CN220577293U - Galvanized fire control steel pipe carrier - Google Patents

Galvanized fire control steel pipe carrier Download PDF

Info

Publication number
CN220577293U
CN220577293U CN202321954739.7U CN202321954739U CN220577293U CN 220577293 U CN220577293 U CN 220577293U CN 202321954739 U CN202321954739 U CN 202321954739U CN 220577293 U CN220577293 U CN 220577293U
Authority
CN
China
Prior art keywords
support
bearing
galvanized
steel pipe
placing bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321954739.7U
Other languages
Chinese (zh)
Inventor
赵国栋
董文强
赵景茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bazhou Yuda Metal Products Co ltd
Original Assignee
Bazhou Yuda Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bazhou Yuda Metal Products Co ltd filed Critical Bazhou Yuda Metal Products Co ltd
Priority to CN202321954739.7U priority Critical patent/CN220577293U/en
Application granted granted Critical
Publication of CN220577293U publication Critical patent/CN220577293U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a galvanized fire-fighting steel pipe carrier, which comprises a first placing bin and a carrying mechanism arranged above the first placing bin, wherein the carrying mechanism comprises an expansion assembly and a rotating assembly, and the expansion assembly comprises a chute, a sliding block, a second placing bin, a first supporting plate, screws, a first support, a first bearing and a first wheel; this have galvanized fire control steel pipe carrier is provided with second backup pad and third backup pad, through first screw bolt and first screw cap, second screw bolt and second screw cap, can dismantle handle frame, second backup pad and third backup pad and assemble, when using the long pipeline of transport, the handle frame sets up in the top in second place the storehouse, alright carry with semi-circular frame, otherwise when carrying the short pipeline, alright set up the handle frame in semi-circular frame's top, place the storehouse with first place the storehouse and carry with the second, with simple and easy device, bring objective effect.

Description

Galvanized fire control steel pipe carrier
Technical Field
The utility model relates to the technical field of a transport vehicle, in particular to a galvanized fire-fighting steel pipe transport vehicle.
Background
The galvanized fire-fighting steel pipe is a workpiece which frequently appears in construction, because the volume and the weight of the galvanized fire-fighting steel pipe are large, manual transportation is very troublesome, so that the galvanized fire-fighting steel pipe needs to be transported by means of a transport vehicle, the current transport vehicle is a simple welding frame, the galvanized layer on the surface of the galvanized fire-fighting steel pipe is easy to scratch, the galvanized fire-fighting steel pipe is also easy to stack up and fall off, some of the transport vehicles even have no wheels, and the galvanized fire-fighting steel pipe is very inconvenient.
Fire-fighting steel pipe carrier on the market can not carry simply, and the carrier is limited to the length of pipeline in some cases, for this reason needs a galvanized fire-fighting steel pipe carrier.
Disclosure of Invention
The utility model aims to provide a galvanized fire-fighting steel pipe carrier, which solves the problems that the carrier cannot be simply carried in the prior art, and the carrier is limited by the length of a pipeline.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the galvanized fire-fighting steel pipe carrier comprises a first placing bin and a carrying mechanism arranged above the first placing bin, wherein the carrying mechanism comprises an expansion assembly and a rotating assembly;
the expansion assembly comprises a sliding chute, a sliding block, a second placing bin, a first supporting plate, screws, a first support column, a first bearing and a first wheel, wherein the sliding chute is arranged in the first placing bin, the sliding block is arranged in the sliding chute, the second placing bin is arranged above the sliding block, the first supporting plate is arranged at one end below the second placing bin, the screws are arranged at the joint of the first supporting plate and the second placing bin, the first support column is arranged on the side surface of the first supporting plate, the first bearing is arranged at one end of the first support column, and the first wheel is arranged at the periphery of the first bearing;
the rotating assembly comprises a support, a second bearing, a second wheel, a second support, a third bearing and a semicircular frame, wherein the support is installed at one end of the first placing bin, the second bearing is installed at one end of the support, the second wheel is installed at the periphery of the second bearing, the second support is installed above the support, the third bearing is installed at the top end of the second support, and the semicircular frame is installed above the third bearing.
Preferably, a second support plate is installed on one side of the second support column, a third support plate is installed at one end of the second support plate, a handle frame is installed at the joint of the second support plate and the third support plate, a second threaded bolt is installed at the joint of the third support plate and the handle frame, and a second threaded cap is installed at the periphery of the other end of the second threaded bolt.
Preferably, the first placing bin and the second placing bin form a sliding structure through a sliding groove and a sliding block.
Preferably, the first support plate and the second placing bin form a detachable structure through screws, the first support plate and the first support column form a fixed structure, and the first support column and the first wheel form a rotating structure through a first bearing.
Preferably, the bracket and the second wheel form a rotating structure through a second bearing, the bracket and the second support post form a fixed structure, and the second support post and the semicircular frame form a rotating structure through a third bearing.
Preferably, the second support post and the second support plate form a fixed structure, the second support plate forms a detachable structure with the third support plate through the first threaded bolt and the first threaded cap, and the third support plate forms a detachable structure with the handle frame through the second threaded bolt and the second threaded cap.
Compared with the prior art, the utility model has the beneficial effects that:
1. this have galvanized fire control steel pipe carrier is provided with second backup pad and third backup pad, through first screw bolt and first screw cap, second screw bolt and second screw cap, can dismantle handle frame, second backup pad and third backup pad and assemble, when using the long pipeline of transport, the handle frame sets up in the top in second place the storehouse, alright carry with semi-circular frame, otherwise when carrying the short pipeline, alright set up the handle frame in semi-circular frame's top, place the storehouse with first place the storehouse and carry with the second, with simple and easy device, bring objective effect.
Drawings
FIG. 1 is a schematic left-view structure diagram of a galvanized fire-fighting steel pipe carrier provided by the utility model;
fig. 2 is a schematic diagram of a right-side view structure of a galvanized fire-fighting steel pipe carrier according to the present utility model;
fig. 3 is a schematic diagram of an unfolding structure of a galvanized fire-fighting steel pipe carrier provided by the utility model.
In the figure: 1. a first placement bin; 2. a chute; 3. a slide block; 4. a second placement bin; 5. a first support plate; 6. a screw; 7. a first support column; 8. a first bearing; 9. a first wheel; 10. a bracket; 11. a second bearing; 12. a second wheel; 13. a second support; 14. a third bearing; 15. a semicircular frame; 16. a second support plate; 17. a first threaded bolt; 18. a first threaded cap; 19. a third support plate; 20. a second threaded bolt; 21. a second threaded cap; 22. a handle frame.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
As shown in fig. 1, 2 and 3, a galvanized fire-fighting steel pipe carrier in the drawings comprises a first placing bin 1 and a carrying mechanism arranged above the first placing bin 1, wherein the carrying mechanism comprises an expansion assembly and a rotating assembly;
the expansion assembly comprises a sliding chute 2, a sliding block 3, a second placing bin 4, a first supporting plate 5, screws 6, a first supporting column 7, a first bearing 8 and a first wheel 9, wherein the sliding chute 2 is arranged in the first placing bin 1, the sliding block 3 is arranged in the sliding chute 2, the second placing bin 4 is arranged above the sliding block 3, the first supporting plate 5 is arranged at one end below the second placing bin 4, the screws 6 are arranged at the joint of the first supporting plate 5 and the second placing bin 4, the first supporting column 7 is arranged on the side surface of the first supporting plate 5, the first bearing 8 is arranged at one end of the first supporting column 7, and the first wheel 9 is arranged at the periphery of the first bearing 8;
the rotating assembly comprises a bracket 10, a second bearing 11, a second wheel 12, a second support column 13, a third bearing 14 and a semicircular frame 15, wherein the bracket 10 is installed at one end of the first placing bin 1, the second bearing 11 is installed at one end of the bracket 10, the second wheel 12 is installed at the periphery of the second bearing 11, the second support column 13 is installed above the bracket 10, the third bearing 14 is installed at the top end of the second support column 13, and the semicircular frame 15 is installed above the third bearing 14.
The first storehouse 1 of placing forms sliding structure through spout 2 and slider 3 and second storehouse 4 of placing, places storehouse 4 through external force reaction second, carries out the quick slip with slider 3 through spout 2 to this increases the area of placing of pipeline.
The first support plate 5 forms a detachable structure with the second placing bin 4 through the screws 6, the first support plate 5 forms a fixed structure with the first support column 7, the first support column 7 forms a rotating structure with the first wheel 9 through the first bearing 8, when the second placing bin 4 is not used, the first support plate 5 can be detached firstly, so that the whole second placing bin 4 can be placed in the first placing bin 1, otherwise, when the second placing bin 4 is used, the whole second placing bin 4 is slid out firstly, and then the first support plate 5 is fixed, so that the stability can be increased.
The bracket 10 forms a rotating structure with the second wheel 12 through the second bearing 11, the bracket 10 forms a fixed structure with the second support column 13, the second support column 13 forms a rotating structure with the semicircular frame 15 through the third bearing 14, the whole device is in a vertical state through external force, then the semicircular frame 15 is attached to the periphery of a pipeline, and the semicircular frame is erected by the lever principle for carrying.
Example 2
As shown in fig. 1, 2 and 3, this embodiment further describes example 1, a second support plate 16 is mounted on one side of the second support column 13, a third support plate 19 is mounted on one end of the second support plate 16, a handle frame 22 is mounted at the connection between the second support plate 16 and the third support plate 19, a second threaded bolt 20 is mounted at the connection between the third support plate 19 and the handle frame 22, and a second threaded cap 21 is mounted on the periphery of the other end of the second threaded bolt 20.
The second support column 13 and the second support plate 16 form a fixed structure, the second support plate 16 and the third support plate 19 form a detachable structure through the first threaded bolt 17 and the first threaded cap 18, the third support plate 19 and the handle frame 22 form a detachable structure through the second threaded bolt 20 and the second threaded cap 21, the handle frame 22, the second support plate 16 and the third support plate 19 can be detached and assembled through the first threaded bolt 17 and the first threaded cap 18, the second threaded bolt 20 and the second threaded cap 21, when long pipes are conveyed, the handle frame 22 is arranged above the second placing bin 4, so that the semicircular frame 15 can be used for conveying, otherwise, the handle frame 22 can be arranged above the semicircular frame 15 when short pipes are conveyed, and the first placing bin 1 and the second placing bin 4 can be used for conveying, so that objective effects are achieved by simple devices.
Working principle: firstly, the device that the staff needs to clearly carry is long or short, if it is long pipeline, first handle frame 22 sets up in the top of second place storehouse 4, through the vertical state of whole device, then laminate at the pipeline periphery with semicircular frame 15, secondly lever principle is put up it, carry, this device is tried out long pipeline, and just can operate under the condition of two equipment, then if be the short pipeline, can set up handle frame 22 in the top of semicircular frame 15, directly use, finally when not using the second place storehouse 4 again, can dismantle first backup pad 5 earlier, so can put into first place storehouse 1 with whole second place storehouse 4 inside, otherwise when using second place storehouse 4, remove the second place storehouse 4 through external force, slide groove 2 and slider 3 carry out the quick slip, thereby increase the area of placing of pipeline, then fix first backup pad 5, so can increase stability.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a galvanized fire control steel pipe carrier, includes that first storehouse (1) and first storehouse (1) top of placing are installed transport mechanism, its characterized in that: the carrying mechanism comprises an expansion assembly and a rotation assembly;
the expansion assembly comprises a sliding chute (2), a sliding block (3), a second placing bin (4), a first supporting plate (5), screws (6), first supporting columns (7), first bearings (8) and first wheels (9), wherein the sliding chute (2) is arranged in the first placing bin (1), the sliding block (3) is arranged in the sliding chute (2), the second placing bin (4) is arranged above the sliding block (3), the first supporting plate (5) is arranged at one end below the second placing bin (4), the screws (6) are arranged at the joint of the first supporting plate (5) and the second placing bin (4), the first supporting columns (7) are arranged on the side surfaces of the first supporting plates (5), the first bearings (8) are arranged at one ends of the first supporting columns (7), and the first wheels (9) are arranged on the periphery of the first bearings (8).
The rotary assembly comprises a support (10), a second bearing (11), a second wheel (12), a second support (13), a third bearing (14) and a semicircular frame (15), wherein the support (10) is installed at one end of the first placement bin (1), the second bearing (11) is installed at one end of the support (10), the second wheel (12) is installed on the periphery of the second bearing (11), the second support (13) is installed above the support (10), the third bearing (14) is installed at the top end of the second support (13), and the semicircular frame (15) is installed above the third bearing (14).
2. A galvanized fire fighting steel pipe carrier according to claim 1, characterized in that: a second supporting plate (16) is arranged on one side of the second supporting column (13), a third supporting plate (19) is arranged at one end of the second supporting plate (16), a handle frame (22) is arranged at the joint of the second supporting plate (16) and the third supporting plate (19), a second threaded bolt (20) is arranged at the joint of the third supporting plate (19) and the handle frame (22), and a second threaded cap (21) is arranged at the periphery of the other end of the second threaded bolt (20).
3. A galvanized fire fighting steel pipe carrier according to claim 1, characterized in that: the first placing bin (1) and the second placing bin (4) form a sliding structure through the sliding groove (2) and the sliding block (3).
4. A galvanized fire fighting steel pipe carrier according to claim 1, characterized in that: the first support plate (5) and the second placing bin (4) form a detachable structure through the screws (6), the first support plate (5) and the first support column (7) form a fixed structure, and the first support column (7) and the first wheel (9) form a rotating structure through the first bearing (8).
5. A galvanized fire fighting steel pipe carrier according to claim 1, characterized in that: the support (10) and the second wheel (12) form a rotating structure through the second bearing (11), the support (10) and the second support (13) form a fixed structure, and the second support (13) and the semicircular frame (15) form a rotating structure through the third bearing (14).
6. A galvanized fire fighting steel pipe carrier according to claim 2, characterized in that: the second support column (13) and the second support plate (16) form a fixed structure, the second support plate (16) and the third support plate (19) form a detachable structure through the first threaded bolt (17) and the first threaded cap (18), and the third support plate (19) and the handle frame (22) form a detachable structure through the second threaded bolt (20) and the second threaded cap (21).
CN202321954739.7U 2023-07-25 2023-07-25 Galvanized fire control steel pipe carrier Active CN220577293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321954739.7U CN220577293U (en) 2023-07-25 2023-07-25 Galvanized fire control steel pipe carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321954739.7U CN220577293U (en) 2023-07-25 2023-07-25 Galvanized fire control steel pipe carrier

Publications (1)

Publication Number Publication Date
CN220577293U true CN220577293U (en) 2024-03-12

Family

ID=90122531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321954739.7U Active CN220577293U (en) 2023-07-25 2023-07-25 Galvanized fire control steel pipe carrier

Country Status (1)

Country Link
CN (1) CN220577293U (en)

Similar Documents

Publication Publication Date Title
CN220577293U (en) Galvanized fire control steel pipe carrier
CN211670467U (en) Electrical cabinet with adjustable mounting structure
CN214368204U (en) Civil engineering construction pipeline strutting arrangement
CN207290059U (en) A kind of civil engineering pipe fitting rack
CN201154836Y (en) Pipe material transporting device of heat treatment production line for metal pipes
CN211550729U (en) Movable pipeline support frame
CN207588364U (en) A kind of steel pipe type cable assembles vehicle
CN218085552U (en) Small-size panel transport vechicle
CN205551162U (en) Vertical swan neck system convenient to carry
CN215824309U (en) Drilling device for processing galvanized wire pipe of metal product
CN215663461U (en) Device for transporting high-rise building pipelines
CN205439198U (en) Traction frame
CN210235117U (en) Power station scarfing cinder device
CN218109596U (en) Three way connection tapping equipment
CN219277589U (en) Building materials conveyer
CN218745844U (en) Pipeline is laid and is used device of keeping to mouthpart
CN216952006U (en) Piping lane petrochemical safety protection system
CN211232244U (en) Mounting bracket for non-negative pressure water supply equipment
CN216976036U (en) Gas pipeline reinforcing apparatus for house
CN216344321U (en) Support positioner that municipal administration plumbing construction was used
CN220702347U (en) 3PE anticorrosion pipe faucet conveying device
CN219749900U (en) Universal transportation vehicle
CN216105668U (en) Large-scale pipeline passes through gleitbretter
CN215706447U (en) Device for pipeline transportation
CN218021726U (en) Building material handling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant