CN220583694U CN202322288373.0U CN202322288373U CN220583694U CN 220583694 U CN220583694 U CN 220583694U CN 202322288373 U CN202322288373 U CN 202322288373U CN 220583694 U CN220583694 U CN 220583694U
Authority
CN
China
Prior art keywords
radiator
diverter valve
air inlet
mounting position
working machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322288373.0U
Other languages
Chinese (zh)
Inventor
王意
王术合
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Santino Thermal Energy Technology Co ltd
Original Assignee
Tianjin Santino Thermal Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Santino Thermal Energy Technology Co ltd filed Critical Tianjin Santino Thermal Energy Technology Co ltd
Priority to CN202322288373.0U priority Critical patent/CN220583694U/en
Application granted granted Critical
Publication of CN220583694U publication Critical patent/CN220583694U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a radiator processing machine with a diverter valve installation position, which belongs to the technical field of radiator airtight test, wherein an electric cabinet is externally connected with 220V alternating current through a power plug, a quick connector is arranged at the left upper corner air inlet port of a radiator through threads and is connected, three air inlet ports on the radiator are blocked by nuts, the left upper corner air inlet port is reserved, a pneumatic pump is used for conveying compressed gas into the radiator from a coil pipe and the diverter valve, four pneumatic connectors are arranged on the diverter valve and can be simultaneously connected with four groups of radiators for airtight test, an operator holds a spray can to spray and observe the overflow condition of bubbles on all the surface of the radiator which is being inflated, the leakage problem exists at the position where the bubbles overflow, and mark marks are used for marking and welding repair treatment; four groups of radiators can be tested simultaneously, a push handle is vertically arranged on one side above the supporting bottom plate, four groups of symmetrical movable wheels are arranged at the bottom of the supporting bottom plate, and occasions and positions can be moved easily by personnel hand pushing.

Description

Radiator processing machinery with shunt valve installation position
Technical Field
The utility model relates to a radiator machining machine with a diverter valve installation position, and belongs to the technical field of radiator airtight tests.
Background
Many users remove the heavy cast iron radiator which is initially installed, and install the novel radiator. While the south family does not have central heating, a set of heating can be installed through a wall-mounted furnace, air energy and other various energy sources. The greatest advantage of the radiator is that the radiator can be heated immediately after being opened, and the radiator is the best choice for office workers who go to the morning, evening and returning. Fresh air heat radiator and whole house are heated quickly. Heating is convenient and is not needed. If the household is a household with infants, old people and other frequent people, the demand for instant heating is not obvious, and long-time heating is needed, the household is recommended to be warmed up selectively, the household is kept warm, and the more long the household is opened, the more money is saved. Of course, large villas can be directly assembled in a mixed mode, the living room is warmed up, and the radiator is assembled in areas such as bedroom study rooms and toilets, so that the heating is more efficient.
The radiator belongs to high-temperature convection heat dissipation, has stronger applicability, and can be installed and used in both central heating and self-heating families. The new house decoration, floor heating and radiator can be installed. The floor heating and the radiator are required to be grooved and the floor heating pipe or the radiator pipe is required to be buried and fixed according to the construction progress. If the house is filled with the heating radiator, the radiator can be selected only, and the paving floor heating engineering is large and the money is burnt. The open radiator is more convenient and quick.
At present, various test tools for heating radiators are not available, and after manual experience assembly is carried out on the radiators manufactured in field production, the radiators are put into a sales link. In order to prevent the radiator from leaking in the using process, each group of assembled radiator needs to be subjected to airtight test, so that potential safety hazards are eliminated, and the product quality and enterprise credibility are improved. A set of tooling for airtight test needs to be designed, which is a technical problem to be solved currently.
Disclosure of Invention
In order to solve the problems in the prior art, the utility model aims to provide a radiator processing machine with a diverter valve installation position, which has good test effect, can test four groups of radiators simultaneously, enables personnel to observe bubble overflow conditions by spraying area by area, is vertically provided with a push handle on one side above a supporting bottom plate, is provided with four groups of symmetrical movable wheels at the bottom of the supporting bottom plate, can easily move occasions and positions by personnel pushing, is convenient for daily operation, and is sanitary and convenient for arranging field environment.
In order to achieve the above purpose, the utility model provides the following technical scheme
A radiator working machine with diverter valve mounting position, characterized in that: comprises a supporting bottom plate 3, a radiator 5, a coil pipe 8 and a pneumatic pump 9; the utility model discloses a radiator, including supporting baseplate 3, the top one side of supporting baseplate 3 be equipped with perpendicularly and push away handle 1, the top activity of supporting baseplate 3 is provided with pneumatic pump 9 and coil pipe 8, the mouth of giving vent to anger of pneumatic pump 9 is connected with the air inlet of coil pipe 8 through the rubber trachea, the mouth of giving vent to anger of coil pipe 8 is equipped with shunt valve 7 through the screw thread, be connected with quick-operation joint 6 through pneumatic connector and rubber trachea on the shunt valve 7, quick-operation joint 6 is then installed at radiator 5 upper left corner air inlet port through the screw thread and is connected.
The outside of the handle 1 is fixedly provided with an electric cabinet 2.
The lower end of the push handle 1 is fixedly provided with a basket 10.
The electric cabinet 2 is externally connected with 220V alternating current through a power plug.
The bottom of the supporting bottom plate 3 is provided with four groups of symmetrical movable wheels 4.
The three air inlet ports on the radiator 5 are blocked by nuts, and the left upper corner air inlet port is reserved.
A spray can 11 is movably arranged in the basket 10.
The utility model has the beneficial effects that
The electric cabinet 2 is connected with 220V alternating current through the power plug, the quick connector 6 is connected with the air inlet port at the upper left corner of the radiator 5 through threads, the three air inlet ports on the radiator 5 are blocked by nuts, and the air inlet port at the upper left corner is reserved. Checking whether the three parts are in a sealed state, starting a control switch in the electric cabinet 2, starting the pneumatic pump 9 to work, conveying compressed gas into the radiator 5 from the coil pipe 8 and the flow dividing valve 7, wherein four pneumatic connectors are arranged on the flow dividing valve 7, four groups of radiators 5 can be connected simultaneously for airtight test, an operator holds the spray can 11 with clean water, sprays everywhere on the surface of the inflated radiator 5 to observe the overflow condition of bubbles, leakage is caused at the overflow position of the bubbles, marking is carried out by using a mark, and welding repair treatment is carried out.
The test effect is good, can test four groups of radiators 5 simultaneously, and personnel only need to carry out the spraying of district by district and observe the bubble and spill over the situation, and the top one side of supporting baseplate 3 is equipped with perpendicularly and pushes away handle 1, and the bottom of supporting baseplate 3 is equipped with four groups of symmetrical movable wheels 4, can easily remove occasion and position through personnel's hand push, makes things convenient for daily operation, and arrangement scene sanitation is convenient.
Drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is a perspective view of the present utility model.
Fig. 3 is a perspective view of the second embodiment of the present utility model.
In the figure: the electric heating radiator comprises a push handle 1, an electric cabinet 2, a supporting bottom plate 3, a movable wheel 4, a heating radiator 5, a quick connector 6, a diverter valve 7, a coil pipe 8, a pneumatic pump 9, a basket 10 and a spray can 11.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
As shown in fig. 1-3, a radiator processing machine with a diverter valve mounting position comprises a supporting bottom plate 3, a radiator 5, a coil pipe 8 and a pneumatic pump 9; the utility model discloses a radiator, including supporting baseplate 3, the top one side of supporting baseplate 3 be equipped with perpendicularly and push away handle 1, the top activity of supporting baseplate 3 is provided with pneumatic pump 9 and coil pipe 8, the mouth of giving vent to anger of pneumatic pump 9 is connected with the air inlet of coil pipe 8 through the rubber trachea, the mouth of giving vent to anger of coil pipe 8 is equipped with shunt valve 7 through the screw thread, be connected with quick-operation joint 6 through pneumatic connector and rubber trachea on the shunt valve 7, quick-operation joint 6 is then installed at radiator 5 upper left corner air inlet port through the screw thread and is connected.
The electric cabinet 2 is fixedly arranged on the outer side of the handle 1, the basket 10 is fixedly arranged at the lower end of the handle 1, the electric cabinet 2 is externally connected with 220V alternating current through a power plug, and the spray can 11 is movably arranged in the basket 10.
The bottom of the supporting bottom plate 3 is provided with four groups of symmetrical movable wheels 4.
The three air inlet ports on the radiator 5 are blocked by nuts, and the left upper corner air inlet port is reserved.
The working principle of the radiator machining machine with the diverter valve installation position is as follows:
before use, the electric cabinet 2 is connected with 220V alternating current through the external connection of a power plug, then the quick connector 6 is connected with the air inlet port at the left upper corner of the radiator 5 through threads, the three air inlet ports on the radiator 5 are blocked by nuts, and the air inlet port at the left upper corner is reserved. Checking whether the three parts are in a sealed state, starting a control switch in the electric cabinet 2, starting the pneumatic pump 9 to work, conveying compressed gas into the radiator 5 from the coil pipe 8 and the flow dividing valve 7, wherein four pneumatic connectors are arranged on the flow dividing valve 7, four groups of radiators 5 can be connected simultaneously for airtight test, an operator holds the spray can 11 with clean water, sprays everywhere on the surface of the inflated radiator 5 to observe the overflow condition of bubbles, leakage is caused at the overflow position of the bubbles, marking is carried out by using a mark, and welding repair treatment is carried out.
The embodiments of the utility model have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the utility model in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (7)

1. A radiator working machine with diverter valve mounting position, characterized in that: comprises a supporting bottom plate (3), a radiator (5), a coil pipe (8) and a pneumatic pump (9); the utility model provides a supporting baseplate (3) top one side be equipped with perpendicularly push handle (1), the top activity of supporting baseplate (3) is provided with pneumatic pump (9) and coil pipe (8), the mouth of giving vent to anger of pneumatic pump (9) is connected with the air inlet of coil pipe (8) through the rubber trachea, the mouth of giving vent to anger of coil pipe (8) is equipped with shunt valve (7) through the screw thread, be connected with quick-operation joint (6) through pneumatic connector on shunt valve (7) with the rubber trachea, quick-operation joint (6) then are connected at radiator (5) upper left corner air inlet port through threaded mounting.
2. A radiator working machine having a diverter valve mounting position as defined in claim 1, wherein: the outer side of the hand push handle (1) is fixedly provided with an electric cabinet (2).
3. A radiator working machine having a diverter valve mounting position as defined in claim 2, wherein: the lower end of the hand push handle (1) is fixedly provided with a basket (10).
4. A radiator working machine having a diverter valve mounting position as defined in claim 2, wherein: the electric cabinet (2) is externally connected with 220V alternating current through a power plug.
5. A radiator working machine having a diverter valve mounting position as defined in claim 1, wherein: the bottom of the supporting bottom plate (3) is provided with four groups of symmetrical moving wheels (4).
6. A radiator working machine having a diverter valve mounting position as defined in claim 1, wherein: three air inlet ports on the radiator (5) are blocked by nuts, and left upper corner air inlet ports are reserved.
7. A radiator working machine having a diverter valve mounting position as defined in claim 3, wherein: a spray can (11) is movably arranged in the basket (10).
CN202322288373.0U 2023-08-24 2023-08-24 Radiator processing machinery with shunt valve installation position Active CN220583694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322288373.0U CN220583694U (en) 2023-08-24 2023-08-24 Radiator processing machinery with shunt valve installation position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322288373.0U CN220583694U (en) 2023-08-24 2023-08-24 Radiator processing machinery with shunt valve installation position

Publications (1)

Publication Number Publication Date
CN220583694U true CN220583694U (en) 2024-03-12

Family

ID=90119535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322288373.0U Active CN220583694U (en) 2023-08-24 2023-08-24 Radiator processing machinery with shunt valve installation position

Country Status (1)

Country Link
CN (1) CN220583694U (en)

Similar Documents

Publication Publication Date Title
CN201145351Y (en) Indoor intelligent hydroelectric heating warmer
CN220583694U (en) Radiator processing machinery with shunt valve installation position
CN209341366U (en) A kind of heat-exchange system with cleaning function
CN204593568U (en) A kind of transformer station's house heating system based on power transformer loss
CN214426925U (en) Underground pipe network monitoring devices that leaks
CN204509967U (en) Road surface hot recycling heater
CN103343990B (en) Stove fuel gas on-off control method and gas furnace
CN211041130U (en) Heating equipment
CN210217221U (en) Integrated laboratory system
CN206780983U (en) A kind of XPS floor drains panel moulding apparatus
CN206310462U (en) A kind of reprocessing plant independent dispersion formula hot cell light fixture ventilation unit
CN207635443U (en) Air source radiation heating system manifold and outer machine connection structure
CN213272781U (en) Movable water circulation heating and cooling device and system
CN205261733U (en) Central heating heating power station secondary side dynamic pressure reducing device
CN203731532U (en) Energy-saving residential house independent heating system
CN219552572U (en) Factory detection platform for power equipment production
CN204678661U (en) A kind of circulating reezer system
CN209415742U (en) A kind of electromagnetic heating type boiled water machine with water purification function
CN220062683U (en) Plate heat exchanger unit with concentrate drainage device
CN203824077U (en) Instant heating type heat pump water heater
CN210320389U (en) Intelligent energy-saving control system of purifying equipment
CN209978141U (en) Coupling connection heating system
CN207122970U (en) A kind of heating plant for building
CN211084232U (en) Metal temporary workshop with safety power utilization guarantee
CN220506903U (en) Radiator with two-way ventilation mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant