CN220506350U - Project progress plan management based on big data - Google Patents
Project progress plan management based on big data Download PDFInfo
- Publication number
- CN220506350U CN220506350U CN202321882288.0U CN202321882288U CN220506350U CN 220506350 U CN220506350 U CN 220506350U CN 202321882288 U CN202321882288 U CN 202321882288U CN 220506350 U CN220506350 U CN 220506350U
- Authority
- CN
- China
- Prior art keywords
- management
- progress
- threaded
- gear
- big data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本实用新型属于进度计划管理技术领域,尤其是一种基于大数据的项目进度计划管理,现提出如下方案,包括安装底座和设置在安装底座上方的安装机构,所述安装机构包括升降组件和调节组件;所述升降组件包括连接块、摇杆、第一齿轮、第二齿轮、螺纹杆、螺纹壳、支撑板和伸缩套杆,所述安装底座的上端面安装有连接块,本实用新型通过设置螺纹杆,设置的螺纹杆通过第一齿轮和第二齿轮与摇杆可以形成一定的转动工作,然后支撑板可以通过伸缩套杆、螺纹壳和螺纹杆与安装底座之间进行一定的高度调节作用,便于在户外进行使用时根据需要进行一定的调节作用,避免造成视野的盲区,提高设备的使用效率,更好地对管理进度板进行观看作用。
The utility model belongs to the technical field of schedule management, especially a project schedule management based on big data. The following solution is proposed, including an installation base and an installation mechanism arranged above the installation base. The installation mechanism includes a lifting component and an adjustment Assembly; the lifting assembly includes a connecting block, a rocker, a first gear, a second gear, a threaded rod, a threaded shell, a support plate and a telescopic sleeve rod. The upper end surface of the installation base is equipped with a connecting block. The utility model adopts A threaded rod is provided, and the set threaded rod can form a certain rotation work through the first gear and the second gear and the rocker, and then the support plate can be adjusted to a certain height through the telescopic sleeve rod, the threaded shell, the threaded rod and the installation base. Function, it is convenient to make certain adjustments as needed when used outdoors, avoid blind spots in the field of vision, improve the efficiency of equipment use, and better view the management progress board.
Description
技术领域Technical field
本实用新型涉及进度计划管理技术领域,尤其涉及一种基于大数据的项目进度计划管理。The utility model relates to the technical field of schedule management, and in particular to a project schedule management based on big data.
背景技术Background technique
互联网的快速普及,在潜移默化间,“云计算”、“互联网+”、“大数据”等词汇逐渐进入各行各业,并且依托互联网从而衍生出的以物联网、电子商务为代表的信息技术正在支撑着各个产业的发展与变革,项目管理都需要使用项目进度表,来展示项目进度,便于观察项目实际进展状态,有助于管理者直观地了解项目进度,方便开展工作。With the rapid popularization of the Internet, terms such as "cloud computing", "Internet +", and "big data" have gradually entered all walks of life, and information technologies represented by the Internet of Things and e-commerce derived from the Internet are becoming more and more popular. Supporting the development and transformation of various industries, project management needs to use project schedules to display project progress, facilitate observation of the actual progress of the project, and help managers intuitively understand project progress and facilitate work.
但是,现有的基于大数据的项目进度计划管理设备主要进行将收集的大数据信息进行管理展示作用,但是现有的项目进度计划管理设备在进行使用时,容易造成观看者的视野盲区,导致无法根据使用者的身高进行调节作用。However, the existing project schedule management equipment based on big data is mainly used to manage and display the collected big data information. However, when the existing project schedule management equipment is used, it is easy to cause blind spots in the viewer's field of vision, resulting in It cannot be adjusted according to the height of the user.
为此需要一种基于大数据的项目进度计划管理。For this purpose, a project schedule management based on big data is needed.
实用新型内容Utility model content
本实用新型提出的一种基于大数据的项目进度计划管理,解决了现有技术中存在的现有的基于大数据的项目进度计划管理设备主要进行将收集的大数据信息进行管理展示作用,但是现有的项目进度计划管理设备在进行使用时,容易造成观看者的视野盲区,导致无法根据使用者的身高进行调节作用的问题。The utility model proposes a project schedule management based on big data, which solves the problem that the existing big data-based project schedule management equipment in the prior art mainly manages and displays the collected big data information, but When the existing project schedule management equipment is used, it is easy to cause blind spots in the viewer's field of vision, resulting in the problem that the adjustment function cannot be adjusted according to the user's height.
为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above purpose, the present utility model provides the following technical solutions:
一种基于大数据的项目进度计划管理,包括安装底座和设置在安装底座上方的安装机构,所述安装机构包括升降组件和调节组件;A project schedule management based on big data, including an installation base and an installation mechanism arranged above the installation base, where the installation mechanism includes a lifting component and an adjustment component;
所述升降组件包括连接块、摇杆、第一齿轮、第二齿轮、螺纹杆、螺纹壳、支撑板和伸缩套杆,所述安装底座的上端面安装有连接块,所述连接块的侧壁安装有摇杆,所述摇杆的末端安装有第一齿轮,所述第一齿轮的内部啮合连接有第二齿轮,所述第二齿轮的内部安装有螺纹杆,所述螺纹杆的外表面安装有螺纹壳,所述螺纹壳的上端安装有支撑板,所述支撑板的下端面四端安装有伸缩套杆;The lifting assembly includes a connecting block, a rocker, a first gear, a second gear, a threaded rod, a threaded shell, a support plate and a telescopic sleeve rod. A connecting block is installed on the upper end of the mounting base, and the side of the connecting block A rocker is installed on the wall. A first gear is installed at the end of the rocker. A second gear is meshed and connected to the inside of the first gear. A threaded rod is installed inside the second gear. The outer part of the threaded rod is A threaded shell is installed on the surface, a support plate is installed on the upper end of the threaded shell, and telescopic sleeve rods are installed on the four ends of the lower end surface of the support plate;
所述调节组件包括连接轴、管理进度板、安装板、第一螺纹栓、螺纹孔、控制仪、卡栓、进度条、卡槽、安装轴、固定板和第二螺纹栓,所述支撑板的上端安装有连接轴,所述连接轴的上端安装有管理进度板,所述连接轴的侧壁安装有安装板,所述安装板的内部安装有第一螺纹栓,所述支撑板的上端面开设有螺纹孔,所述管理进度板的前端面下方安装有控制仪,所述管理进度板的内部安装有卡栓,所述卡栓的外表面安装有进度条,所述进度条的内部开设有卡槽,所述管理进度板的上端安装有安装轴,所述安装轴的外表面安装有固定板,所述固定板的下端安装有第二螺纹栓。The adjustment component includes a connecting shaft, a management progress plate, a mounting plate, a first threaded bolt, a threaded hole, a controller, a clamping bolt, a progress bar, a slot, a mounting shaft, a fixing plate and a second threaded bolt. The support plate A connecting shaft is installed at the upper end of the connecting shaft. A management progress plate is installed at the upper end of the connecting shaft. A mounting plate is installed on the side wall of the connecting shaft. A first threaded bolt is installed inside the mounting plate. The upper end of the supporting plate A threaded hole is provided on the end face, a controller is installed below the front end of the management progress board, a clamp is installed inside the management progress plate, a progress bar is installed on the outer surface of the clamp, and a progress bar is installed on the inside of the management progress board. A card slot is provided, an installation shaft is installed on the upper end of the management progress plate, a fixed plate is installed on the outer surface of the installation shaft, and a second threaded bolt is installed on the lower end of the fixed plate.
所述安装底座的下端面安装有移动轮。A moving wheel is installed on the lower end surface of the installation base.
优选的,所述螺纹杆通过第一齿轮和第二齿轮与摇杆构成转动结构,所述支撑板通过伸缩套杆、螺纹壳和螺纹杆与安装底座构成升降结构。Preferably, the threaded rod forms a rotation structure through the first gear and the second gear and the rocker, and the support plate forms a lifting structure through the telescopic sleeve rod, the threaded shell, the threaded rod and the installation base.
优选的,所述管理进度板通过连接轴与支撑板构成转动结构,所述螺纹孔设置为四组,所述连接轴通过安装板、第一螺纹栓和螺纹孔与支撑板构成固定结构。Preferably, the management progress board forms a rotating structure through a connecting shaft and a support plate, the threaded holes are arranged in four groups, and the connecting shaft forms a fixed structure with the support plate through the mounting plate, the first threaded bolt and the threaded hole.
优选的,所述管理进度板通过控制仪与进度条之间呈电性连接。Preferably, the management progress board is electrically connected to the progress bar through the control instrument.
优选的,所述进度条通过卡栓和卡槽与管理进度板构成滑动结构,所述固定板通过安装轴与管理进度板构成转动结构。Preferably, the progress bar forms a sliding structure with the management progress plate through the latches and grooves, and the fixed plate forms a rotation structure with the management progress plate through the mounting shaft.
优选的,所述移动轮设置四组,四组所述移动轮沿安装底座的下端面呈矩阵分布。Preferably, the moving wheels are arranged in four groups, and the four groups of moving wheels are distributed in a matrix along the lower end surface of the mounting base.
本实用新型提出了一种基于大数据的项目进度计划管理,与现有技术相比,本实用新型的有益效果是:This utility model proposes a project schedule management based on big data. Compared with the existing technology, the beneficial effects of this utility model are:
1.本实用新型通过设置连接轴,设置的管理进度板可以通过连接轴与支撑板之间进行转动工作,实现对进度条进行转动作用,更好地进行展示作用,方便进行全方位的观看作用,然后连接轴通过安装板、第一螺纹栓和螺纹孔与支撑板之间进行紧固,保证对管理进度板的固定作用;1. This utility model is provided with a connecting shaft, and the management progress board can be rotated between the connecting shaft and the support plate to realize the rotation of the progress bar, better display, and convenient all-round viewing. , and then the connecting shaft is fastened with the support plate through the mounting plate, the first threaded bolt and the threaded hole to ensure the fixation of the management progress plate;
2.本实用新型通过设置螺纹杆,设置的螺纹杆通过第一齿轮和第二齿轮与摇杆可以形成一定的转动工作,然后支撑板可以通过伸缩套杆、螺纹壳和螺纹杆与安装底座之间进行一定的高度调节作用,便于在户外进行使用时根据需要进行一定的调节作用,避免造成视野的盲区,提高设备的使用效率,更好地对管理进度板进行观看作用。2. The utility model provides a threaded rod, which can form a certain rotation through the first gear, the second gear and the rocker, and then the support plate can pass between the telescopic sleeve rod, the threaded shell and the threaded rod and the installation base. A certain height adjustment function can be performed at intervals to facilitate certain adjustments as needed when used outdoors to avoid blind spots in the field of vision, improve the use efficiency of the equipment, and better view the management progress board.
附图说明Description of the drawings
图1为本实用新型提出的一种基于大数据的项目进度计划管理的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of a project schedule management based on big data proposed by this utility model;
图2为本实用新型提出的一种基于大数据的项目进度计划管理的支撑板结构示意图;Figure 2 is a schematic structural diagram of a support plate for project schedule management based on big data proposed by this utility model;
图3为本实用新型提出的一种基于大数据的项目进度计划管理的管理进度板结构示意图。Figure 3 is a schematic structural diagram of a management progress board for project schedule management based on big data proposed by this utility model.
图中:1、安装底座;2、连接块;3、摇杆;4、第一齿轮;5、第二齿轮;6、螺纹杆;7、螺纹壳;8、支撑板;9、伸缩套杆;10、连接轴;11、管理进度板;12、安装板;13、第一螺纹栓;14、螺纹孔;15、控制仪;16、卡栓;17、进度条;18、卡槽;19、安装轴;20、固定板;21、第二螺纹栓;22、移动轮。In the picture: 1. Installation base; 2. Connecting block; 3. Rocker; 4. First gear; 5. Second gear; 6. Threaded rod; 7. Threaded shell; 8. Support plate; 9. Telescopic sleeve rod ; 10. Connecting shaft; 11. Management progress board; 12. Installation board; 13. First threaded bolt; 14. Threaded hole; 15. Control instrument; 16. Clamping bolt; 17. Progress bar; 18. Clamping slot; 19 , Installation shaft; 20. Fixed plate; 21. Second threaded bolt; 22. Moving wheel.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.
请参阅图1-3,本实用新型提供一种技术方案:一种基于大数据的项目进度计划管理,包括安装底座1和设置在安装底座1上方的安装机构,安装机构包括升降组件和调节组件;Please refer to Figures 1-3. The present utility model provides a technical solution: a project schedule management based on big data, including an installation base 1 and an installation mechanism arranged above the installation base 1. The installation mechanism includes a lifting component and an adjustment component. ;
升降组件包括连接块2、摇杆3、第一齿轮4、第二齿轮5、螺纹杆6、螺纹壳7、支撑板8和伸缩套杆9,安装底座1的上端面安装有连接块2,连接块2的侧壁安装有摇杆3,摇杆3的末端安装有第一齿轮4,第一齿轮4的内部啮合连接有第二齿轮5,第二齿轮5的内部安装有螺纹杆6,螺纹杆6的外表面安装有螺纹壳7,螺纹壳7的上端安装有支撑板8,支撑板8的下端面四端安装有伸缩套杆9;The lifting assembly includes a connecting block 2, a rocker 3, a first gear 4, a second gear 5, a threaded rod 6, a threaded shell 7, a support plate 8 and a telescopic sleeve rod 9. The connecting block 2 is installed on the upper end surface of the installation base 1. A rocker 3 is installed on the side wall of the connecting block 2, and a first gear 4 is installed at the end of the rocker 3. A second gear 5 is engaged and connected to the interior of the first gear 4, and a threaded rod 6 is installed to the interior of the second gear 5. A threaded shell 7 is installed on the outer surface of the threaded rod 6, a support plate 8 is installed on the upper end of the threaded shell 7, and telescopic sleeve rods 9 are installed on the four ends of the lower end surface of the support plate 8;
调节组件包括连接轴10、管理进度板11、安装板12、第一螺纹栓13、螺纹孔14、控制仪15、卡栓16、进度条17、卡槽18、安装轴19、固定板20和第二螺纹栓21,支撑板8的上端安装有连接轴10,连接轴10的上端安装有管理进度板11,连接轴10的侧壁安装有安装板12,安装板12的内部安装有第一螺纹栓13,支撑板8的上端面开设有螺纹孔14,管理进度板11的前端面下方安装有控制仪15,管理进度板11的内部安装有卡栓16,卡栓16的外表面安装有进度条17,进度条17的内部开设有卡槽18,管理进度板11的上端安装有安装轴19,安装轴19的外表面安装有固定板20,固定板20的下端安装有第二螺纹栓21。The adjustment component includes a connecting shaft 10, a management progress plate 11, a mounting plate 12, a first threaded bolt 13, a threaded hole 14, a controller 15, a clamping bolt 16, a progress bar 17, a slot 18, an installation shaft 19, a fixing plate 20 and The second threaded bolt 21 has a connecting shaft 10 installed on the upper end of the support plate 8. A management progress plate 11 is installed on the upper end of the connecting shaft 10. A mounting plate 12 is installed on the side wall of the connecting shaft 10. The first mounting plate 12 is installed inside. Threaded bolts 13, threaded holes 14 are provided on the upper end surface of the support plate 8, a controller 15 is installed below the front end surface of the management progress plate 11, a clamping bolt 16 is installed inside the management progress plate 11, and a clamping bolt 16 is installed on the outer surface of the clamping bolt 16 Progress bar 17, a slot 18 is provided inside the progress bar 17, a mounting shaft 19 is installed on the upper end of the management progress plate 11, a fixing plate 20 is installed on the outer surface of the installation shaft 19, and a second threaded bolt is installed on the lower end of the fixing plate 20 twenty one.
安装底座1的下端面安装有移动轮22。A moving wheel 22 is installed on the lower end surface of the mounting base 1 .
进一步的,螺纹杆6通过第一齿轮4和第二齿轮5与摇杆3构成转动结构,支撑板8通过伸缩套杆9、螺纹壳7和螺纹杆6与安装底座1构成升降结构,设置的螺纹杆6通过第一齿轮4和第二齿轮5与摇杆3可以形成一定的转动工作,然后支撑板8可以通过伸缩套杆9、螺纹壳7和螺纹杆6与安装底座1之间进行一定的高度调节作用,便于在户外进行使用时根据需要进行一定的调节作用,避免造成视野的盲区,提高设备的使用效率,更好地对管理进度板11进行观看作用。Further, the threaded rod 6 forms a rotation structure through the first gear 4 and the second gear 5 and the rocker 3, and the support plate 8 forms a lifting structure through the telescopic sleeve rod 9, the threaded shell 7 and the threaded rod 6 and the installation base 1. The threaded rod 6 can form a certain rotation work with the rocker 3 through the first gear 4 and the second gear 5, and then the support plate 8 can perform a certain rotation between the telescopic sleeve rod 9, the threaded shell 7 and the threaded rod 6 and the installation base 1. The height adjustment function facilitates certain adjustments as needed when used outdoors to avoid blind spots in the field of vision, improve the use efficiency of the equipment, and better view the management progress board 11.
进一步的,管理进度板11通过连接轴10与支撑板8构成转动结构,螺纹孔14设置为四组,连接轴10通过安装板12、第一螺纹栓13和螺纹孔14与支撑板8构成固定结构,设置的管理进度板11可以通过连接轴10与支撑板8之间进行转动工作,实现对进度条17进行转动作用,更好地进行展示作用,方便进行全方位的观看作用,然后连接轴10通过安装板12、第一螺纹栓13和螺纹孔14与支撑板8之间进行紧固,保证对管理进度板11的固定作用。Furthermore, the management progress board 11 forms a rotating structure through the connecting shaft 10 and the supporting plate 8. The threaded holes 14 are arranged in four groups. The connecting shaft 10 forms a fixed structure with the supporting plate 8 through the mounting plate 12, the first threaded bolt 13 and the threaded hole 14. Structure, the set management progress board 11 can be rotated through the connection shaft 10 and the support plate 8 to realize the rotation of the progress bar 17 for better display and convenient all-round viewing, and then the connection shaft 10 Fasten the mounting plate 12, the first threaded bolt 13 and the threaded hole 14 to the support plate 8 to ensure the fixation of the management progress plate 11.
进一步的,管理进度板11通过控制仪15与进度条17之间呈电性连接,在管理进度板11侧壁安装蓄电池,设置的进度条17表面均匀安装有灯管,控制仪15用于控制进度条17的灯管的开关,均属于现有技术,不做赘述,实现对大计划数据管理的进度。Furthermore, the management progress board 11 is electrically connected to the progress bar 17 through the controller 15. A battery is installed on the side wall of the management progress board 11. The surface of the progress bar 17 is evenly installed with light tubes. The controller 15 is used for control. The switch of the light tube of the progress bar 17 belongs to the existing technology and will not be described in detail to realize the progress of large-scale data management.
进一步的,进度条17通过卡栓16和卡槽18与管理进度板11构成滑动结构,固定板20通过安装轴19与管理进度板11构成转动结构,设置的卡槽18和卡栓16均呈十字状状结构,然后进度条17通过卡栓16和卡槽18与管理进度板11之间进行滑动安装作用,且固定板20通过安装轴19与管理进度板11之间进行转动工作,然后通过第二螺纹栓21进行对固定板20的拆卸,实现对内部的进度条17进行拆卸作用,便于进行维护收纳管理。Furthermore, the progress bar 17 forms a sliding structure with the management progress plate 11 through the clamping bolt 16 and the clamping slot 18, and the fixed plate 20 forms a rotating structure with the management progress plate 11 through the mounting shaft 19. The clamping slot 18 and the clamping bolt 16 are arranged in a Cross-shaped structure, and then the progress bar 17 is slidably installed between the clamping bolt 16 and the slot 18 and the management progress plate 11, and the fixed plate 20 rotates through the installation shaft 19 and the management progress plate 11, and then through The second threaded bolt 21 is used to disassemble the fixed plate 20 and realize the disassembly of the internal progress bar 17 to facilitate maintenance, storage and management.
进一步的,移动轮22设置四组,四组移动轮22沿安装底座1的下端面呈矩阵分布,设置的移动轮22便于对设备进行一定的携带更加方便。Further, four sets of moving wheels 22 are provided, and the four sets of moving wheels 22 are distributed in a matrix along the lower end surface of the installation base 1. The moving wheels 22 provided make it easier to carry the equipment to a certain extent.
工作原理,首先,设置的管理进度板11可以通过连接轴10与支撑板8之间进行转动工作,实现对进度条17进行转动作用,更好地进行展示作用,方便进行全方位的观看作用,然后连接轴10通过安装板12、第一螺纹栓13和螺纹孔14与支撑板8之间进行紧固,保证对管理进度板11的固定作用,且设置的螺纹杆6通过第一齿轮4和第二齿轮5与摇杆3可以形成一定的转动工作,然后支撑板8可以通过伸缩套杆9、螺纹壳7和螺纹杆6与安装底座1之间进行一定的高度调节作用,便于在户外进行使用时根据需要进行一定的调节作用,避免造成视野的盲区,提高设备的使用效率,更好地对管理进度板11进行观看作用。Working principle: firstly, the management progress board 11 can be rotated through the connection shaft 10 and the support plate 8 to realize the rotation of the progress bar 17 for better display and convenient all-round viewing. Then the connecting shaft 10 is fastened to the support plate 8 through the mounting plate 12, the first threaded bolt 13 and the threaded hole 14 to ensure the fixation of the management progress plate 11, and the set threaded rod 6 passes through the first gear 4 and The second gear 5 and the rocker 3 can form a certain rotation work, and then the support plate 8 can perform a certain height adjustment function between the telescopic sleeve rod 9, the threaded shell 7 and the threaded rod 6 and the installation base 1, which is convenient for outdoor use. During use, certain adjustments are made as needed to avoid blind spots in the field of vision, improve the use efficiency of the equipment, and provide a better viewing effect on the management progress board 11 .
最后,设置的卡槽18和卡栓16均呈十字状状结构,然后进度条17通过卡栓16和卡槽18与管理进度板11之间进行滑动安装作用,且固定板20通过安装轴19与管理进度板11之间进行转动工作,然后通过第二螺纹栓21进行对固定板20的拆卸,实现对内部的进度条17进行拆卸作用,便于进行维护收纳管理。Finally, the provided clamping slot 18 and the clamping bolt 16 both have a cross-shaped structure, and then the progress bar 17 is slidably installed between the clamping bolt 16 and the clamping slot 18 and the management progress board 11, and the fixed plate 20 passes through the installation shaft 19 Carry out rotation work with the management progress plate 11, and then disassemble the fixed plate 20 through the second threaded bolt 21 to realize the disassembly of the internal progress bar 17 to facilitate maintenance, storage and management.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention. , substitutions and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321882288.0U CN220506350U (en) | 2023-07-18 | 2023-07-18 | Project progress plan management based on big data |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321882288.0U CN220506350U (en) | 2023-07-18 | 2023-07-18 | Project progress plan management based on big data |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220506350U true CN220506350U (en) | 2024-02-20 |
Family
ID=89873687
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321882288.0U Expired - Fee Related CN220506350U (en) | 2023-07-18 | 2023-07-18 | Project progress plan management based on big data |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220506350U (en) |
-
2023
- 2023-07-18 CN CN202321882288.0U patent/CN220506350U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN220506350U (en) | Project progress plan management based on big data | |
| CN206683695U (en) | A kind of environmental monitoring system based on Internet of Things | |
| CN214699882U (en) | LED display screen with angle modulation and convenient dismantlement function | |
| CN205354545U (en) | Outdoor advertising device of clean energy power supply | |
| CN219530429U (en) | Fixed bolster that LED display screen installation was used | |
| CN208000710U (en) | A kind of solar energy electronic message board | |
| CN208156944U (en) | A kind of multifunction display that can splice | |
| CN208281978U (en) | It is a kind of can 360 degree rotate freely gynemetrics childbirth operation lamps | |
| CN214171718U (en) | Computer display supporting seat | |
| CN212256747U (en) | A multi-functional indicating device for landscape garden is vwatched | |
| CN213339152U (en) | Wall map billboard for economics teaching | |
| CN217521710U (en) | Warning device for power communication maintenance | |
| CN219734918U (en) | a guide rail device | |
| CN219386061U (en) | Construction road indicating device | |
| CN222145711U (en) | A sign based on energy saving | |
| CN219875536U (en) | Movable distributed photovoltaic power generation device | |
| CN220017313U (en) | Photovoltaic street lamp convenient to hang and replace lamp box | |
| CN219872714U (en) | Signboard | |
| CN220366244U (en) | LED display screen with interaction function | |
| CN221648134U (en) | LED display screen activity back splint | |
| CN221196807U (en) | Electronic information data acquisition device | |
| CN221897546U (en) | A Consulting System for Engineering Cost | |
| CN220303174U (en) | Plant phenotype observation and data acquisition equipment | |
| CN216010031U (en) | Mounting base for anti-theft alarm liquid crystal monitor | |
| CN218935868U (en) | Visual intercom display screen |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240226 Address after: 830000, No.78 Yutian Street, Shayibak District, Urumqi City, Xinjiang Uygur Autonomous Region Patentee after: Xinjiang Jiaotou Construction Management Co.,Ltd. Country or region after: China Address before: No. 456, wuchangfu Road, Urumqi, Xinjiang Uygur Autonomous Region Patentee before: XINJIANG COMMUNICATIONS CONSTRUCTION GROUP Co.,Ltd. Country or region before: China Patentee before: Xinjiang Huatian Engineering Construction Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240613 Address after: 830011 No. 840 Wuchang Road Auxiliary Road, Urumqi High tech Industrial Development Zone (New Urban Area), Xinjiang Uygur Autonomous Region Patentee after: XINJIANG COMMUNICATIONS CONSTRUCTION GROUP Co.,Ltd. Country or region after: China Patentee after: Xinjiang Infrastructure Construction Co.,Ltd. Patentee after: Xinjiang Jiaotou Construction Management Co.,Ltd. Address before: 830000, No.78 Yutian Street, Shayibak District, Urumqi City, Xinjiang Uygur Autonomous Region Patentee before: Xinjiang Jiaotou Construction Management Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20240220 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |