CN220521065U - Pavement marking device for constructional engineering - Google Patents

Pavement marking device for constructional engineering Download PDF

Info

Publication number
CN220521065U
CN220521065U CN202321798221.9U CN202321798221U CN220521065U CN 220521065 U CN220521065 U CN 220521065U CN 202321798221 U CN202321798221 U CN 202321798221U CN 220521065 U CN220521065 U CN 220521065U
Authority
CN
China
Prior art keywords
fixedly connected
installation shell
pavement marking
main body
construction engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321798221.9U
Other languages
Chinese (zh)
Inventor
刘奇禄
许灵芳
蒋军
吴晓花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sheng Er Construction Group Co ltd
Original Assignee
Sheng Er Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sheng Er Construction Group Co ltd filed Critical Sheng Er Construction Group Co ltd
Priority to CN202321798221.9U priority Critical patent/CN220521065U/en
Application granted granted Critical
Publication of CN220521065U publication Critical patent/CN220521065U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Repair (AREA)

Abstract

The utility model discloses pavement marking equipment for constructional engineering, which belongs to the technical field of constructional engineering and comprises a mounting shell, wherein a group of moving wheels are fixedly connected to the bottom surface of the mounting shell, a push rod is fixedly connected to the inner bottom wall of the mounting shell, a first through hole and a second through hole are formed in the bottom surface of the mounting shell, an equipment main body is arranged in the mounting shell, a material outlet head is arranged on the bottom surface of the equipment main body, the bottom surface of the material outlet head penetrates through the second through hole and extends to the lower side of the mounting shell, materials used for marking can be processed by the equipment main body, the materials can be outwards output for marking, and the materials can be blown by the cooperation of the material outlet head, so that the pavement can be cleaned by the cooperation of the air pump, a conveying pipeline and a spray head, the quality of marking is ensured, and workers can conveniently move the equipment for use by the moving wheels and the push rod, so that the operation is convenient.

Description

Pavement marking device for constructional engineering
Technical Field
The utility model relates to the field of constructional engineering, in particular to pavement marking equipment for constructional engineering.
Background
The construction engineering is a part of the construction engineering, and refers to engineering entities formed by construction of various house buildings and auxiliary facilities thereof and installation activities of lines, pipelines and equipment matched with the construction engineering, including factory buildings, theatres, hotels, shops, schools, hospitals and houses, so as to meet the demands of people on production, living, study and public activities.
When the construction engineering is constructed, the road surface in the field needs to be marked, but the conventional road surface marking device is generally simpler in structure, has only a marking function when in use, cannot clean the road surface, and can easily influence the marking quality if the dust and the foreign matters on the road surface are more, so that a person skilled in the art provides the road surface marking device for the construction engineering to solve the problems in the background art.
Disclosure of Invention
The utility model aims to provide pavement marking equipment for constructional engineering, which solves the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a road surface marking off equipment for building engineering, includes the installation shell, the bottom surface fixedly connected with of installation shell removes the wheel in a set of, the interior bottom wall fixedly connected with push rod of installation shell, first opening and second opening have been seted up to the bottom surface of installation shell, the inside of installation shell is provided with the equipment main part, the bottom surface of equipment main part is provided with out the stub bar, the bottom surface of out the stub bar runs through the second opening and extends to the below of installation shell, the interior bottom wall fixedly connected with air pump of installation shell, the bottom surface fixedly connected with shower nozzle of installation shell, the output fixedly connected with pipeline of air pump, pipeline keeps away from the one end of air pump and runs through first opening and fixedly connected with the input of shower nozzle.
As still further aspects of the utility model: the left side of equipment main part is equipped with the battery, the bottom surface of battery and the interior bottom wall fixed connection of installation shell.
As still further aspects of the utility model: the inner bottom wall of the installation shell is fixedly connected with a protective shell, and the storage battery is positioned in the protective shell.
As still further aspects of the utility model: the inner bottom wall of the installation shell is fixedly connected with a limit ring, and the inner wall of the limit ring is contacted with the outer surface of the equipment main body.
As still further aspects of the utility model: the top of equipment main part is equipped with the inlet pipe, the bottom of inlet pipe and the fixed intercommunication of upper surface of equipment main part.
As still further aspects of the utility model: the right side of installation shell is equipped with the connecting plate, the left surface of connecting plate and the right side fixed connection of installation shell.
As still further aspects of the utility model: the right side of connecting plate fixedly connected with a set of spring, a set of the right-hand member of spring is fixedly connected with the arc jointly.
Compared with the prior art, the utility model has the beneficial effects that:
this road surface marking device for building engineering, through being provided with the equipment main part, utilize the equipment main part can handle the material that the marking off used, through the cooperation of play stub bar, can outwards export the material and mark the line and use, through being provided with the air pump, utilize the cooperation of air pump, pipeline and shower nozzle, can blow to clear up the road surface, with the quality of guaranteeing to mark a line, through being provided with and removing the wheel, utilize and remove the wheel and push rod can make things convenient for the staff to remove the use to this equipment, the operation of being convenient for.
Drawings
Fig. 1 is a schematic perspective view of a pavement marking apparatus for construction engineering;
FIG. 2 is a schematic perspective view of a bottom view of a pavement marking apparatus for construction;
FIG. 3 is a schematic perspective view of a side view of a pavement marking apparatus for construction;
fig. 4 is a schematic perspective view of a side sectional view of a pavement marking apparatus for construction engineering.
In the figure: 1. a push rod; 2. a protective shell; 3. a moving wheel; 4. a limit ring; 5. a discharge head; 6. a mounting shell; 7. an air pump; 8. a spray head; 9. a connecting plate; 10. an arc-shaped plate; 11. a first port; 12. a delivery conduit; 13. an apparatus main body; 14. a feed pipe; 15. a second port; 16. a spring; 17. and a storage battery.
Detailed Description
In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first", "a second", etc. may explicitly or implicitly include one or more such feature. In the description of the present utility model, unless otherwise indicated, the meaning of "a plurality" is two or more.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art in a specific case.
Referring to fig. 1 to 4, in an embodiment of the present utility model, a pavement marking apparatus for construction engineering includes a mounting case 6, a group of moving wheels 3 is fixedly connected to a bottom surface of the mounting case 6, a push rod 1 is fixedly connected to an inner bottom wall of the mounting case 6, a first through hole 11 and a second through hole 15 are provided on a bottom surface of the mounting case 6, an apparatus main body 13 is provided inside the mounting case 6, a material outlet head 5 is provided on a bottom surface of the apparatus main body 13, a bottom surface of the material outlet head 5 penetrates through the second through hole 15 and extends to a lower portion of the mounting case 6, an air pump 7 is fixedly connected to an inner bottom wall of the mounting case 6, a nozzle 8 is fixedly connected to a bottom surface of the mounting case 6, an output end of the air pump 7 is fixedly connected with a conveying pipe 12, and one end of the conveying pipe 12 far from the air pump 7 penetrates through the first through hole 11 and is fixedly connected to an input end of the nozzle 8.
The left side of equipment main part 13 is equipped with battery 17, the bottom surface of battery 17 and the interior bottom wall fixed connection of installation shell 6, utilize battery 17 can supply power for this equipment, need not external power supply during this use, convenient operation, the interior bottom wall fixedly connected with protecting crust 2 of installation shell 6, battery 17 is located the inside of protecting crust 2, can play the guard action to battery 17 through protecting crust 2, in order to guarantee its service condition, the interior bottom wall fixedly connected with spacing collar 4 of installation shell 6, the inner wall of spacing collar 4 contacts with the surface of equipment main part 13, utilize spacing collar 4 can fix equipment main part 13, avoid it to take place the displacement when using.
The top of equipment main part 13 is equipped with inlet pipe 14, the bottom of inlet pipe 14 and the fixed intercommunication of upper surface of equipment main part 13, can make things convenient for the staff to the inside supplementary material of equipment main part 13 through inlet pipe 14, the right side of installation shell 6 is equipped with connecting plate 9, the left surface of connecting plate 9 and the right flank fixed connection of installation shell 6, can play the guard action to this equipment through connecting plate 9, avoid its during the use with external collision, the right flank fixedly connected with spring 16 of connecting plate 9, the common fixedly connected with arc 10 of the right-hand member of spring 16 of a set, utilize arc 10 can push away great foreign matter on the road surface, avoid causing the influence to its marking off.
The working principle of the utility model is as follows: when the device is used, firstly, materials are required to be added into the device main body 13 through the feeding pipe 14, the device main body 13 is started to process the materials, then the device is pushed to move, the materials can be outwards output to be marked by utilizing the cooperation of the discharging head 5, meanwhile, in the use process, if the quantity of the pavement foreign matters is large, the air pump 7 can be started, and the pavement can be cleaned by utilizing the cooperation of the air pump 7, the conveying pipeline 12 and the spray head 8 so as to ensure the marking quality.
While the utility model has been described with reference to the preferred embodiments, it will be apparent to those skilled in the art that the utility model is not limited to the details of the exemplary embodiments and that the utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof, as long as the scope of the utility model is defined by the claims and its spirit and scope. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (7)

1. The utility model provides a road surface marking off equipment for building engineering, includes installation shell (6), a serial communication port, the bottom surface fixedly connected with of installation shell (6) removes round (3), the interior bottom wall fixedly connected with push rod (1) of installation shell (6), first through-hole (11) and second through-hole (15) have been seted up to the bottom surface of installation shell (6), the inside of installation shell (6) is provided with equipment main part (13), the bottom surface of equipment main part (13) is provided with out stub bar (5), the bottom surface of ejection stub bar (5) runs through second through-hole (15) and extends to the below of installation shell (6), the interior bottom wall fixedly connected with air pump (7) of installation shell (6), the bottom surface fixedly connected with shower nozzle (8) of air pump (7), the output fixedly connected with pipeline (12) of air pump (7), the one end that air pump (7) were kept away from to pipeline (12) runs through first through-hole (11) and fixedly connected with the input of shower nozzle (8).
2. The pavement marking apparatus for construction engineering according to claim 1, wherein the left side of the apparatus main body (13) is provided with a storage battery (17), and the bottom surface of the storage battery (17) is fixedly connected with the inner bottom wall of the installation case (6).
3. The pavement marking apparatus for construction engineering according to claim 2, wherein the inner bottom wall of the mounting case (6) is fixedly connected with the protective case (2), and the storage battery (17) is located inside the protective case (2).
4. The pavement marking apparatus for construction engineering according to claim 1, wherein the inner bottom wall of the mounting case (6) is fixedly connected with a limit ring (4), and the inner wall of the limit ring (4) is in contact with the outer surface of the apparatus main body (13).
5. The pavement marking apparatus for construction engineering according to claim 1, wherein a feeding pipe (14) is provided above the apparatus main body (13), and a bottom end of the feeding pipe (14) is fixedly communicated with an upper surface of the apparatus main body (13).
6. The pavement marking apparatus for construction engineering according to claim 1, wherein the right side of the installation shell (6) is provided with a connecting plate (9), and the left side surface of the connecting plate (9) is fixedly connected with the right side surface of the installation shell (6).
7. The pavement marking apparatus for construction engineering according to claim 6, wherein the right side surface of the connecting plate (9) is fixedly connected with a set of springs (16), and the right ends of the springs (16) are fixedly connected with an arc plate (10) together.
CN202321798221.9U 2023-07-10 2023-07-10 Pavement marking device for constructional engineering Active CN220521065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321798221.9U CN220521065U (en) 2023-07-10 2023-07-10 Pavement marking device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321798221.9U CN220521065U (en) 2023-07-10 2023-07-10 Pavement marking device for constructional engineering

Publications (1)

Publication Number Publication Date
CN220521065U true CN220521065U (en) 2024-02-23

Family

ID=89937671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321798221.9U Active CN220521065U (en) 2023-07-10 2023-07-10 Pavement marking device for constructional engineering

Country Status (1)

Country Link
CN (1) CN220521065U (en)

Similar Documents

Publication Publication Date Title
CN212077769U (en) Building site dust device for construction
CN220521065U (en) Pavement marking device for constructional engineering
CN210229467U (en) Mill dust treatment device
CN212338812U (en) A installing support for supervisory equipment
CN110338729A (en) A kind of top-jet-type feeding bottle washer-disinfector
CN212190383U (en) Radar level meter with sweep function
CN211142960U (en) Road sweeper is with water jet equipment who has anti-clogging function
CN218204095U (en) Municipal administration road bridge removes and maintains device
CN215031883U (en) Special cleaner suitable for meteorological station equipment instrument is clean
CN215085843U (en) A environmental protection dust device for green building construction
CN218798032U (en) Cleaning device capable of collecting dust particles
CN214126692U (en) Railway double-track pesticide sprayer
CN219826171U (en) Portable roughening device
CN215780366U (en) Breathe internal medicine nursing and use sputum cleaning device
CN219052230U (en) Cleaning device for bin pump material level observation hole
CN213101387U (en) Computer lab dust keeper for communication base station
CN216579313U (en) Oil press with cleaning function
CN220119902U (en) Shell-and-tube heat exchanger convenient for cleaning pipe network
CN219631581U (en) Tubular wet-type electrostatic precipitator
CN211130889U (en) Cleaning device for pre-coating film production line
CN217107107U (en) Movable tunnel construction spraying dust device
CN212790122U (en) Multi-pipe cyclone impact dust remover
CN212268419U (en) Liquid buffer tank with cleaning function
CN209321437U (en) A kind of SMT automatic labeling machine dust-extraction unit
CN217876356U (en) Plank cutting workshop dust recovery device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant