CN220474275U - Progress management device - Google Patents

Progress management device Download PDF

Info

Publication number
CN220474275U
CN220474275U CN202322334702.0U CN202322334702U CN220474275U CN 220474275 U CN220474275 U CN 220474275U CN 202322334702 U CN202322334702 U CN 202322334702U CN 220474275 U CN220474275 U CN 220474275U
Authority
CN
China
Prior art keywords
groups
management
group
sets
push rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322334702.0U
Other languages
Chinese (zh)
Inventor
李明蓉
刘凤山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jiantong Engineering Tendering Consulting Co ltd Jimo Branch
Original Assignee
Qingdao Jiantong Engineering Tendering Consulting Co ltd Jimo Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jiantong Engineering Tendering Consulting Co ltd Jimo Branch filed Critical Qingdao Jiantong Engineering Tendering Consulting Co ltd Jimo Branch
Priority to CN202322334702.0U priority Critical patent/CN220474275U/en
Application granted granted Critical
Publication of CN220474275U publication Critical patent/CN220474275U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drawing Aids And Blackboards (AREA)

Abstract

The utility model relates to the technical field of project cost progress management, in particular to a progress management device which can greatly reduce the manufacturing cost of the management device and improve the practicability while managing the project cost progress; including two sets of vertical beams, two sets of vertical beam bottom all are connected with two sets of bottom plates, management billboard fixed mounting is on two sets of bottom plates, management billboard front end downside is equipped with seven sets of clipboards side by side, management billboard inside is equipped with the cavity, management billboard front end equidistance is equipped with seven sets of state windows with the cavity intercommunication, seven equidistant slidable mounting of ejector pin is on management billboard, all be connected with ejection spring in every group guiding hole, all slide on every group guiding hole and be equipped with the round pin pole, every round pin pole is connected with every ejection spring of group, management billboard front end equidistance is equipped with seven sets of mounts, all the cover is equipped with push rod spring on every push rod, every push rod spring both ends are connected in mount and push rod button respectively.

Description

Progress management device
Technical Field
The utility model relates to the technical field of project cost progress management, in particular to a progress management device.
Background
The engineering cost is the engineering price, which is the price and the total price of the construction installation engineering formed by trading modes such as bidding in the markets such as land, equipment, technical labor, contractors and the like, and the like.
The current cost flow is that the staff carries out the cost calculation work of different stages according to the information provided by the owner and the information obtained by the on-site investigation on the accepted engineering and the progress of the engineering, because the complicated cost work needs to carry out the supervision and management on the work of the cost staff, but the supervision and management on the cost work of the cost staff can only be carried out by related staff at present, the mode can not only ensure the timeliness of the supervision and management, but also has low supervision and management efficiency, and simultaneously needs additional staff, thereby causing the waste of manpower resources, and the constructor and the cost party still lack communication in the aspect of progress and can not know the progress condition of the other party well, so the engineering cost progress management device is provided to solve the problems.
Through retrieving, the construction cost progress management device disclosed in China patent publication No. CN212032601U can solve the existing technical problems, but still has certain drawbacks, when the rotating ball needs to be reset after one week of work is finished, the rotating ball needs to be finished by means of an air cylinder, and the air cylinder needs to have an air source and an air pump, so that the manufacturing cost of the device is relatively low, and the practicability is lower.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a progress management device which can greatly reduce the manufacturing cost of the management device and improve the practicability while managing the progress of engineering cost.
Technical proposal
In order to achieve the above purpose, the present utility model provides the following technical solutions: including two sets of vertical beams, management subassembly and adjustment mechanism, two sets of vertical beam bottom all are connected with two sets of bottom plates, management subassembly includes the management billboard, management billboard fixed mounting is on two sets of bottom plates, management billboard front end downside is equipped with seven sets of clipboards side by side, management billboard inside is equipped with the cavity, management billboard front end equidistance is equipped with seven sets of state windows with cavity intercommunication, equidistant slip is equipped with seven sets of state boards in the cavity, all be embedded on every set of state board be equipped with green board and red board, adjustment mechanism includes seven sets of ejector pins, seven sets of ejector pin equidistant slidable mounting is on the management billboard, seven sets of ejector pin bottom stretches into in the cavity and is connected with seven sets of state board tops respectively, seven sets of ejector pin buttons all are connected with the ejector pin button on the seven sets of ejector pins, all cover is equipped with reset spring on seven sets of ejector pin buttons on seven sets of ejector pins, all be connected with seven sets of ejector pin holes in each set of ejector pin hole, seven sets of ejector pin holes are connected with each set of ejector pin hole, each set of ejector pin hole is equipped with each set of ejector pin hole, each set of ejector pin hole is connected with each set of ejector pin hole, each set of ejector pin is connected with each set of ejector pin.
Preferably, two groups of universal wheels are arranged at the bottom ends of the two groups of bottom plates.
Preferably, a hand push handle is connected to the left side of the vertical beam.
Preferably, an anti-slip handle sleeve is fixedly sleeved on the outer wall of the hand-push handle.
Preferably, a cross beam is connected between the two sets of vertical beams.
Compared with the prior art, the utility model has the beneficial effects that: when the device is used, initially, the red plate is positioned at the position of the state window, the pin rod is propped against the inner wall of the cavity to enable the ejection spring to be compressed, the red plate defaults that the task is not completed on the same day, after the task is completed, the ejector rod is pressed downwards through the ejector rod button to enable the reset spring to be compressed, the ejector rod drives the pin rod to move downwards, meanwhile, the ejector rod pushes the state plate to slide downwards, when the pin rod moves to the position of the pin hole, the pin rod is propped into the pin hole under the action of the ejection spring, at the moment, the green plate is positioned at the position of the state window, the task is completed on the same day through the green plate, and the working content can be written on the writing plate.
Drawings
FIG. 1 is a schematic front side view of the present utility model;
FIG. 2 is a left side schematic view of the present utility model;
FIG. 3 is a schematic view of a right side partial cross-sectional structure of the management sign of the present utility model;
FIG. 4 is a schematic view of the partial enlarged structure at A of the present utility model;
the reference numerals in the drawings: 1. a vertical beam; 2. a bottom plate; 3. managing the signboard; 4. a writing board; 5. a status window; 6. a status board; 7. a green panel; 8. a red panel; 9. a push rod; 10. a push rod button; 11. a return spring; 12. a pin rod; 13. an ejector spring; 14. a fixing frame; 15. a push rod; 16. a push rod button; 17. a push rod spring; 18. a universal wheel; 19. a hand push handle; 20. an anti-slip handle sleeve; 21. and a cross beam.
Detailed Description
The following describes in further detail the embodiments of the present utility model with reference to the drawings and examples. The following examples are illustrative of the utility model and are not intended to limit the scope of the utility model.
Examples
Referring to fig. 1-4, a progress management device of the utility model comprises two groups of vertical beams 1, wherein the bottom ends of the two groups of vertical beams 1 are respectively connected with two groups of bottom plates 2, a management board 3 is fixedly arranged on the two groups of bottom plates 2, seven groups of writing boards 4 are respectively sleeved on the lower sides of the front ends of the management board 3, a cavity is arranged in the management board 3, seven groups of state windows 5 communicated with the cavity are equidistantly arranged at the front ends of the management board 3, seven groups of state boards 6 are equidistantly arranged in the cavity in a sliding manner, a green plate 7 and a red plate 8 are respectively embedded in each group of state boards 6, the bottom ends of the seven groups of push rods 9 are respectively connected with the top ends of the seven groups of state boards 6, push rods 9 are respectively connected with push rod buttons 10, reset springs 11 are respectively sleeved on the seven groups of push rods 9, the upper ends and lower ends of each reset spring 11 are respectively connected with the push rod buttons 10 and the management board 3, seven groups of push rods 9 are respectively provided with guide holes 13, each group of guide holes are respectively connected with one push rod 13, each group of push rods are respectively provided with one push rod 16, each group of push rods 15 are respectively connected with one push rod 16 and each push rod 15 is respectively connected with one push rod 16, each push rod 16 is respectively connected with one end of each push rod 15, and each push rod 15 is respectively connected with one push rod 15, each group of the front ends of the push rods 15 is respectively connected with the corresponding push rods 15, and each push rods 15 is provided with each push rod 15, and each push rod 15 is respectively connected with each push rod 15, and each push rod 15 is provided with each push rod 15, and each push rod 15 is connected with each push rod 15, and is connected with each push rod and is connected with a corresponding with a push rod and is connected; when the device is used, initially the red plate 8 is positioned at the position of the state window 5, the pin rod 12 is propped against the inner wall of the cavity to enable the ejection spring 13 to be compressed, the red plate 8 defaults for the same day, the push rod 9 is pressed downwards through the push rod button 10 to enable the reset spring 11 to be compressed after the same day is completed, the push rod 9 drives the pin rod 12 to move downwards, meanwhile, the push rod 9 pushes the state plate 6 to slide downwards, when the pin rod 12 moves to the pin hole position, the pin rod 12 is propped into the pin hole under the action of the ejection spring 13, at the moment, the green plate 7 is positioned at the position of the state window 5, the task is completed on the same day by default through the green plate 7, and the working content can be written on the writing plate 4, when the task is completed, a week, a worker pushes the push rod 15 through the push rod button 16 to enable the push rod 15 to push the pin rod 12 to push out of the pin hole, and after the pin rod 12 is pushed out, the reset spring 11 starts to reset, thereby enabling the push rod 9 to drive the state plate 6 to slide upwards under the action of the reset spring 11, the effect that the red plate 8 returns to the position of the state window 5, the task is completed on the position of the state window, the task is completed, the task is written on the day on the writing plate 4, the work is written on the writing plate 4, the work is completed on the work is written on the work plate 4, the work is written on the work plate 4, and the work is required to be written on the work red plate, and the work is the work, and the work is convenient and the work and has high.
Referring to fig. 1, two sets of universal wheels 18 are mounted at the bottom ends of the two sets of bottom plates 2; by providing the universal wheel 18, the movement of the device can be more labor-saving and convenient.
Referring to fig. 1, a hand push handle 19 is connected to the left side of the vertical beam 1; by providing the push handle 19, the pushing device can be moved conveniently.
Referring to fig. 1, an anti-slip handle sleeve 20 is fixedly sleeved on the outer wall of the hand handle 19; by providing the anti-slip grip 20, slipping can be effectively prevented when the push handle 19 is held by hand to push the device.
Referring to fig. 1, a cross beam 21 is connected between the two sets of vertical beams 1; by providing the cross beam 21, the overall structural strength of the device can be enhanced, and the device is more stable.
According to the progress management device, when the progress management device is used, initially the red plate 8 is positioned at the position of the state window 5, the pin rod 12 is abutted against the inner wall of the cavity to enable the ejection spring 13 to be compressed, after the task of the red plate 8 is completed in the default day, the push rod 9 is pressed downwards through the push rod button 10 to enable the reset spring 11 to be compressed, the push rod 9 drives the pin rod 12 to move downwards, meanwhile, the push rod 9 pushes the state plate 6 to slide downwards, when the pin rod 12 moves to the pin hole position, the pin rod 12 is pushed into the pin hole under the action of the ejection spring 13, at the moment, the green plate 7 is positioned at the position of the state window 5, the task of the day is completed through the green plate 7 by default, and work content can be written on the writing plate 4, after one week of work is completed, when the task of the green plate 7 needs to be switched into the red plate 8, a worker pushes the push rod 15 through the push rod button 16 to enable the push rod 15 to push the pin rod 12 to be pushed out of the pin hole, and after the pin rod 12 is pushed out, the reset spring 11 starts reset, so that the push rod 9 drives the state plate 6 to slide upwards under the action of the reset spring 11, the red plate 8 is enabled to slide, the state plate 8 is enabled to be in the state, and the state 5 is enabled to be reset to be in the state of the state, and the state 5, and the progress can be displayed through the observation window, and the progress of the progress management can be seen, and the progress of the work progress can be seen by a visual person is seen per day, and can be seen through the work, and the work progress state and can be seen through the work.
The installation mode, the connection mode or the setting mode of the progress management device are common mechanical modes, and the progress management device can be implemented as long as the beneficial effects can be achieved; those skilled in the art will readily install and operate the device in accordance with the instructions accompanying thereto.
The foregoing is merely a preferred embodiment of the present utility model, and it should be noted that it will be apparent to those skilled in the art that modifications and variations can be made without departing from the technical principles of the present utility model, and these modifications and variations should also be regarded as the scope of the utility model.

Claims (5)

1. The progress management device comprises two groups of vertical beams (1) and is characterized by further comprising a management assembly and an adjusting mechanism;
the two groups of vertical beams (1), the bottom ends of the two groups of vertical beams (1) are connected with two groups of bottom plates (2);
the management assembly comprises a management billboard (3), the management billboard (3) is fixedly arranged on two groups of bottom plates (2), seven groups of writing boards (4) are arranged on the lower side of the front end of the management billboard (3) side by side, a cavity is formed in the management billboard (3), seven groups of state windows (5) communicated with the cavity are formed in the front end of the management billboard (3) at equal intervals, seven groups of state boards (6) are arranged in the cavity at equal intervals in a sliding mode, and a green board (7) and a red board (8) are embedded in each group of state boards (6);
the adjusting mechanism comprises seven groups of ejector rods (9), the seven groups of ejector rods (9) are slidably mounted on the management signboard (3) at equal intervals, the bottom ends of the seven groups of ejector rods (9) extend into the cavity and are respectively connected with the top ends of the seven groups of status boards (6), the top ends of the seven groups of ejector rods (9) are respectively connected with ejector rod buttons (10), reset springs (11) are respectively sleeved on the seven groups of ejector rods (9), the upper end and the lower end of each group of reset springs (11) are respectively connected with the ejector rod buttons (10) and the management signboard (3), guide holes are respectively formed in the seven groups of ejector rods (9), ejector springs (13) are respectively connected in each group of guide holes, pin rods (12) are respectively slidably arranged in each group of guide holes, each group of pin rods (12) are respectively connected with each group of ejector springs (13), seven groups of fixing frames (14) are respectively arranged at the front ends of the management signboard (3), seven groups of pin holes communicated with the cavity are respectively sleeved on each group of fixing frames (14), each group of push rods (15) can extend into the pin holes, each group of push rods (15) are respectively connected with each push rod (16) in each group of push rods (16), and each group of push rods (17) is respectively connected with each push rod (17).
2. A schedule management apparatus as claimed in claim 1, characterised in that the base ends of the two sets of base plates (2) are each provided with two sets of universal wheels (18).
3. A schedule management apparatus as claimed in claim 2, characterised in that the vertical beam (1) is connected on the left side with a push handle (19).
4. A schedule management apparatus as claimed in claim 3, characterised in that the outer wall of the push handle (19) is fixedly fitted with an anti-slip handle sleeve (20).
5. A schedule management apparatus as claimed in claim 4, characterised in that a cross beam (21) is connected between the two sets of vertical beams (1).
CN202322334702.0U 2023-08-29 2023-08-29 Progress management device Active CN220474275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322334702.0U CN220474275U (en) 2023-08-29 2023-08-29 Progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322334702.0U CN220474275U (en) 2023-08-29 2023-08-29 Progress management device

Publications (1)

Publication Number Publication Date
CN220474275U true CN220474275U (en) 2024-02-09

Family

ID=89805328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322334702.0U Active CN220474275U (en) 2023-08-29 2023-08-29 Progress management device

Country Status (1)

Country Link
CN (1) CN220474275U (en)

Similar Documents

Publication Publication Date Title
CN220474275U (en) Progress management device
CN112543306B (en) Urban parking area uses video monitoring device based on 5G is intelligent
CN211891180U (en) Punching device for machining automobile damping piston
CN204670798U (en) A kind of adjustable showcase device
CN214780173U (en) Automatic cleaning machine for step type escalator
CN210035843U (en) Machine room air conditioner fan lifting device
CN204377281U (en) A kind of electrical control cabinet
CN211906863U (en) Wall-mounted billboard lifting installation structure
CN208497717U (en) A kind of panel double-station alternately operating jig
CN206952207U (en) A kind of runner in assembly system using cabinet or so drive device
CN213075022U (en) Cabinet body fixing device convenient to detach for architectural decoration
CN112185245A (en) Safety warning device for electric power
CN220268879U (en) Luminous three-dimensional character
CN212598662U (en) Hardware riveting device
CN220643955U (en) House construction engineering safety management device
CN219387693U (en) Door and window convenient to installation
CN205398044U (en) Electric power overhauls, elevating gear is used in construction
CN210667535U (en) Outdoor nanometer touch advertisement machine
CN220338621U (en) Ventilation device for architectural design
CN215814551U (en) AI parking stall display terminal of two-sided demonstration
CN214147267U (en) Display screen for scientific and technological information retrieval
CN219548389U (en) Square column plastic formwork
CN220475227U (en) Switch cabinet preassembled protection structure
CN221168816U (en) Crack repairing device for building engineering
CN217438766U (en) Splicing type active luminous traffic safety sign

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant