CN220580063U - Soil excavation slope releasing slope rate control measuring tool - Google Patents

Soil excavation slope releasing slope rate control measuring tool Download PDF

Info

Publication number
CN220580063U
CN220580063U CN202321581859.7U CN202321581859U CN220580063U CN 220580063 U CN220580063 U CN 220580063U CN 202321581859 U CN202321581859 U CN 202321581859U CN 220580063 U CN220580063 U CN 220580063U
Authority
CN
China
Prior art keywords
rope
winding wheel
rod
rope winding
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321581859.7U
Other languages
Chinese (zh)
Inventor
张洲耀
梁国艳
王振
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi First Construction Group Co Ltd
Original Assignee
Shanxi First Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi First Construction Group Co Ltd filed Critical Shanxi First Construction Group Co Ltd
Priority to CN202321581859.7U priority Critical patent/CN220580063U/en
Application granted granted Critical
Publication of CN220580063U publication Critical patent/CN220580063U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Abstract

The utility model relates to a tool for controlling and measuring the slope rate of earth excavation slope release, which comprises a sleeve rod, wherein a telescopic rod is inserted in the sleeve rod in a sliding manner; the front end of the loop bar is hung with a hanging block through a rope, the telescopic bar is provided with scales, the bottoms of the two ends of the loop bar are provided with gaskets, and the outer wall of the loop bar is provided with a level bar; the front end of the telescopic rod is provided with a steering wheel, the upper part of the front end of the loop rod is provided with a rope winding wheel through a base, one end of a rope is wound on the rope winding wheel, and the other end of the rope winds around the steering wheel to be suspended with a hanging block; one side of the rope winding wheel is provided with a handle for rotating the rope winding wheel, the rope winding wheel is connected to the base in a damping way, and the telescopic rod is connected to the loop rod in a damping way. The utility model has simple structure and ingenious design, realizes the measurement of the gradient of the foundation pit by adjusting the loop bar, the telescopic bar and the rope, is applicable to foundation pits with various different specifications, has strong adaptability, reduces the labor intensity, improves the measurement efficiency and improves the measurement accuracy.

Description

Soil excavation slope releasing slope rate control measuring tool
Technical Field
The utility model relates to building construction auxiliary equipment, in particular to a slope rate control and measurement tool for earth excavation slope release.
Background
Along with the rapid development of urban construction, large-scale development of underground space has become a trend, foundation pit earthwork excavation is an important content of foundation pit engineering, reasonable earthwork excavation construction can ensure the safety of foundation pit and surrounding environment, and whether the slope rate of the foundation pit excavation slope is accurately controlled directly influences the stability of the deep foundation pit slope and the safety of later support. The traditional deep foundation pit excavation slope rate control is a manual control method according to upper and lower boundary lines of a foundation pit, the slope rate is calculated after the horizontal distance between the upper and lower edge lines is roughly measured, layered excavation with different elevations and different slope rates cannot be accurately and quickly controlled by the method, and accidents such as foundation pit slope instability and foundation pit collapse are easily caused by serious insufficient slope rates.
Disclosure of Invention
In view of the above, an object of the present utility model is to provide a soil excavation slope rate control measuring tool to solve the above-mentioned problems.
In order to achieve the above purpose, the following technical scheme is adopted:
the soil excavation slope release rate control measuring tool comprises a sleeve rod, wherein a telescopic rod is inserted in the sleeve rod in a sliding manner;
the hanging of loop bar front end is hung through the rope and is equipped with the piece that hangs down, simultaneously, is provided with the scale on the telescopic link.
As a further improvement of the utility model, gaskets are arranged at the bottoms of the two ends of the loop bar, and a level bar is arranged on the outer wall of the loop bar.
As a further improvement of the utility model, the front end of the telescopic rod is provided with a steering wheel, the upper part of the front end of the loop rod is provided with a rope coiling wheel through a base, one end of a rope is wound on the rope coiling wheel, and the other end of the rope is wound around the steering wheel to hang a hanging block.
As a further improvement of the utility model, a handle for rotating the rope winding wheel is arranged on one side of the rope winding wheel, the rope winding wheel is connected to the base in a damping way, and the telescopic rod is connected to the loop rod in a damping way.
As a further improvement of the utility model, a balancing weight is arranged on the gasket at the tail end of the loop bar.
The beneficial effects of the utility model are as follows:
the utility model has simple structure and ingenious design, realizes the measurement of the gradient of the foundation pit by adjusting the loop bar, the telescopic bar and the rope, is applicable to foundation pits with various different specifications, has strong adaptability, reduces the labor intensity, improves the measurement efficiency and improves the measurement accuracy.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the utility model. In the drawings:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a state diagram of the present utility model;
fig. 3 is a schematic view of the structure of the sheave of the present utility model.
Detailed Description
It should be noted that, in the case of no conflict, the embodiments and features in the embodiments may be combined with each other. The utility model will be described in detail below with reference to the drawings in connection with embodiments.
In order to make the present application solution better understood by those skilled in the art, the following description will be made in detail and with reference to the accompanying drawings in the embodiments of the present application, it is apparent that the described embodiments are only some embodiments of the present application, not all embodiments. All other embodiments, which can be made by one of ordinary skill in the art based on the embodiments herein without making any inventive effort, shall fall within the scope of the present application.
Please refer to fig. 1-3:
the tool for controlling and measuring the slope rate of earth excavation comprises a sleeve rod 1, wherein a telescopic rod 2 is slidably inserted into the sleeve rod 1;
the front end of the loop bar 1 is hung with a hanging block 4 through a rope 3, and simultaneously, the telescopic bar 2 is provided with scales 5.
The bottoms of the two ends of the loop bar 1 are provided with gaskets 6, and the outer wall of the loop bar 1 is provided with a level bar 7.
The steering wheel 8 is installed to telescopic link 2 front end, and rope winding wheel 10 is installed through base 9 in loop bar 1 front end upper portion, and rope 3 one end twines on rope winding wheel 10, and rope 3 other end has walked around steering wheel 8 and has hung perpendicular piece 4, and handle 11 on the rope winding wheel 10 is installed to rope winding wheel 10 one side, has placed balancing weight 12 on the gasket 6 of loop bar 1 tail end, and simultaneously, rope winding wheel 10 damping connection is on base 9 to and telescopic link 2 damping connection is on loop bar 1.
When the telescopic rod is used, the sleeve rod 1 is placed on the ground, the telescopic rod 2 is extended, the vertical block 4 is perpendicular to the foundation pit ground at the slope intersection, the rope winding wheel 10 is rotated to pay off according to the depth of the foundation pit, the extending length of the telescopic rod 2 is read, the length of the vertical line is measured, and then the gradient is calculated according to the trigonometric function through the extending length of the telescopic rod 2 and the length of the vertical line.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, but various modifications and variations can be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (2)

1. The tool for controlling and measuring the slope rate of earth excavation is characterized by comprising a sleeve rod, wherein a telescopic rod is inserted in the sleeve rod in a sliding manner;
the front end of the loop bar is hung with a hanging block through a rope, and meanwhile, the telescopic bar is provided with scales; the front end of the telescopic rod is provided with a steering wheel, the upper part of the front end of the loop rod is provided with a rope winding wheel through a base, one end of a rope is wound on the rope winding wheel, and the other end of the rope winds around the steering wheel to be suspended with a hanging block; one side of the rope winding wheel is provided with a handle for rotating the rope winding wheel, and meanwhile, the rope winding wheel is connected to the base in a damping way, and the telescopic rod is connected to the loop rod in a damping way; the gasket at the tail end of the loop bar is provided with a balancing weight.
2. The tool for controlling and measuring the slope rate of earth excavation slope production according to claim 1, wherein gaskets are arranged at the bottoms of two ends of the loop bar, and a level bar is arranged on the outer wall of the loop bar.
CN202321581859.7U 2023-06-20 2023-06-20 Soil excavation slope releasing slope rate control measuring tool Active CN220580063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321581859.7U CN220580063U (en) 2023-06-20 2023-06-20 Soil excavation slope releasing slope rate control measuring tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321581859.7U CN220580063U (en) 2023-06-20 2023-06-20 Soil excavation slope releasing slope rate control measuring tool

Publications (1)

Publication Number Publication Date
CN220580063U true CN220580063U (en) 2024-03-12

Family

ID=90112415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321581859.7U Active CN220580063U (en) 2023-06-20 2023-06-20 Soil excavation slope releasing slope rate control measuring tool

Country Status (1)

Country Link
CN (1) CN220580063U (en)

Similar Documents

Publication Publication Date Title
CN205296873U (en) Real -time correction lattice column hang down straightness's device and lattice column installation mechanism
CN103470041B (en) The cast-in-place concrete beam template steel pipe support precompressed construction method that adopts loose sand to load
CN109881721A (en) A kind of device and its application method that detection concrete is superfilled
CN205224125U (en) Steel -pipe pile hangs down straightness and detects structure
CN207214994U (en) A kind of wall column verticality measuring tool
CN110656890B (en) Deepwater geological drilling casing, casing hoisting system and casing hoisting method
CN107938675A (en) A kind of Vertical spots concrete placings technique and device
CN102108870A (en) Shaft equipment mounting construction platform
CN220580063U (en) Soil excavation slope releasing slope rate control measuring tool
CN208701697U (en) A kind of narrow foundation trench adjustable supporting device
CN102926388B (en) Earth moving method for deep foundation pit excavation
CN209038882U (en) A kind of moveable suspended bracket for lifting pipeline in piping lane
CN204298830U (en) Based on lattice column plane in subterranean excavation and elevation regulation device
CN207943803U (en) Diaphram wall steel reinforcement cage lifting device under overpass
CN111256776A (en) Red line monitoring and early warning device and method for water level of karst collapse area
CN208105272U (en) One kind preventing superfilled device
CN108179749B (en) Lattice column positioner and positioning method thereof
CN203334319U (en) Novel joint device of underground diaphragm wall
CN215252128U (en) Paving and leveling device for road cement stabilized base layer
CN212714689U (en) Adjustable highway safety protection facility
CN211824212U (en) Device for measuring hole depth of pile foundation
CN210827478U (en) Deep foundation pit underground structure reverse construction method steel pipe column positioning device
CN208884590U (en) A kind of new pile foundation self-balancing experiment displacement tester
CN206784371U (en) Cast-in-situ bored pile building mortion under a kind of Karst Geology
CN114164858A (en) High-precision construction method for vertical column in cover-excavation type subway station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant