CN220523517U - Combined prefabricated component - Google Patents
Combined prefabricated component Download PDFInfo
- Publication number
- CN220523517U CN220523517U CN202322281241.5U CN202322281241U CN220523517U CN 220523517 U CN220523517 U CN 220523517U CN 202322281241 U CN202322281241 U CN 202322281241U CN 220523517 U CN220523517 U CN 220523517U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- prefabricated
- connecting piece
- prefabricated part
- pipeline prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 claims abstract description 35
- 238000009434 installation Methods 0.000 claims abstract description 33
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 239000011150 reinforced concrete Substances 0.000 abstract description 9
- 206010063659 Aversion Diseases 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000008878 coupling Effects 0.000 abstract description 2
- 238000010168 coupling process Methods 0.000 abstract description 2
- 238000005859 coupling reaction Methods 0.000 abstract description 2
- 238000010030 laminating Methods 0.000 abstract description 2
- 239000004567 concrete Substances 0.000 description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 8
- 230000007547 defect Effects 0.000 description 5
- 238000009417 prefabrication Methods 0.000 description 4
- 230000002265 prevention Effects 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a combined prefabricated part, which comprises a first pipeline prefabricated part, a pipeline prefabricated part connecting mechanism and a pipeline prefabricated part sealing mechanism, wherein the pipeline prefabricated part connecting mechanism and the pipeline prefabricated part sealing mechanism are positioned on one side of the first pipeline prefabricated part. The beneficial effects of the utility model are as follows: through the pipeline prefabricated component coupling mechanism who sets up, make closely laminating between first installation piece and the second installation piece, then insert the inside spacing inserted bar of second connecting piece and first connecting piece inside the jack of first installation piece and second installation piece, it is spacing to it, prevent not hard up, rotatory knob drive the bolt rotation at last makes second connecting piece and first connecting piece connect and lock fixedly first pipeline prefabricated component and second pipeline prefabricated component, this setting has improved that current reinforced concrete pipe prefabricated component has the concatenation degree of difficulty height, troublesome operation, the problem of the shortcoming of easy not hard up aversion of long-time use, can improve adjacent pipeline prefabricated component's connection wholeness.
Description
Technical Field
The utility model relates to the field of prefabricated parts, in particular to a combined prefabricated part.
Background
The prefabricated concrete member is a building member which is made of concrete as basic material in factory in advance, and comprises beams, plates, columns, cement pipelines and the like, wherein the cement pipelines are also called reinforced concrete pipes, and can be used as sewer pipes in urban construction bases to play roles of sewage drainage and flood prevention drainage.
In the process of realizing the utility model, the inventor finds that at least the following problems exist in the technology, and the existing reinforced concrete pipe prefabricated part has the defects of high splicing difficulty, troublesome operation and easy loosening and displacement after long-time use, so that a combined prefabricated part is now proposed.
Disclosure of Invention
In order to solve the problems that the existing reinforced concrete pipe prefabricated part is high in splicing difficulty and troublesome in operation and is easy to loosen and shift after long-time use, the utility model provides a combined prefabricated part.
The utility model provides a combined prefabricated part, which adopts the following technical scheme:
a combined prefabricated part comprises a first pipeline prefabricated part, a pipeline prefabricated part connecting mechanism and a pipeline prefabricated part sealing mechanism, wherein the pipeline prefabricated part connecting mechanism and the pipeline prefabricated part sealing mechanism are arranged on one side of the first pipeline prefabricated part;
the connecting mechanism of the pipeline prefabricated part comprises a second connecting piece, knobs are arranged on the left side and the right side of the second connecting piece, bolts are connected below the knobs, and a limiting inserted bar is fixedly arranged at the center of the second connecting piece.
By adopting the technical scheme, the problems that the existing reinforced concrete pipe prefabricated part has the defects of high splicing difficulty and troublesome operation and is easy to loosen and shift after long-time use are solved, and the connection integrity of the adjacent pipe prefabricated parts can be improved.
As still further scheme of the utility model, a first connecting piece is arranged below the second connecting piece, and the first connecting piece is matched with the appearance structure of the second connecting piece.
By adopting the technical scheme, the problems that the existing reinforced concrete pipe prefabricated part has the defects of high splicing difficulty and troublesome operation and is easy to loosen and shift after long-time use are solved, and the connection integrity of the adjacent pipe prefabricated parts can be improved.
As still further scheme of the utility model, the outside of one side of the first pipeline prefabricated part is fixedly provided with a first installation block, and one side of the first installation block is provided with an interface.
By adopting the technical scheme, the connecting device is used for connecting the first pipeline prefabricated part and the second pipeline prefabricated part.
As a still further aspect of the present utility model, a second pipe prefabricating member is provided at one side of the interface, and a second mounting block is fixedly mounted at an outer portion of one side of the second pipe prefabricating member.
By adopting the technical scheme, the connecting device is used for connecting the first pipeline prefabricated part and the second pipeline prefabricated part.
As still further aspects of the present utility model, the sealing mechanism for a prefabricated part of a pipeline includes a first sealing ring, the first sealing ring is located outside the joint, and a second sealing ring is adhered to the inside of the second connecting member.
By adopting the technical scheme, the water seepage phenomenon at the junction of adjacent concrete pipelines and the junction of the first installation block and the second installation block after the operation of the following concrete pipeline prefabricated parts can be reduced, and the problems of dirty water seepage and the like are avoided.
As a still further aspect of the present utility model, a third sealing ring is provided inside the second pipe prefabrication member.
By adopting the technical scheme, the water seepage phenomenon at the junction of adjacent concrete pipelines and the junction of the first installation block and the second installation block after the operation of the following concrete pipeline prefabricated parts can be reduced, and the problems of dirty water seepage and the like are avoided.
As a still further scheme of the utility model, jacks are arranged on the upper side and the lower side of the first installation block and the second installation block.
By adopting the technical scheme, the jack is used for placing the limit inserted bar.
In summary, the utility model has the following beneficial effects:
1. according to the utility model, through the connecting mechanism of the prefabricated parts of the pipeline, the connector is inserted into the second prefabricated parts of the pipeline, so that the first installation block and the second installation block are tightly attached, then the second connecting piece and the limiting inserting rod in the first connecting piece are inserted into the inserting holes of the first installation block and the second installation block, the limiting and looseness prevention are carried out on the second connecting piece and the limiting inserting rod, and finally the rotating knob drives the bolt to rotate, so that the second connecting piece and the first connecting piece are connected and locked and fixed with the first prefabricated parts of the pipeline, and the arrangement improves the problems that the existing prefabricated parts of the reinforced concrete pipe have the defects of high splicing difficulty, troublesome operation and easy looseness and displacement after long-time use, and can improve the connection integrity of the prefabricated parts of the adjacent pipelines;
2. according to the sealing mechanism of the prefabricated part of the pipeline, the first sealing ring is matched with the second sealing ring and the third sealing ring, so that a gap between the interface and the socket end of the prefabricated part of the second pipeline can be sealed, water seepage phenomenon at the joint of adjacent concrete pipelines and the joint of the first mounting block and the second mounting block after the prefabricated part of the subsequent concrete pipeline runs is reduced, and the problems of dirty water seepage and the like are avoided.
Drawings
Fig. 1 is a schematic diagram of the front view structure of the present utility model.
Fig. 2 is a schematic structural view of the pipe prefabrication member connecting mechanism according to the present utility model.
Fig. 3 is a schematic view showing the internal structure of the first and second pipe prefabricated members according to the present utility model.
Fig. 4 is a schematic side view of a second duct preform according to the present utility model.
Reference numerals illustrate:
1. a first pipe preform; 2. a first mounting block; 3. a second mounting block; 4. a pipe prefabrication member connecting mechanism; 401. a first connector; 402. a bolt; 403. a knob; 404. a second connector; 405. a limit inserted link; 406. a jack; 5. a sealing mechanism for the prefabricated parts of the pipeline; 501. a first seal ring; 502. a second seal ring; 503. a third seal ring; 6. a second pipe preform; 7. an interface.
Detailed Description
The present application is described in further detail below in conjunction with fig. 1-4.
Referring to fig. 1 and 3, a combined prefabricated component includes a first prefabricated component 1, a prefabricated component connecting mechanism 4 and a prefabricated component sealing mechanism 5, wherein the prefabricated component connecting mechanism 4 and the prefabricated component sealing mechanism 5 are located on one side of the first prefabricated component 1, a first installation block 2 is fixedly installed on the outer portion of one side of the first prefabricated component 1, an interface 7 is arranged on one side of the first installation block 2, a second prefabricated component 6 is arranged on one side of the interface 7, and a second installation block 3 is fixedly installed on the outer portion of one side of the second prefabricated component 6.
Referring to fig. 1 and 2, the pipe prefabrication member connecting mechanism 4 comprises a second connecting piece 404, knobs 403 are installed on the left side and the right side of the second connecting piece 404, bolts 402 are connected below the knobs 403, a limiting inserted rod 405 is fixedly installed in the center of the second connecting piece 404, a first connecting piece 401 is arranged below the second connecting piece 404, the first connecting piece 401 is matched with the appearance structure of the second connecting piece 404, and insertion holes 406 are formed in the upper side and the lower side of the first installation block 2 and the second installation block 3; through the inside that the pipeline prefabricated component coupling mechanism 4 that sets up, insert interface 7 second pipeline prefabricated component 6, make closely laminating between first installation piece 2 and the second installation piece 3, then insert the inside spacing inserted bar 405 of second connecting piece 404 and first connecting piece 401 inside the jack 406 of first installation piece 2 and second installation piece 3, it prevents not hard up to carry out spacing to it, rotatory knob 403 drives bolt 402 rotation at last and makes second connecting piece 404 and first connecting piece 401 connect and lock fixedly first pipeline prefabricated component 1 and second pipeline prefabricated component 6, this setting has improved that current reinforced concrete pipe prefabricated component has the concatenation degree of difficulty height, troublesome operation, the problem of easy not hard up aversion of long-time use, can improve adjacent pipeline prefabricated component's connection wholeness.
Referring to fig. 2 to 4, the sealing mechanism 5 for the prefabricated parts of the pipeline comprises a first sealing ring 501, the first sealing ring 501 is positioned outside the joint 7, a second sealing ring 502 is adhered to the inside of the second connecting piece 404, and a third sealing ring 503 is arranged inside the prefabricated parts of the pipeline 6; through the pipeline prefabricated part sealing mechanism 5 that sets up, wherein first sealing washer 501 cooperation second sealing washer 502 and third sealing washer 503 can seal the clearance between interface 7 and the second pipeline prefabricated part 6 socket end, reduce adjacent concrete pipe's junction and the junction of first installation piece 2 and second installation piece 3 appear the infiltration phenomenon after the operation of follow-up concrete pipe prefabricated part, avoid appearing dirty water seepage scheduling problem.
The implementation principle of the utility model is as follows: when the first and second prefabricated parts 1 and 6 are used, the joint 7 is inserted into the second prefabricated parts 6 through the arranged connecting mechanism 4 of the prefabricated parts of the pipeline, so that the first and second installation blocks 2 and 3 are tightly attached, then the second connecting piece 404 and the limiting inserting rod 405 in the first connecting piece 401 are inserted into the inserting holes 406 of the first and second installation blocks 2 and 3, the limiting and loosening prevention are carried out, and finally the rotating knob 403 drives the bolt 402 to rotate, so that the second connecting piece 404 and the first connecting piece 401 connect and lock and fix the first and second prefabricated parts 1 and 6, and the arrangement improves the problems that the existing reinforced concrete pipe prefabricated parts have the defects of high splicing difficulty, troublesome operation and easy loosening and shifting after long-time use, and can improve the connection integrity of adjacent prefabricated parts of the pipeline; through the pipeline prefabricated part sealing mechanism 5 that sets up, wherein first sealing washer 501 cooperation second sealing washer 502 and third sealing washer 503 can seal the clearance between interface 7 and the second pipeline prefabricated part 6 socket end, reduce adjacent concrete pipe's junction and the junction of first installation piece 2 and second installation piece 3 appear the infiltration phenomenon after the operation of follow-up concrete pipe prefabricated part, avoid appearing dirty water seepage scheduling problem.
The above embodiments are not intended to limit the scope of the present utility model, so: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.
Claims (7)
1. A combined prefabricated part is characterized by comprising a first pipeline prefabricated part (1), and a pipeline prefabricated part connecting mechanism (4) and a pipeline prefabricated part sealing mechanism (5) which are positioned at one side of the first pipeline prefabricated part (1);
the connecting mechanism for the pipeline prefabricated part (4) comprises a second connecting piece (404), knobs (403) are arranged on the left side and the right side of the second connecting piece (404), bolts (402) are connected below the knobs (403), and limiting inserted bars (405) are fixedly arranged in the centers of the second connecting pieces (404).
2. A prefabricated combined component according to claim 1, characterized in that a first connecting piece (401) is arranged below the second connecting piece (404), and the first connecting piece (401) is matched with the appearance structure of the second connecting piece (404).
3. A modular prefabricated unit according to claim 1, characterized in that the first installation block (2) is fixedly installed outside one side of the first pipe prefabricated unit (1), and that one side of the first installation block (2) is provided with an interface (7).
4. A modular prefabricated unit according to claim 3, characterized in that a second pipe prefabricated unit (6) is provided on one side of the interface (7), and a second mounting block (3) is fixedly mounted on the outside of one side of the second pipe prefabricated unit (6).
5. A modular prefabricated element according to claim 1, wherein the sealing mechanism (5) for the prefabricated element for the pipeline comprises a first sealing ring (501), the first sealing ring (501) is located outside the interface (7), and a second sealing ring (502) is adhered to the inside of the second connecting piece (404).
6. A modular prefabricated element according to claim 4, characterized in that the second pipe prefabricated element (6) is internally provided with a third sealing ring (503).
7. A prefabricated combined component according to claim 3, wherein the first mounting block (2) and the second mounting block (3) are provided with insertion holes (406) at the upper and lower sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322281241.5U CN220523517U (en) | 2023-08-23 | 2023-08-23 | Combined prefabricated component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322281241.5U CN220523517U (en) | 2023-08-23 | 2023-08-23 | Combined prefabricated component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220523517U true CN220523517U (en) | 2024-02-23 |
Family
ID=89925898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322281241.5U Active CN220523517U (en) | 2023-08-23 | 2023-08-23 | Combined prefabricated component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220523517U (en) |
-
2023
- 2023-08-23 CN CN202322281241.5U patent/CN220523517U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218236612U (en) | Reinforced concrete pipeline repairing device | |
CN209873873U (en) | Prefabricated assembled power pipeline working well | |
CN220523517U (en) | Combined prefabricated component | |
CN202577363U (en) | H-shaped steel joint structure of underground diaphragm wall | |
CN218060410U (en) | Prefabricated piping lane of straight bolt transverse connection | |
CN211446883U (en) | Underground continuous wall antiseep connection structure | |
CN204098067U (en) | Side's culvert formula underground pipe gallery | |
CN212427206U (en) | Assembled underground pipe gallery | |
KR200272596Y1 (en) | A fabricated type duct block | |
CN221276523U (en) | Assembled glass fiber reinforced plastic water channel | |
CN221647840U (en) | Prefabricated cement pipeline of road | |
CN218178149U (en) | Connecting structure of drain pipe and inspection well | |
CN221255665U (en) | Drain pipe connection structure for building civil engineering | |
CN220847918U (en) | Municipal administration sewer line seepage prevention structure | |
CN214500393U (en) | Corrugated plate reinforced anti-leakage flange structure | |
CN214090251U (en) | Modular drainage inspection shaft | |
CN215565961U (en) | Construction structure for underground, water conservancy and tunnel engineering construction and disease remediation | |
CN212000458U (en) | Assembling type highway drainage channel | |
CN221504242U (en) | High-strength concrete drain pipe | |
CN211423694U (en) | Hoop structure | |
CN209873874U (en) | Well chamber and shaft connecting structure of prefabricated cable working well | |
CN221276683U (en) | Basement outer wall post-pouring zone thickening stagnant water seal structure | |
CN215594122U (en) | Waterproof structure of pipe jacking pipe joint and pipe jacking well | |
CN214532992U (en) | Top shield combines transition pipe section | |
CN215053290U (en) | Embedded rubber water stop structure for underground engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |