CN220492600U - Cable hook fixing device used during construction of secondary structure - Google Patents

Cable hook fixing device used during construction of secondary structure Download PDF

Info

Publication number
CN220492600U
CN220492600U CN202322133302.3U CN202322133302U CN220492600U CN 220492600 U CN220492600 U CN 220492600U CN 202322133302 U CN202322133302 U CN 202322133302U CN 220492600 U CN220492600 U CN 220492600U
Authority
CN
China
Prior art keywords
box
side wall
self
locking
secondary structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322133302.3U
Other languages
Chinese (zh)
Inventor
张晋桢
左晓光
马雨坤
王小军
李锋玉
霍泽瑞
秦田聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Technology Construction Co Ltd
Original Assignee
China Construction Eighth Engineering Division Technology Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Technology Construction Co Ltd filed Critical China Construction Eighth Engineering Division Technology Construction Co Ltd
Priority to CN202322133302.3U priority Critical patent/CN220492600U/en
Application granted granted Critical
Publication of CN220492600U publication Critical patent/CN220492600U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/80Packaging reuse or recycling, e.g. of multilayer packaging

Landscapes

  • Packaging Of Annular Or Rod-Shaped Articles, Wearing Apparel, Cassettes, Or The Like (AREA)

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a cable hook fixing device used during secondary structure construction, which comprises a packing box, wherein two mounting plates are fixedly arranged on the front side wall surface of the packing box, hooks are rotatably arranged in the two mounting plates, and the cable hook fixing device also comprises a packing box; the shrinkage spring is rotatably arranged at the central position inside the packaging box, and a storage rope is wound on the side wall of the shrinkage spring; the self-locking box is fixedly arranged on the outer side wall of the packaging box, and one end, far away from the shrinkage spring, of the storage rope penetrates through the packaging box and the side wall of the self-locking box to extend outwards; the connecting ring is fixedly arranged at one end, far away from the self-locking box, of the side wall of the packing box, and one end, far away from the shrinkage spring, of the storage rope is fixedly connected with an anti-unhooking hook.

Description

Cable hook fixing device used during construction of secondary structure
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a cable hook fixing device used during secondary structure construction.
Background
In the secondary structure construction process, the movable switch box is more in use and frequent in movement, and the cable of the switch box is difficult to pull and set up, so that the standard requirement cannot be met, even the criss-cross like cobweb appears, the hidden danger is frequent, and therefore, the overhead of the cable of the switch box becomes a serious difficulty in site temporary electricity safety management. The common insulating porcelain insulator cannot be installed before the wall body is built, and the common insulating porcelain insulator has the defects of high installation difficulty, high cost, large damage to the wall body and the like after the wall body is built; the common S-shaped hooks often lack a hooking point and cannot be used; the cable bridge is used as a temporary cable overhead and has high cost and inconvenient use.
A temporary cable hook capable of being quickly installed is disclosed in China utility model with publication number of CN210957680U, and belongs to the technical field of building construction auxiliary devices. The technical proposal is as follows: the temporary cable hook comprises a fixed part arranged in a wall body and a movable part movably connected to the fixed part; the fixing piece comprises an embedded wire box with an embedded wire pipe on the side wall; the moving part comprises a folded line type supporting part, a hook, a bolt and a draw hook, wherein one end part of the hook is arranged in the middle of the supporting part, the bolt is arranged at one end part of the supporting part, and the draw hook is arranged at the other end part of the supporting part. The beneficial effects of the utility model are as follows: the temporary cable hook capable of being quickly installed is low in cost, simple in structure and disassembly, free of damage to a wall body and high in practicability.
The prior art scheme has the advantages of low cost, simple structure and disassembly, no damage to the wall body and strong practicability, but the use premise of the prior art scheme is that the embedded wire box and the embedded wire tube are needed, and the embedded wire box and the embedded wire tube are not needed during the construction of the secondary structure, so that the prior art scheme cannot be used during the construction of the secondary structure.
Disclosure of Invention
The utility model aims at overcoming the defects of the prior art, and provides a cable hook fixing device used during construction of a secondary structure, which can be installed and used on a column body and a wall screw hole in the construction process, has no damage to the structure, and can adjust the hanging height and span of a cable at any time according to the site construction condition.
The technical scheme of the utility model is as follows: the cable hook fixing device comprises a packing box, wherein two mounting plates are fixedly arranged on the front side wall surface of the packing box, and hooks are rotatably arranged in the two mounting plates;
the shrinkage spring is rotatably arranged at the central position inside the packaging box, and a storage rope is wound on the side wall of the shrinkage spring;
the self-locking box is fixedly arranged on the outer side wall of the packaging box, and one end, far away from the shrinkage spring, of the storage rope penetrates through the packaging box and the side wall of the self-locking box to extend outwards;
the connecting ring is fixedly arranged on one end, far away from the self-locking box, of the side wall of the packaging box, and one end, far away from the shrinkage spring, of the storage rope is fixedly connected with an anti-unhooking hook.
Preferably, the outer side wall of the packing box is wrapped with anti-falling plastic, the anti-falling plastic is made of polycarbonate, the storage rope is made of wear-resistant high-strength fiber ropes, and the hooks are made of high-strength and insulating materials.
Preferably, the rear side wall surface fixed mounting of packing carton has the mounting bracket, and folding steel pipe is installed in the inside rotation of mounting bracket, and the one end of keeping away from the mounting bracket on the folding steel pipe is "T" font form, and the one end of keeping away from folding steel pipe on the mounting bracket can rotate.
Preferably, the front side wall surface of the packing box is fixedly provided with a positioning buckle, and the rear side wall surface of the packing box is fixedly provided with a plurality of folding buckles.
Preferably, the inside bottom wall fixedly connected with self-locking spring of self-locking box, the inside top sliding connection of self-locking box has the self-locking button, and the one end that keeps away from the shrink clockwork spring on the rope is accomodate runs through the inside of self-locking button.
The utility model provides a cable hook fixing device used during secondary structure construction through improvement, which has the following improvement and advantages compared with the prior art:
the method comprises the following steps: according to the utility model, the storage rope is outwards extended by pulling the anti-unhooking hook, so that the storage rope surrounds the column body for a circle, then the anti-unhooking hook is buckled on the connecting ring, at the moment, the storage rope is attached to the side wall of the column body due to friction force, the elasticity of the shrinkage spring can pull the storage rope to shrink, and the packing box moves downwards due to gravity, so that the packing box can pull the storage rope, the position of the storage rope is fixed, the structure is not damaged, and no damage is caused to the structure;
and two,: according to the utility model, one end, far away from the folding steel pipe, of the mounting frame is rotated to be folded, so that the mounting frame can extend into the screw hole in the wall body when the mounting frame is horizontally stretched, and then one end, far away from the mounting frame, of the folding steel pipe is rotated to be perpendicular to the folding steel pipe, so that the mounting frame is clamped in the wall body, the device is fixed on the wall body, the environment is fully utilized for the device, and the application range of the device is increased.
Drawings
The utility model is further explained below with reference to the drawings and examples:
FIG. 1 is a front view of a cable hanger fixture device used during construction of a secondary structure of the present utility model;
fig. 2 is a schematic view of the internal structure of the packing box of the present utility model;
FIG. 3 is a cross-sectional view of the self-locking cassette of the present utility model;
FIG. 4 is a rear view of a cable hanger fixture device used during construction of the secondary structure of the present utility model;
FIG. 5 is a view of the wall body of the cable hook fixing device of the present utility model;
fig. 6 is a view showing the operation of the cable hook fixing device according to the present utility model.
Reference numerals illustrate:
1. packaging box; 2. a mounting plate; 3. a hook; 4. a connecting ring; 5. a self-locking box; 6. unhooking prevention; 7. anti-falling plastic; 8. positioning buckle; 9. a mounting frame; 10. folding the steel pipe; 11. folding buckle; 12. a self-locking spring; 13. a storage rope; 14. shrinking the spring; 15. a self-locking button.
Detailed Description
The following detailed description of the present utility model clearly and fully describes the technical solutions of the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model provides a cable hook fixing device used during secondary structure construction through improvement, which comprises the following technical scheme:
as shown in fig. 1, 2 and 6, a cable hook fixing device used during construction of a secondary structure comprises a packing box 1, wherein two mounting plates 2 are fixedly arranged on the front side wall surface of the packing box 1, a hook 3 is rotatably arranged in the two mounting plates 2, and the cable hook fixing device further comprises a contraction spring 14, a self-locking box 5 and a connecting ring 4;
the shrinkage spring 14 is rotatably arranged at the central position inside the packaging box 1, and a storage rope 13 is wound on the side wall of the shrinkage spring 14;
the self-locking box 5 is fixedly arranged on the outer side wall of the packaging box 1, and one end, far away from the shrinkage spring 14, of the storage rope 13 penetrates through the packaging box 1 and the side wall of the self-locking box 5 to extend outwards;
the connecting ring 4 is fixedly arranged at one end of the side wall of the packaging box 1 far away from the self-locking box 5, and an anti-unhooking hook 6 is fixedly connected at one end of the storage rope 13 far away from the retraction spring 14; through pulling unhook 6, make accomodate rope 13 outwards extend, make accomodate rope 13 around cylinder a week, then detain unhook 6 on go-between 4, accomodate rope 13 because frictional force and the lateral wall laminating of cylinder this moment, and the elasticity of shrink clockwork spring 14 can stimulate accomodate rope 13 shrink, and packing carton 1 because gravity moves down, so packing carton 1 can pull accomodate rope 13 to make accomodate rope 13's fixed position, do not destroy the structure, do not have any damage to the structure.
As a further scheme of the utility model, referring to fig. 1-4, in order to improve the service life of the device, the outer side wall of the packaging box 1 is wrapped with anti-falling plastic 7, the anti-falling plastic 7 is made of polycarbonate material, the storage rope 13 is made of wear-resistant high-strength fiber ropes, and the hooks 3 are made of high-strength and insulating materials; through preventing falling 7 plastics and protecting packing carton 1, avoid packing carton 1 to drop because operational environment is abominable and the circumstances that damages easily take place, make the device can hang the circuit through couple 3 to can guarantee operational environment's safety.
As a further scheme of the utility model, referring to fig. 4 and 5, in order to improve the use environment of the device, a mounting frame 9 may be fixedly installed on the rear side wall surface of the packaging box 1, a folding steel pipe 10 is rotatably installed inside the mounting frame 9, one end of the folding steel pipe 10 far away from the mounting frame 9 is in a T shape, and one end of the mounting frame 9 far away from the folding steel pipe 10 may be rotated; because at secondary structure construction period, can reserve the screw hole on the wall body, make things convenient for the construction in later stage, through keeping away from the one end rotation of folding steel pipe 10 on the mounting bracket 9 and folding, when making mounting bracket 9 extend to be the horizontality, the mounting bracket 9 can go deep into the inside in screw hole on the wall body, it is perpendicular with folding steel pipe 10 to keep away from the one end rotation of mounting bracket 9 on the folding steel pipe 10 again, make mounting bracket 9 card in the inside of wall body, make the device fix on the wall body, make full use of environment carries out the environment to the device, improve the application range of the device.
Furthermore, in order to avoid the unstable condition of the hook 3 and the folding steel pipe 10 caused by shaking generated during moving when the device is carried, the positioning buckle 8 for clamping the hook 3 is fixedly arranged on the front side wall surface of the packing box 1, and a plurality of folding buckles 11 are fixedly arranged on the rear side wall surface of the packing box 1, so that the folding steel pipe 10 can be clamped in the folding buckles 11 when being folded; by fixing the positions of the positioning buckle 8 and the folding steel pipe 10, the device is prevented from being loose.
As a further scheme of the utility model, referring to fig. 3, in order to fix the outward extending length of the storage rope 13 conveniently, a self-locking spring 12 is fixedly connected to the inner bottom wall surface of the self-locking box 5, a self-locking button 15 is slidingly connected to the inner top end of the self-locking box 5, and one end of the storage rope 13 far away from the retraction spring 14 penetrates through the inner part of the self-locking button 15; through utilizing the elasticity of auto-lock spring 12 to make accomodate rope 13 along with auto-lock button 15 upwards move together, and be in the inside at self-locking box 5 of accomodating rope 13 at auto-lock button 15 left and right sides both ends, make accomodate rope 13 unable outwards extend and shrink spring 14 can't shrink accomodate rope 13, make things convenient for the staff to select accomodate rope 13 of suitable length according to the demand, make things convenient for the use of staff.
The working principle of the utility model is as follows: the storage rope 13 is outwards extended by pulling the anti-unhooking hook 6, so that the storage rope 13 surrounds the column body for a circle, then the anti-unhooking hook 6 is buckled on the connecting ring 4, at the moment, the storage rope 13 is attached to the side wall of the column body due to friction force, the elasticity of the shrinkage spring 14 can pull the storage rope 13 to shrink, and the packing box 1 moves downwards due to gravity, so that the packing box 1 can pull the storage rope 13, the position of the storage rope 13 is fixed, the structure is not damaged, and no damage is caused to the structure;
because at secondary structure construction period, can reserve the screw hole on the wall body, make things convenient for the construction in later stage, through keeping away from the one end rotation of folding steel pipe 10 on the mounting bracket 9 and folding, when making mounting bracket 9 extend to be the horizontality, the mounting bracket 9 can go deep into the inside in screw hole on the wall body, it is perpendicular with folding steel pipe 10 to keep away from the one end rotation of mounting bracket 9 on the folding steel pipe 10 again, make mounting bracket 9 card in the inside of wall body, make the device fix on the wall body, make full use of environment carries out the environment to the device, improve the application range of the device.

Claims (5)

1. The utility model provides a cable hook fixing device that secondary structure construction period used, includes packing carton (1), and the front side wall face of packing carton (1) is fixed mounting has two mounting panels (2), and couple (3) are installed in the rotation of the inside of two mounting panels (2), its characterized in that still includes;
a shrinkage spring (14), wherein the shrinkage spring (14) is rotatably arranged at the central position inside the packaging box (1), and a storage rope (13) is wound on the side wall of the shrinkage spring (14);
the self-locking box (5) is fixedly arranged on the outer side wall of the packaging box (1), and one end, far away from the shrinkage spring (14), of the storage rope (13) penetrates through the packaging box (1) and the side wall of the self-locking box (5) to extend outwards;
the connecting ring (4), connecting ring (4) fixed mounting is on the one end that the lateral wall of packing carton (1) kept away from auto-lock box (5), and the one end fixedly connected with anticreep hook (6) that keeps away from shrink clockwork spring (14) on accomodating rope (13).
2. A cable hanger fixing apparatus for use during construction of a secondary structure as claimed in claim 1, wherein: the outer side wall of the packing box (1) is wrapped with anti-falling plastic (7), the anti-falling plastic (7) is made of polycarbonate, the storage rope (13) is made of wear-resistant high-strength fiber ropes, and the hook (3) is made of high-strength and insulating materials.
3. A cable hanger fixing apparatus for use during construction of a secondary structure as claimed in claim 1, wherein: the packaging box is characterized in that a mounting frame (9) is fixedly mounted on the rear side wall surface of the packaging box (1), a folding steel pipe (10) is rotatably mounted in the mounting frame (9), one end, far away from the mounting frame (9), of the folding steel pipe (10) is in a T-shaped form, and one end, far away from the folding steel pipe (10), of the mounting frame (9) can rotate.
4. A cable hanger fixing apparatus for use during construction of a secondary structure as claimed in claim 1, wherein: the front side wall surface of the packing box (1) is fixedly provided with a positioning buckle (8), and the rear side wall surface of the packing box (1) is fixedly provided with a plurality of folding buckles (11).
5. A cable hanger fixing apparatus for use during construction of a secondary structure as claimed in claim 1, wherein: the self-locking box is characterized in that a self-locking spring (12) is fixedly connected to the wall surface of the bottom of the inside of the self-locking box (5), a self-locking button (15) is slidably connected to the top end of the inside of the self-locking box (5), and one end, far away from a shrinkage spring (14), of the storage rope (13) penetrates through the inside of the self-locking button (15).
CN202322133302.3U 2023-08-09 2023-08-09 Cable hook fixing device used during construction of secondary structure Active CN220492600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322133302.3U CN220492600U (en) 2023-08-09 2023-08-09 Cable hook fixing device used during construction of secondary structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322133302.3U CN220492600U (en) 2023-08-09 2023-08-09 Cable hook fixing device used during construction of secondary structure

Publications (1)

Publication Number Publication Date
CN220492600U true CN220492600U (en) 2024-02-13

Family

ID=89832292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322133302.3U Active CN220492600U (en) 2023-08-09 2023-08-09 Cable hook fixing device used during construction of secondary structure

Country Status (1)

Country Link
CN (1) CN220492600U (en)

Similar Documents

Publication Publication Date Title
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN103792136B (en) The coupling arrangement that a kind of expansion bolt special for suspended ceiling drawing detects and detection method
CN111614022B (en) Can guarantee to stabilize tensioner bullwheel for electric power installation that dismouting used
CN220492600U (en) Cable hook fixing device used during construction of secondary structure
CN116131175B (en) Cable bridge, use method thereof and power supply system
CN210223702U (en) Auxiliary device for transformer
CN213796293U (en) Electric power communication aerial optical cable signboard hanger
CN212277438U (en) Auxiliary hanger for hanging wire
CN204215696U (en) Hang flag suspender
CN211554425U (en) Line protection device for communication engineering
CN112134198A (en) Substation equipment overhauls device
CN220870463U (en) Be used for total back to survey wind station sensor hanger frame
CN212025913U (en) Corrosion-resistant railway pier hanging fence capable of being installed quickly
CN111111041A (en) Power supply company uses high altitude construction safety device convenient to adjust working range
CN221042278U (en) Hanging wire transverse steel beam
CN205377604U (en) Stator core hoist device of ribbon winding
CN216319689U (en) Fire hose fixing structure and fire hose
CN218280344U (en) Fastening and hanging bracket of safety belt
CN216836627U (en) Automatic retracting device for towing cable of tunneling and anchoring integrated machine
CN213597639U (en) Building construction safety device
CN218951988U (en) T roof beam simply supported installation and taking device
CN211752517U (en) Multifunctional stage suspender
CN215520325U (en) Face limit guardrail with activity couple
CN216524466U (en) Self-anchored suspension bridge main cable and suspender cable tension monitoring device
CN215291303U (en) Prevent empting building scaffold with attach wall direction sliding construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant