CN220396758U - Novel warm siphunculus installation fixed bolster - Google Patents

Novel warm siphunculus installation fixed bolster Download PDF

Info

Publication number
CN220396758U
CN220396758U CN202321378871.8U CN202321378871U CN220396758U CN 220396758 U CN220396758 U CN 220396758U CN 202321378871 U CN202321378871 U CN 202321378871U CN 220396758 U CN220396758 U CN 220396758U
Authority
CN
China
Prior art keywords
pipe
air
warm
belt pulley
supporting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321378871.8U
Other languages
Chinese (zh)
Inventor
陈前明
潘雨阳
陈灿辉
赵树国
钟华斌
石卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial and Energy Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial and Energy Engineering Group Co Ltd filed Critical China Construction Industrial and Energy Engineering Group Co Ltd
Priority to CN202321378871.8U priority Critical patent/CN220396758U/en
Application granted granted Critical
Publication of CN220396758U publication Critical patent/CN220396758U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a novel warm through pipe installation fixing support, in particular to the warm through pipe installation field, which comprises a supporting frame, wherein two installation racks are arranged on the supporting frame, an adjusting component is arranged at the lower end of the supporting frame, a placing frame is arranged in the supporting frame, two beam plates are lapped in the supporting frame, the beam plates are connected with the adjusting component, a limiting plate is arranged at the other end of each beam plate, an anti-slip soft cushion is arranged below each limiting plate, an air blowing component is arranged in the supporting frame, the air blowing component is connected with the limiting plate, and the air blowing component is connected with the beam plates; according to the utility model, the air-blowing device can effectively and freely regulate according to the size of the warm through pipe, so that the limitation of installation is reduced, the overall practicability is improved, and the extruded air blows and cleans sundries on the surface of the warm through pipe through the air-blowing pipe, so that the limiting plate is in close and stable contact with the warm through pipe.

Description

Novel warm siphunculus installation fixed bolster
Technical Field
The utility model relates to the technical field of warm through pipe installation equipment, in particular to a novel warm through pipe installation fixing bracket.
Background
The heating ventilation is a classification name of work types in building equipment and mainly comprises three aspects of heating, ventilation and air conditioning, wherein a heating through pipe is a pipeline for gas exchange, the heating through pipe is generally divided into a plastic pipeline, a metal pipeline and a composite pipeline according to purposes, the heating through pipe is generally arranged in an indoor roof for facilitating fresh gas circulation, the heating through pipe is quite wide in application range, a purifying system air supply and return pipe, a central air conditioning ventilation pipe, an industrial air supply and exhaust ventilation pipe, an environmental protection system air suction and exhaust pipe, a mining gas extraction pipe, a mining glue spreading pipe and the like, and when the heating through pipe needs to be fixed, the heating through pipe is generally installed by using a fixing bracket.
For example, chinese patent grant bulletin nos.: CN218761810U discloses a fixing bracket for mounting a heating pipe, which utilizes an upper fixing plate and a lower fixing plate to clamp and fix the heating pipe, and the upper fixing plate and the lower fixing plate are connected through a plurality of bolts, when the heating pipes with different specifications are required to be mounted and fixed, the fixing bracket is inconvenient to adjust according to the size freedom of the heating pipe, thereby causing the practicality to be reduced, and during mounting, chip particles are easy to fall on the upper surface of the heating pipe due to vibration, and after mounting, the mounting is easy to be unstable due to chips, therefore, a novel fixing bracket for mounting the heating pipe is required to improve the problems.
Disclosure of Invention
The utility model aims to provide a novel warm through pipe installation fixing bracket so as to solve the problems in the background technology.
In order to solve the technical problems, the utility model provides the following technical scheme: the utility model provides a novel warm siphunculus installation fixed bolster, includes the carriage, be equipped with two mounting brackets on the carriage, the carriage lower extreme is equipped with adjusting part, be equipped with in the carriage and place the frame, the overlap joint has two crossbeam boards in the carriage, the crossbeam board is connected with adjusting part, the other end of crossbeam board is equipped with the limiting plate, the limiting plate has set up anti-skidding cushion down, be equipped with the subassembly of blowing in the carriage, the subassembly of blowing is connected with the limiting plate, the subassembly of blowing is connected with the crossbeam board.
In a preferred embodiment, the air blowing component comprises a piston cylinder, the piston cylinder is arranged in the supporting frame, a piston plate is arranged in the piston cylinder, a connecting rod is fixedly arranged at the upper end of the piston plate, the upper end of the connecting rod is fixedly arranged at the bottom end of the cross beam plate, an air outlet pipe is arranged on the side face of the piston cylinder, dust on the upper surface of the warm through pipe can be blown off by the aid of the air blowing component, and stability after installation is improved.
In a preferred embodiment, one end of the air outlet pipe is connected with an air bag, the air outlet end of the air bag is connected with an air ejector pipe, one end of the air ejector pipe is arranged below the limiting plate, extruded air can be collected by the air bag, and the air can be ejected out again when a certain pressure value is reached, so that the air blowing force is larger, and the dust treatment effect is better.
In a preferred embodiment, an air inlet is formed in one end of the piston cylinder, one-way valves are arranged in the air inlet and the air outlet, a pressure release valve is arranged in the air ejector tube, and the flow direction of air can be controlled by the arrangement of the one-way valves and the pressure release valve.
In a preferred embodiment, the adjusting part is including setting up in the hand wheel of carriage bottom, the top of hand wheel is equipped with first belt pulley, first belt pulley is connected with the second belt pulley through belt drive, the upper end intermediate position of first belt pulley and second belt pulley is all fixed and is provided with the lead screw, be provided with coupling nut on the lead screw, coupling nut's side is equipped with the slider, and adjusting part's setting can be effectual according to the size free regulation of warm siphunculus, has not only reduced the limitation of installation, has still improved holistic practicality moreover.
In a preferred embodiment, the screw rod, the first belt pulley, the belt and the second belt pulley are all arranged in the supporting frame, a sliding hole matched with the sliding block is formed in the inner side wall of the supporting frame, a positioning bearing is arranged at the upper end of the screw rod, and the screw rods at the two ends can synchronously move through the belt pulley and the belt.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, the support frame, the hand wheel, the screw rods, the connecting nuts, the sliding blocks and the limiting plates are arranged, the warm through pipe is firstly contacted with the placement frame, then the hand wheel is controlled to drive the first rotary table, the belt, the second rotary table and the two screw rods to rotate, so that the two screw rods rotate and simultaneously drive the two connecting nuts, the two sliding blocks and the two beam plates to move downwards, the beam plates drive the limiting plates and the anti-skid soft cushion to stably contact with the warm through pipe for limiting, and the warm through pipe can be effectively and freely adjusted according to the size of the warm through pipe under the mutual coordination of the hand wheel, the screw rods, the connecting nuts, the sliding blocks and the limiting plates, so that the limitation of installation is reduced, and the overall practicability is improved;
2. according to the utility model, the piston cylinder, the air ejector, the air bag, the one-way valve, the pressure release valve and the cross beam plate are arranged, the cross beam plate can drive the limiting plate to stably move up and down, meanwhile, under the mutual cooperation of the piston cylinder, the air bag, the air ejector and the cross beam plate, as the position of the warm through pipe is higher, the surface of the warm through pipe possibly adheres with some impurities in the process of erecting and pulling the warm through pipe, the cross beam plate extrudes gas in the piston cylinder, so that the extruded gas blows and cleans impurities on the surface of the warm through pipe through the air ejector, the limiting plate is tightly and stably contacted with the warm through pipe, the air bag is arranged to enable the gas to be collected and compressed, the force of the gas during spraying can be increased, and the cleaning effect on the warm through pipe is better.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic view of a three-dimensional structure of the present utility model;
FIG. 2 is a schematic view of a cross-sectional perspective structure of a support frame according to the present utility model;
FIG. 3 is a schematic view of a three-dimensional structure of a screw rod according to the present utility model;
FIG. 4 is a schematic view of the internal structure of the piston cylinder of the present utility model;
in the figure: 1. a support frame; 2. a mounting frame; 3. an adjustment assembly; 31. a hand wheel; 32. a first pulley; 33. a belt; 34. a second pulley; 35. a screw rod; 36. a coupling nut; 37. a slide block; 38. a slide hole; 39. positioning a bearing; 4. a cross beam plate; 5. a limiting plate; 6. an anti-slip soft pad; 7. placing a frame; 8. an air blowing assembly; 81. a piston cylinder; 82. an air outlet pipe; 83. a piston plate; 84. a connecting rod; 85. an air bag; 86. a gas lance; 87. an air inlet.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the utility model provides a novel installation and fixing support for a heating pipe, which comprises a supporting frame 1, wherein two installation frames 2 are arranged on the supporting frame 1, an adjusting component 3 is arranged at the lower end of the supporting frame 1, a placing frame 7 is arranged in the supporting frame 1, two beam plates 4 are lapped in the supporting frame 1, the beam plates 4 are connected with the adjusting component 3, a limiting plate 5 is arranged at the other end of the beam plates 4, an anti-slip cushion 6 is arranged below the limiting plate 5, an air blowing component 8 is arranged in the supporting frame 1, the air blowing component 8 is connected with the limiting plate 5, the air blowing component 8 is connected with the beam plates 4, the arrangement of the anti-slip cushion 6 can protect heating pipes, the air blowing component 8 is driven to operate by lifting of the beam plates 4, and the structure is simple, and the operation is convenient.
In a preferred embodiment, the air blowing assembly 8 includes a piston cylinder 81, the piston cylinder 81 is disposed in the supporting frame 1, a piston plate 83 is disposed in the piston cylinder 81, a connecting rod 84 is fixedly disposed at an upper end of the piston plate 83, an upper end of the connecting rod 84 is fixedly disposed at a bottom end of the beam plate 4, an air outlet pipe 82 is disposed on a side surface of the piston cylinder 81, one end of the air outlet pipe 82 is connected with an air bag 85, an air outlet end of the air bag 85 is connected with an air ejector 86, one end of the air ejector 86 is disposed below the limiting plate 5, one end of the piston cylinder 81 is provided with an air inlet 87, check valves are disposed in the air inlet 87 and the air outlet pipe 82, a pressure release valve is disposed in the air ejector 86, the beam plate 4 can press down the piston plate 83 through the connecting rod 84 when the beam plate 4 presses down, the air inside the piston plate 83 can squeeze the air bag 85 into the air bag 85, when the piston plate 83 presses down to a certain extent, the air pressure inside the air bag 85 reaches a preset value, and the air inside the air bag 85 blows the air towards the surface to warm the surface to clean the warm surface.
In a preferred embodiment, the adjusting assembly 3 includes a hand wheel 31 disposed at the bottom end of the supporting frame 1, a first belt pulley 32 is disposed at the top end of the hand wheel 31, the first belt pulley 32 is connected with a second belt pulley 34 through a belt 33 in a transmission manner, a screw rod 35 is fixedly disposed at middle positions of upper ends of the first belt pulley 32 and the second belt pulley 34, a connecting nut 36 is disposed on the screw rod 35, a sliding block 37 is disposed on a side surface of the connecting nut 36, the screw rod 35, the first belt pulley 32, the belt 33 and the second belt pulley 34 are disposed inside the supporting frame 1, a sliding hole 38 matched with the sliding block 37 is formed in an inner side wall of the supporting frame 1, a positioning bearing 39 is disposed at an upper end of the screw rod 35, and by means of the arrangement of the hand wheel 31, the first belt pulley 32, the belt 33 and the second belt pulley 34, under mutual cooperation of the hand wheel 31, the first belt pulley 32 and the second belt pulley 34, a worker can rotate the two screw rods 35 simultaneously through the hand wheel 31; through setting up mounting bracket 2, mounting bracket 2 then makes things convenient for the staff to install braced frame 1 and warm siphunculus to required position, through setting up positioning bearing 39, lead screw 35 and coupling nut 36, positioning bearing 39 plays support and spacing effect to lead screw 35 for lead screw 35 steadily rotates in positioning bearing 39, and lead screw 35 plays support and spacing effect to coupling nut 36 simultaneously, thereby has guaranteed that coupling nut 36 can not appear the phenomenon of random rocking in the in-process that lead screw 35 surface carries out the up-and-down motion; by arranging the sliding block 37 and the sliding hole 38, the sliding hole 38 plays a role in supporting and limiting the sliding block 37, so that the sliding block 37 can slide up and down in the sliding hole 38 smoothly.
The working principle of the utility model is as follows: when the warm through pipe is required to be installed, the warm through pipe is firstly contacted with the placement frame 7, the appropriate length of the warm through pipe is adjusted, and then the hand wheel 31 is controlled to drive the first belt pulley 32, the belt 33, the second belt pulley 34 and the two screw rods 35 to rotate; the two lead screws 35 are enabled to rotate and simultaneously drive the two connecting nuts 36 to move downwards, the two connecting nuts 36 drive the two sliding blocks 37 and the two cross beam plates 4 to move downwards, the cross beam plates 4 drive the limiting plate 5 and the anti-slip cushion 6 to be in stable contact with the warm through pipe to limit and fix the warm through pipe smoothly, the connecting rod 84 can drive the piston plate 83 to descend in the process of pressing down the cross beam plates 4, the piston plate 83 can push gas inside the piston cylinder 81 into the air bag 85, the air bag 85 is enabled to expand, when the piston plate 83 is pressed down to a certain extent, the air pressure inside the air bag 85 reaches the preset value of the pressure release valve, the pressure release valve is opened, the air blow inside the air bag 85 is used for cleaning the surface of the warm through pipe, sundries on the surface of the warm through pipe are blown and cleaned, the situation that the sundries are enabled to be removed through pipe vibration along with the vibration of the warm through pipe is further avoided, and the limiting plate 5 and the warm through pipe are enabled to be released, and the tight and stable contact between the limiting plate 5 and the anti-slip cushion 6 and the warm through pipe is guaranteed.
Standard parts used in the application files can be purchased from the market, and can be customized according to the description of the specification and the drawing, the specific connection modes of the parts are conventional means such as mature bolts, rivets and welding in the prior art, and the machines, the parts and the equipment are of conventional types in the prior art.
Finally, it should be noted that: the above is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that the present utility model is described in detail with reference to the foregoing embodiments, and modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. Novel warm siphunculus installation fixed bolster, including braced frame (1), its characterized in that: be equipped with two mounting brackets (2) on braced frame (1), braced frame (1) lower extreme is equipped with adjusting part (3), be equipped with in braced frame (1) and place frame (7), overlap joint has two crossbeam boards (4) in braced frame (1), crossbeam board (4) are connected with adjusting part (3), the other end of crossbeam board (4) is equipped with limiting plate (5), limiting plate (5) have anti-skidding cushion (6) down, be equipped with in braced frame (1) and blow subassembly (8), blow subassembly (8) are connected with limiting plate (5), blow subassembly (8) are connected with crossbeam board (4).
2. The novel warm through pipe installation fixing support according to claim 1, wherein the air blowing assembly (8) comprises a piston cylinder (81), the piston cylinder (81) is arranged in the supporting frame (1), a piston plate (83) is arranged in the piston cylinder (81), a connecting rod (84) is fixedly arranged at the upper end of the piston plate (83), the upper end of the connecting rod (84) is fixedly arranged at the bottom end of the cross beam plate (4), and an air outlet pipe (82) is arranged on the side face of the piston cylinder (81).
3. The novel warm through pipe installation fixing support according to claim 2, wherein one end of the air outlet pipe (82) is connected with an air bag (85), an air outlet end of the air bag (85) is connected with an air ejector pipe (86), and one end of the air ejector pipe (86) is arranged below the limiting plate (5).
4. A novel warm through pipe installation fixing support according to claim 3, characterized in that an air inlet (87) is formed in one end of the piston cylinder (81), one-way valves are arranged in the air inlet (87) and the air outlet pipe (82), and a pressure release valve is arranged in the air ejector pipe (86).
5. The novel warm siphunculus installation fixed bolster of claim 1, characterized in that, adjusting part (3) is including setting up in hand wheel (31) of carriage (1) bottom, the top of hand wheel (31) is equipped with first belt pulley (32), first belt pulley (32) are connected with second belt pulley (34) through belt (33) transmission, the upper end intermediate position of first belt pulley (32) and second belt pulley (34) is all fixed and is provided with lead screw (35), be provided with coupling nut (36) on lead screw (35), the side of coupling nut (36) is equipped with slider (37).
6. The novel warm through pipe installation fixing support according to claim 5, wherein the screw rod (35), the first belt pulley (32), the belt (33) and the second belt pulley (34) are all arranged in the supporting frame (1), a sliding hole (38) matched with the sliding block (37) is formed in the inner side wall of the supporting frame (1), and a positioning bearing (39) is arranged at the upper end of the screw rod (35).
CN202321378871.8U 2023-06-01 2023-06-01 Novel warm siphunculus installation fixed bolster Active CN220396758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321378871.8U CN220396758U (en) 2023-06-01 2023-06-01 Novel warm siphunculus installation fixed bolster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321378871.8U CN220396758U (en) 2023-06-01 2023-06-01 Novel warm siphunculus installation fixed bolster

Publications (1)

Publication Number Publication Date
CN220396758U true CN220396758U (en) 2024-01-26

Family

ID=89601934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321378871.8U Active CN220396758U (en) 2023-06-01 2023-06-01 Novel warm siphunculus installation fixed bolster

Country Status (1)

Country Link
CN (1) CN220396758U (en)

Similar Documents

Publication Publication Date Title
CN113385964B (en) All-round dust suppression inflation formula tubular product of three-phase revolution mechanic presss from both sides tight processing all-in-one
CN207254791U (en) Wiring board deashing device
CN214108116U (en) Clean device of maintaining of central air conditioning
CN220396758U (en) Novel warm siphunculus installation fixed bolster
CN214766280U (en) Panel paint spraying apparatus with stoving function
CN210817215U (en) Cooling device for ring rolling forging
CN219383040U (en) Suction nozzle hot press device
CN117283658A (en) Energy-saving and environment-friendly furniture board processing equipment and processing method thereof
CN111558568A (en) Surface cleaning device for die machining
CN217569949U (en) Stamping die with self-cleaning function
CN217595734U (en) Fine blanking die capable of automatically taking workpiece
CN216399979U (en) Refractory material compression molding equipment
CN109383009A (en) A kind of plastics mould and pressing die tool of effective
CN214442550U (en) Automatic workpiece moving device
CN208853169U (en) A kind of point glue equipment for multi-panel back-off workpiece
CN112207107B (en) Smoke purification system for automobile welding workshop and application method of smoke purification system
CN112091076A (en) Automobile metal plate stamping die
CN113942099A (en) Refractory material compression molding equipment
CN106945338A (en) A kind of control system of forcing press dry clutch brake
CN219683685U (en) Stamping device
CN209532684U (en) Handware stamping device
CN207951811U (en) A kind of oiling device for the production of air conditioning for automobiles part
CN216178856U (en) Porous product is clean with blowing hole device
CN218004785U (en) Die bonding structure of full-automatic die bonding machine
CN117565144B (en) Sheet punching machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant