CN220506350U - Project progress plan management based on big data - Google Patents

Project progress plan management based on big data Download PDF

Info

Publication number
CN220506350U
CN220506350U CN202321882288.0U CN202321882288U CN220506350U CN 220506350 U CN220506350 U CN 220506350U CN 202321882288 U CN202321882288 U CN 202321882288U CN 220506350 U CN220506350 U CN 220506350U
Authority
CN
China
Prior art keywords
management
progress
mounting
big data
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321882288.0U
Other languages
Chinese (zh)
Inventor
张旭锋
张国斌
鄢家浪
和航航
武凯
王慧丽
高�玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Communications Construction Group Co ltd
Xinjiang Infrastructure Construction Co ltd
Xinjiang Jiaotou Construction Management Co ltd
Original Assignee
Xinjiang Huatian Engineering Construction Co ltd
Xinjiang Communications Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Huatian Engineering Construction Co ltd, Xinjiang Communications Construction Group Co ltd filed Critical Xinjiang Huatian Engineering Construction Co ltd
Priority to CN202321882288.0U priority Critical patent/CN220506350U/en
Application granted granted Critical
Publication of CN220506350U publication Critical patent/CN220506350U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model belongs to the technical field of schedule management, in particular to project schedule management based on big data, which currently proposes the following scheme, wherein the project schedule management comprises a mounting base and a mounting mechanism arranged above the mounting base, and the mounting mechanism comprises a lifting component and an adjusting component; the lifting assembly comprises a connecting block, a rocker, a first gear, a second gear, a threaded rod, a thread shell, a supporting plate and a telescopic sleeve rod, wherein the connecting block is arranged on the upper end face of the installation base.

Description

Project progress plan management based on big data
Technical Field
The utility model relates to the technical field of schedule management, in particular to project schedule management based on big data.
Background
The rapid popularization of the Internet, in the acquiescence, the words such as 'cloud computing', 'Internet plus', 'big data' gradually enter each industry, and the information technology which is derived by relying on the Internet and represented by the Internet and electronic commerce supports the development and transformation of each industry, and project management needs to use a project schedule to display the project schedule, so that the project progress is convenient to observe the actual progress state of the project, the manager is helped to intuitively know the project progress, and the work is convenient to develop.
However, the existing project schedule management apparatus based on big data mainly performs management and display functions of the collected big data information, but when the existing project schedule management apparatus is used, a blind area of a view of a viewer is easily caused, and thus the adjustment function cannot be performed according to the height of a user.
For this purpose, a project schedule management based on big data is required.
Disclosure of Invention
The project schedule management based on big data solves the problems that the prior project schedule management equipment based on big data in the prior art mainly manages and displays the collected big data information, but the prior project schedule management equipment is easy to cause blind areas of visual fields of viewers when in use, so that the adjustment effect cannot be carried out according to the height of a user.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the project progress plan management based on big data comprises a mounting base and a mounting mechanism arranged above the mounting base, wherein the mounting mechanism comprises a lifting assembly and an adjusting assembly;
the lifting assembly comprises a connecting block, a rocker, a first gear, a second gear, a threaded rod, a threaded shell, a supporting plate and a telescopic sleeve rod, wherein the connecting block is arranged on the upper end face of the mounting base;
the utility model provides a management progress board, including adjusting part, control instrument, mounting axle, fixed plate and second screw bolt, connecting axle is installed to the upper end of backup pad, the mounting panel is installed to the upper end of connecting axle, the mounting panel is installed to the lateral wall of connecting axle, the internally mounted of mounting panel has first screw bolt, the screw hole is seted up to the up end of backup pad, the control instrument is installed to the preceding terminal surface below of management progress board, the internally mounted of management progress board has the clip, the external surface mounting of clip has the progress bar, the draw-in groove has been seted up to the inside of progress bar, the installation axle is installed to the upper end of management progress board, the surface mounting of installation axle has the fixed plate, the second screw bolt is installed to the lower extreme of fixed plate.
And a movable wheel is arranged on the lower end surface of the mounting base.
Preferably, the threaded rod forms a rotating structure with the rocker through the first gear and the second gear, and the supporting plate forms a lifting structure with the mounting base through the telescopic loop bar, the thread shell and the threaded rod.
Preferably, the management progress board and the supporting plate form a rotating structure through a connecting shaft, the threaded holes are arranged into four groups, and the connecting shaft and the supporting plate form a fixed structure through a mounting plate, a first threaded bolt and the threaded holes.
Preferably, the management progress board is electrically connected with the progress bar through a controller.
Preferably, the progress bar and the management progress plate form a sliding structure through a clamping bolt and a clamping groove, and the fixed plate and the management progress plate form a rotating structure through a mounting shaft.
Preferably, the moving wheels are provided with four groups, and the four groups of moving wheels are distributed in a matrix along the lower end face of the mounting base.
The utility model provides project schedule management based on big data, which has the beneficial effects that compared with the prior art:
1. according to the utility model, the connecting shaft is arranged, the arranged management progress board can rotate between the connecting shaft and the supporting plate, so that the progress bar can be rotated, the display effect is better, the omnibearing viewing effect is convenient, and then the connecting shaft is fastened between the supporting plate and the first threaded bolt and the threaded hole through the mounting plate, so that the fixing effect of the management progress board is ensured;
2. according to the utility model, the threaded rod is arranged, the arranged threaded rod can form certain rotation work through the first gear, the second gear and the rocker, and then the supporting plate can perform certain height adjustment function through the telescopic loop bar, the threaded shell, the threaded rod and the mounting base, so that certain adjustment function can be performed according to requirements when the device is used outdoors, a blind area causing visual field is avoided, the use efficiency of the device is improved, and the viewing function of the management progress plate is better.
Drawings
FIG. 1 is a schematic diagram of an overall structure of project schedule management based on big data according to the present utility model;
FIG. 2 is a schematic diagram of a supporting plate structure for project schedule management based on big data according to the present utility model;
fig. 3 is a schematic diagram of a management progress board structure for project progress plan management based on big data according to the present utility model.
In the figure: 1. a mounting base; 2. a connecting block; 3. a rocker; 4. a first gear; 5. a second gear; 6. a threaded rod; 7. a threaded shell; 8. a support plate; 9. a telescopic loop bar; 10. a connecting shaft; 11. a management progress board; 12. a mounting plate; 13. a first threaded bolt; 14. a threaded hole; 15. a control instrument; 16. a latch; 17. a progress bar; 18. a clamping groove; 19. a mounting shaft; 20. a fixing plate; 21. a second threaded bolt; 22. and (5) moving the wheel.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: the project progress plan management based on big data comprises a mounting base 1 and a mounting mechanism arranged above the mounting base 1, wherein the mounting mechanism comprises a lifting assembly and an adjusting assembly;
the lifting assembly comprises a connecting block 2, a rocker 3, a first gear 4, a second gear 5, a threaded rod 6, a threaded shell 7, a supporting plate 8 and a telescopic sleeve rod 9, wherein the connecting block 2 is installed on the upper end face of the installation base 1, the rocker 3 is installed on the side wall of the connecting block 2, the first gear 4 is installed at the tail end of the rocker 3, the second gear 5 is connected with the first gear 4 in a meshed manner, the threaded rod 6 is installed in the second gear 5, the threaded shell 7 is installed on the outer surface of the threaded rod 6, the supporting plate 8 is installed at the upper end of the threaded shell 7, and the telescopic sleeve rod 9 is installed at the four ends of the lower end face of the supporting plate 8;
the adjusting component comprises a connecting shaft 10, a management progress plate 11, a mounting plate 12, a first threaded bolt 13, a threaded hole 14, a control instrument 15, a clamping bolt 16, a progress bar 17, a clamping groove 18, a mounting shaft 19, a fixing plate 20 and a second threaded bolt 21, wherein the connecting shaft 10 is installed at the upper end of the supporting plate 8, the management progress plate 11 is installed at the upper end of the connecting shaft 10, the mounting plate 12 is installed on the side wall of the connecting shaft 10, the first threaded bolt 13 is installed in the inner part of the mounting plate 12, the threaded hole 14 is formed in the upper end face of the supporting plate 8, the control instrument 15 is installed below the front end face of the management progress plate 11, the clamping bolt 16 is installed in the inner part of the management progress plate 11, the progress bar 17 is installed on the outer surface of the clamping bolt 16, the clamping groove 18 is formed in the inner part of the progress bar 17, the mounting shaft 19 is installed at the upper end of the management progress plate 11, the fixing plate 20 is installed on the outer surface of the mounting shaft 19, and the second threaded bolt 21 is installed at the lower end of the fixing plate 20.
The lower end surface of the mounting base 1 is provided with a moving wheel 22.
Further, threaded rod 6 constitutes rotating structure through first gear 4 and second gear 5 and rocker 3, backup pad 8 constitutes elevation structure through flexible loop bar 9, screw shell 7 and threaded rod 6 and installation base 1, the threaded rod 6 of setting can form certain rotation work through first gear 4 and second gear 5 and rocker 3, then backup pad 8 can carry out certain altitude mixture control effect through flexible loop bar 9, screw shell 7 and threaded rod 6 and installation base 1 between, be convenient for carry out certain regulatory effect as required when outdoor carrying out the use, avoid causing the blind area of field of vision, improve the availability factor of equipment, watch the effect to management progress board 11 better.
Further, the management progress board 11 forms a rotating structure through the connecting shaft 10 and the supporting plate 8, the threaded holes 14 are arranged into four groups, the connecting shaft 10 forms a fixed structure through the mounting plate 12, the first threaded bolt 13 and the threaded holes 14 and the supporting plate 8, the management progress board 11 can rotate between the connecting shaft 10 and the supporting plate 8, the progress bar 17 is rotated, the display effect is better, the omnibearing watching effect is convenient to carry out, and then the connecting shaft 10 is fastened between the mounting plate 12, the first threaded bolt 13 and the threaded holes 14 and the supporting plate 8, so that the fixing effect on the management progress board 11 is ensured.
Further, the management progress board 11 is electrically connected with the progress bar 17 through the control instrument 15, the storage battery is installed on the side wall of the management progress board 11, the surface of the arranged progress bar 17 is uniformly provided with the lamp tubes, the control instrument 15 is used for controlling the switch of the lamp tubes of the progress bar 17, the prior art is omitted, and the progress of large-plan data management is achieved.
Further, the progress bar 17 forms a sliding structure with the management progress plate 11 through the clamping bolt 16 and the clamping groove 18, the fixed plate 20 forms a rotating structure with the management progress plate 11 through the mounting shaft 19, the clamping groove 18 and the clamping bolt 16 are of a cross-shaped structure, then the progress bar 17 performs a sliding mounting function with the management progress plate 11 through the clamping bolt 16 and the clamping groove 18, the fixed plate 20 performs a rotating operation with the management progress plate 11 through the mounting shaft 19, and then the fixed plate 20 is detached through the second threaded bolt 21, so that the inside progress bar 17 is detached, and maintenance, storage and management are facilitated.
Further, the moving wheels 22 are provided with four groups, the four groups of moving wheels 22 are distributed in a matrix along the lower end face of the mounting base 1, and the moving wheels 22 are convenient for carrying the equipment to a certain extent and are more convenient.
The theory of operation, at first, the management progress board 11 that sets up can rotate work through between connecting axle 10 and the backup pad 8, realize rotating the effect to progress bar 17, better show the effect, conveniently carry out the omnidirectional and watch the effect, then the connecting axle 10 is fastened through between mounting panel 12, first screw bolt 13 and screw hole 14 and the backup pad 8, guarantee the fixed action to management progress board 11, and the threaded rod 6 that sets up can form certain rotation work through first gear 4 and second gear 5 and rocker 3, then backup pad 8 can carry out certain altitude mixture control effect through telescopic loop bar 9, screw shell 7 and threaded rod 6 and installation base 1 between, be convenient for carry out certain regulatory effect as required when using outdoors, avoid causing the blind area of field of vision, improve the availability factor of equipment, watch the effect better to management progress board 11.
Finally, the clamping groove 18 and the clamping bolt 16 are of cross-shaped structures, then the progress bar 17 is in sliding installation through the clamping bolt 16 and the clamping groove 18 and the management progress plate 11, the fixed plate 20 rotates between the installation shaft 19 and the management progress plate 11, then the fixed plate 20 is detached through the second threaded bolt 21, the inside progress bar 17 is detached, and maintenance, storage and management are facilitated.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. Project progress plan management based on big data, including installation base and the installation mechanism of setting in installation base top, its characterized in that: the mounting mechanism comprises a lifting assembly and an adjusting assembly;
the lifting assembly comprises a connecting block, a rocker, a first gear, a second gear, a threaded rod, a threaded shell, a supporting plate and a telescopic sleeve rod, wherein the connecting block is arranged on the upper end face of the mounting base;
the utility model provides a management progress board, including adjusting part, control instrument, mounting axle, fixed plate and second screw bolt, connecting axle is installed to the upper end of backup pad, the mounting panel is installed to the upper end of connecting axle, the mounting panel is installed to the lateral wall of connecting axle, the internally mounted of mounting panel has first screw bolt, the screw hole is seted up to the up end of backup pad, the control instrument is installed to the preceding terminal surface below of management progress board, the internally mounted of management progress board has the clip, the external surface mounting of clip has the progress bar, the draw-in groove has been seted up to the inside of progress bar, the installation axle is installed to the upper end of management progress board, the surface mounting of installation axle has the fixed plate, the second screw bolt is installed to the lower extreme of fixed plate.
2. A big data based project schedule management in accordance with claim 1, wherein: and a movable wheel is arranged on the lower end surface of the mounting base.
3. A big data based project schedule management in accordance with claim 1, wherein: the threaded rod forms a rotating structure with the rocker through the first gear and the second gear, and the supporting plate forms a lifting structure with the mounting base through the telescopic loop bar, the threaded shell and the threaded rod.
4. A big data based project schedule management in accordance with claim 1, wherein: the management progress board forms a rotating structure with the supporting plate through the connecting shaft, the threaded holes are arranged into four groups, and the connecting shaft forms a fixed structure with the supporting plate through the mounting plate, the first threaded bolt and the threaded holes.
5. A big data based project schedule management in accordance with claim 1, wherein: the management progress board is electrically connected with the progress bar through the control instrument.
6. A big data based project schedule management in accordance with claim 1, wherein: the progress bar forms a sliding structure with the management progress plate through the clamping bolt and the clamping groove, and the fixed plate forms a rotating structure with the management progress plate through the mounting shaft.
7. A big data based project schedule management in accordance with claim 2, wherein: the movable wheels are provided with four groups, and the four groups of movable wheels are distributed in a matrix along the lower end face of the mounting base.
CN202321882288.0U 2023-07-18 2023-07-18 Project progress plan management based on big data Active CN220506350U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321882288.0U CN220506350U (en) 2023-07-18 2023-07-18 Project progress plan management based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321882288.0U CN220506350U (en) 2023-07-18 2023-07-18 Project progress plan management based on big data

Publications (1)

Publication Number Publication Date
CN220506350U true CN220506350U (en) 2024-02-20

Family

ID=89873687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321882288.0U Active CN220506350U (en) 2023-07-18 2023-07-18 Project progress plan management based on big data

Country Status (1)

Country Link
CN (1) CN220506350U (en)

Similar Documents

Publication Publication Date Title
CN220506350U (en) Project progress plan management based on big data
CN208000710U (en) A kind of solar energy electronic message board
CN204631396U (en) Opencell shields pick-up unit
CN216079186U (en) Cloud software remote development demonstration device
CN215252458U (en) Warning device for engineering construction management
CN210831313U (en) Adjustable LED display screen fixing support
CN114717987A (en) Warning mechanism for engineering construction of 220 KV transformer substation and using method thereof
CN208596500U (en) A kind of tourism guide device
CN219999442U (en) Photovoltaic monitoring device
CN219177522U (en) Separated solar lamp
CN213745627U (en) Can be used to suspension type video controller
CN217521710U (en) Warning device for power communication maintenance
CN219933588U (en) Adjustable liquid crystal display panel
CN218935868U (en) Visual intercom display screen
CN214541381U (en) Display device for construction cost control
CN213339152U (en) Wall map billboard for economics teaching
CN217153659U (en) Many LED display screen aggregate erection orthotic devices
CN217634979U (en) Stable display screen fixed knot constructs
CN216615566U (en) Intelligent guide sign for creating tourist writings
CN218863787U (en) Supporting device for erecting electrical equipment
CN219164297U (en) Oil immersed power transformer monitoring device
CN216749127U (en) Shockproof disaster reduction education is with propaganda device
CN214336229U (en) Engineering progress display device for building engineering management
CN212986573U (en) Vehicle-mounted turnover liquid crystal display screen
CN213809914U (en) Solar energy control fixed bolster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240226

Address after: 830000, No.78 Yutian Street, Shayibak District, Urumqi City, Xinjiang Uygur Autonomous Region

Patentee after: Xinjiang Jiaotou Construction Management Co.,Ltd.

Country or region after: China

Address before: No. 456, wuchangfu Road, Urumqi, Xinjiang Uygur Autonomous Region

Patentee before: XINJIANG COMMUNICATIONS CONSTRUCTION GROUP Co.,Ltd.

Country or region before: China

Patentee before: Xinjiang Huatian Engineering Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240613

Address after: 830011 No. 840 Wuchang Road Auxiliary Road, Urumqi High tech Industrial Development Zone (New Urban Area), Xinjiang Uygur Autonomous Region

Patentee after: XINJIANG COMMUNICATIONS CONSTRUCTION GROUP Co.,Ltd.

Country or region after: China

Patentee after: Xinjiang Infrastructure Construction Co.,Ltd.

Patentee after: Xinjiang Jiaotou Construction Management Co.,Ltd.

Address before: 830000, No.78 Yutian Street, Shayibak District, Urumqi City, Xinjiang Uygur Autonomous Region

Patentee before: Xinjiang Jiaotou Construction Management Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right