中B处的放大结构示意图;Figure 3 is an enlarged structural schematic diagram of position B in Figure 1 of the present invention;
图4为本实用新型中的立体结构示意图;Figure 4 is a schematic diagram of the three-dimensional structure of the utility model;
图5为本实用新型图4中C处的立体结构示意图;Figure 5 is a schematic three-dimensional structural diagram of C in Figure 4 of the present utility model;
图6为本实用新型所述吸附箱内的插槽的结构示意图;Figure 6 is a schematic structural diagram of the slot in the adsorption box of the utility model;
图7为本实用新型所述第一滤纱与第二滤纱位于密封滑槽内的结构示意图。Figure 7 is a schematic structural diagram of the first filter yarn and the second filter yarn located in the sealing chute according to the present invention.
具体实施方式Detailed ways
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。In order to make the purpose, technical solutions and advantages of the present utility model more clear, the utility model will be further described in detail below with reference to the drawings and embodiments.
如图1-图7所示。一种污水处理装置,包括净化箱1,净化箱1的顶部设置进水口,净化箱1内部从上至下依次设置过滤网2、第一滤纱3与第二滤纱4,过滤网2具有外框架15,外框架15两侧均设置有卡板10,净化箱1顶部两侧均开设有卡槽101,卡板10卡接在对应位置的卡槽101内部,净化箱1上开设有两个密封滑槽103,第一滤纱3具有第一外框16,第一外框16滑动安装在其中一个密封滑槽103内部,第一外框16与密封滑槽103内壁之间密封,第二滤纱4具有第二外框17,第二外框17滑动安装在另一个密封滑槽103内部,第二外框17与密封滑槽103内壁之间密封,第一外框16与第二外框17上均设置拉把。As shown in Figure 1-Figure 7. A sewage treatment device includes a purification box 1. A water inlet is provided on the top of the purification box 1. A filter 2, a first filter gauze 3 and a second filter gauze 4 are arranged inside the purification box 1 from top to bottom. The filter net 2 has The outer frame 15 has clamping plates 10 on both sides of the outer frame 15. There are clamping slots 101 on both sides of the top of the purification box 1. The clamping plates 10 are clamped inside the slots 101 at corresponding positions. There are two slots 101 on the purification box 1. There are two sealing chute 103. The first filter yarn 3 has a first outer frame 16. The first outer frame 16 is slidably installed inside one of the sealing chute 103. There is a seal between the first outer frame 16 and the inner wall of the sealing chute 103. The second filter yarn 4 has a second outer frame 17. The second outer frame 17 is slidably installed inside another sealing chute 103. There is a seal between the second outer frame 17 and the inner wall of the sealing chute 103. The first outer frame 16 and the second The outer frame 17 is provided with handles.
使用时,把需要进行处理的污水,倾倒在净化箱1的上方,污水首先经过过滤网2的过滤,能够去除大型的杂物,避免了大型杂物进行到净化箱1的内部,进行首次过滤后的污水在依次通过第一滤纱3和第二滤纱4,进行二次过滤。更换过滤网2时,只需通过提起卡板10使其脱离卡槽101,更换第一滤纱3与第二滤纱4时,只需将第一外框16与第二外框17从密封滑槽103内抽出即可,用新的第一滤纱3和第一外框16总成、第二滤纱4和第二外框17总成替换旧的即可,第二外框17与密封滑槽103内壁之间密封可以通过在滑槽内壁上设置密封垫301或者密封圈实现。During use, the sewage that needs to be treated is poured above the purification box 1. The sewage is first filtered by the filter 2, which can remove large debris and avoid large debris from entering the inside of the purification box 1 for the first filtering. The final sewage passes through the first filter yarn 3 and the second filter yarn 4 in sequence for secondary filtration. When replacing the filter 2, you only need to lift the clamping plate 10 to separate it from the slot 101. When replacing the first filter gauze 3 and the second filter gauze 4, you only need to remove the first outer frame 16 and the second outer frame 17 from the seal. Just pull it out from the chute 103, and replace the old ones with the new first filter yarn 3 and first outer frame 16 assembly, second filter yarn 4 and second outer frame 17 assembly, and the second outer frame 17 and The sealing between the inner walls of the sealing chute 103 can be achieved by providing a sealing gasket 301 or a sealing ring on the inner wall of the chute.
通过在净化箱1的内部由上向下依次设置过滤网2、第一滤纱3、第二滤纱4,污水经过过滤网2的第一次过滤,能够去除大型水中杂物,然后再经过第一滤纱3和第二滤纱4的二次过滤,去除污水中的细微杂物,在实现污水过滤处理的同时,第一滤纱3、第二滤纱4通过抽拉的方式安装在净化箱1内部,过滤网2的卡板10卡设在净化箱1顶部的卡槽101内,相比传统方式本方案可以实现便于更换和清理净化箱1的内部滤网和滤纱。By arranging the filter screen 2, the first filter gauze 3, and the second filter gauze 4 from top to bottom inside the purification box 1, the sewage is first filtered by the filter screen 2 to remove large impurities in the water, and then passes through The secondary filtration of the first filter gauze 3 and the second filter gauze 4 removes fine impurities in the sewage. While achieving the sewage filtration treatment, the first filter gauze 3 and the second filter gauze 4 are installed in the Inside the purification box 1, the card plate 10 of the filter 2 is clamped in the slot 101 on the top of the purification box 1. Compared with the traditional method, this solution can facilitate the replacement and cleaning of the internal filter screen and filter yarn of the purification box 1.
所述净化箱1底部连接有吸附箱6,吸附箱6的内部和净化箱1的内部相连通,吸附箱6内部设置活性炭板8,排水口7设置在吸附箱6下部。An adsorption box 6 is connected to the bottom of the purification box 1. The interior of the adsorption box 6 is connected with the interior of the purification box 1. An activated carbon plate 8 is provided inside the adsorption box 6, and a drain outlet 7 is provided at the lower part of the adsorption box 6.
所述吸附箱6的上表面开设有若干贯穿其内部的插槽601,活性炭板8的数量和位置与插槽601数量和位置相匹配,活性炭板8插接在对应的插槽601内部,插槽601侧壁上开设有过水孔18,吸附箱6顶部设置有盖板,盖板与吸附箱6之间通过密封圈密封,盖板依靠重量或者通过螺栓固定在吸附箱6顶部,水量少的情况下可以不放置盖板。The upper surface of the adsorption box 6 is provided with a number of slots 601 running through its interior. The number and position of the activated carbon plates 8 match the number and position of the slots 601. The activated carbon plates 8 are plugged into the corresponding slots 601. There is a water hole 18 on the side wall of the tank 601, and a cover plate is provided on the top of the adsorption box 6. The cover plate and the adsorption box 6 are sealed by a sealing ring. The cover plate relies on weight or is fixed on the top of the adsorption box 6 by bolts, and the amount of water is small. In this case, the cover plate does not need to be placed.
所述密封滑槽103的内壁上胶粘连接有密封垫301,所述密封垫301的与对应位置的第一外框16和第二外框17相接触,实现第一外框16与密封滑槽103之间的密封,密封垫301为天然橡胶构件。A sealing gasket 301 is adhesively connected to the inner wall of the sealing chute 103. The sealing gasket 301 is in contact with the first outer frame 16 and the second outer frame 17 at the corresponding position, so that the first outer frame 16 and the sealing slide are connected. The sealing gasket 301 between the grooves 103 is made of natural rubber.
过滤网2的滤网孔直径大于第一滤纱3的滤网孔直径,第一滤纱3的滤网孔直径大于第二滤纱4的滤网孔直径。The filter mesh hole diameter of the filter screen 2 is larger than the filter mesh hole diameter of the first filter yarn 3 , and the filter mesh hole diameter of the first filter yarn 3 is larger than the filter mesh hole diameter of the second filter yarn 4 .
所述净化箱1的底部设置移动轮组9。A moving wheel set 9 is provided at the bottom of the purification box 1 .
所述净化箱1的上表面两侧还开着有限位槽102,且所述限位槽102和卡槽101相连通并相互垂直,所述限位槽102的内部设置有限位机构,限位机构包括限位螺母11、螺杆12、限位板13与弹簧14,所述螺杆12固定安装限位槽102的底部,所述弹簧14套接在螺杆12的底部,且所述弹簧14的下端与限位槽102底部固定连接,所述弹簧14的上端与限位板13固定连接,所述限位板13活动套接在螺杆12的外侧,所述限位螺母11旋合安装在螺杆12的外表面,且所述限位螺母11的底部与限位板13相接触,所述限位板13的下表面与卡板10的上表面相接触,可以进一步固定过滤网2。Limiting grooves 102 are also opened on both sides of the upper surface of the purification box 1, and the limiting groove 102 and the clamping groove 101 are connected and perpendicular to each other. A limiting mechanism is provided inside the limiting groove 102. The mechanism includes a limit nut 11, a screw rod 12, a limit plate 13 and a spring 14. The screw rod 12 is fixedly installed at the bottom of the limit groove 102. The spring 14 is sleeved at the bottom of the screw rod 12, and the lower end of the spring 14 Fixedly connected to the bottom of the limiting groove 102, the upper end of the spring 14 is fixedly connected to the limiting plate 13, the limiting plate 13 is movably sleeved on the outside of the screw 12, and the limiting nut 11 is screwed and installed on the screw 12 The outer surface of the limit nut 11 is in contact with the limit plate 13, and the lower surface of the limit plate 13 is in contact with the upper surface of the clamping plate 10, so that the filter screen 2 can be further fixed.
本实用新型的工作原理及使用流程:使用时,把需要进行处理的污水,倾倒在净化箱1的上方,污水首先经过过滤网2的过滤,能够去除大型的杂物,避免了大型杂物进行到净化箱1的内部,进行首次过滤后的污水在依次通过第一滤纱3和第二滤纱4,进行二次过滤,最后进入到吸附箱6的内部,通过活性炭板8,进行水中更为细小杂质和异味的吸附工作,处理后的污水通过吸附箱6排出,当净化箱1内部的过滤网2、第一滤纱3、第二滤纱4,以及活性炭板8需要进行更换时,对于过滤网2,通过手动拧动限位螺母11,使限位螺母11脱离螺杆12,这时在弹簧14的作用下,限位板13被弹出,取出限位板13,然后取下过滤网2,对过滤网2进行清理,对于第一滤纱3和第二滤纱4,直接通过拉把5抽拉出来,进行清理或者更换,对于活性炭板8,再去除盖板后直接将其抽来出来,进行清理更换。The working principle and usage process of the utility model: During use, the sewage that needs to be treated is poured above the purification box 1. The sewage is first filtered by the filter 2, which can remove large debris and avoid the removal of large debris. After entering the purification box 1, the sewage that has been filtered for the first time passes through the first filter gauze 3 and the second filter gauze 4 in sequence for secondary filtration, and finally enters the inside of the adsorption box 6 and passes through the activated carbon plate 8 for water replacement. In order to adsorb fine impurities and odors, the treated sewage is discharged through the adsorption box 6. When the filter 2, the first filter gauze 3, the second filter gauze 4, and the activated carbon plate 8 inside the purification box 1 need to be replaced, For the filter 2, manually twist the limit nut 11 to separate the limit nut 11 from the screw 12. At this time, under the action of the spring 14, the limit plate 13 is ejected. Take out the limit plate 13, and then remove the filter. 2. Clean the filter 2. For the first filter gauze 3 and the second filter gauze 4, pull them out directly through the handle 5 for cleaning or replacement. For the activated carbon plate 8, remove the cover and pull it out directly. Come out and clean and replace.
以上仅为本实用新型的较佳实施例而已。The above are only preferred embodiments of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322076055.8U CN220618471U (en) | 2023-08-03 | 2023-08-03 | Sewage treatment device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322076055.8U CN220618471U (en) | 2023-08-03 | 2023-08-03 | Sewage treatment device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220618471U true CN220618471U (en) | 2024-03-19 |
Family
ID=90211857
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322076055.8U Active CN220618471U (en) | 2023-08-03 | 2023-08-03 | Sewage treatment device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220618471U (en) |
-
2023
- 2023-08-03 CN CN202322076055.8U patent/CN220618471U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN116020185A (en) | A sewage multi-stage filter equipment | |
| CN220618471U (en) | Sewage treatment device | |
| CN221309742U (en) | Water resource recycling and collecting device | |
| CN202238811U (en) | Wastewater recycling device of bottle cleaning machine | |
| CN217972809U (en) | A high-salt and high-COD wastewater treatment tank | |
| CN207581524U (en) | A kind of sewage purification circulation uses environmental protecting device | |
| CN214571144U (en) | Green energy-conserving waste water utilization equipment | |
| CN207628040U (en) | A kind of mechanical device quickly removing algae | |
| CN210736361U (en) | Sewage treatment purifier | |
| CN211158816U (en) | Sewage treatment equipment | |
| CN204714537U (en) | Full-automatic car-washing sewage disposal device | |
| CN211813909U (en) | Sewage treatment filter equipment | |
| CN204958576U (en) | Domestic sewage treatment equipment of family | |
| CN218573056U (en) | Filtering device for reclaimed water treatment | |
| CN107551661A (en) | Comprehensive industrial sewage purification processing equipment | |
| CN221267387U (en) | Sewage outlet purifying device | |
| CN223674337U (en) | Mud cleaning device for sewage treatment | |
| CN218166249U (en) | Paper mill biomass combustion furnace sewage recycling device | |
| CN221217215U (en) | A water treatment water distributor | |
| CN215628990U (en) | System for be used for concentrated or white water of paper pulp to retrieve | |
| CN206981336U (en) | Clean oil cylinder | |
| CN221662655U (en) | Simple and easy high-efficient water treatment facilities | |
| CN220237937U (en) | Water resource cyclic utilization filter equipment with prevent blockking up function | |
| CN221471093U (en) | Advanced treatment and recycling device for reclaimed water | |
| CN218451923U (en) | Suspended solid microsphere separation device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |