CN220456071U - Project progress management device - Google Patents

Project progress management device Download PDF

Info

Publication number
CN220456071U
CN220456071U CN202322117238.XU CN202322117238U CN220456071U CN 220456071 U CN220456071 U CN 220456071U CN 202322117238 U CN202322117238 U CN 202322117238U CN 220456071 U CN220456071 U CN 220456071U
Authority
CN
China
Prior art keywords
display board
project progress
board
grip block
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322117238.XU
Other languages
Chinese (zh)
Inventor
李英锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322117238.XU priority Critical patent/CN220456071U/en
Application granted granted Critical
Publication of CN220456071U publication Critical patent/CN220456071U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The utility model discloses a project progress management device, which has the technical scheme that: the display device comprises a display board, wherein two support cylinders are arranged on the bottom surface of the display board, support rods are movably sleeved in the support cylinders, the support rods are fixedly connected with the display board, and a support base is fixedly arranged on the bottom surface of the support cylinders; the clamping assembly is arranged on one side of the display board and used for clamping project progress files, the clamping plate is arranged, when the project progress files are required to be placed on the display board, workers pull the clamping plate, at the moment, the springs are in a compressed state, after the files are placed between the clamping plate and the display board, the clamping plate is loosened, the springs are driven to drive the clamping plate to clamp and fix the files, and accordingly the project progress files are replaced by the aid of the clamping plate.

Description

Project progress management device
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a project progress management device.
Background
In the building engineering, in order to intuitively show construction target values and progress conditions, a display board is generally used for displaying target values and progress of construction projects, so that workers can paste specific data files of the project progress on the display board, and management analysis is conveniently conducted on the project progress conditions.
According to the application number: the Chinese patent of CN202220802083.6 discloses a project progress management device for project management of building engineering, which comprises a base, a support, a first display board, a second display board and an angle adjusting mechanism, wherein the support is fixedly connected to the upper surface of the base, the first display board is rotationally connected to one side of the support, the second display board is rotationally connected to the other side of the support, the first display board and the second display board are oppositely arranged, the angle adjusting mechanism is arranged on one side of the support, and the angle adjusting mechanism is connected with the first display board and the second display board. This project progress management device for building engineering project management passes through angle adjustment mechanism's setting to can adjust the angular position of first show board and second show board, make it can be applicable to different people to the different user demands with the angular position of first show board and second show board.
The conventional project progress management device for managing various building projects has some disadvantages, such as: after project progress file adhesion is on the show board, when follow-up to changing the file, inconvenient tearing the file of adhesion from the show board, and after tearing, the paper of show board surface also remains partial file, just can paste follow-up file again after the clearance, and is very inconvenient.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a project progress management device, which solves the problems that when a project progress file is adhered to a display board and is replaced, the adhered file is inconvenient to tear off from the display board, and after the adhered file is torn off, part of paper of the file remains on the surface of the display board, and the subsequent file can be adhered after cleaning, so that the project progress management device is very inconvenient.
The technical aim of the utility model is realized by the following technical scheme:
a project progress management apparatus comprising: the display board is provided with two supporting cylinders on the bottom surface, a supporting rod is movably sleeved in the supporting cylinders, the supporting rod is fixedly connected with the display board, and a supporting base is fixedly arranged on the bottom surface of the supporting cylinders; the clamping assembly is arranged on one side of the display board and used for clamping project progress files.
Through adopting above-mentioned technical scheme, through setting up clamping assembly, in the building engineering, the staff prints the progress condition of project into the file after, places on the show board, makes the staff in the building site know the project progress condition, through clamping assembly, conveniently carries out the centre gripping to the file fixedly.
Preferably, the clamping assembly comprises: the utility model provides a show board, including the show board, a plurality of grip block sets up in one side of show board, a plurality of movable hole has been seted up to one side of show board, one side fixed mounting of grip block has two movable rods, the movable rod passes the movable hole and extends to the outside of show board, the one end fixed mounting of movable rod has the butt piece, the outside cover of movable rod is equipped with the spring, one side fixed adhesion of grip block has the rubber pad.
Through adopting above-mentioned technical scheme, through setting up the grip block, when needs place project progress file on the show board, the staff pulls the grip block, and the spring is compressed state this moment, places the file between grip block and show board after, loosens the grip block, and the spring drives, drives the grip block and carries out the centre gripping fixed to the file to have and utilize follow-up change to project progress file.
Preferably, one side of the display board is provided with two transparent dustproof shells, and the transparent dustproof shells are connected with the display board through hinges.
Through adopting above-mentioned technical scheme, through setting up transparent shield, after project progress file centre gripping on the show board, cover transparent shield, protect progress file.
Preferably, a magnetic block is fixedly arranged on one side of the inside of the transparent dustproof shell, two iron blocks are fixedly arranged on one side of the display board, and the magnetic block is adsorbed with the iron blocks.
Through adopting above-mentioned technical scheme, through setting up the magnetic path, after transparent dustproof cap on the show board, transparent dustproof cap closes, adsorbs on the iron plate through the magnetic path to fix transparent dustproof cap.
Preferably, an adjusting hole is formed in the outer circular wall surface of the supporting cylinder, and an adjusting bolt is connected to the inner thread of the adjusting hole.
Through adopting above-mentioned technical scheme, through setting up adjusting bolt, when the show board needs to adjust, the staff can unscrew adjusting bolt, has the height that utilizes convenient adjustment show board.
Preferably, the top surface of show board fixed mounting has the weather shield.
Through adopting above-mentioned technical scheme, through setting up the weather shield, when the show board was placed outdoor in the building site, through the weather shield, prevent that the rainwater from splashing in the show board, on flowing the progress file from the gap between transparent dirt proof boot and the show board, lead to the file to wet.
In summary, the utility model has the following advantages:
through setting up the grip block, when needs place project progress file on the show board, the staff pulls the grip block, and the spring is compressed state this moment, places the file between grip block and show board after, loosens the grip block, and the spring drives, drives the grip block and carries out the centre gripping to the file fixedly to have the utilization follow-up change to project progress file.
Through setting up transparent dustproof shell, after project progress file centre gripping is on the show board, cover transparent dustproof shell, protect progress file, through setting up the magnetic path, after transparent dustproof cap is on the show board, transparent dustproof cap closes, adsorbs on the iron plate through the magnetic path to fix transparent dustproof shell.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic diagram of a display board structure of the present utility model;
FIG. 3 is a schematic view of a clamping plate structure of the present utility model;
fig. 4 is a schematic view of the transparent dust-proof housing structure of the present utility model.
Reference numerals: 1. a display board; 2. a support cylinder; 3. a support rod; 4. a support base; 5. a clamping plate; 6. a movable hole; 7. a movable rod; 8. pressing blocks; 9. a spring; 10. a rubber pad; 11. a transparent dust-proof case; 12. a magnetic block; 13. iron blocks; 14. an adjustment aperture; 15. an adjusting bolt; 16. rain shield.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, a project progress management apparatus includes: the display board 1, the bottom surface of the display board 1 is provided with two support cylinders 2, a support rod 3 is movably sleeved in the support cylinder 2, the support rod 3 is fixedly connected with the display board 1, and a support base 4 is fixedly arranged on the bottom surface of the support cylinder 2; the clamping component is arranged on one side of the display board 1 and is used for clamping project progress files, the clamping component is arranged, workers print progress conditions of projects into files and then put the files on the display board 1, workers in a building site know the progress conditions of the projects, the files are conveniently clamped and fixed through the clamping component, the outer circular wall surface of the supporting cylinder 2 is provided with the adjusting holes 14, the adjusting bolts 15 are connected with the adjusting holes 14 in an internal threaded mode, the adjusting bolts 15 are arranged, when the display board 1 needs to be adjusted, the workers can unscrew the adjusting bolts 15, the height of the display board 1 is conveniently adjusted, the rain baffle 16 is fixedly arranged on the top surface of the display board 1, and rainwater is prevented from splashing into the display board 1 through the rain baffle 16 when the display board 1 is placed outdoors on the building site, and gaps between the transparent dustproof shell 11 and the display board 1 flow onto the progress files to cause the files to be wet.
Referring to fig. 2 and 3, the clamping assembly includes: the utility model provides a plurality of grip block 5, a plurality of grip block 5 sets up in the one side of show board 1, a plurality of movable hole 6 has been seted up to one side of show board 1, one side fixed mounting of grip block 5 has two movable rods 7, movable rod 7 passes movable hole 6 and extends to the outside of show board 1, the one end fixed mounting of movable rod 7 supports briquetting 8, the outside cover of movable rod 7 is equipped with spring 9, the fixed adhesion of one side of grip block 5 has rubber pad 10, through setting up grip block 5, when needs place project progress file on show board 1, the staff pulls grip block 5, spring 9 is compressed state this moment, place the file behind between grip block 5 and the show board 1, loosen grip block 5, spring 9 drives, it is fixed to drive grip block 5 to the file centre gripping, thereby it changes to have the utilization follow-up project progress file.
Referring to fig. 2 and 4, two transparent dustproof shells 11 are arranged on one side of the display board 1, the transparent dustproof shells 11 are connected with the display board 1 through hinges, the transparent dustproof shells 11 are arranged, after project progress files are clamped on the display board 1, the transparent dustproof shells 11 are covered to protect the progress files, magnetic blocks 12 are fixedly arranged on one side of the inside of the transparent dustproof shells 11, two iron blocks 13 are fixedly arranged on one side of the display board 1, the magnetic blocks 12 are adsorbed with the iron blocks 13, the magnetic blocks 12 are arranged, after the transparent dustproof shells 11 are covered on the display board 1, the transparent dustproof shells 11 are covered, and the magnetic blocks 12 are adsorbed on the iron blocks 13, so that the transparent dustproof shells 11 are fixed.
Working principle: referring to fig. 1-4, in the construction engineering, after the staff prints the progress condition of the project into a file, the file is placed on the display board 1, the staff pulls the clamping board 5, at this time, the spring 9 is in a compressed state, after the file is placed between the clamping board 5 and the display board 1, the clamping board 5 is loosened, the spring 9 drives and drives the clamping board 5 to clamp and fix the file, the transparent dustproof shell 11 is covered, and the transparent dustproof shell 11 is adsorbed on the iron block 13 through the magnetic block 12, so that the transparent dustproof shell 11 is fixed, the progress file is protected, the project progress file is replaced later, and the replacement is convenient.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A project progress management apparatus, comprising:
the display board (1), the bottom surface of display board (1) is provided with two support barrels (2), the inside movable sleeve of support barrels (2) is equipped with bracing piece (3), bracing piece (3) and display board (1) fixed connection, the bottom surface of support barrels (2) fixed mounting has support base (4);
the clamping assembly is arranged on one side of the display board (1) and used for clamping project progress files.
2. The project schedule management apparatus of claim 1, wherein said clamping assembly comprises:
a plurality of grip block (5), a plurality of grip block (5) set up in one side of show board (1), a plurality of movable hole (6) have been seted up to one side of show board (1), one side fixed mounting of grip block (5) has two movable rods (7), movable rod (7) pass movable hole (6) and extend to the outside of show board (1), the one end fixed mounting of movable rod (7) has to press block (8), the outside cover of movable rod (7) is equipped with spring (9), one side fixed adhesion of grip block (5) has rubber pad (10).
3. A project progress management device according to claim 1, characterized in that one side of the display board (1) is provided with two transparent dust-proof shells (11), the transparent dust-proof shells (11) being connected with the display board (1) by hinges.
4. A project progress management device according to claim 3, characterized in that a magnet (12) is fixedly mounted on one side of the inside of the transparent dust-proof shell (11), two iron blocks (13) are fixedly mounted on one side of the display board (1), and the magnet (12) is adsorbed to the iron blocks (13).
5. The project progress management device according to claim 1, wherein an adjusting hole (14) is formed in the outer circumferential wall surface of the supporting cylinder (2), and an adjusting bolt (15) is connected to the adjusting hole (14) in a threaded manner.
6. A project progress management device according to claim 1, characterized in that the top surface of the display board (1) is fixedly provided with a weather shield (16).
CN202322117238.XU 2023-08-07 2023-08-07 Project progress management device Active CN220456071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322117238.XU CN220456071U (en) 2023-08-07 2023-08-07 Project progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322117238.XU CN220456071U (en) 2023-08-07 2023-08-07 Project progress management device

Publications (1)

Publication Number Publication Date
CN220456071U true CN220456071U (en) 2024-02-06

Family

ID=89735411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322117238.XU Active CN220456071U (en) 2023-08-07 2023-08-07 Project progress management device

Country Status (1)

Country Link
CN (1) CN220456071U (en)

Similar Documents

Publication Publication Date Title
CN211040170U (en) Ball machine hoist and mount fixed bolster convenient to installation
CN220456071U (en) Project progress management device
CN210896313U (en) Electro-optical display screen with adjusting function
CN212203034U (en) Multifunctional transmission chain wheel
CN210867856U (en) Intelligent security camera device
CN216243076U (en) A installing support for installing surveillance camera machine
CN215173822U (en) A atmosphere detection device for building site
CN213580576U (en) Environmental monitoring device for construction management
CN209676355U (en) A kind of novel monitor
CN210567145U (en) Intelligent monitoring camera
CN210719216U (en) Environment monitoring equipment convenient to installation
CN111103015A (en) Building engineering environment monitoring device and method with good stability
CN214425619U (en) Intelligent electronic monitoring device with moisture-proof mechanism
CN213092549U (en) Computer-based multimedia teaching device for ladder classroom
CN212643974U (en) District security protection camera protection device
CN213043711U (en) Cell-phone frame punching device
CN214744777U (en) Think political affairs classroom recording camera wall built-up structure
CN211107999U (en) Soil and water conservation monitoring unmanned aerial vehicle
CN214335893U (en) Landscape fire protection alarm device
CN214335236U (en) Municipal administration road inspection shaft lid damages location monitoring management device
CN214501050U (en) Protection device of intelligence street lamp
CN214340406U (en) Portable detector for monitoring homeland resources
CN219057077U (en) Intelligent device management box convenient to overhaul
CN218626346U (en) Laser positioning head suspension structure
CN209056182U (en) A kind of guideboard being convenient for changing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant