CN220414131U - Plastic formwork for river course slope protection concrete pouring construction - Google Patents

Plastic formwork for river course slope protection concrete pouring construction Download PDF

Info

Publication number
CN220414131U
CN220414131U CN202321898168.XU CN202321898168U CN220414131U CN 220414131 U CN220414131 U CN 220414131U CN 202321898168 U CN202321898168 U CN 202321898168U CN 220414131 U CN220414131 U CN 220414131U
Authority
CN
China
Prior art keywords
wall
fixed
mould
close
plastic formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321898168.XU
Other languages
Chinese (zh)
Inventor
尤元飞
魏绪武
李政安
刘强
于连源
杨道清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yishu River Water Conservancy Project Co ltd
Original Assignee
Shandong Yishu River Water Conservancy Project Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yishu River Water Conservancy Project Co ltd filed Critical Shandong Yishu River Water Conservancy Project Co ltd
Priority to CN202321898168.XU priority Critical patent/CN220414131U/en
Application granted granted Critical
Publication of CN220414131U publication Critical patent/CN220414131U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a plastic formwork for river slope protection concrete pouring construction, and relates to the technical field of river slope protection. According to the utility model, the limiting block and the limiting post are arranged to limit the two groups of dies, the two groups of dies are fixed through the overturning die, the two groups of dies can be fixed more tightly through the limiting rod, and the fixing rod is pushed into the round hole and the round groove through the fixing rod, so that the fixing die and the fixing die can be fixed and firmed.

Description

Plastic formwork for river course slope protection concrete pouring construction
Technical Field
The utility model relates to the technical field of river channel revetments, in particular to a plastic template for river channel revetment concrete pouring construction.
Background
The cast-in-place concrete plastic template is an injection molding template, the raw materials are selected from PP or ABS for processing, the cast-in-place concrete plastic template has higher smoothness compared with other material templates, the surface of the cast concrete is smooth and smooth, and the cast-in-place concrete plastic template has light weight, can reduce the labor force of workers during construction, and is very popular with the workers. But the existing plastic forms are not easy to assemble.
In the prior art, as disclosed in chinese patent CN104775611B, an "integrated concrete casting plastic formwork" is disclosed, and its structure includes a flat panel series formwork for constructing a building plane, a female corner series formwork for constructing a building female corner, a male corner series formwork for constructing a building male corner, a male and female corner plastic formwork for constructing a building beam frame, and a connecting member for realizing connection between the formworks; the panel series templates comprise panel plastic templates and strip plastic templates, and the reentrant corner series templates comprise reentrant corner plastic templates and triple reentrant corner plastic templates; the external corner series templates comprise an external corner plastic template and a three external corner plastic template.
However, in the prior art, in the assembly process of the existing plastic formwork, the connecting piece is required to be screwed up by a wrench while being supported, so that the assembly is not convenient enough in time and labor consumption, and the plastic formwork for river slope protection concrete pouring construction is provided for the problems.
Disclosure of Invention
The utility model aims to solve the problem that the prior plastic formwork in the prior art needs to be supported and screwed up by a wrench at the same time in the assembly process, and is inconvenient to assemble in time and labor consumption, and provides the plastic formwork for river slope protection concrete pouring construction.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a plastic formwork of river course bank protection concrete placement construction, includes the mould, the outer wall of mould is close to upper end edge fixed mounting and has had the stopper, one side of stopper runs through and has seted up spacing hole, the outer wall of mould is close to lower limb position department fixed mounting has spacing post, the outer wall of mould is close to lower limb position department fixed mounting has the gag lever post, the outer wall of mould is close to lower limb position department fixed mounting has the fixed block, one side of fixed block runs through and has seted up the round hole, the outer wall of mould is close to upper edge position department and has seted up the circular slot, the inside of circular slot is provided with the dead lever.
Preferably, the outer wall of the die is fixedly provided with a connecting lug near the upper edge, and the outer wall of the die is fixedly provided with a connecting seat near the lower edge.
Preferably, the inside of engaging lug runs through and is provided with the connecting rod, the outer wall of connecting rod and the inner wall in close contact of engaging lug.
Preferably, the connecting rod runs through the inside of setting at the connecting seat, the outer wall and the inner wall in close contact of connecting seat of connecting rod.
Preferably, the limit post is arranged at the top of the limit rod.
Preferably, the fixing rod is arranged in the round hole in a penetrating way.
Preferably, the outer wall of the fixing rod is in close contact with the inner wall of the round groove, and the outer wall of the fixing rod is in close contact with the inner wall of the round hole.
Compared with the prior art, the utility model has the advantages and positive effects that:
1. according to the utility model, the limiting block and the limiting post are arranged to limit the two groups of dies, the two groups of dies are fixed through the overturning die, the two groups of dies can be fixed more tightly through the limiting rod, and the fixing rod is pushed into the round hole and the round groove through the fixing rod, so that the fixing die and the fixing die can be fixed and firmed.
2. According to the utility model, the connecting lugs and the connecting seats are arranged, so that the two groups of dies can be assembled more firmly, the dies to be fixed are turned over by 90 degrees only by taking down the fixing rods when being disassembled, and the two groups of dies are staggered, so that the disassembly can be realized, and the operation is simple, convenient, time-saving and labor-saving.
Drawings
Fig. 1 is a schematic diagram of a plastic formwork for river slope protection concrete pouring construction in a three-dimensional structure;
fig. 2 is a schematic diagram of a three-dimensional structure of two sets of assembled molds of a plastic formwork for river slope protection concrete pouring construction;
FIG. 3 is a schematic diagram showing a three-dimensional structure of two sets of molds of a plastic formwork for river slope protection concrete pouring construction;
fig. 4 is a schematic perspective view of two sets of mold stoppers of a plastic mold plate for river slope protection concrete pouring construction.
Legend description: 1. a mold; 2. a limiting block; 3. a limiting hole; 4. a limit column; 5. a limit rod; 6. a fixed block; 7. a round hole; 8. a circular groove; 9. a fixed rod; 10. a connecting lug; 11. a connecting seat; 12. and (5) connecting a rod.
Description of the embodiments
In order that the above objects, features and advantages of the utility model will be more clearly understood, a further description of the utility model will be rendered by reference to the appended drawings and examples. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments may be combined with each other.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, however, the present utility model may be practiced otherwise than as described herein, and therefore the present utility model is not limited to the specific embodiments of the disclosure that follow.
Examples
As shown in fig. 1-4, the utility model provides a plastic formwork for river slope protection concrete pouring construction, which comprises a die 1, wherein a limiting block 2 is fixedly arranged at the position, close to the upper end edge, of the outer wall of the die 1, a limiting hole 3 is formed in a penetrating manner, a limiting post 4 is fixedly arranged at the position, close to the lower edge, of the outer wall of the die 1, a limiting rod 5 is fixedly arranged at the position, close to the lower edge, of the outer wall of the die 1, a fixing block 6 is fixedly arranged at the position, close to the lower edge, of the outer wall of the die 1, a circular hole 7 is formed in a penetrating manner, close to the upper edge, of the outer wall of the die 1, a circular groove 8 is formed in a penetrating manner, a fixing rod 9 is arranged at the top of the limiting post 5, the fixing rod 9 is arranged in the circular hole 7 in a penetrating manner, the outer wall of the fixing rod 9 is in tight contact with the inner wall of the circular groove 8, and the outer wall of the fixing rod 9 is in tight contact with the inner wall of the circular hole 7.
The concrete setting and the effect of this embodiment are put in detail below, fix a set of mould 1, present the right angle with another set of mould 1 and first set of mould 1, stagger the outer wall of putting two sets of mould 1, make the spacing post 4 of a set of mould 1 that treats fixed be located the inside of fixed mould 1, the spacing hole 3 of fixing mould 1 is aimed at to spacing post 4 that treats fixed mould 1, promote to treat fixed mould 1, make spacing post 4 get into spacing hole 3, the angle that will treat fixed mould 1 upset and fixed mould 1 is the same again, make the gag lever post 5 chucking of treating fixed mould 1 the outer wall of the stopper 2 of stopper 2, through setting up stopper 2 and spacing post 4, realize the spacing of two sets of moulds 1, the fixed of two sets of moulds 1 is realized to rethread upset mould 1, through setting up gag lever 5, can make the fixed more closely of two sets of moulds 1, when two sets of moulds 1 are assembled together, the fixed block 6 that treats fixed mould 1 is in the outer wall department of fixed mould 1, treat fixed mould 1's round hole 7 and fixed mould 1's circular slot 8 are aimed at, it is just to treat fixed mould 1, it is just by setting up dead lever 9, it is just to take down fixed mould 1, can take down fixed mould 1 through setting up 9, can take down fixed mould 1 with fixed die 1 through setting up 9, can take down the fixed die 1 conveniently, can be fixed by the fixed die 1, can be fixed through the fixed hole, can be easily and can be fixed by the fixed, and can be easily and convenient, the fixed, can be fixed by the fixed, the die is easy.
Examples
As shown in fig. 1-4, a connecting lug 10 is fixedly installed at a position, close to the upper edge, of the outer wall of the die 1, a connecting seat 11 is fixedly installed at a position, close to the lower edge, of the outer wall of the die 1, a connecting rod 12 penetrates through the connecting lug 10, the outer wall of the connecting rod 12 is in tight contact with the inner wall of the connecting lug 10, the connecting rod 12 penetrates through the connecting seat 11, and the outer wall of the connecting rod 12 is in tight contact with the inner wall of the connecting seat 11.
The whole embodiment of the die assembly structure achieves the effects that after two groups of dies 1 are assembled together, the connecting base 11 of the dies 1 to be fixed is just aligned with the connecting lug 10 of the dies 1 to be fixed, the connecting rod 12 passes through the connecting base 11 and then passes through the connecting lug 10, and the two groups of dies 1 can be assembled more firmly by arranging the connecting lug 10 and the connecting base 11.
The application method and the working principle of the device are as follows: the method comprises the steps of fixing one group of dies 1, enabling the other group of dies 1 to be at right angles to a first group of dies 1, staggering the outer walls of the two groups of dies 1, enabling a limit post 4 of the group of dies 1 to be fixed to be located inside the fixed dies 1, enabling the limit post 4 of the group of dies 1 to be aligned with a limit hole 3 of the fixed dies 1, pushing the group of dies 1 to be fixed, enabling the limit post 4 to enter the limit hole 3, overturning the group of dies 1 to be fixed to be the same as the angle of the fixed dies 1, enabling a limit rod 5 of the group of dies 1 to clamp the outer wall of a limit block 2 of the fixed dies 1, fixing the two groups of dies 1, enabling a fixed block 6 of the group of dies 1 to be located at the outer wall of the fixed dies 1, enabling a round hole 7 of the group of dies 1 to be exactly aligned with a round groove 8 of the fixed dies 1, enabling the fixed rod 9 to be pushed into the round hole 7 and the round groove 8, enabling a connecting seat 11 of the group of dies 1 to be exactly aligned with a connecting lug 10 of the fixed dies 1, enabling the connecting rod 12 to penetrate through the connecting seat 11, enabling the connecting lug 10 to penetrate the connecting lug 10 to be the same, enabling the two groups of dies 1 to be exactly aligned with the round groove 8, and detaching the two groups of dies 1 to be exactly aligned when the two groups of dies 1 are assembled together, and detaching the two groups of dies 1 to be needed to be detached, and detaching the fixed dies 1, and accordingly, and achieving the fixing 1.
The present utility model is not limited to the above-mentioned embodiments, and any equivalent embodiments which can be changed or modified by the technical content disclosed above can be applied to other fields, but any simple modification, equivalent changes and modification made to the above-mentioned embodiments according to the technical substance of the present utility model without departing from the technical content of the present utility model still belong to the protection scope of the technical solution of the present utility model.

Claims (7)

1. The utility model provides a plastic formwork of river course bank protection concrete placement construction, includes mould (1), its characterized in that: the outer wall of mould (1) is close to upper end edge fixed mounting and has limited block (2), limit hole (3) have been run through to one side of limited block (2), the outer wall of mould (1) is close to lower edge position department fixed mounting and has spacing post (4), the outer wall of mould (1) is close to lower edge position department fixed mounting and has gag lever post (5), the outer wall of mould (1) is close to lower edge position department fixed mounting and has fixed block (6), round hole (7) have been run through to one side of fixed block (6), round groove (8) have been seted up near upper edge position department to the outer wall of mould (1), the inside of round groove (8) is provided with dead lever (9).
2. The plastic formwork for river slope concrete casting construction according to claim 1, wherein: the connecting lug (10) is fixedly arranged at the position, close to the upper edge, of the outer wall of the die (1), and the connecting seat (11) is fixedly arranged at the position, close to the lower edge, of the outer wall of the die (1).
3. The plastic formwork for river slope concrete casting construction according to claim 2, wherein: the inside of engaging lug (10) runs through and is provided with connecting rod (12), the outer wall of connecting rod (12) and the inner wall in close contact of engaging lug (10).
4. A river course bank protection concrete placement's plastics template according to claim 3, characterized in that: the connecting rod (12) penetrates through the connecting seat (11), and the outer wall of the connecting rod (12) is in tight contact with the inner wall of the connecting seat (11).
5. The plastic formwork for river slope concrete casting construction according to claim 1, wherein: the limit post (4) is arranged at the top of the limit rod (5).
6. The plastic formwork for river slope concrete casting construction according to claim 1, wherein: the fixing rod (9) is arranged in the round hole (7) in a penetrating mode.
7. The plastic formwork for river slope concrete casting construction according to claim 1, wherein: the outer wall of the fixed rod (9) is tightly contacted with the inner wall of the round groove (8), and the outer wall of the fixed rod (9) is tightly contacted with the inner wall of the round hole (7).
CN202321898168.XU 2023-07-19 2023-07-19 Plastic formwork for river course slope protection concrete pouring construction Active CN220414131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321898168.XU CN220414131U (en) 2023-07-19 2023-07-19 Plastic formwork for river course slope protection concrete pouring construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321898168.XU CN220414131U (en) 2023-07-19 2023-07-19 Plastic formwork for river course slope protection concrete pouring construction

Publications (1)

Publication Number Publication Date
CN220414131U true CN220414131U (en) 2024-01-30

Family

ID=89644346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321898168.XU Active CN220414131U (en) 2023-07-19 2023-07-19 Plastic formwork for river course slope protection concrete pouring construction

Country Status (1)

Country Link
CN (1) CN220414131U (en)

Similar Documents

Publication Publication Date Title
CN109676761B (en) Prefabricated superimposed sheet forming die
CN220414131U (en) Plastic formwork for river course slope protection concrete pouring construction
CN209812639U (en) Integrated automatic grouting forming device for ceramic blank
CN209682504U (en) The adjustable exterior wall board mold of convex block
CN201693656U (en) Forming die for special rotating angle wallboard
CN214925382U (en) Mould for ceramic embryo
CN205674436U (en) A kind of attaching plug upper cover injection mold
CN210851129U (en) Injection mold convenient to replace
CN207620223U (en) Class rectangle column with bolumn cap or bracket
CN208179888U (en) A kind of one-time formed hollow floor core model mold with chamfering
CN107433674A (en) A kind of formwork erection production method of concrete Slab with Slat
CN208180143U (en) Large complicated plastic products segmented injection mold
CN217666245U (en) Well apron mould
CN111391112A (en) Production method of prefabricated reinforced concrete hollow template with internal crossed holes
CN213006240U (en) Double-color integrated thermoplastic molding fixing structure for mold
CN219806248U (en) Fixed interior wallboard of draw-in groove stifled thick liquid frock
CN205058646U (en) Prevent blockking up RTM mould
CN215881996U (en) Fast assembly formula concrete mould for concrete garden component
CN211682690U (en) U-shaped brick mold
CN218138767U (en) Novel full-prefabricated bay window mould
CN216139126U (en) Concrete prefabricated part forming die
CN212826551U (en) Clothes hanger main part forming die
CN219133074U (en) Bait mould
CN218748409U (en) Device for manufacturing concrete floor thickness control block
CN209440438U (en) A kind of window lattice mold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant