CN220468766U - Water conservancy river levee reinforced structure - Google Patents
Water conservancy river levee reinforced structure Download PDFInfo
- Publication number
- CN220468766U CN220468766U CN202321916571.0U CN202321916571U CN220468766U CN 220468766 U CN220468766 U CN 220468766U CN 202321916571 U CN202321916571 U CN 202321916571U CN 220468766 U CN220468766 U CN 220468766U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- river levee
- groove
- plate
- reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 17
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 71
- 230000000087 stabilizing effect Effects 0.000 claims description 8
- 230000000694 effects Effects 0.000 description 15
- 239000010410 layer Substances 0.000 description 12
- 239000004567 concrete Substances 0.000 description 9
- 238000009434 installation Methods 0.000 description 9
- 230000002787 reinforcement Effects 0.000 description 8
- 239000002689 soil Substances 0.000 description 8
- 239000011178 precast concrete Substances 0.000 description 6
- 230000006978 adaptation Effects 0.000 description 3
- 238000001125 extrusion Methods 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 239000003381 stabilizer Substances 0.000 description 3
- 230000007774 longterm Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Revetment (AREA)
Abstract
The utility model provides a water conservancy river levee reinforcing structure, which relates to the technical field of reinforcing structures and comprises two prefabricated reinforcing plates, wherein fixing devices are respectively arranged on the surfaces of the two prefabricated reinforcing plates, each fixing device comprises a mounting plate, mounting grooves are respectively formed in the surfaces of the two prefabricated reinforcing plates, the mounting plates are clamped on the inner walls of the mounting grooves, two reinforcing rods are inserted on the surfaces of the mounting plates in an inserted manner, the cross sections of the two reinforcing rods are in a T shape, two clamping blocks are respectively fixedly connected to the surfaces of the two sides of the mounting plates, clamping grooves are respectively formed in one side, close to each other, of the inner walls of the mounting grooves, and the clamping blocks are clamped with the inner walls of the clamping grooves.
Description
Technical Field
The utility model relates to the technical field of reinforcing structures, in particular to a water conservancy river levee reinforcing structure.
Background
The reinforcing structure of the river levee is a structural device with a protection effect on the river levee, is an important measure link in hydraulic engineering, and has the main effects of resisting flood inundation, blocking tide and preventing waves, preventing water and soil loss and affecting the foundation safety of roads and houses.
The traditional river levee reinforcing structure is characterized in that a layer of reinforced concrete surface layer is painted on the inclined surface of the river levee, so that the effect of reinforcing the surface of the river levee is achieved, the condition that water and soil loss are difficult to occur when the inclined surface of the river levee is impacted by flowing river water is achieved, the safety of the river levee is better protected, the inventor finds that the connectivity between the reinforced concrete layer and the inclined surface of the river levee is not strong in daily use, the reinforced concrete layer can be impacted by long-term impact of tide, looseness occurs, looseness and collapse occur between a concrete layer and the surface of the river levee, and the stability and the using effect of the reinforcing structure are affected.
In order to cope with the above-mentioned problem, can be when concrete layer lays, the compaction is handled on the river levee inclined plane, and the hole is seted up to the concrete layer face for the planting of vegetation to further improvement, concrete layer's stability makes concrete layer and the further reinforcing of the relation of connection of river levee face, lets concrete layer be difficult for taking place to collapse in the use, has improved the result of use, and this application provides another kind of solution.
Disclosure of Invention
The utility model aims to solve the defects that in the prior art, the connectivity between a concrete reinforcing layer and an inclined surface of a river dike is not strong, looseness can occur when the concrete reinforcing layer is impacted by long-term impact of a wave tide, so that looseness and collapse occur between the concrete layer and the river dike surface, and the stability and the using effect of a reinforcing structure are affected.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a water conservancy river levee reinforced structure, includes two prefabricated reinforcing plates, two the surface of prefabricated reinforcing plate is provided with fixing device respectively, fixing device includes the mounting panel, two the mounting groove has been seted up respectively to the surface of prefabricated reinforcing plate, the mounting panel joint is at the inner wall of mounting groove, the surface grafting of mounting panel has two reinforcing rods, two the cross-section of reinforcing rod is "T" shape, two fixture blocks of both sides surface fixedly connected with respectively of mounting panel, the draw-in groove has been seted up respectively to one side that the inner wall of mounting groove is close to each other, the fixture block is the joint mutually with the inner wall of draw-in groove.
The effects achieved by the components are as follows: when installing precast concrete board's prefabricated gusset plate on the river levee inclined plane, at first peg graft two stiffening rods on the surface of mounting panel, then insert two stiffening rods on the river levee inclined plane, then with the mounting groove joint of precast gusset plate on the surface of mounting panel, the fixture block of mounting panel surface both sides can the joint in the draw-in groove on precast gusset plate surface simultaneously, the setting that precast gusset plate can be more stable at this moment is installed on the river levee inclined plane, difficult emergence is become flexible to separate, carry out stable reinforcement protection, make the river levee be difficult for collapsing more, the practicality of precast gusset plate and the security of river levee have been improved.
Preferably, the cross section of the clamping block is in a T shape, and the size of the clamping block is matched with the clamping groove.
The effects achieved by the components are as follows: through the adaptation setting of fixture block and draw-in groove, make the connection between fixture block and the draw-in groove more firm to make the assembly between mounting panel and the prefabricated gusset plate more firm, improved fixing device's result of use.
Preferably, two jacks are respectively arranged at the positions of the two sides of the surface of the prefabricated reinforcing plate, which are positioned on the inner wall of the mounting groove, two slots are respectively arranged at the two sides of the surface of the mounting plate, the inner walls of the two slots are respectively connected with inserting rods in a clamping manner, and the inserting rods on the inner walls of the slots are slidably inserted into the two jacks.
The effects achieved by the components are as follows: through the setting of inserted bar, make the further improvement of joint strength between mounting panel and the prefabricated gusset plate, make the prefabricated gusset plate more firm of installation on the river levee inclined plane, improved the result of use of prefabricated gusset plate.
Preferably, the surfaces of the two reinforcing rods are respectively provided with threads, the positions, located at the threads, on the arc surfaces of the two reinforcing rods are respectively in threaded connection with nuts, and the nuts are abutted against the surface of the mounting plate.
The effects achieved by the components are as follows: through the setting of nut, make the connection of stiffening rod and mounting panel more firm stable, be difficult for taking place the slip skew between the two to make the assembly of prefabricated gusset plate more stable.
Preferably, the two reinforcing rods are provided with thread grooves on the surface of one end far away from the mounting plate, the inner wall of the thread grooves is in threaded connection with fixing columns, and the surface of each fixing column is fixedly connected with a fixing plate.
The effects achieved by the components are as follows: through the setting of fixed plate, when making the stabilizer bar installation insert in river levee soil, through the contact extrusion force between fixed plate and the soil, the setting of messenger's stabilizer bar is more stable, is difficult for extracting from the soil, makes prefabricated stabilizer plate more stability.
Preferably, two connecting devices are arranged on two sides of the position, close to each other, of the prefabricated reinforcing plates, each connecting device comprises two connecting frames, the cross section of each connecting frame is in a T shape, connecting grooves are respectively formed in two sides of the surface of each prefabricated reinforcing plate, two surfaces of two ends of each connecting frame are respectively clamped with the connecting grooves on two sides of each prefabricated reinforcing plate, two ends of each connecting frame are respectively connected with bolts through threads, and the bolts are in threaded connection with the inner walls of the connecting grooves.
The effects achieved by the components are as follows: when using fixing device to install prefabricated gusset plate at the river levee inclined plane, install two link at the position that is close to each other of two prefabricated gusset plates, make the both ends card of link in the spread groove between two prefabricated gusset plates, then at two bolts of surface threaded connection of link, make two bolt threaded connection at the inner wall of two spread grooves, prefabricated gusset plate can form stable relation of connection between each other when installing the use this moment, prefabricated gusset plate of precast concrete use intensity has further been improved, the river levee protects the reinforcement better, improve its result of use.
Preferably, the inner walls of the two connecting frames are respectively provided with an assembly groove, the inner walls of the assembly grooves are respectively connected with a stabilizing plate in a clamping mode, the stabilizing plates are connected with the surface of the prefabricated reinforcing plate in a clamping mode, and the section of each stabilizing plate is U-shaped.
The effects achieved by the components are as follows: through setting up of firm board, make the link when strengthening the connection to two prefabricated gusset plates, can make the inseparabler of being connected between the prefabricated gusset plate to better install prefabricated gusset plate at the river levee inclined plane, consolidate the protection to the river levee.
Preferably, the inner wall of the stabilizing plate is fixedly connected with a reinforcing pad, and the reinforcing pad is a rubber pad.
The effects achieved by the components are as follows: through the setting of reinforcement pad, when making firm board joint at prefabricated reinforcement board surface, be difficult for producing the gap to connect more stable firm, be difficult for taking place not hard up, further improved the result of use of firm board.
Compared with the prior art, the utility model has the advantages and positive effects that:
according to the utility model, the prefabricated reinforcing plate can be more stably arranged and installed on the inclined surface of the river dike, so that the river dike is not easy to loosen and separate, and is stably reinforced and protected, so that the river dike is not easy to collapse, and the practicability of the prefabricated reinforcing plate and the safety of the river dike are improved.
Drawings
FIG. 1 is a schematic perspective view of the present application;
FIG. 2 is a schematic perspective view of the fixing device of the present application;
FIG. 3 is a schematic perspective view of a prefabricated reinforcement panel of the present application;
FIG. 4 is a schematic view of a perspective structure of a reinforcing rod of the fixing device of the present application;
fig. 5 is a schematic perspective view of the connection device of the present application.
Legend description: 1. prefabricating a reinforcing plate; 2. a fixing device; 21. a mounting groove; 22. a mounting plate; 23. a reinforcing rod; 24. a clamping groove; 25. a clamping block; 26. a nut; 27. a thread groove; 28. fixing the column; 29. a fixing plate; 210. a slot; 211. a rod; 212. a jack; 3. a connecting device; 31. a connecting groove; 32. a connecting frame; 33. a bolt; 34. an assembly groove; 35. a stabilizing plate; 36. and (5) reinforcing the pad.
Detailed Description
Embodiment 1, as shown in fig. 1, a water conservancy river levee reinforcing structure, including two prefabricated reinforcing plates 1, the surface of two prefabricated reinforcing plates 1 is provided with fixing device 2 respectively, and the position both sides that two prefabricated reinforcing plates 1 are close to each other are provided with connecting device 3.
Referring to fig. 1 to 4, in the present embodiment: fixing device 2 includes mounting panel 22, mounting groove 21 has been seted up respectively to the surface of two prefabricated gusset plates 1, mounting panel 22 joint is at the inner wall of mounting groove 21, the surface grafting of mounting panel 22 has two stiffening rod 23, the cross-section of two stiffening rod 23 is "T" shape, two fixture blocks 25 of both sides surface difference fixedly connected with of mounting panel 22, the draw-in groove 24 has been seted up respectively to the one side that the inner wall of mounting groove 21 is close to each other, fixture block 25 and the inner wall looks joint of draw-in groove 24, when installing precast concrete slab's prefabricated gusset plate 1 on the river levee inclined plane, at first peg graft two stiffening rod 23 on the surface of mounting panel 22, then insert two stiffening rod 23 on the river levee inclined plane, then with the mounting groove 21 joint of prefabricated gusset plate 1 on the surface of mounting panel 22, the fixture block 25 of mounting panel 22 surface both sides can the joint in the draw-in groove 24 of prefabricated gusset plate 1 surface simultaneously, the setting that this moment prefabricated gusset plate 1 can be more stable installs at the inclined plane of river levee, difficult emergence not hard up separation, carry out stable reinforcement protection, make the river levee be difficult for the performance of the river levee, the practicality of the river levee 1 that collapses has been improved.
Referring to fig. 1 to 4, in the present embodiment: the cross-section of fixture block 25 is "T" shape, the size of fixture block 25 and draw-in groove 24 looks adaptation, through the adaptation setting of fixture block 25 and draw-in groove 24, make the connection between fixture block 25 and the draw-in groove 24 more firm, thereby make the assembly between mounting panel 22 and the prefabricated gusset plate 1 more firm, fixing device 2's result of use has been improved, two jacks 212 have been seted up respectively to the position that two prefabricated gusset plate 1's surface both sides are located the mounting groove 21 inner wall, two slots 210 have been seted up respectively to the surface both sides of mounting panel 22, the inserted bar 211 of two slots 210 inner wall has inserted bar 211 respectively, through the setting of inserted bar 211, make the further improvement of joint strength between mounting panel 22 and the prefabricated gusset plate 1, make the prefabricated gusset plate 1 install more firm on the river levee inclined plane, the result of use of prefabricated gusset plate 1 has been improved.
Referring to fig. 1 to 4, in the present embodiment: the screw thread has been seted up respectively on the surface of two stiffening rods 23, be located the position of screw thread on the arc surface of two stiffening rods 23 and threaded connection has nut 26 respectively, the surface butt of nut 26 and mounting panel 22, through the setting of nut 26, make the connection of stiffening rod 23 and mounting panel 22 more firm stable, be difficult for taking place the slip skew between the two, thereby the assembly of prefabricated gusset plate 1 is more stable, the screw thread groove 27 has been seted up on the one end surface that the mounting panel 22 was kept away from to two stiffening rods 23, the inner wall threaded connection of screw thread groove 27 has fixed column 28, fixed column 28's fixed surface is connected with fixed plate 29, when making the stiffening rod 23 install and insert in river levee soil through the setting of fixed plate 29, contact extrusion force between the soil through fixed plate 29, make the setting of stiffening rod 23 more stable, be difficult for extracting from soil, make prefabricated gusset plate 1 more stability.
Referring to fig. 1, 3 and 5, in this embodiment: the connecting device 3 comprises two connecting frames 32, the cross sections of the two connecting frames 32 are in a T shape, connecting grooves 31 are respectively formed in two sides of the surfaces of the two prefabricated reinforcing plates 1, two end surfaces of the two connecting frames 32 are respectively clamped with the connecting grooves 31 on two sides of the two prefabricated reinforcing plates 1, two ends of the two connecting frames 32 are respectively connected with bolts 33 in a penetrating threaded mode, the bolts 33 are connected with the inner walls of the connecting grooves 31 in a threaded mode, when the prefabricated reinforcing plates 1 are installed on the inclined surface of a river levee by using the fixing device 2, the two connecting frames 32 are installed at positions, close to each other, of the two prefabricated reinforcing plates 1, two ends of the connecting frames 32 are clamped in the connecting grooves 31 between the two prefabricated reinforcing plates 1, then the two bolts 33 are connected with the surfaces of the connecting frames 32 in a threaded mode, at the moment, the prefabricated reinforcing plates 1 can form a stable connecting relation with each other in installation, the use strength of the prefabricated reinforcing plates 1 of precast concrete is further improved, the river levee is better protected and the use effect is improved.
Referring to fig. 1, 3 and 5, in this embodiment: the assembly groove 34 has been seted up respectively to the inner wall of two link 32, the inner wall of assembly groove 34 joint has firm board 35 respectively, firm board 35's joint is on the surface of prefabricated gusset plate 1, firm board 35's cross-section is "U" shape, through firm board 35's setting, make link 32 when carrying out the reinforcement to two prefabricated gusset plates 1 and connect, can make the inseparabler of connection between the prefabricated gusset plate 1, thereby better install prefabricated gusset plate 1 at the river levee inclined plane, consolidate the protection to the river levee, firm board 35's inner wall fixedly connected with reinforcing pad 36, reinforcing pad 36 is the rubber pad, through reinforcing pad 36's setting, make firm board 35 joint when prefabricated gusset plate 1 surface, thereby connect more stably firm, difficult emergence is not hard up, the result of use of firm board 35 has been further improved.
Working principle: when the precast reinforced plate 1 of the precast concrete slab is installed on the inclined surface of the river levee, the two reinforced rods 23 are inserted and arranged on the surface of the installation plate 22, then the nuts 26 are in threaded connection with the reinforced rods 23 until the nuts 26 are in threaded connection with the installation plate 22, then the fixing columns 28 on the fixing plates 29 are in threaded connection with the threaded grooves 27 on the surface of the reinforced rods 23, then the two reinforced rods 23 are inserted on the inclined surface of the river levee, then the installation grooves 21 of the precast reinforced plate 1 are clamped on the surface of the installation plate 22, meanwhile the clamping blocks 25 on two sides of the surface of the installation plate 22 are clamped in the clamping grooves 24 on the surface of the precast reinforced plate 1, then the two inserted rods 211 are inserted into the insertion holes 212 on two sides of the surface of the precast reinforced plate 1 until the two inserted grooves 210 are inserted on the surface of the installation plate 22, at this time, the precast reinforced plate 1 can be installed on the inclined surface of the river levee more stably, loose separation is not easy to occur, stable reinforcement protection is performed, the river levee is not easy to collapse, and the practicability and the safety of the precast reinforced plate 1 are improved.
When the fixing device 2 is used for installing the prefabricated reinforcing plate 1 on the inclined surface of the river levee, the two stabilizing plates 35 are respectively clamped at two sides of the prefabricated reinforcing plate 1, then the two connecting frames 32 are installed at the positions, close to each other, of the two prefabricated reinforcing plates 1, two ends of each connecting frame 32 are clamped in the connecting grooves 31 between the two prefabricated reinforcing plates 1, meanwhile, the assembling grooves 34 of the inner walls of the connecting frames 32 are in contact extrusion with the stabilizing plates 35, then the two bolts 33 are connected with the surfaces of the connecting frames 32 in a threaded mode, the two bolts 33 are connected with the inner walls of the two connecting grooves 31 in a threaded mode, at the moment, when the prefabricated reinforcing plate 1 is installed and used, the adjacent prefabricated reinforcing plates can form a stable connection relationship, the use strength of the prefabricated reinforcing plate 1 of precast concrete is further improved, the river levee is better protected and the use effect is improved.
Claims (8)
1. The utility model provides a water conservancy river levee reinforced structure, includes two prefabricated gusset plates (1), its characterized in that: two the surface of prefabricated gusset plate (1) is provided with fixing device (2) respectively, fixing device (2) are including mounting panel (22), two mounting groove (21) have been seted up respectively to the surface of prefabricated gusset plate (1), mounting panel (22) joint is at the inner wall of mounting groove (21), peg graft on the surface of mounting panel (22) has two stiffening rod (23), two the cross-section of stiffening rod (23) is "T" shape, two fixture blocks (25) of fixedly connected with are respectively on the both sides surface of mounting panel (22), draw-in groove (24) have been seted up respectively to one side that the inner wall of mounting groove (21) is close to each other, fixture block (25) and the inner wall looks joint of draw-in groove (24).
2. The water conservancy river levee reinforcing structure of claim 1, wherein: the section of the clamping block (25) is in a T shape, and the size of the clamping block (25) is matched with the clamping groove (24).
3. The water conservancy river levee reinforcing structure of claim 1, wherein: two jack (212) have been seted up respectively to the position that is located mounting groove (21) inner wall in two in the surface both sides of prefabricated gusset plate (1), two slot (210) have been seted up respectively to the surface both sides of mounting panel (22), and the inner wall of two slot (210) has inserted bar (211) respectively the joint, two inserted bar (211) and two jack (212) slip of slot (210) inner wall are inserted and are set up.
4. The water conservancy river levee reinforcing structure of claim 1, wherein: threads are respectively arranged on the surfaces of the two reinforcing rods (23), nuts (26) are respectively connected to the positions, located at the threads, of the arc surfaces of the two reinforcing rods (23) in a threaded mode, and the nuts (26) are abutted to the surface of the mounting plate (22).
5. The water conservancy river levee reinforcing structure of claim 1, wherein: two the one end surface that mounting panel (22) was kept away from to stiffening rod (23) has seted up screw thread groove (27), the inner wall threaded connection of screw thread groove (27) has fixed column (28), the fixed plate (29) is connected with to the fixed surface of column (28).
6. The water conservancy river levee reinforcing structure of claim 1, wherein: two prefabricated gusset plate (1) are provided with connecting device (3) each other in position both sides that are close to, connecting device (3) are including two link (32), two the cross-section of link (32) is "T" shape, two spread groove (31) have been seted up respectively to the surface both sides of prefabricated gusset plate (1), two the both ends surface of link (32) respectively with the both sides spread groove (31) looks joint of two prefabricated gusset plate (1), two threaded connection has bolt (33) are run through respectively at the both ends of link (32), inner wall threaded connection of bolt (33) and spread groove (31).
7. The water conservancy river levee reinforcing structure of claim 6, wherein: the inner walls of the two connecting frames (32) are respectively provided with an assembly groove (34), the inner walls of the assembly grooves (34) are respectively connected with a fixing plate (35) in a clamping mode, the fixing plates (35) are connected with the surface of the prefabricated reinforcing plate (1) in a clamping mode, and the section of each fixing plate (35) is U-shaped.
8. The water conservancy river levee reinforcing structure of claim 7, wherein: the inner wall of the stabilizing plate (35) is fixedly connected with a reinforcing pad (36), and the reinforcing pad (36) is a rubber pad.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321916571.0U CN220468766U (en) | 2023-07-20 | 2023-07-20 | Water conservancy river levee reinforced structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321916571.0U CN220468766U (en) | 2023-07-20 | 2023-07-20 | Water conservancy river levee reinforced structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220468766U true CN220468766U (en) | 2024-02-09 |
Family
ID=89780244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321916571.0U Active CN220468766U (en) | 2023-07-20 | 2023-07-20 | Water conservancy river levee reinforced structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220468766U (en) |
-
2023
- 2023-07-20 CN CN202321916571.0U patent/CN220468766U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213926311U (en) | Slope protection reinforced structure | |
CN220468766U (en) | Water conservancy river levee reinforced structure | |
CN113638381B (en) | Hydraulic engineering river channel trash blocking device and installation method thereof | |
CN211948251U (en) | Novel slope protection water conservancy net | |
CN210737843U (en) | Prefabricated assembled concrete shear force wall | |
CN212153394U (en) | Recoverable scalable device that props that trades of subway station deep basal pit | |
CN114032924A (en) | Foundation ditch bank protection reinforced structure for civil engineering | |
CN113944171A (en) | Foundation pit construction supporting device is built in room | |
CN209040286U (en) | Steel concrete assembled connected node | |
CN213233474U (en) | Foundation pit supporting structure | |
CN206941624U (en) | Assembly concrete cofferdam | |
CN219196020U (en) | Prefabricated assembled foundation building structure | |
CN218436670U (en) | Novel assembly connection structure of bridge steel arch | |
CN114775520B (en) | Stretching assembly type emergency flood control structure and assembly construction method thereof | |
CN219862746U (en) | Mounting structure of flood control U type sheet pile | |
CN220888521U (en) | Ecological frame | |
CN217601405U (en) | Take protective structure's linear type larsen steel sheet pile | |
CN220352717U (en) | Dyke reinforcing construction mechanism | |
CN217026906U (en) | Ecological water conservancy bank protection device based on hydraulic engineering | |
CN217267393U (en) | Civil engineering is with pre-buried fender soil mechanism | |
CN217974317U (en) | Corrugated steel sheet pile wall structure | |
CN211285485U (en) | River course restoration is with preventing river course bank protection that runs off | |
CN221567023U (en) | Water conservancy dyke reinforcing apparatus | |
CN219195922U (en) | Steel sheet pile supporting structure convenient to detach and install | |
CN217651815U (en) | Foundation pit supporting structure in shaft construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |