CN220451415U - Anchor sealing template reinforcing device - Google Patents

Anchor sealing template reinforcing device Download PDF

Info

Publication number
CN220451415U
CN220451415U CN202321873361.8U CN202321873361U CN220451415U CN 220451415 U CN220451415 U CN 220451415U CN 202321873361 U CN202321873361 U CN 202321873361U CN 220451415 U CN220451415 U CN 220451415U
Authority
CN
China
Prior art keywords
template reinforcing
arc
anchor
magnet
reinforcing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321873361.8U
Other languages
Chinese (zh)
Inventor
郭凡
张汝洋
杨肖肖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321873361.8U priority Critical patent/CN220451415U/en
Application granted granted Critical
Publication of CN220451415U publication Critical patent/CN220451415U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an anchor sealing template reinforcing device, which belongs to the technical field of building construction equipment and comprises a fixing plate, wherein one end of the fixing plate is fixedly provided with a U-shaped plate, two ends of the upper side of the U-shaped plate are fixedly provided with round pipes, the interiors of the round pipes are rotatably provided with rotary pipes, the interiors of the rotary pipes are slidably provided with telescopic rods, one ends of the telescopic rods are sleeved with mounting blocks, one ends of the mounting blocks are slidably provided with arc plates, the upper ends and the lower ends of two sides of the fixing plate are fixedly provided with guide frames, the interiors of the guide frames are slidably provided with first magnets, the two ends of the fixing plate are fixedly provided with second magnets, and one side of the fixing plate is coated with polytetrafluoroethylene films.

Description

Anchor sealing template reinforcing device
Technical Field
The utility model relates to an anchor sealing template reinforcing device, and belongs to the technical field of building construction equipment.
Background
The anchor sealing means that the anchor device which is clamped with the steel strand is sealed by high-strength cement mortar after tensioning work is completed and cement slurry is poured into the pore canal after the anchor device reaches a certain strength, an anchor sealing template is required to be installed at the anchor device position after the cement slurry reaches a certain strength, the anchor device is wrapped in concrete, the protection effect of preventing the anchor head from damage or corrosion is achieved, the anchor device is required to be fixed by a reinforcing device when the anchor sealing template is used, and the flatness is high when cement pouring is ensured, and the slurry leakage of the mould is avoided.
The publication number is: CN216914265U, a prefabricated T Liang Fengmao end template supporting structure, including sealing anchor template, be used for connecting the last supporting mechanism that seals anchor template and beam end expansion joint embedded bar and be used for connecting the lower supporting mechanism that seals anchor template and T beam pedestal, seal anchor template and compress tightly the laminating under last supporting mechanism and lower supporting mechanism and seal the anchor end at the T beam. The structure is characterized in that the upper end and the lower end of the sealing anchor template are respectively provided with supporting mechanisms which are tied with the embedded bars of the expansion joints of the beam ends and the T-beam pedestal, so that the stability and the quick disassembly and the obvious construction efficiency of the sealing anchor template are ensured.
The common anchor sealing template reinforcing apparatus is when using, although can fix the anchor sealing template, guarantee the stability and the quick assembly disassembly of anchor sealing template, avoided sealing the easy overturning of anchor sealing template, gliding problem, strengthened the construction security, but fixed the anchor sealing template that the fixed point is different when the effect is not good, moreover when demolishing reinforcing apparatus difficult operation, also remain cement on the device easily, influence follow-up use.
Disclosure of Invention
The utility model aims to solve the problems and provide the anchor sealing template reinforcing device which can adapt to fixed points at different positions when fixing the anchor sealing template, has simple dismantling operation and can not leave cement on the device.
The utility model realizes the purpose through the following technical scheme that the anchor sealing template reinforcing device comprises a fixed plate, wherein one end of the fixed plate is fixedly provided with a U-shaped plate, two ends of the upper side of the U-shaped plate are fixedly provided with round pipes, the interiors of the round pipes are rotatably provided with rotating pipes, the interiors of the rotating pipes are slidably provided with telescopic rods, one ends of the telescopic rods are sleeved with mounting blocks, one ends of the mounting blocks are slidably provided with arc plates, the upper ends and the lower ends of two sides of the fixed plate are fixedly provided with guide frames, the interiors of the guide frames are slidably provided with first magnets, two ends of the fixed plate are fixedly provided with second magnets, one side of the fixed plate is coated with polytetrafluoroethylene films, the two ends of each polytetrafluoroethylene film extend to the positions between the first magnets and the second magnets on two sides, the U-shaped plate is used for fixing the fixed plate, the telescopic rods slide in the rotating pipes so as to adjust the lengths of the telescopic rods, and the arc plates are used for fixing the mounting blocks.
Preferably, in order to adjust the length and the position of telescopic link, the helicla flute has been seted up on the inner wall of pipe, the sliding tray has been seted up to the both sides of swivelling tube, the both sides fixed mounting of telescopic link has the sliding block, the sliding block joint is in the sliding tray, just the one end of sliding block extends to in the helicla flute, waist type hole has been seted up to the inside of installing block, the rolling tray has been seted up at the both ends in waist type hole, the one end rotation of telescopic link has installed the roll wheel, just the roll wheel joint is in the rolling tray, the both ends of U-shaped board are located the upper end fixed mounting of pipe has the square board, threaded connection has positioning nut on the square board, just positioning nut's one end with the one end of swivelling tube compresses tightly mutually, the sliding block joint is in the helicla flute, for the sliding block is in the sliding tray slides power, the gyro wheel is in the rolling tray to adjust the position of installing block, positioning nut is used for fixing the swivelling tube.
Preferably, in order to fix the telescopic link, square groove has been seted up to the one end of installation piece, the arc joint is in square inslot, square inslot fixed mounting has the round bar, the round bar runs through the arc, the spring has been cup jointed in the outside of round bar, the one end of spring with arc looks fixed connection, the other end fixed connection of spring is in on the inner wall of square groove, the one end threaded connection of arc has stop nut, the arc is in slide in the square groove, the round bar is used for stabilizing in the slip the arc, stop nut is used for fixing the arc, thereby fix the installation piece.
Preferably, in order to fix the polytetrafluoroethylene film, a guide rod is fixedly installed inside the guide frame, the guide rod penetrates through the first magnet, and the guide rod is used for fixing the position of the first magnet when the first magnet slides in the guide frame, so that the first magnet is prevented from shifting in movement.
The beneficial effects of the utility model are as follows: when the anchor sealing template is used, the fixing points at different positions are adapted by changing the length of the telescopic rod and the position of the mounting block, so that the stability of the anchor sealing template is ensured, and when the anchor sealing template is removed, the anchor sealing template is simple and convenient to operate, cement cannot be remained on the fixing plate, and the anchor sealing template has strong practicability.
Drawings
Fig. 1 is a schematic diagram of the overall structure of the present utility model.
Fig. 2 is a schematic diagram of a connection structure of a rotary pipe and a telescopic rod according to the present utility model.
FIG. 3 is a schematic cross-sectional view of a circular tube and a rotary tube according to the present utility model.
Fig. 4 is a schematic view of a connection structure of a mounting block according to the present utility model.
Fig. 5 is a schematic diagram of a connection structure between a fixing plate and a first magnet according to the present utility model.
In the figure: 1. a fixing plate; 2. a U-shaped plate; 3. a round tube; 4. a rotating tube; 5. a telescopic rod; 6. a mounting block; 7. an arc-shaped plate; 8. a guide frame; 9. a first magnet; 10. a second magnet; 11. a polytetrafluoroethylene film; 12. a spiral groove; 13. a sliding groove; 14. a sliding block; 15. a waist-shaped hole; 16. a rolling groove; 17. a rolling wheel; 18. a square groove; 19. a round bar; 20. a spring; 21. a limit nut; 22. a guide rod; 23. a square plate; 24. and positioning a nut.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, an anchor sealing template reinforcing device comprises a fixing plate 1, wherein a U-shaped plate 2 is fixedly installed at one end of the fixing plate 1, a round tube 3 is fixedly installed at two ends of the upper side of the U-shaped plate 2, a rotary tube 4 is rotatably installed inside the round tube 3, a telescopic rod 5 is slidably installed inside the rotary tube 4, an installation block 6 is sleeved at one end of the telescopic rod 5, an arc 7 is slidably installed at one end of the installation block 6, a guide frame 8 is fixedly installed at the upper end and the lower end of two sides of the fixing plate 1, a first magnet 9 is slidably installed inside the guide frame 8, a second magnet 10 is fixedly installed at two ends of the fixing plate 1, a polytetrafluoroethylene film 11 is wrapped on one side of the fixing plate 1, two ends of the polytetrafluoroethylene film 11 extend between the first magnet 9 and the second magnet 10 on two sides, when the anchor sealing template is tightly adhered to the fixing plate 1, the rotary tube 4 is rotated, the telescopic rod 5 slides outwards at the moment, the sliding installation block 6 is adjusted to a proper position, and the arc 6 is fixedly installed at the sliding installation block 7.
As shown in fig. 2 to 4, the inner wall of the circular tube 3 is provided with a spiral groove 12, two sides of the rotary tube 4 are provided with a sliding groove 13, two sides of the telescopic rod 5 are fixedly provided with a sliding block 14, the sliding block 14 is clamped in the sliding groove 13, one end of the sliding block 14 extends into the spiral groove 12, a waist-shaped hole 15 is formed in the mounting block 6, two ends of the interior of the waist-shaped hole 15 are provided with rolling grooves 16, one end of the telescopic rod 5 is rotatably provided with a rolling wheel 17, the rolling wheel 17 is clamped in the rolling grooves 16, two ends of the U-shaped plate 2 are fixedly provided with square plates 23 at the upper end of the circular tube 3, the square plates 23 are in threaded connection with positioning nuts 24, one ends of the positioning nuts 24 are tightly pressed with one end of the rotary tube 4, when the rotary tube 4 rotates, the position of the telescopic rod 5 is adjusted, the rolling wheel 17 is rotated in the rolling groove 16 in the waist-shaped hole 15, and the rotary tube 4 is fixed by the positioning nuts 24.
As shown in fig. 4, one end of the installation block 6 is provided with a square groove 18, the arc plate 7 is clamped in the square groove 18, a round rod 19 is fixedly installed inside the square groove 18, the round rod 19 penetrates through the arc plate 7, a spring 20 is sleeved on the outer side of the round rod 19, one end of the spring 20 is fixedly connected with the arc plate 7, the other end of the spring 20 is fixedly connected to the inner wall of the square groove 18, one end of the arc plate 7 is in threaded connection with a limit nut 21, and when the installation block is in use, the arc plate 7 slides in the square groove 18, and then the limit nut 21 is used for fixing the arc plate 7.
As shown in fig. 5, a guide rod 22 is fixedly mounted inside the guide frame 8, the guide rod 22 penetrates the first magnet 9, and when in use, the first magnet 9 is slid along the guide rod 22, thereby adjusting the position of the first magnet 9.
When the utility model is used, firstly, two ends of the polytetrafluoroethylene film 11 are placed between the first magnet 9 and the second magnet 10, the polytetrafluoroethylene film 11 is fixed on one side of the fixed plate 1 by magnetic force between the two magnets, then the upper end of the U-shaped plate 2 is held by hand to enable the fixed plate 1 to be closely attached to the anchor sealing template, as the fixed plate 1 is of a convex structure, the flatness is good during concrete pouring, the rotary pipe 4 is rotated, the sliding block 14 moves along the spiral groove 12 on the inner wall of the circular pipe 3, thereby providing power for the sliding block 14 to slide in the sliding groove 13, thereby driving the telescopic rod 5 to stretch, the telescopic rod 5 is adjusted to a proper position according to the fixed point, then the telescopic rod 5 is slid in the waist-shaped hole 15 in the mounting block 6, the mounting block 6 is adjusted to a proper position according to the position of the fixed point, at the moment, the rolling wheel 17 rotates in the rolling groove 16, through the operation, the fixing plate 1 can be fixed on fixed points at different positions, then the arc plate 7 is manually opened, the main rib of the fixed point is clamped between the arc plates 7, the spring 20 is compressed at the moment, the arc plates 7 are fixed by the limit nuts 21, the mounting block 6 is fixed, then the positioning nuts 24 on the square plates 23 are used for fixing the rotary pipe 4, the integral fixing of the fixing plate 1 is realized, after the concrete pouring is finished, the limit nuts 21 are firstly unscrewed, the arc plates 7 are separated from the main rib, the arc plates 7 are reset due to the deformation force of the spring 20, the first magnet 9 is upwards slid along the guide rods 22 in the guide frames 8, the polytetrafluoroethylene film 11 is separated from the fixing plate 1, the integral fixing plate is taken out, cement cannot be remained on the fixing plate 1, the positioning nuts 24 are rotated again, the rotary pipe 4 is rotated reversely, the telescopic rod 5 is reset, for the next use.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (8)

1. The utility model provides a seal anchor template reinforcing apparatus which characterized in that: including fixed plate (1), the one end fixed mounting of fixed plate (1) has U shaped plate (2), the upside both ends fixed mounting of U shaped plate (2) have pipe (3), the inside rotation of pipe (3) is installed rotatory pipe (4), the inside slidable mounting of rotatory pipe (4) has telescopic link (5), installation piece (6) have been cup jointed to the one end of telescopic link (5), the one end slidable mounting of installation piece (6) has arc (7), the equal fixed mounting of upper end and the lower extreme of fixed plate (1) both sides has leading truck (8), the inside slidable mounting of leading truck (8) has first magnet (9), the both ends fixed mounting of fixed plate (1) has second magnet (10), one side cladding of fixed plate (1) has polytetrafluoroethylene film (11), just the both ends of polytetrafluoroethylene film (11) extend to both sides first magnet (9) with between second magnet (10).
2. The anchor seal template reinforcing device according to claim 1, wherein: spiral grooves (12) are formed in the inner wall of the round tube (3), sliding grooves (13) are formed in the two sides of the rotary tube (4), and sliding blocks (14) are fixedly arranged on the two sides of the telescopic rod (5).
3. The anchor seal template reinforcing device according to claim 2, wherein: the sliding block (14) is clamped in the sliding groove (13), and one end of the sliding block (14) extends into the spiral groove (12).
4. The anchor seal template reinforcing device according to claim 1, wherein: the inside of installation piece (6) has seted up waist type hole (15), rolling groove (16) have been seted up at the both ends of the inside in waist type hole (15), one end rotation of telescopic link (5) is installed and is rolled round (17), just roll round (17) joint in rolling groove (16).
5. The anchor seal template reinforcing device according to claim 1, wherein: square groove (18) have been seted up to one end of installation piece (6), arc (7) joint is in square groove (18), square groove (18) inside fixed mounting has round bar (19), round bar (19) run through arc (7).
6. The anchor seal template reinforcing apparatus according to claim 5, wherein: the outside of round bar (19) has cup jointed spring (20), the one end of spring (20) with arc (7) looks fixed connection, the other end fixed connection of spring (20) is in on the inner wall of square groove (18), the one end threaded connection of arc (7) has stop nut (21).
7. The anchor seal template reinforcing device according to claim 1, wherein: the guide frame (8) is internally and fixedly provided with a guide rod (22), and the guide rod (22) penetrates through the first magnet (9).
8. The anchor seal template reinforcing device according to claim 1, wherein: square plates (23) are fixedly arranged at the upper ends of the round tubes (3) at the two ends of the U-shaped plates (2), positioning nuts (24) are connected to the square plates (23) in a threaded mode, and one ends of the positioning nuts (24) are tightly pressed with one ends of the rotary tubes (4).
CN202321873361.8U 2023-07-17 2023-07-17 Anchor sealing template reinforcing device Active CN220451415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321873361.8U CN220451415U (en) 2023-07-17 2023-07-17 Anchor sealing template reinforcing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321873361.8U CN220451415U (en) 2023-07-17 2023-07-17 Anchor sealing template reinforcing device

Publications (1)

Publication Number Publication Date
CN220451415U true CN220451415U (en) 2024-02-06

Family

ID=89735538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321873361.8U Active CN220451415U (en) 2023-07-17 2023-07-17 Anchor sealing template reinforcing device

Country Status (1)

Country Link
CN (1) CN220451415U (en)

Similar Documents

Publication Publication Date Title
CN220451415U (en) Anchor sealing template reinforcing device
CN109594686A (en) A kind of assembled integral steel reinforced concrete frame support composite shear wall structure
CN218438271U (en) Concrete building template for civil engineering
CN211437558U (en) Scaffold steel pipe aligning device
CN210732757U (en) Interior gliding style high leakproofness prefabricated staircase mould
CN209725602U (en) A kind of ultraviolet curing device
CN211081073U (en) Steel constructs construction and uses steel pipe support frame
CN215106163U (en) Drainage structure of assembled composite heat-insulation external wall board
CN206784618U (en) Waterstop stationary fixture
CN209780244U (en) Be used for room to build engineering movement joint department template reinforcing apparatus
CN221518232U (en) Pre-buried hole pore-forming device
CN215442691U (en) Green light steel keel composite wall building material
CN221260859U (en) Pccp pipeline reinforcing bar corrosion monitoring facilities
CN216112556U (en) Pre-buried flexible waterproof sleeve formwork leak protection thick liquid device
CN216040876U (en) Municipal works easy dismounting's green isolating device
CN221031496U (en) Building concrete pouring pump
CN215289726U (en) Long-span steel pipe concrete arch bridge construction platform
CN107794953B (en) Construction device for waterproofing pile head of punched bored pile
CN216304584U (en) Concrete formwork is used in construction of water conservancy water and electricity dam
CN216766768U (en) Molding clamping mechanism for early-dismantling formwork production of post-cast strip
CN219343988U (en) Building wall template structure of leak protection thick liquid
CN217481301U (en) Positioning device for positioning position of inverted arch longitudinal waterstop
CN220565662U (en) Scaffold lapping structure for silo construction
CN211774618U (en) Easy-to-recycle embedded steel plate
CN220870351U (en) Transverse and vertical connecting device for aluminum alloy round tubes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant