CN220392886U - Paying-off device for hydraulic engineering - Google Patents

Paying-off device for hydraulic engineering Download PDF

Info

Publication number
CN220392886U
CN220392886U CN202321630895.8U CN202321630895U CN220392886U CN 220392886 U CN220392886 U CN 220392886U CN 202321630895 U CN202321630895 U CN 202321630895U CN 220392886 U CN220392886 U CN 220392886U
Authority
CN
China
Prior art keywords
rack
wall
hydraulic engineering
pay
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321630895.8U
Other languages
Chinese (zh)
Inventor
王丽丽
张梦茜
韩琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tongli Construction Project Management Co ltd
Original Assignee
Shandong Tongli Construction Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tongli Construction Project Management Co ltd filed Critical Shandong Tongli Construction Project Management Co ltd
Priority to CN202321630895.8U priority Critical patent/CN220392886U/en
Application granted granted Critical
Publication of CN220392886U publication Critical patent/CN220392886U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Unwinding Of Filamentary Materials (AREA)

Abstract

The utility model discloses a paying-off device for hydraulic engineering, which comprises a rack, a driving mechanism and an adjusting mechanism, wherein moving wheels are arranged on two sides of the bottom end of the rack, an upright post is welded at the top end of the rack, a paying-off reel is arranged at the top end of the upright post, a cable is wound on the inner wall of the paying-off reel, the driving mechanism is arranged on one side of the top end of the rack, and the adjusting mechanism is welded on the other side of the top end of the rack. This a pay-off for hydraulic engineering, through the adjustment mechanism who sets up, be convenient for like this when laying the cable pay-off, drive down solid fixed ring through the lifter in the adjustment mechanism and go up and down to guide the unwrapping wire through the guide ring with the cable in the unwrapping wire reel to the height of adjusting the cable unwrapping wire according to the laying position of cable.

Description

Paying-off device for hydraulic engineering
Technical Field
The utility model relates to the technical field related to hydraulic engineering, in particular to a paying-off device for hydraulic engineering.
Background
The hydraulic engineering refers to various projects (including projects of new construction, expansion, reconstruction, such as fixation, repair, demolition and the like) of flood control, drainage, irrigation, hydroelectric generation, water (supply), beach treatment, water and soil conservation, water resource protection and the like, and matched and auxiliary projects thereof, and a paying-off device is needed when paying off and laying a cable, so that the paying-off device for the hydraulic engineering is needed.
The paying-off device for hydraulic engineering used at present is inconvenient to adjust according to the laying height of the cable.
Disclosure of Invention
The utility model aims to provide a paying-off device for hydraulic engineering, which solves the problem that the paying-off device for hydraulic engineering, which is used at present and is proposed in the background art, is inconvenient to adjust according to the laying height of a cable.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a pay-off for hydraulic engineering, includes rack, actuating mechanism and adjustment mechanism, the removal wheel is all installed to the bottom both sides of rack, and the top welding of rack has the stand, the reel is installed on the top of stand, and the inner wall rolling of reel has the cable, actuating mechanism installs on the top one side of rack, adjustment mechanism welds the top opposite side at the rack.
Preferably, the driving mechanism comprises a driver, a motor, a driving gear, a braking belt and a driven gear, wherein the driver is arranged on one side of the top end of the bench, the motor is arranged on the top end of the driver, the driving gear is arranged at the front end of the driver, the braking belt is arranged on the outer wall of the driving gear, and the driven gear is arranged at the other end of the braking belt.
Preferably, the driven gear is connected with the braking belt in a meshed mode, and the outer wall of the driven gear and the inner wall of the braking belt are arranged in a zigzag mode.
Preferably, the adjustment mechanism comprises a lifting rod, a lower fixing ring, a guide ring, an upper fixing ring and a fixing rod, wherein the lifting rod is welded on one side of the top end of the bench, the lower fixing ring is welded on the top end of the lifting rod, the guide rings are welded on two ends of the outer wall of the lower fixing ring, the upper fixing ring is connected with the top end screw of the lower fixing ring, and the fixing rod is connected with two ends of the outer wall of the upper fixing ring by screws.
Preferably, the lower fixing ring and the rack form a lifting structure through a lifting rod, and the lifting rod and the lower fixing ring are vertically arranged.
Preferably, the upper fixing ring is in threaded connection with the lower fixing ring through a fixing rod, and the outer wall of the fixing rod and the inner wall of the lower fixing ring are in threaded arrangement.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the paying-off device for the hydraulic engineering, through the arranged adjusting mechanism, when the cables are paid off and laid, the fixed ring is driven to lift by the lifting rod in the adjusting mechanism, and the cables in the paying-off reel are guided and paid off through the guide ring, so that the paying-off height of the cables is adjusted according to the laying position of the cables;
2. this a pay-off for hydraulic engineering, through the actuating mechanism who sets up, be convenient for like this when the unwrapping wire, drive driving gear rotation through the driver, thereby driving gear can drive braking belt and driven gear and drive the unreel dish and carry out the linkage rotation for unreel the cable on the reel carries out unreeling from unreeling, need not artifical manual unreeling, thereby uses manpower sparingly.
Drawings
FIG. 1 is a front view of the present utility model;
FIG. 2 is a part view of the adjustment mechanism of the present utility model;
FIG. 3 is a part view of the drive mechanism of the present utility model.
In the figure: 1. a stand; 2. a moving wheel; 3. a column; 4. placing a reel; 5. a cable; 6. a driving mechanism; 601. a driver; 602. a motor; 603. a drive gear; 604. a brake belt; 605. a driven gear; 7. an adjusting mechanism; 701. a lifting rod; 702. a lower fixing ring; 703. a guide ring; 704. an upper fixing ring; 705. and a fixing rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: the utility model provides a pay-off for hydraulic engineering, including rack 1, actuating mechanism 6 and adjustment mechanism 7, the bottom both sides of rack 1 all are installed and are removed round 2, and the top of rack 1 welds and has stand 3, the reel 4 is installed on the top of stand 3, and the inner wall rolling of reel 4 has cable 5, actuating mechanism 6 installs in the top side of rack 1, actuating mechanism 6 includes driver 601, motor 602, actuating gear 603, brake belt 604 and driven gear 605, the actuating mechanism 601 installs in the top side of rack 1, motor 602 is installed on the top of actuating mechanism 601, and actuating gear 603 is installed to the front end of driver 601, the outer wall of actuating gear 603 is provided with brake belt 604, and the other end of brake belt 604 is provided with driven gear 605, be connected for the meshing between driven gear 605 and brake belt 604, and the inner wall of driven gear 605 is the zigzag setting, in the time of paying out, through actuating mechanism 6 of setting up, drive gear 603 drive brake belt 604 and driven gear 605 thereby drive the reel 4 and driven gear 603 rotate, thereby, manual labor is saved in the reel 5 of unreeling of reel that makes the manual work unreeling;
the adjustment mechanism 7 is welded on the other side of the top end of the rack 1, the adjustment mechanism 7 comprises a lifting rod 701, a lower fixing ring 702, a guide ring 703, an upper fixing ring 704 and a fixing rod 705, the lifting rod 701 is welded on one side of the top end of the rack 1, the lower fixing ring 702 is welded on the top end of the lifting rod 701, the guide rings 703 are welded on two ends of the outer wall of the lower fixing ring 702, the upper fixing ring 704 is connected with the upper fixing ring 704 through screws on two ends of the outer wall of the upper fixing ring 704, the lower fixing ring 702 and the rack 1 form a lifting structure through the lifting rod 701, the lifting rod 701 and the lower fixing ring 702 are vertically arranged, the upper fixing ring 704 is in threaded connection with the lower fixing ring 702 through the fixing rod 705, the outer wall of the fixing rod 705 and the inner wall of the lower fixing ring 702 are in threaded arrangement, through the arranged adjustment mechanism 7, so that when a cable 5 is laid in a paying-off manner, the lower fixing ring 702 is driven to lift through the lifting rod 701 in the adjustment mechanism 7, the cable 5 in the paying-off reel 4 is guided and paying-off through the guide ring 703, the cable 5 in the paying-off position according to the position of the cable 5.
Working principle: when the paying-off device is used, firstly, after the rack 1 is moved to a designated position through the moving wheel 2, the cable 5 on the paying-off reel 4 is inserted through the guide ring 703 in the adjusting mechanism 7, then the driving gear 603 is driven to rotate through the driver 601 in the driving mechanism 6, the driving gear 603 can drive the brake belt 604 and the driven gear 605 to drive the paying-off reel 4 to rotate in a linkage manner, the cable 5 on the paying-off reel 4 is automatically unreeled, manual unreeled is not needed, so that manpower is saved, then the lower fixed ring 702 is driven to lift through the lifting rod 701 in the adjusting mechanism 7, the paying-off is guided through the cable 5 in the paying-off reel 4 through the guide ring 703, and the paying-off height of the cable 5 is adjusted according to the laying position of the cable 5, so that the operation flow of the paying-off device for hydraulic engineering is completed.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A pay-off for hydraulic engineering, its characterized in that includes rack (1), actuating mechanism (6) and adjustment mechanism (7), movable wheel (2) are all installed to the bottom both sides of rack (1), and the top welding of rack (1) has stand (3), put reel (4) are installed on the top of stand (3), and put the inner wall rolling cable (5) of reel (4), actuating mechanism (6) are installed on one side of the top of rack (1), adjustment mechanism (7) welding is on the top opposite side of rack (1).
2. A pay-off device for hydraulic engineering according to claim 1, wherein: the driving mechanism (6) comprises a driver (601), a motor (602), a driving gear (603), a braking belt (604) and a driven gear (605), wherein the driver (601) is arranged on one side of the top end of the rack (1), the motor (602) is arranged on the top end of the driver (601), the driving gear (603) is arranged at the front end of the driver (601), the braking belt (604) is arranged on the outer wall of the driving gear (603), and the driven gear (605) is arranged at the other end of the braking belt (604).
3. A pay-off device for hydraulic engineering according to claim 2, wherein: the driven gear (605) is in meshed connection with the brake belt (604), and the outer wall of the driven gear (605) and the inner wall of the brake belt (604) are arranged in a zigzag mode.
4. A pay-off device for hydraulic engineering according to claim 1, wherein: adjustment mechanism (7) are including lifter (701), lower solid fixed ring (702), guide ring (703), go up solid fixed ring (704) and dead lever (705), lifter (701) welding is in top one side of rack (1), the top welding of lifter (701) has lower solid fixed ring (702), and all welds guide ring (703) at the outer wall both ends of lower solid fixed ring (702), the top screw connection of lower solid fixed ring (702) has last solid fixed ring (704), and go up the equal screw connection in outer wall both ends of solid fixed ring (704) and have dead lever (705).
5. The pay-off device for hydraulic engineering according to claim 4, wherein: the lower fixing ring (702) forms a lifting structure with the bench (1) through the lifting rod (701), and the lifting rod (701) and the lower fixing ring (702) are vertically arranged.
6. The pay-off device for hydraulic engineering according to claim 4, wherein: the upper fixing ring (704) is in threaded connection with the lower fixing ring (702) through a fixing rod (705), and the outer wall of the fixing rod (705) and the inner wall of the lower fixing ring (702) are in threaded arrangement.
CN202321630895.8U 2023-06-26 2023-06-26 Paying-off device for hydraulic engineering Active CN220392886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321630895.8U CN220392886U (en) 2023-06-26 2023-06-26 Paying-off device for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321630895.8U CN220392886U (en) 2023-06-26 2023-06-26 Paying-off device for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN220392886U true CN220392886U (en) 2024-01-26

Family

ID=89600842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321630895.8U Active CN220392886U (en) 2023-06-26 2023-06-26 Paying-off device for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN220392886U (en)

Similar Documents

Publication Publication Date Title
CN108488484B (en) Efficient socket joint pipeline interface installation device
CN106472257B (en) Solar energy translation formula sprinkling irrigation machine
CN210710042U (en) Pay-off rack for power construction
CN210113241U (en) Power line tension device for power line paying-off
CN208345451U (en) Hydraulic lifting type just adjusts pay off rack
CN218809691U (en) Semi-automatic winding and unwinding mechanism
CN220392886U (en) Paying-off device for hydraulic engineering
CN113788358A (en) Cable pay-off for electric power construction
CN209777885U (en) Pipe laying and paying-off device for hydraulic engineering
CN219585706U (en) Hanging equipment for water conservancy pipeline laying
CN217394177U (en) Pipeline welding frame
CN217600284U (en) Electric installation elevating gear that construction used
CN216662294U (en) Pipeline lifting device for laying hydraulic engineering pipeline
CN221607492U (en) Buried pipe paying-off device for hydraulic engineering
KR102234797B1 (en) Self propelled reel type hydraulic puller
CN112499364B (en) Pay-off is used in construction of power transmission and distribution power consumption electric engineering
CN220316867U (en) Buried pipe paying-off mechanism for water conservancy construction preventing cable from bending
CN212429964U (en) Water conservancy construction pipe laying pay-off
CN219585515U (en) Buried pipe paying-off device for laying water conservancy construction cables
CN115149460B (en) Cable laying device for electromechanical installation of building
CN218828802U (en) Cable threading device
CN220358693U (en) Water conservancy and hydropower engineering is with burying line device
CN220054296U (en) Anti-toppling device before steel coil packaging
CN221644151U (en) Hydraulic engineering construction buried pipe pay-off
CN218061340U (en) Climbing device of air purification laboratory construction fitment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant