CN220565213U - Building engineering pile - Google Patents

Building engineering pile Download PDF

Info

Publication number
CN220565213U
CN220565213U CN202420246415.6U CN202420246415U CN220565213U CN 220565213 U CN220565213 U CN 220565213U CN 202420246415 U CN202420246415 U CN 202420246415U CN 220565213 U CN220565213 U CN 220565213U
Authority
CN
China
Prior art keywords
steel
connecting rod
solid
fixedly connected
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420246415.6U
Other languages
Chinese (zh)
Inventor
商艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Provincial Construction Engineering Cost Service Center
Original Assignee
Shaanxi Provincial Construction Engineering Cost Service Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Provincial Construction Engineering Cost Service Center filed Critical Shaanxi Provincial Construction Engineering Cost Service Center
Priority to CN202420246415.6U priority Critical patent/CN220565213U/en
Application granted granted Critical
Publication of CN220565213U publication Critical patent/CN220565213U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a building engineering pile, which comprises a connecting pipe and is characterized in that: the steel solid connecting rod is connected with the top end of the connecting pipe in a clamping mode, a screw rod is connected to the steel solid connecting rod in a penetrating and sliding mode, a straight slot hole is formed in the outer wall of the steel solid connecting rod in a penetrating mode, the screw rod penetrates through the straight slot hole, two nuts are sleeved on the outer wall of the screw rod in a threaded mode.

Description

Building engineering pile
Technical Field
The utility model relates to the field of engineering piles, in particular to a building engineering pile.
Background
The engineering pile is used in engineering, and is used in engineering entity to bear certain load and test pile for detection.
The authorized bulletin number is: the utility model of CN218027631U relates to the technical field of constructional engineering, in particular to a constructional engineering pile, which comprises a pile body and a pile tip, wherein the pile body is of a hollow structure, at least one group of through holes are formed in the outer peripheral surface of the pile body, each group of through holes are circumferentially distributed, reinforcing rods movably penetrate through the through holes, a central shaft is arranged in a cavity of the pile body, a driving assembly is arranged on the central shaft, and the driving assembly is in driving connection with the inner ends of the reinforcing rods. The driving assembly pushes the reinforcing rods out of the pile body, so that the reinforcing rods are pricked into the inner wall of the pile pit, the stability of the pile body is improved, and the piling efficiency is high.
The construction pile has a hollow structure inside, and the hollow construction pile is compressed or broken due to extrusion deformation when bearing larger pressure, so that the pressed object at the top can be inclined, and when the object is inclined and crashed, the object has great potential safety hazard, therefore, a construction pile is provided by a person skilled in the art to solve the problems in the prior art.
Disclosure of Invention
The present utility model is directed to a construction pile for solving the above-mentioned problems.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a building engineering stake, includes the connecting pipe, the top looks joint of connecting pipe has the solid connecting rod of steel, run through sliding connection has the screw rod on the solid connecting rod of steel, link up on the outer wall of the solid connecting rod of steel and seted up straight slot hole, and the screw rod runs through straight slot hole, the equal thread bush in both ends of screw rod is equipped with the nut, and two opposite one sides of nut contradict respectively in the both sides of the solid connecting rod outer wall of steel, the equal fixedly connected with L shape connecting block in both ends of screw rod, two the top fixedly connected with one connection pad of L shape connecting block, the solid supporting disk of top fixedly connected with steel of connection pad, the bottom fixedly connected with of connection pad two gag levers of pegging graft at the solid connecting rod top of steel.
As still further aspects of the utility model: the top of connecting pipe has seted up the slot, a plurality of draw-in grooves have been seted up on the inner wall of slot, solid connecting rod of steel and slot peg graft mutually, be provided with a plurality of fixture blocks with annular array's form on the outer wall of solid connecting rod of steel, and the fixture block joint is in the draw-in groove.
As still further aspects of the utility model: the steel solid connecting rod comprises a connecting plate, wherein a connecting ring is fixedly connected to the outer wall of the steel solid connecting rod and corresponds to the position of the arc plate, steel bars penetrate through the connecting ring, a plurality of supporting frames are fixedly connected to the outer wall of the connecting plate, and the tops of the supporting frames are fixedly connected with the bottom of the steel solid supporting plate.
As still further aspects of the utility model: the outer wall of the steel solid connecting rod is annularly provided with a plurality of supporting legs, and the bottoms of the supporting legs are fixedly connected with a plug-in floor.
As still further aspects of the utility model: the support legs are fixedly embedded with arc plates, the arc plates enclose the steel solid connecting rods and the steel solid supporting plates, and gaps exist between the steel solid supporting plates and the arc plates.
Compared with the prior art, the utility model has the beneficial effects that:
1. the steel solid connecting rod can be inserted into the slot to be connected with the connecting pipe, when the steel solid connecting rod is inserted into the clamping groove through a plurality of clamping blocks to be fixed with the connecting pipe, the inserted floor arranged at the bottom of the supporting leg is inserted into soil to fix the supporting leg so as to increase the stability of the connecting pipe, long steel bars can be inserted into connecting rings on the steel solid connecting rod and connected with connecting rings on other steel solid connecting rods, so that a plurality of steel solid connecting rods can be arranged in a group, two nuts are rotated to release the interference with the steel solid connecting rod, the connecting disc, the L-shaped connecting block and the screw rod can be pulled up through the steel solid supporting disc, then the height of the steel solid supporting disc can be fixed after the screws are reset, so that the height of the steel solid supporting disc is adjusted to increase the length of the engineering pile, a plurality of supporting frames are connected at the bottom of the steel solid supporting disc so as to increase the bearable pressure of the steel solid supporting disc, and a plurality of arc plates surround the steel solid connecting rod, intermittent cement is injected between the steel solid supporting disc and the steel solid connecting rod, a plurality of arc plates can be coated with cement blocks simultaneously, and a plurality of groups of arc plates can be coated with cement blocks can be formed on the same wall body when the cement is filled in a certain space, and the cement is more than the whole steel solid arc plates can bear the same.
The utility model has simple use, a plurality of insert floors are inserted into the soil to fix the support legs and increase the stability of the connecting pipes, steel bars can be inserted into the connecting rings to be connected with connecting rings on other steel solid connecting rods for group arrangement, the length of the engineering piles can be adjusted by rotating nuts and pulling the steel solid supporting plates, a larger engineering pile can be formed to bear larger pressure when cement is injected into the gaps between the steel solid supporting plates and the arc plates, and the intervals among a plurality of groups of steel bars can be filled with cement to form a wall body.
Drawings
FIG. 1 is a three-dimensional schematic of the present utility model;
FIG. 2 is an exploded three-dimensional schematic of the present utility model;
FIG. 3 is a schematic view of a partial explosion in three dimensions according to the present utility model;
fig. 4 is a schematic cross-sectional view of the present utility model.
In the figure: 1. a steel solid support disc; 2. an arc-shaped plate; 3. a connecting disc; 4. a support frame; 5. a connecting ring; 6. reinforcing steel bars; 7. a limit rod; 8. a steel solid connecting rod; 9. a connecting pipe; 10. a support leg; 11. a floor board; 12. a clamping block; 13. a slot; 14. a straight slot; 15. a clamping groove; 16. an L-shaped connecting block; 17. a nut; 18. and (3) a screw.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments, and all other embodiments obtained by those skilled in the art without making creative efforts based on the embodiments of the present utility model are included in the protection scope of the present utility model.
Referring to fig. 1-4, in the embodiment of the utility model, a constructional engineering pile comprises a connecting pipe 9, wherein the top end of the connecting pipe 9 is clamped with a steel solid connecting rod 8, a screw rod 18 is connected to the steel solid connecting rod 8 in a penetrating and sliding manner, a straight slot hole 14 is formed in the outer wall of the steel solid connecting rod 8 in a penetrating manner, the screw rod 18 penetrates through the straight slot hole 14, nuts 17 are sleeved at two ends of the screw rod 18 in a threaded manner, two opposite sides of the two nuts 17 respectively abut against two sides of the outer wall of the steel solid connecting rod 8, two ends of the screw rod 18 are fixedly connected with L-shaped connecting blocks 16, the tops of the two L-shaped connecting blocks 16 are fixedly connected with the same connecting disc 3, the top of the connecting disc 3 is fixedly connected with a steel solid supporting disc 1, and two limiting rods 7 inserted at the top of the steel solid connecting rod 8 are fixedly connected to the bottom of the connecting disc 3.
In this embodiment, slot 13 has been seted up on the top of connecting pipe 9, has seted up a plurality of draw-in grooves 15 on the inner wall of slot 13, and steel solid connecting rod 8 and slot 13 peg graft mutually, be provided with a plurality of fixture blocks 12 in annular array's form on the outer wall of steel solid connecting rod 8, and fixture block 12 joint is in draw-in groove 15, and steel solid connecting rod 8 peg graft at draw-in groove 15 internal fixation and connecting pipe 9's connection through a plurality of fixture blocks 12.
In this embodiment, the outer wall of the steel solid connecting rod 8 is fixedly connected with the connecting ring 5 at the position corresponding to the arc plate 2, the steel bars 6 penetrate through the connecting ring 5, the long steel bars 6 can be inserted into the connecting ring 5 on the steel solid connecting rod 8 and connected with the connecting rings 5 on other steel solid connecting rods 8, so that a plurality of steel solid connecting rods 8 can be assembled and arranged, a plurality of supporting frames 4 are fixedly connected to the outer wall of the connecting disc 3, the tops of the supporting frames 4 are fixedly connected with the bottoms of the steel solid supporting plates 1, and the bottoms of the steel solid supporting plates 1 are connected with the supporting frames 4 to increase the bearable pressure of the steel solid supporting plates 1.
In this embodiment, the outer wall of the steel solid connecting rod 8 is perforated with a straight slot hole 14, and the screw 18 penetrates through the straight slot hole 14, and after rotating the two nuts 17 to release the interference with the steel solid connecting rod 8, the connecting disc 3, the L-shaped connecting block 16 and the screw 18 can be lifted up through the steel solid supporting disc 1, then the screws 18 are formulated after resetting the two nuts 17, and then the height of the steel solid supporting disc 1 is fixed, so that the height of the steel solid supporting disc 1 is adjusted to increase the length of the engineering pile.
In this embodiment, a plurality of landing legs 10 are arranged on the outer wall of the steel solid connecting rod 8 in an annular arrangement, the bottom of the landing legs 10 is fixedly connected with a plug floor 11, and the plug floor 11 arranged at the bottom of the landing legs 10 can fix the landing legs 10 when being inserted into soil.
In this embodiment, the arc plates 2 are fixedly embedded on the plurality of supporting legs 10, the arc plates 2 enclose the steel solid connecting rod 8 and the steel solid supporting disc 1, and gaps exist between the steel solid supporting disc 1 and the arc plates 2, because the plurality of arc plates 2 enclose the steel solid connecting rod 8, and because gaps exist between the steel solid supporting disc 1 and the arc plates 2, when cement is injected into the gaps and reaches a certain amount, the part below the steel solid supporting disc 1 can be completely enclosed by the cement to form a larger engineering pile to bear larger pressure.
The working principle of the utility model is as follows: the steel solid connecting rod 8 can be inserted into the slot 13 and connected with the connecting pipe 9, can install when the steel solid connecting rod 8 inserts in the slot 13, steel solid connecting rod 8 is fixed in the draw-in groove 15 through a plurality of fixture blocks 12 and is connected with the connecting pipe 9, the floor 11 of inserting that landing leg 10 bottom set up can be fixed landing leg 10 when inserting in soil, all can insert the bar 6 of length in the go-between 5 on the steel solid connecting rod 8 and be connected with go-between 5 on other steel solid connecting rods 8, thereby can arrange a plurality of steel solid connecting rods 8 in groups, rotate two nuts 17 and remove the conflict with steel solid connecting rod 8 after, can pull up connection disc 3 through steel solid supporting disk 1, L shape connecting block 16, screw 18 rises, then go again after resetting two nuts 17 and can fix steel solid supporting disk 1 place height after making screw 18, thereby adjust the height of steel solid supporting disk 1, the length of this engineering stake has been increased, the bottom connection of steel solid supporting disk 1 has a plurality of support frames 4 and can bear the pressure to form a plurality of solid supporting disks 1 in order to bear the intermittent type more than the steel solid supporting disk 1, can be more than the intermittent type is filled with the steel arc plate 2 and can be reached because of forming a plurality of intermittent type is filled with the steel arc plate 2 in between the steel solid supporting disk 1, the gap is formed in the space between the steel arc plate is more than can be more filled with the steel arc plate 1.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (5)

1. Building engineering stake, including connecting pipe (9), its characterized in that: the top looks joint of connecting pipe (9) has solid connecting rod (8) of steel, run through sliding connection has screw rod (18) on solid connecting rod (8) of steel, link up on the outer wall of solid connecting rod (8) of steel and seted up straight slotted hole (14), and screw rod (18) run through straight slotted hole (14), the equal thread bush in both ends of screw rod (18) is equipped with nut (17), and two opposite one sides of nut (17) are contradicted respectively in the both sides of solid connecting rod (8) outer wall of steel, the equal fixedly connected with L shape connecting block (16) in both ends of screw rod (18), two the top fixedly connected with of L shape connecting block (16) is same connection pad (3), the top fixedly connected with steel solid supporting disk (1) of connection pad (3), the bottom fixedly connected with of connection pad (3) is two peg graft gag lever post (7) at solid connecting rod (8) top of steel.
2. A construction pile according to claim 1, characterised in that: the top of connecting pipe (9) has seted up slot (13), a plurality of draw-in grooves (15) have been seted up on the inner wall of slot (13), solid connecting rod of steel (8) are pegged graft mutually with slot (13), be provided with a plurality of fixture blocks (12) with annular array's form on the outer wall of solid connecting rod of steel (8), and fixture block (12) joint is in draw-in groove (15).
3. A construction pile according to claim 1, characterised in that: the steel solid connecting rod is characterized in that a connecting ring (5) is fixedly connected to the outer wall of the steel solid connecting rod (8) and corresponds to the position of the arc-shaped plate (2), steel bars (6) penetrate through the connecting ring (5), a plurality of supporting frames (4) are fixedly connected to the outer wall of the connecting disc (3), and the tops of the supporting frames (4) are fixedly connected with the bottom of the steel solid supporting disc (1).
4. A construction pile according to claim 1, characterised in that: a plurality of supporting legs (10) are annularly arranged on the outer wall of the steel solid connecting rod (8), and the bottoms of the supporting legs (10) are fixedly connected with an inserting floor (11).
5. A construction pile according to claim 4, characterised in that: the support legs (10) are fixedly embedded with arc plates (2), the arc plates (2) enclose the steel solid connecting rods (8) and the steel solid support plates (1), and gaps exist between the steel solid support plates (1) and the arc plates (2).
CN202420246415.6U 2024-02-01 2024-02-01 Building engineering pile Active CN220565213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420246415.6U CN220565213U (en) 2024-02-01 2024-02-01 Building engineering pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420246415.6U CN220565213U (en) 2024-02-01 2024-02-01 Building engineering pile

Publications (1)

Publication Number Publication Date
CN220565213U true CN220565213U (en) 2024-03-08

Family

ID=90095081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420246415.6U Active CN220565213U (en) 2024-02-01 2024-02-01 Building engineering pile

Country Status (1)

Country Link
CN (1) CN220565213U (en)

Similar Documents

Publication Publication Date Title
CN220565213U (en) Building engineering pile
CN117307214A (en) Underground mine safety support device
CN221256121U (en) Connecting piece for aluminum alloy scaffold cross rod
CN214117434U (en) Building structure convenient to installation
CN215802696U (en) Vertical steel bar positioning device of column
CN214423373U (en) Foundation pit supporting device
CN213268865U (en) Connecting structure for building plate buckle
CN210049272U (en) Insertion type column base structure of reinforced concrete frame column
CN113445725A (en) High-altitude operation steel platform for super high-rise refuge room and implementation method thereof
CN109459224B (en) Loop-to-loop joint test device considering transverse performance of shield tunnel and installation method
CN219344021U (en) Template fixing support
CN219471212U (en) Steel skeleton supporting structure
CN113235609B (en) Combined supporting structure of large-diameter steel pipe pile and small-diameter steel pipe pile
CN220538699U (en) Reinforced concrete core-filled retaining wall
CN219450850U (en) Pile foundation static load test equipment for improving safety
CN220486468U (en) Self-stabilizing type foundation pit inner supporting structure
CN220246990U (en) Pile foundation device for wind power installation platform
CN211922594U (en) Combined pile for civil engineering
CN219863284U (en) Prefabricated roof beam of assembled building
CN219732286U (en) Novel combination component for houses
CN221195081U (en) Underground mine safety support device
CN217537000U (en) Anchor rope drilling bored concrete pile combination retaining structure
CN219840068U (en) High-strength concrete pipe pile
CN219450798U (en) Cup rim foundation with anti-pulling bearing capacity component
CN220868924U (en) Masonry enclosure steel column reinforcing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant