CN220432079U - Temporary lead hoisting equipment for constructional engineering - Google Patents

Temporary lead hoisting equipment for constructional engineering Download PDF

Info

Publication number
CN220432079U
CN220432079U CN202321821824.6U CN202321821824U CN220432079U CN 220432079 U CN220432079 U CN 220432079U CN 202321821824 U CN202321821824 U CN 202321821824U CN 220432079 U CN220432079 U CN 220432079U
Authority
CN
China
Prior art keywords
fixedly connected
fly leaf
drives
front side
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321821824.6U
Other languages
Chinese (zh)
Inventor
庞金英
黄荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321821824.6U priority Critical patent/CN220432079U/en
Application granted granted Critical
Publication of CN220432079U publication Critical patent/CN220432079U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the technical field of constructional engineering and discloses a temporary wire hoisting device for the constructional engineering, which comprises a bottom plate, wherein a fixed box is fixedly connected to the left side of the top of the bottom plate, a screw is movably connected to the middle end of an inner cavity of the fixed box through a bearing, a threaded sleeve is connected to the surface of the screw in a threaded manner, movable plates are fixedly connected to the front side and the back side of the threaded sleeve, a supporting rod is fixedly connected to the top of the movable plate, and a movable rod is fixedly connected to the top of the supporting rod. This interim wire lifting device of building engineering drives the swivel nut through the effect of screw rod in the rotation in-process and upwards moves, and the swivel nut drives the fly leaf upwards moves, and the fly leaf drives the butt pole upwards and moves, and the butt pole drives the fly leaf and upwards moves, and the fly leaf passes through the jib and drives the gallows and upwards move, conveniently adjusts the hoist and mount height, has solved current wire lifting device and does not possess height-adjusting's function when using to inconvenient people's problem of using.

Description

Temporary lead hoisting equipment for constructional engineering
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to temporary wire hoisting equipment for constructional engineering.
Background
The building engineering refers to engineering entities formed by building various house buildings and auxiliary facilities thereof and installing and moving lines, pipelines and equipment matched with the building buildings. The house building is an engineering which has a top cover, a beam column, a wall, a foundation and can form an inner space and meet the requirements of production, living, study and public activities of people, and wire hoisting equipment is needed in wire installation.
Although the prior art meets the use requirements of users to a certain extent, certain defects still exist in the use process, and the specific problems are as follows: the existing wire hoisting equipment does not have the function of adjusting the height when in use, and cannot limit the wires, and the wires are easy to fall off in the guiding hoisting process, so that the wire hoisting equipment is inconvenient for people to use.
In order to solve the problems, the temporary wire hoisting equipment for the construction engineering is improved.
Disclosure of Invention
In order to solve the technical problems, the utility model provides the following technical scheme: the utility model provides a building engineering temporary conductor lifting device, includes the bottom plate, the left side fixedly connected with fixed box at bottom plate top, the middle-end of fixed box inner chamber has the screw rod through bearing swing joint, the surface threaded connection of screw rod has the swivel nut, the equal fixedly connected with fly leaf of front side and the dorsal part of swivel nut, the top fixedly connected with of fly leaf supports the pole, the top fixedly connected with movable rod that supports the pole, the right side fixedly connected with jib of movable rod, the bottom fixedly connected with gallows of jib.
Preferably, the front side and the back side on the right side of the top of the bottom plate are fixedly connected with guide posts, the surfaces of the guide posts are slidably connected with guide sleeves, the inner sides of the guide sleeves are fixedly connected with connecting plates, the front sides and the back sides of the tops of the connecting plates are fixedly connected with connecting rods, the tops of the connecting rods are fixedly connected with cross bars, and the right sides of the suspenders are fixedly connected to the left sides of the cross bars.
Preferably, the bottom fixedly connected with servo motor of fixed case front side, servo motor's output fixedly connected with driving gear, the bottom fixedly connected with driven gear on screw rod surface, through tooth meshing between driving gear and the driven gear.
Preferably, the front side and the back side of the inner wall of the fixed box are both provided with sliding grooves, and the outer side of the movable plate is slidably connected in the inner cavity of the sliding groove.
Preferably, the front side at gallows top has the threaded rod through screw threaded connection, the top fixedly connected with hand wheel of threaded rod, the bottom swing joint of threaded rod has the clamp plate, the bottom bonding of clamp plate has the protection pad.
Preferably, universal wheels are movably connected to the periphery of the bottom plate, a battery box is fixedly connected to the right side of the top of the bottom plate, a storage battery is arranged in an inner cavity of the battery box, and a charging hole is formed in the right side of the battery box.
Compared with the prior art, the utility model provides the temporary wire hoisting equipment for the construction engineering, which has the following beneficial effects:
1. this interim wire lifting device of building engineering drives the swivel nut through the effect of screw rod in the rotation in-process and upwards moves, and the swivel nut drives the fly leaf upwards moves, and the fly leaf drives the butt pole upwards and moves, and the butt pole drives the fly leaf and upwards moves, and the fly leaf passes through the jib and drives the gallows and upwards move, conveniently adjusts the hoist and mount height, has solved current wire lifting device and does not possess height-adjusting's function when using to inconvenient people's problem of using.
2. This interim wire lifting device of building engineering, through rotating the hand wheel, the hand wheel drives the threaded rod and rotates, and the threaded rod passes through the effect of screw along the inner chamber of screw downwardly moving to drive clamp plate downwardly moving, make the bottom of protection pad and the top contact of wire, spacing the wire, avoid the wire to take place to drop at the hoist and mount in-process.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic cross-sectional view of the stationary box of the present utility model in a left-hand view;
FIG. 3 is a schematic view of a hanger according to the present utility model;
fig. 4 is a schematic cross-sectional structure of the battery case of the present utility model.
Wherein: 1. a bottom plate; 2. a fixed box; 3. a movable rod; 4. a boom; 5. a hanging bracket; 6. a guide sleeve; 7. a guide post; 8. a cross bar; 9. a connecting rod; 10. a connecting plate; 11. a servo motor; 12. a universal wheel; 13. a battery case; 14. a supporting rod; 15. a screw; 16. a screw sleeve; 17. a movable plate; 18. a chute; 19. a driven gear; 20. a drive gear; 21. a hand wheel; 22. a threaded rod; 23. a protective pad; 24. a pressing plate; 25. and a storage battery.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, a temporary wire hoisting device for construction engineering comprises a bottom plate 1, wherein a fixed box 2 is fixedly connected to the left side of the top of the bottom plate 1, a screw 15 is movably connected to the middle end of an inner cavity of the fixed box 2 through a bearing, a threaded sleeve 16 is connected to the surface of the screw 15, a movable plate 17 is fixedly connected to the front side and the back side of the threaded sleeve 16, a supporting rod 14 is fixedly connected to the top of the movable plate 17, a movable rod 3 is fixedly connected to the top of the supporting rod 14, a suspender 4 is fixedly connected to the right side of the movable rod 3, and a hanging bracket 5 is fixedly connected to the bottom of the suspender 4.
Specifically, the front side and the back side on the right side of the top of the bottom plate 1 are fixedly connected with guide posts 7, the surfaces of the guide posts 7 are slidably connected with guide sleeves 6, the inner sides of the guide sleeves 6 are fixedly connected with connecting plates 10, the front sides and the back sides on the top of the connecting plates 10 are fixedly connected with connecting rods 9, the tops of the connecting rods 9 are fixedly connected with cross rods 8, and the right sides of the suspenders 4 are fixedly connected to the left sides of the cross rods 8.
Through above-mentioned technical scheme, through setting up uide bushing 6, guide post 7 and connecting plate 10, effectively improve stability and the smoothness nature of jib 4 in the reciprocates the in-process, and then improve hoist and mount stability.
Specifically, the bottom of fixed box 2 front side fixedly connected with servo motor 11, servo motor 11's output fixedly connected with driving gear 20, the bottom fixedly connected with driven gear 19 on screw rod 15 surface, through tooth meshing between driving gear 20 and the driven gear 19.
Through above-mentioned technical scheme, drive gear 20 rotates through servo motor 11's output, and drive gear 20 drives driven gear 19 through tooth meshing's effect and rotates, conveniently drives screw rod 15 and rotates.
Specifically, the front side and the back side of the inner wall of the fixed box 2 are both provided with a chute 18, and the outer side of the movable plate 17 is slidably connected in the inner cavity of the chute 18.
Through the technical scheme, the stability of the movable plate 17 and the screw sleeve 16 in the up-and-down moving process is effectively improved through the arrangement of the sliding groove 18.
Specifically, the front side at the top of the hanging bracket 5 is connected with a threaded rod 22 through screw threads, the top of the threaded rod 22 is fixedly connected with a hand wheel 21, the bottom of the threaded rod 22 is movably connected with a pressing plate 24, and the bottom of the pressing plate 24 is adhered with a protection pad 23.
Through above-mentioned technical scheme, through setting up gallows 5, the convenience carries out preliminary spacing to the wire, through setting up protection pad 23, effectively improves the protection effect to the wire.
Specifically, all around the bottom of bottom plate 1 swing joint has universal wheel 12, and the right side fixedly connected with battery case 13 at bottom plate 1 top, the inner chamber of battery case 13 is provided with battery 25, and the right side of battery case 13 has been seted up and has been charged the hole.
Through above-mentioned technical scheme, through setting up universal wheel 12, convenient whole removes, through setting up battery 25, can wholly supply power.
When the wire lifting device is used, firstly, after the wire is initially limited, the hand wheel 21 is rotated, the hand wheel 21 drives the threaded rod 22 to rotate, the threaded rod 22 moves downwards along the inner cavity of the threaded hole through the action of threads, and drives the pressing plate 24 to move downwards, the bottom of the protection pad 23 contacts with the top of the wire, the wire is limited, the wire is prevented from falling off in the lifting process, then the output end of the servo motor 11 drives the driving gear 20 to rotate, the driving gear 20 drives the driven gear 19 to rotate through the action of tooth meshing, the driven gear 19 drives the screw 15 to rotate, the screw 15 drives the threaded sleeve 16 to move upwards through the action of threads in the rotating process, the threaded sleeve 16 drives the movable plate 17 to move upwards, the movable plate 17 drives the support rod 14 to move upwards, the movable rod 3 drives the lifting frame 5 to move upwards through the lifting rod 4, the lifting height is convenient to adjust, and the problem that people are inconvenient to use is solved (the working process of the whole device is not described in detail in the prior art).
In the description of the present utility model, it should be noted that the azimuth or positional relationship indicated by the terms "vertical", "upper", "lower", "horizontal", etc. are based on the azimuth or positional relationship shown in the drawings, and are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or element referred to must have a specific azimuth, be constructed and operated in a specific azimuth, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, it should also be noted that, unless explicitly specified and limited otherwise, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances. Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. Temporary wire lifting device for constructional engineering, comprising a bottom plate (1), and being characterized in that: the left side fixedly connected with fixed box (2) at bottom plate (1) top, the middle-end of fixed box (2) inner chamber is through bearing swing joint has screw rod (15), the surface threaded connection of screw rod (15) has swivel nut (16), the equal fixedly connected with fly leaf (17) of front side and the dorsal part of swivel nut (16), the top fixedly connected with butt pole (14) of fly leaf (17), the top fixedly connected with fly leaf (3) of butt pole (14), the right side fixedly connected with jib (4) of fly leaf (3), the bottom fixedly connected with gallows (5) of jib (4).
2. The construction temporary conductor hoisting device according to claim 1, wherein: the front side and the back side on bottom plate (1) top right side are all fixedly connected with guide post (7), the surface sliding connection of guide post (7) has uide bushing (6), inboard fixedly connected with connecting plate (10) of uide bushing (6), the front side and the back side on connecting plate (10) top are all fixedly connected with connecting rod (9), the top fixedly connected with horizontal pole (8) of connecting rod (9), the right side fixedly connected with of jib (4) is in the left side of horizontal pole (8).
3. The construction temporary conductor hoisting device according to claim 1, wherein: the bottom of fixed box (2) front side fixedly connected with servo motor (11), the output fixedly connected with driving gear (20) of servo motor (11), the bottom fixedly connected with driven gear (19) on screw rod (15) surface, through tooth meshing between driving gear (20) and driven gear (19).
4. The construction temporary conductor hoisting device according to claim 1, wherein: the front side and the back side of the inner wall of the fixed box (2) are both provided with sliding grooves (18), and the outer sides of the movable plates (17) are slidably connected in the inner cavities of the sliding grooves (18).
5. The construction temporary conductor hoisting device according to claim 1, wherein: the front side at gallows (5) top is through screw threaded connection having threaded rod (22), the top fixedly connected with hand wheel (21) of threaded rod (22), the bottom swing joint of threaded rod (22) has clamp plate (24), the bottom bonding of clamp plate (24) has protection pad (23).
6. The construction temporary conductor hoisting device according to claim 1, wherein: all swing joint has universal wheel (12) around bottom plate (1) bottom, the right side fixedly connected with battery case (13) at bottom plate (1) top, the inner chamber of battery case (13) is provided with battery (25), and the right side of battery case (13) has seted up the hole that charges.
CN202321821824.6U 2023-07-11 2023-07-11 Temporary lead hoisting equipment for constructional engineering Active CN220432079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321821824.6U CN220432079U (en) 2023-07-11 2023-07-11 Temporary lead hoisting equipment for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321821824.6U CN220432079U (en) 2023-07-11 2023-07-11 Temporary lead hoisting equipment for constructional engineering

Publications (1)

Publication Number Publication Date
CN220432079U true CN220432079U (en) 2024-02-02

Family

ID=89697545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321821824.6U Active CN220432079U (en) 2023-07-11 2023-07-11 Temporary lead hoisting equipment for constructional engineering

Country Status (1)

Country Link
CN (1) CN220432079U (en)

Similar Documents

Publication Publication Date Title
CN111620280B (en) Movable lifting device for engineering decoration and lifting method thereof
CN210920780U (en) Rotary monitoring tower
CN220432079U (en) Temporary lead hoisting equipment for constructional engineering
CN215866845U (en) Displacement type electricity meter box convenient to check
CN211306959U (en) Building construction wall perforating device
CN111186800A (en) Portable power maintenance device
CN113798276B (en) Lifting platform for laser live cleaning of insulator
CN211126829U (en) Threading construction device for building electrical engineering
CN209782452U (en) Adjustable energy-saving construction lamp for construction site
CN209871928U (en) A pay-off for in wire and cable work progress
CN214835251U (en) Signal tower signal diffusion device based on thing networking is used
CN214330158U (en) Sliding support for erecting iron tower for television broadcasting
CN212101730U (en) Lifting bracket for mounting electrical equipment
CN209860513U (en) Computer network strutting arrangement
CN213711257U (en) Hydraulic engineering is with regulation formula water pump
CN219792335U (en) Material lifting device for constructional engineering
CN212127026U (en) Adjustable electric cable support
CN218968580U (en) Height-adjustable type suspension cage for construction lifter
CN217956389U (en) Waterproof over-and-under type medium voltage switchgear
CN216305620U (en) Guardrail mounting base for building construction
CN215052099U (en) Bridge maintenance workbench
CN213774370U (en) Scaffold for building engineering
CN219739772U (en) Overhead line construction device for electric power installation
CN216129301U (en) Electromechanical device elevating gear for interior decoration
CN218032883U (en) Lifting type explosion-proof high-pole lamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant