CN220504454U CN202321875538.8U CN202321875538U CN220504454U CN 220504454 U CN220504454 U CN 220504454U CN 202321875538 U CN202321875538 U CN 202321875538U CN 220504454 U CN220504454 U CN 220504454U
Authority
CN
China
Prior art keywords
steel pipe
clamping
pin
cross rod
key
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321875538.8U
Other languages
Chinese (zh)
Inventor
刘熠
甫尔海提·艾尼瓦尔
王家会
鄢家浪
周昌
李建东
高�玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Communications Construction Group Co ltd
Xinjiang Infrastructure Construction Co ltd
Xinjiang Jiaotou Construction Management Co ltd
Original Assignee
Xinjiang Huatian Engineering Construction Co ltd
Xinjiang Communications Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Huatian Engineering Construction Co ltd, Xinjiang Communications Construction Group Co ltd filed Critical Xinjiang Huatian Engineering Construction Co ltd
Priority to CN202321875538.8U priority Critical patent/CN220504454U/en
Application granted granted Critical
Publication of CN220504454U publication Critical patent/CN220504454U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of scaffolds, in particular to a pin key type steel pipe full scaffold reinforced by a steel pipe arc arch, which adopts the following scheme that the pin key type steel pipe full scaffold comprises a vertical rod and a mounting mechanism arranged above the vertical rod, wherein the mounting mechanism comprises a clamping assembly and an elastic assembly; the clamping assembly comprises the pin key seat, the through holes, the cross bars, the clamping grooves and the clamping pins, the two ends of the cross bars are concave, so that the cross bars can be attached to the outer surfaces of the pin key seat, the clamping pins are inserted into the through holes and the clamping grooves through the clamping grooves and the through holes, the cross bars are fixedly connected to the vertical rods, the stability of the device can be better ensured, the body safety of workers is protected, the clamping plates are pressed inwards, the clamping plates can extend inwards and outwards under the action of the springs, the clamping plates can be clamped on the cross bars well through the reset of the springs when the clamping pins are inserted into the clamping grooves, and the stability of the device is ensured.

Description

Pin key type steel pipe full scaffold reinforced by steel pipe circular arch
Technical Field
The utility model relates to the technical field of scaffolds, in particular to a pin key type steel pipe full scaffold reinforced by a steel pipe arc arch.
Background
The full-hall scaffold is also called as a full-house scaffold, is a construction process for fully paving and erecting the scaffold in the horizontal direction, is widely used for construction channels of constructors and the like, and cannot be used as a support system of a building structure. The full scaffold is a high-density scaffold, the distance between adjacent rods is fixed, and the pressure conduction is uniform, so that the full scaffold is more stable.
However, when the existing pin key type steel pipe full scaffold reinforced by the steel pipe circular arch is used, the capability of the cross bar is poor, so that the scaffold is easy to deform, and meanwhile, when a worker stands on the scaffold, the device is not firmly fixed, so that the cross bar slides downwards, the unstable condition of the device is caused, and the damage is caused to the physical safety of the worker.
For this purpose, a pin-key type steel pipe full scaffold with reinforced steel pipe circular arches is required.
Disclosure of Invention
The pin key type steel pipe full scaffold with the reinforced steel pipe circular arch solves the problems that when the existing steel pipe circular arch reinforced pin key type steel pipe full scaffold in the prior art is used, the capacity of a cross bar is poor, so that the scaffold is easy to deform, meanwhile, when a worker stands on the scaffold, the device is not firmly fixed, the cross bar can slide downwards, the unstable condition of the device is caused, and the safety of the worker is endangered.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the pin key type steel pipe full scaffold with the reinforced steel pipe circular arch comprises a vertical rod and a mounting mechanism arranged above the vertical rod, wherein the mounting mechanism comprises a clamping assembly and an elastic assembly;
the clamping assembly comprises a pin key seat, a through hole, a cross rod, a clamping groove and a clamping pin, wherein the pin key seat is welded on the outer surface of the vertical rod, the through hole is formed in the pin key seat, the cross rod is arranged on the outer surface of the pin key seat, the clamping groove is formed in one end of the cross rod, and the clamping pin is arranged in the clamping groove;
the elastic component includes bayonet lock, square groove, spring, cardboard and pivot, square groove has been seted up to the lower surface of bayonet lock, and the surface in square groove is connected with the spring, the end-to-end connection of spring has the cardboard, the lower extreme of cardboard is connected with the pivot.
The middle part of horizontal pole is connected with fixed cover, the circular arc arched door is installed to the lower terminal surface of fixed cover, the one end of circular arc arched door is provided with the connecting rod.
Preferably, the cross rod forms a clamping structure through the clamping groove, the clamping pin, the through hole, the pin key seat and the upright rod, and one end of the cross rod is arranged in a concave shape.
Preferably, the clamping plate forms a rotating structure through the rotating shaft and the clamping pin, and forms an elastic structure through the spring and the square groove.
Preferably, the concave groove at one end of the cross rod is in fit connection with the outer surface of the pin key seat.
Preferably, the arc arch is fixedly connected with the cross rod through the fixing sleeve, and the clamping grooves are distributed in a central symmetry mode along the cross rod.
Preferably, the connecting rod is fixedly connected with the vertical rod, and the connecting rod is centrosymmetric along the arc arch.
The utility model provides a pin key type steel pipe full scaffold reinforced by a steel pipe circular arch, which has the beneficial effects that compared with the prior art, the pin key type steel pipe full scaffold comprises the following components:
1. according to the utility model, the two ends of the cross rod are concave, so that the cross rod can be attached to the outer surface of the pin key seat, then the clamping pin is inserted into the through hole and the through hole, the cross rod is fixedly connected to the upright rod, the stability of the device can be better ensured, the body safety of a worker is protected, the clamping plate is pressed inwards, the clamping plate can extend inwards and outwards under the action of the spring, and when the clamping pin is inserted into the clamping groove, the clamping pin can be well clamped on the cross rod through the reset of the spring, so that the cross rod is well fixed, and the stability of the device is ensured;
2. according to the utility model, the arc arch is fixedly connected with the cross rod through the fixing sleeve, the arc arch can enlarge the support of the scaffold, the stability of the device is improved, workers are better helped to work, and the arc arch is fixedly connected with the upright rod through the connecting rod, so that the arc arch can have a good supporting effect on the cross rod and the upright rod respectively, the cross rod is better prevented from sliding downwards, and the stability of the device is improved.
Drawings
Fig. 1 is a schematic diagram of the overall structure of a pin key type steel pipe full scaffold reinforced by a steel pipe circular arch;
fig. 2 is a schematic diagram of a pin key seat structure of a pin key type steel pipe full scaffold reinforced by a steel pipe circular arch;
fig. 3 is a schematic diagram of a bayonet structure of a pin key type steel pipe full scaffold reinforced by a steel pipe circular arch;
fig. 4 is a schematic view of the arc arch structure of the pin key type steel pipe full scaffold reinforced by the steel pipe arc arch.
In the figure: 1. a vertical rod; 2. a pin key seat; 3. a through hole; 4. a cross bar; 5. a clamping groove; 6. a bayonet lock; 7. a square groove; 8. a spring; 9. a clamping plate; 10. a rotating shaft; 11. a fixed sleeve; 12. arc arch; 13. and (5) connecting a rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution: the pin key type steel pipe full scaffold with reinforced steel pipe arc arch comprises a vertical rod 1 and a mounting mechanism arranged above the vertical rod 1, wherein the mounting mechanism comprises a clamping assembly and an elastic assembly;
the clamping assembly comprises a pin key seat 2, a through hole 3, a cross rod 4, a clamping groove 5 and a clamping pin 6, wherein the pin key seat 2 is welded on the outer surface of the upright rod 1, the through hole 3 is formed in the pin key seat 2, the cross rod 4 is arranged on the outer surface of the pin key seat 2, the clamping groove 5 is formed in one end of the cross rod 4, and the clamping pin 6 is arranged in the clamping groove 5;
the elastic component includes bayonet lock 6, square groove 7, spring 8, cardboard 9 and pivot 10, and square groove 7 has been seted up to the lower surface of bayonet lock 6, and the surface in square groove 7 is connected with spring 8, and the end-to-end connection of spring 8 has cardboard 9, and the lower extreme of cardboard 9 is connected with pivot 10.
The middle part of horizontal pole 4 is connected with fixed cover 11, and circular arc arched door 12 is installed to the lower terminal surface of fixed cover 11, and the one end of circular arc arched door 12 is provided with connecting rod 13.
Further, the horizontal pole 4 forms the block structure through draw-in groove 5, bayonet lock 6, through-hole 3 and between cotter key seat 2 and the pole setting 1, and the one end of horizontal pole 4 sets up to concave shape, and horizontal pole 4 both ends all set up to concave shape, can laminate horizontal pole 4 and the surface of cotter key seat 2 mutually, and inside the draw-in groove 5 and the through-hole 3 of rethread seting up, inject bayonet lock 6 into through-hole 3 and draw-in groove 5, with horizontal pole 4 fixed connection on pole setting 1, can guarantee the stability of device better, protection staff's health safety.
Further, the clamping plate 9 forms a rotating structure through the rotating shaft 10 and the clamping pin 6, and the clamping plate 9 forms an elastic structure through the spring 8 and the square groove 7 and the clamping pin 6, the clamping plate 9 is pressed inwards to extrude the clamping plate 9, the clamping plate 9 can extend inwards and outwards under the action of the spring 8, when the clamping pin 6 is inserted into the clamping groove 5, the clamping pin 6 can be clamped on the cross rod 4 well through the reset of the spring 8, the cross rod 4 is well fixed, and the stability of the device is guaranteed.
Further, the concave groove of horizontal pole 4 one end is connected with the laminating of the key seat 2 surface, through the concave groove that horizontal pole 4 one end set up, can realize with horizontal pole 4 block on key seat 2 to realize simple block connection better, fix whole device, when using, can conveniently assemble and dismantle, improve the work efficiency of device, shorten the time that the equipment was used.
Further, the arc arch 12 is fixedly connected with the cross rod 4 through the fixing sleeve 11, the clamping grooves 5 are distributed in a central symmetry mode along the cross rod 4, the arc arch 12 is fixedly connected with the cross rod 4 through the fixing sleeve 11, the arc arch 12 can enlarge the support of the scaffold, the stability of the device is improved, and the operation of workers is better assisted.
Further, the connecting rod 13 is fixed connection with the pole setting 1, and the connecting rod 13 is central symmetry along circular arc arched door 12, also forms fixed connection with pole setting 1 through setting up connecting rod 13 with circular arc arched door 12 for circular arc arched door 12 can play fine supporting effect to horizontal pole 4 and pole setting 1 respectively, better prevent horizontal pole 4 and slide down, improve the stability of device.
The theory of operation, at first, horizontal pole 4 both ends all set up to concave shape, can make horizontal pole 4 laminate with the surface of round pin keyseat 2, the effect of draw-in groove 5 and through-hole 3 that the rethread was offered, it is inside with draw-in pin 6 intubate through-hole 3 and draw-in groove 5, again with horizontal pole 4 fixed connection in pole setting 1, can guarantee the stability of device better, protection staff's health safety inwards presses extrusion cardboard 9, cardboard 9 is under spring 8's effect for cardboard 9 can realize inwards outwards extending, when inserting draw-in pin 6 in draw-in groove 5, can be fine with the block of draw-in pin 6 on horizontal pole 4 through spring 8's reset, play fine fixed action to horizontal pole 4, guarantee the stability of device.
Finally, through inwards pressing extrusion cardboard 9, cardboard 9 is under the effect of spring 8 for cardboard 9 can realize inwards outwards extending, when inserting bayonet lock 6 in draw-in groove 5, can be fine with bayonet lock 6 block on horizontal pole 4 through the reset of spring 8, play fine fixed action to horizontal pole 4, also form fixed connection with circular arc arched door 12 and pole setting 1 through setting up connecting rod 13, make circular arc arched door 12 can play fine supporting effect to horizontal pole 4 and pole setting 1 respectively, better prevent horizontal pole 4 to slide down, improve the stability of device.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a full hall scaffold of key formula steel pipe of round arc arch reinforcement of steel pipe, includes pole setting and the installation mechanism of setting in the pole setting top, its characterized in that: the mounting mechanism comprises a clamping assembly and an elastic assembly;
the clamping assembly comprises a pin key seat, a through hole, a cross rod, a clamping groove and a clamping pin, wherein the pin key seat is welded on the outer surface of the vertical rod, the through hole is formed in the pin key seat, the cross rod is arranged on the outer surface of the pin key seat, the clamping groove is formed in one end of the cross rod, and the clamping pin is arranged in the clamping groove;
the elastic component includes bayonet lock, square groove, spring, cardboard and pivot, square groove has been seted up to the lower surface of bayonet lock, and the surface in square groove is connected with the spring, the end-to-end connection of spring has the cardboard, the lower extreme of cardboard is connected with the pivot.
2. A pin-and-key steel pipe full scaffold reinforced by a steel pipe circular arch as claimed in claim 1, wherein: the middle part of horizontal pole is connected with fixed cover, the circular arc arched door is installed to the lower terminal surface of fixed cover, the one end of circular arc arched door is provided with the connecting rod.
3. A pin-and-key steel pipe full scaffold reinforced by a steel pipe circular arch as claimed in claim 1, wherein: the cross rod is in a clamping structure through the clamping groove, the clamping pin, the through hole, the pin key seat and the vertical rod, and one end of the cross rod is arranged in a concave shape.
4. A pin-and-key steel pipe full scaffold reinforced by a steel pipe circular arch as claimed in claim 1, wherein: the clamping plate forms a rotating structure between the rotating shaft and the clamping pin, and forms an elastic structure between the clamping plate and the clamping pin through the spring and the square groove.
5. A pin-and-key steel pipe full scaffold reinforced by a steel pipe circular arch as claimed in claim 1, wherein: the concave groove at one end of the cross rod is connected with the outer surface of the pin key seat in a fitting way.
6. A pin-and-key steel pipe full scaffold reinforced by a steel pipe circular arch as claimed in claim 2, wherein: the arc arch is fixedly connected with the cross rod through the fixing sleeve, and the clamping grooves are distributed in a central symmetry mode along the cross rod.
7. A pin-and-key steel pipe full scaffold reinforced by a steel pipe circular arch as claimed in claim 2, wherein: the connecting rod is fixedly connected with the vertical rod, and the connecting rod is centrosymmetric along the arc arch.
CN202321875538.8U 2023-07-17 2023-07-17 Pin key type steel pipe full scaffold reinforced by steel pipe circular arch Active CN220504454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321875538.8U CN220504454U (en) 2023-07-17 2023-07-17 Pin key type steel pipe full scaffold reinforced by steel pipe circular arch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321875538.8U CN220504454U (en) 2023-07-17 2023-07-17 Pin key type steel pipe full scaffold reinforced by steel pipe circular arch

Publications (1)

Publication Number Publication Date
CN220504454U true CN220504454U (en) 2024-02-20

Family

ID=89878239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321875538.8U Active CN220504454U (en) 2023-07-17 2023-07-17 Pin key type steel pipe full scaffold reinforced by steel pipe circular arch

Country Status (1)

Country Link
CN (1) CN220504454U (en)

Similar Documents

Publication Publication Date Title
CN217480405U (en) Assembled steel construction building
CN210976070U (en) Connecting structure of concrete beam column
CN220504454U (en) Pin key type steel pipe full scaffold reinforced by steel pipe circular arch
CN213143950U (en) Replacement, reinforcement and support device for concrete building shear wall
CN210421877U (en) Climbing frame convenient to disassemble and assemble for building
CN215168088U (en) Combined connecting and locking device for building template
CN212104724U (en) Unit formula aluminum plate connection structure for curtain convenient to use
CN209817127U (en) Clip type node connection structure
CN111622349A (en) Assembled brace rod connection form suitable for cable support prestressed steel column
CN219451411U (en) Frame device is chosen in construction
CN219952231U (en) Steel construction building of convenient assembly
CN214785826U (en) Truss for steel construction factory building convenient to dismouting
CN214575614U (en) Stable scaffold for municipal construction
CN220100177U (en) Steel beam and core tube inner steel rib column connecting node
CN219863343U (en) Building site protection canopy
CN213062950U (en) Building templates link for civil engineering and electrical engineering
CN204590563U (en) A kind of Novel dismountable scaffold
CN214833533U (en) Limiting device of steel structure truss
CN219993094U (en) Bolt-free building template
CN220319106U (en) Antiskid type construction support
CN214697055U (en) Concrete column reinforced structure
CN212453642U (en) Improve fixed subassembly of big template support system stability
CN219451067U (en) Light steel joist house assembling structure
CN220538865U (en) Steel structure support convenient to production and manufacture
CN220827961U (en) Bending-resistant steel column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240227

Address after: 830000, No.78 Yutian Street, Shayibak District, Urumqi City, Xinjiang Uygur Autonomous Region

Patentee after: Xinjiang Jiaotou Construction Management Co.,Ltd.

Country or region after: China

Address before: No. 456, wuchangfu Road, Urumqi, Xinjiang Uygur Autonomous Region

Patentee before: XINJIANG COMMUNICATIONS CONSTRUCTION GROUP Co.,Ltd.

Country or region before: China

Patentee before: Xinjiang Huatian Engineering Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240428

Address after: 830011 No. 840 Wuchang Road Auxiliary Road, Urumqi High tech Industrial Development Zone (New Urban Area), Xinjiang Uygur Autonomous Region

Patentee after: XINJIANG COMMUNICATIONS CONSTRUCTION GROUP Co.,Ltd.

Country or region after: China

Patentee after: Xinjiang Infrastructure Construction Co.,Ltd.

Patentee after: Xinjiang Jiaotou Construction Management Co.,Ltd.

Address before: 830000, No.78 Yutian Street, Shayibak District, Urumqi City, Xinjiang Uygur Autonomous Region

Patentee before: Xinjiang Jiaotou Construction Management Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right