CN220453087U - Underground protection PE spool sleeve - Google Patents

Underground protection PE spool sleeve Download PDF

Info

Publication number
CN220453087U
CN220453087U CN202321957997.0U CN202321957997U CN220453087U CN 220453087 U CN220453087 U CN 220453087U CN 202321957997 U CN202321957997 U CN 202321957997U CN 220453087 U CN220453087 U CN 220453087U
Authority
CN
China
Prior art keywords
spool
main body
underground
underground protection
spool sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321957997.0U
Other languages
Chinese (zh)
Inventor
林水聘
房永龙
陈太极
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Tengyun Plastic Co ltd
Original Assignee
Xiamen Tengyun Plastic Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Tengyun Plastic Co ltd filed Critical Xiamen Tengyun Plastic Co ltd
Priority to CN202321957997.0U priority Critical patent/CN220453087U/en
Application granted granted Critical
Publication of CN220453087U publication Critical patent/CN220453087U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the technical field of sleeves, and discloses an underground protection PE (polyethylene) spool sleeve, which comprises a main body mechanism, a fixing mechanism and a connecting mechanism, wherein the fixing mechanism is positioned at the upper end of the main body mechanism, the connecting mechanism is positioned at the inner end of the main body mechanism, the main body mechanism comprises an underground protection PE spool sleeve main body I, a connecting groove I and a fixing groove I, the connecting groove I is fixedly arranged at the upper end of the underground protection PE spool sleeve main body I, the fixing groove I is fixedly arranged at the upper end of the underground protection PE spool sleeve main body I, the main body mechanism further comprises a heat preservation assembly, an underground protection PE spool sleeve main body II, a fixing groove II and a connecting groove II, and the underground protection PE spool sleeve main body II is movably arranged at the front end of the underground protection PE spool sleeve main body I. The PE spool sleeve with the underground protection function can enable the PE spool to be normally used when the temperature of the PE spool is low in winter, and cannot be frozen out, so that the service life of the PE spool is prolonged.

Description

Underground protection PE spool sleeve
Technical Field
The utility model relates to the technical field of sleeves, in particular to an underground protection PE (polyethylene) spool sleeve.
Background
PE pipe is used in building water supply, building drainage, buried drain pipe, building heating etc. and is easy to damage when in use, so an underground protection PE pipe sleeve is needed to protect PE pipe.
The protection PE spool sleeve in the prior art can better protect the PE spool from being damaged, so that the PE spool can be used for a long time, and the service life of the PE spool is prolonged.
The protection PE spool sleeve pipe of prior art is not good in the heat preservation effect, in winter, when weather is cold, PE spool can be because of the temperature is too low, leads to the PE spool to be frozen out, and then also can influence the life of PE spool.
Disclosure of Invention
(one) solving the technical problems
The utility model aims to provide an underground protection PE (polyethylene) spool sleeve, which aims to solve the problem that the heat preservation effect is poor in the background technology.
(II) technical scheme
In order to achieve the above purpose, the present utility model provides the following technical solutions: the underground protection PE spool sleeve comprises a main body mechanism, a fixing mechanism and a connecting mechanism, wherein the fixing mechanism is positioned at the upper end of the main body mechanism, the connecting mechanism is positioned at the inner end of the main body mechanism, the main body mechanism comprises an underground protection PE spool sleeve main body I, a connecting groove I and a fixing groove I, the connecting groove I is fixedly arranged at the upper end of the underground protection PE spool sleeve main body I, and the fixing groove I is fixedly arranged at the upper end of the underground protection PE spool sleeve main body I;
the main body mechanism further comprises a heat preservation assembly, a second underground protection PE tube sleeve main body, a second fixing groove and a second connecting groove, the second underground protection PE tube sleeve main body is movably mounted at the front end of the first underground protection PE tube sleeve main body, the second underground protection PE tube sleeve main body and the first underground protection PE tube sleeve main body are identical in structure, the second fixing groove is fixedly arranged at the upper end of the second underground protection PE tube sleeve main body, and the second connecting groove is fixedly arranged at the upper end of the second underground protection PE tube sleeve main body.
Preferably, the heat preservation subassembly includes polyethylene heat preservation material layer and compound silicate heat preservation material layer, heat preservation subassembly fixed mounting is in the inside of underground protection PE spool sleeve pipe main part one, polyethylene heat preservation material layer fixed mounting is in the inside of underground protection PE spool sleeve pipe main part one, compound silicate heat preservation material layer fixed mounting is in the downside on polyethylene heat preservation material layer, can make the PE spool in winter temperature lower time, can normally use, can not be frozen out to PE spool's life has been improved.
Preferably, the fixing mechanism comprises a fixing plate, a fixing groove III, a fixing bolt I, a fixing groove IV and a fixing bolt II, wherein the fixing plate is movably arranged at the upper end of the underground protection PE spool sleeve body I, so that the underground protection PE spool sleeve body I and the underground protection PE spool sleeve body II are connected together.
Preferably, the fixing groove III is fixedly arranged at the upper end of the fixing plate, and the fixing bolt I is movably arranged at the upper end of the fixing groove III, so that the fixing plate is fixed more firmly.
Preferably, the fixing groove four is fixedly arranged at the upper end of the fixing plate, and the fixing bolt two is movably arranged at the upper end of the fixing groove four, so that the fixing plate can be reinforced again.
Preferably, the connecting mechanism comprises a first connecting block, a second connecting block, a third connecting groove, a fourth connecting groove, a PE spool placing channel and a PE spool limiting block, wherein the first connecting block is fixedly arranged at the left end of the first underground protection PE spool sleeve body, and the first underground protection PE spool sleeve body and the second underground protection PE spool sleeve body can be connected more tightly.
Preferably, the second connecting block is fixedly arranged at the left end of the first underground protection PE spool sleeve body, the third connecting groove is fixedly arranged inside the first underground protection PE spool sleeve body, and the fourth connecting groove is fixedly arranged inside the first underground protection PE spool sleeve body, so that the first underground protection PE spool sleeve body and the second underground protection PE spool sleeve body are connected more firmly.
Preferably, the PE spool is placed the fixed setting in underground protection PE spool sleeve pipe main part one inside, PE spool is placed the fixed inner that sets up in PE spool and is placed the recess in passageway, PE spool stopper fixed mounting is placed the inner of passageway at PE spool, through installation PE spool stopper, can make the position of PE spool installation more accurate.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the underground protection PE spool sleeve, the main body mechanism is arranged, so that the PE spool can be normally used in winter when the temperature is low, and cannot be frozen out, and the service life of the PE spool is prolonged;
2. according to the underground protection PE spool sleeve, the first underground protection PE spool sleeve body and the second underground protection PE spool sleeve body are connected together through the mounting of the fixing plate, the fixing plate can be fixed more firmly through the mounting of the fixing bolt I, and the fixing plate can be reinforced again through the mounting of the fixing bolt II;
3. this underground protection PE spool sleeve pipe through installation connecting block one, can make the inseparabler of underground protection PE spool sleeve pipe main part one with underground protection PE spool sleeve pipe main part two connect, through installation connecting groove three, can make the underground protection PE spool sleeve pipe main part one with the more firm of underground protection PE spool sleeve pipe main part two connect, through installation PE spool stopper, can make the position of PE spool installation more accurate.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic cross-sectional view of the present utility model;
FIG. 3 is a schematic perspective view of a fixing plate according to the present utility model;
FIG. 4 is a schematic cross-sectional view of a composite silicate insulation material layer according to the present utility model;
FIG. 5 is a schematic view of two three-dimensional structures of a sleeve body of an underground protection PE spool in the utility model;
fig. 6 is an enlarged schematic view of a part of the fixing mechanism of the present utility model.
In the figure: 1. a main body mechanism; 101. an underground protection PE spool sleeve body I; 102. a first connecting groove; 103. a first fixing groove; 104. a thermal insulation assembly; 1041. a polyethylene heat-insulating material layer; 1042. a composite silicate heat-insulating material layer; 105. an underground protection PE spool sleeve main body II; 106. a second fixing groove; 107. a second connecting groove; 2. a fixing mechanism; 201. a fixing plate; 202. a fixing groove III; 203. a first fixing bolt; 204. a fixing groove IV; 205. a second fixing bolt; 3. a connecting mechanism; 301. a first connecting block; 302. a second connecting block; 303. a third connecting groove; 304. a connecting groove IV; 305. PE spool placement groove; 306. PE spool placement channel; 307. PE spool stopper.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, the present utility model provides a technical solution: the underground protection PE spool sleeve comprises a main body mechanism 1, a fixing mechanism 2 and a connecting mechanism 3, wherein the fixing mechanism 2 is positioned at the upper end of the main body mechanism 1, the connecting mechanism 3 is positioned at the inner end of the main body mechanism 1, the main body mechanism 1 comprises an underground protection PE spool sleeve main body I101, a connecting groove I102 and a fixing groove I103, the connecting groove I102 is fixedly arranged at the upper end of the underground protection PE spool sleeve main body I101, and the fixing groove I103 is fixedly arranged at the upper end of the underground protection PE spool sleeve main body I101;
the main body mechanism 1 further comprises a heat preservation assembly 104, an underground protection PE tube sleeve main body II 105, a fixing groove II 106 and a connecting groove II 107, wherein the underground protection PE tube sleeve main body II 105 is movably mounted at the front end of the underground protection PE tube sleeve main body I101, the underground protection PE tube sleeve main body II 105 and the underground protection PE tube sleeve main body I101 are identical in structure, the fixing groove II 106 is fixedly arranged at the upper end of the underground protection PE tube sleeve main body II 105, and the connecting groove II 107 is fixedly arranged at the upper end of the underground protection PE tube sleeve main body II 105.
The insulation component 104 comprises a polyethylene insulation material layer 1041 and a composite silicate insulation material layer 1042, the insulation component 104 is fixedly arranged in the first underground protection PE tube sleeve body 101, the polyethylene insulation material layer 1041 is fixedly arranged in the first underground protection PE tube sleeve body 101, the composite silicate insulation material layer 1042 is fixedly arranged at the lower side of the polyethylene insulation material layer 1041, the fixing mechanism 2 comprises a fixing plate 201, a fixing groove III 202, a fixing bolt III 203, a fixing groove IV 204 and a fixing bolt II 205, the fixing plate 201 is movably arranged at the upper end of the first underground protection PE tube sleeve body 101, the fixing groove III 202 is fixedly arranged at the upper end of the fixing plate 201, the fixing bolt I203 is movably arranged at the upper end of the fixing groove III 202, the fixing bolt II 205 is movably arranged at the upper end of the fixing groove IV 204, when the underground protection PE tube sleeve is required to be used, the fixing groove II 106 is arranged at the left end of the first underground protection PE tube sleeve body 101, the polyethylene insulation material layer 1041 and the composite silicate insulation material layer in winter is arranged at the inner side of the first underground protection PE tube sleeve body 101, the PE tube body is prevented from being fixed by the PE tube body 101, and the PE tube body is prevented from being fixed by the PE tube body 105, and the PE tube body is prevented from being fixed by the PE tube body 101, and the PE tube body is prevented from being fixed by the underground protection sleeve body 101.
The connecting mechanism 3 comprises a first connecting block 301, a second connecting block 302, a third connecting groove 303, a fourth connecting groove 304, a PE spool placing groove 305, a PE spool placing channel 306 and a PE spool limiting block 307, wherein the first connecting block 301 is fixedly arranged at the left end of the first underground protection PE spool sleeve body 101, the second connecting block 302 is fixedly arranged at the left end of the first underground protection PE spool sleeve body 101, the third connecting groove 303 is fixedly arranged inside the first underground protection PE spool sleeve body 101, the fourth connecting groove 304 is fixedly arranged inside the first underground protection PE spool sleeve body 101, the PE spool placing groove 305 is fixedly arranged inside the first underground protection PE spool sleeve body 101, the PE spool placing channel 306 is fixedly arranged at the inner end of the PE spool placing groove 305, the PE spool limiting block 307 is fixedly arranged at the inner end of the PE spool placing channel 306, the PE spool placing channel 306 is arranged at the inner end of the PE spool placing groove 305, the PE spool limiting block 307 can be arranged at the inner end of the PE spool placing groove 305, and the PE spool is prevented from being inclined.
Working principle: when the underground protection PE spool sleeve is required to be used, the fixing groove II 106 is arranged at the left end of the underground protection PE spool sleeve main body I101, the polyethylene heat insulation material layer 1041 and the composite silicate heat insulation material layer 1042 are arranged inside the underground protection PE spool sleeve main body I101, heat insulation performance of the underground protection PE spool sleeve main body I101 is improved, a PE spool inside the underground protection PE spool sleeve main body I101 can not be frozen to crack in winter, service life of the PE spool is prolonged, the fixing plate 201 is arranged at the upper ends of the underground protection PE spool sleeve main body I101 and the underground protection PE spool sleeve main body II 105, the underground protection PE spool sleeve main body I101 and the underground protection PE spool sleeve main body II 105 are fixed, the PE spool placing channel 306 is arranged at the inner end of the PE spool placing groove 305, the PE spool limiting block 307 is arranged at the inner end of the PE spool placing groove 305, and the PE spool is prevented from being inclined.
Finally, it should be noted that the above description is only for illustrating the technical solution of the present utility model, and not for limiting the scope of the present utility model, and that the simple modification and equivalent substitution of the technical solution of the present utility model can be made by those skilled in the art without departing from the spirit and scope of the technical solution of the present utility model.

Claims (8)

1. The utility model provides an underground protection PE spool sleeve pipe, includes main part mechanism (1), fixed establishment (2) and coupling mechanism (3), its characterized in that: the fixing mechanism (2) is positioned at the upper end of the main body mechanism (1), the connecting mechanism (3) is positioned at the inner end of the main body mechanism (1), the main body mechanism (1) comprises an underground protection PE spool sleeve main body I (101), a connecting groove I (102) and a fixing groove I (103), the connecting groove I (102) is fixedly arranged at the upper end of the underground protection PE spool sleeve main body I (101), and the fixing groove I (103) is fixedly arranged at the upper end of the underground protection PE spool sleeve main body I (101);
the main body mechanism (1) further comprises a heat preservation assembly (104), an underground protection PE spool sleeve main body II (105), a fixing groove II (106) and a connecting groove II (107), the underground protection PE spool sleeve main body II (105) is movably mounted at the front end of the underground protection PE spool sleeve main body I (101), the underground protection PE spool sleeve main body II (105) and the underground protection PE spool sleeve main body I (101) are identical in structure, the fixing groove II (106) is fixedly arranged at the upper end of the underground protection PE spool sleeve main body II (105), and the connecting groove II (107) is fixedly arranged at the upper end of the underground protection PE spool sleeve main body II (105).
2. An underground protective PE spool sleeve according to claim 1, wherein: the heat preservation assembly (104) comprises a polyethylene heat preservation material layer (1041) and a composite silicate heat preservation material layer (1042), the heat preservation assembly (104) is fixedly installed inside an underground protection PE (polyethylene) wire tube sleeve main body I (101), the polyethylene heat preservation material layer (1041) is fixedly installed inside the underground protection PE wire tube sleeve main body I (101), and the composite silicate heat preservation material layer (1042) is fixedly installed on the lower side of the polyethylene heat preservation material layer (1041).
3. An underground protective PE spool sleeve according to claim 2, wherein: the fixing mechanism (2) comprises a fixing plate (201), a fixing groove III (202), a fixing bolt I (203), a fixing groove IV (204) and a fixing bolt II (205), wherein the fixing plate (201) is movably arranged at the upper end of the underground protection PE spool sleeve main body I (101).
4. A subsurface protective PE conduit sleeve according to claim 3, wherein: the fixing groove III (202) is fixedly arranged at the upper end of the fixing plate (201), and the fixing bolt I (203) is movably arranged at the upper end of the fixing groove III (202).
5. An underground protective PE spool sleeve according to claim 4, wherein: the fixing groove IV (204) is fixedly arranged at the upper end of the fixing plate (201), and the fixing bolt II (205) is movably arranged at the upper end of the fixing groove IV (204).
6. An underground protective PE spool sleeve according to claim 5, wherein: the connecting mechanism (3) comprises a first connecting block (301), a second connecting block (302), a third connecting groove (303), a fourth connecting groove (304), a PE spool placing groove (305), a PE spool placing channel (306) and a PE spool limiting block (307), wherein the first connecting block (301) is fixedly arranged at the left end of the first underground protection PE spool sleeve main body (101).
7. An underground protective PE spool sleeve according to claim 6, wherein: the connecting block II (302) is fixedly arranged at the left end of the underground protection PE spool sleeve main body I (101), the connecting groove III (303) is fixedly arranged inside the underground protection PE spool sleeve main body I (101), and the connecting groove IV (304) is fixedly arranged inside the underground protection PE spool sleeve main body I (101).
8. An underground protective PE spool sleeve according to claim 7, wherein: PE spool places recess (305) fixed setting is inside underground protection PE spool sleeve pipe main part one (101), PE spool places passageway (306) fixed setting in the inner of PE spool places recess (305), PE spool stopper (307) fixed mounting is in the inner of PE spool places passageway (306).
CN202321957997.0U 2023-07-25 2023-07-25 Underground protection PE spool sleeve Active CN220453087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321957997.0U CN220453087U (en) 2023-07-25 2023-07-25 Underground protection PE spool sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321957997.0U CN220453087U (en) 2023-07-25 2023-07-25 Underground protection PE spool sleeve

Publications (1)

Publication Number Publication Date
CN220453087U true CN220453087U (en) 2024-02-06

Family

ID=89727277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321957997.0U Active CN220453087U (en) 2023-07-25 2023-07-25 Underground protection PE spool sleeve

Country Status (1)

Country Link
CN (1) CN220453087U (en)

Similar Documents

Publication Publication Date Title
CN109209449B (en) Intelligent heat preservation system for railway tunnel in cold region and control method thereof
CN220453087U (en) Underground protection PE spool sleeve
CN215215711U (en) Heat tracing structure of long-distance heat transmission net drainage system
CN212078106U (en) Anti-freezing pipeline universal to conventional pipe fittings
CN218861711U (en) Underground drainage pipeline structure for green building
CN201285181Y (en) Anti-freezing defrosting apparatus for pipes of solar water heater
CN210034705U (en) Anti-freezing explosion-proof pipeline for hydraulic engineering
CN218455062U (en) Anti-freezing MPP pipeline joint
CN220341965U (en) External pressure resistant MPP power cable protection tube
CN220727553U (en) Antifreezing heat insulation sleeve
CN211693850U (en) Anti-freezing vacuum heat-insulating pipe
CN214662582U (en) Pipeline for hydraulic engineering
CN206837303U (en) Roof fire protection pipeline anti-freezing and heat-insulating structure
CN218000703U (en) Passive building steel tube bundle shear wall broken heat bridge wall penetrating pipeline
CN204491725U (en) The non-current water service pipe of a kind of severe cold area roofing antifreeze protection insulation ditch
CN220688434U (en) Antifreezing tap water pipeline
CN217734101U (en) Prefabricated piping lane's of assembled connection structure
CN213806226U (en) Roof or bridge floor deicing snow melt system device based on energy stake
CN209760624U (en) Roof anti-icing snow-melting device
CN219107023U (en) Easily install anti-compression MPP power tube
CN211371651U (en) Chemical pipeline with heat preservation cover
CN218625750U (en) Anti-freezing heat-resistant building water supply pipeline
CN214334075U (en) Structure of temperature measuring cable in ground temperature monitoring system of soil source ground source heat pump
CN215490437U (en) Novel bushing type ground source heat pump buried pipe
CN115305878A (en) Reservoir dam anti-freezing structure in severe cold region and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant