CN220379066U - A gallows for pipeline installation - Google Patents
A gallows for pipeline installation Download PDFInfo
- Publication number
- CN220379066U CN220379066U CN202321974790.4U CN202321974790U CN220379066U CN 220379066 U CN220379066 U CN 220379066U CN 202321974790 U CN202321974790 U CN 202321974790U CN 220379066 U CN220379066 U CN 220379066U
- Authority
- CN
- China
- Prior art keywords
- support frame
- frame
- support
- adjustable
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 22
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 28
- 230000002787 reinforcement Effects 0.000 claims description 14
- 230000000694 effects Effects 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to the technical field of support and hanging frames, and discloses a support and hanging frame for pipeline installation, which solves the problem that the traditional support and hanging frame is inconvenient to install and detach a pipeline rapidly, and comprises a support and hanging frame body, wherein the support and hanging frame body consists of a main support frame, an adjustable reinforcing support frame I, an adjustable reinforcing support frame II, a pipeline fixing frame I and a pipeline fixing frame II, the adjustable reinforcing support frame I and the adjustable reinforcing support frame II are respectively positioned at two sides of the main support frame, the pipeline fixing frame I and the pipeline fixing frame II are respectively fixedly connected at two sides of the top end of the main support frame, a pipeline is connected inside the pipeline fixing frame I and the pipeline fixing frame II, and the main support frame, the adjustable reinforcing support frame I and the adjustable reinforcing support frame II are connected at the bottom end of a building body in a hoisting mode; can realize installing and dismantling the pipeline fast through this gallows, can improve the whole steadiness of gallows simultaneously.
Description
Technical Field
The utility model belongs to the technical field of support and hanging frames, and particularly relates to a support and hanging frame for pipeline installation.
Background
The support hanger can be used for installing and fixing pipelines of different types, the current support hanger is of a U-shaped structure generally, the stability of pipeline installation can be improved, when the support hanger and the pipelines are installed, the support hanger and the building body are installed and fixed firstly, then the pipelines penetrate from one end of the support hanger, but when the length and the width of the building are smaller, the whole pipeline cannot penetrate through the support hangers in sequence, the installation process is affected, and when the pipeline is required to be replaced or maintained in the later period, the old pipeline cannot be detached conveniently, the new pipeline cannot be installed conveniently, and the use effect is affected.
Disclosure of Invention
Aiming at the situation, in order to overcome the defects of the prior art, the utility model provides the support and hanger for pipeline installation, which effectively solves the problem that the conventional support and hanger is inconvenient to rapidly install and detach a pipeline.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a support and hanger for pipeline installation, includes the support and hanger body, the support and hanger body comprises main support, adjustable reinforcement support, pipeline mount and pipeline mount, and adjustable reinforcement support are located the both sides of main support respectively, and pipeline mount are fixed connection in the both sides on main support top respectively, and pipeline connection is in the inside of pipeline mount and pipeline mount, and main support, adjustable reinforcement support and adjustable reinforcement support are all hoisted and are connected in the bottom of building body.
Preferably, the main support frame comprises a hanging plate, a plurality of first anchor bolts and a supporting bottom plate, wherein the first anchor bolts are fixedly connected to two ends of the top of the hanging plate, the supporting bottom plate is fixedly connected to the bottom end of the hanging plate, and a plurality of limiting through holes matched with the first adjustable reinforcing support frame and the second adjustable reinforcing support frame are formed in two sides of the top end of the supporting bottom plate.
Preferably, the first adjustable reinforcement support frame and the second adjustable reinforcement support frame are composed of a fixed hanging beam, a plurality of anchor bolts, a movable hanging beam, a plurality of adjustable pull rods and an L-shaped support plate, wherein the anchor bolts are fixedly connected to two ends of the top of the fixed hanging beam, the movable hanging beam is connected to the bottom end of the fixed hanging beam through a movable support shaft, the L-shaped support plate is connected with the movable hanging beam through the adjustable pull rods, and a plurality of limiting inserting posts matched with the limiting through holes are fixedly arranged on one side of the top end of the L-shaped support plate.
Preferably, the adjustable pull rod consists of a first screw rod, a second screw rod and a screw sleeve, wherein the first screw rod is fixedly connected to the bottom end of the movable hanging beam, the second screw rod is fixedly connected to the top end of the L-shaped supporting plate, and the screw sleeve is sleeved on the first screw rod and the second screw rod.
Preferably, the first pipeline fixing frame and the second pipeline fixing frame are composed of a supporting base, a movable clamping seat, a plurality of connecting screws and a plurality of locking nuts, the connecting screws are fixedly connected to two sides of the top end of the supporting base, the movable clamping seat is arranged at the top of the supporting base in a sleeved mode, the connecting screws are arranged in a sleeved mode through the locking nuts, the top end of the supporting base and the bottom end of the movable clamping seat are of arc-shaped structures, and buffer cushions are fixedly arranged at the top end of the supporting base and the bottom end of the movable clamping seat.
Compared with the prior art, the utility model has the beneficial effects that:
(1) In operation, the main support frame consisting of the hanging plate, the first anchor bolts and the supporting bottom plate, the first adjustable reinforcing support frame and the second adjustable reinforcing support frame consisting of the fixed hanging beam, the second anchor bolts, the movable hanging beam, the adjustable pull rods and the L-shaped supporting plate are arranged, so that the quick installation of the pipeline can be facilitated, the pipeline can be placed from the side edge of the supporting hanger during the installation without penetrating from one end, the convenience of the installation and the disassembly can be improved, the stability of the whole supporting hanger can be ensured, the two pipelines can be supported, and the adaptability is improved;
(2) The first pipeline fixing frame and the second pipeline fixing frame which are formed by the supporting base, the movable clamping seat, the connecting screws and the locking nuts are arranged, so that the pipeline can be supported and fixed, and meanwhile, the pipeline fixing frame can be suitable for installing pipelines with different diameters.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model.
In the drawings:
FIG. 1 is a schematic illustration of one of the support and hanger configurations for pipe installation of the present utility model;
FIG. 2 is a schematic diagram of a second support and hanger for pipe installation according to the present utility model;
FIG. 3 is a schematic view of the structure of the main support frame of the present utility model;
FIG. 4 is a schematic view of an adjustable reinforcement support frame according to the present utility model;
FIG. 5 is a schematic view of a pipe fixing frame according to the present utility model;
in the figure: 1. a support hanger body; 2. a main support frame; 3. an adjustable reinforcement support frame I; 4. an adjustable reinforcing support frame II; 5. a first pipeline fixing frame; 6. a second pipeline fixing frame; 7. a hanger plate; 8. an anchor bolt I; 9. a support base plate; 10. limiting through holes; 11. a fixed hanging beam; 12. an anchor bolt II; 13. a movable hanging beam; 14. an adjustable tie rod; 15. an L-shaped support plate; 16. a movable support shaft; 17. limiting plug posts; 18. a first screw; 19. a second screw; 20. a screw sleeve; 21. a support base; 22. a movable clamping seat; 23. a connecting screw; 24. a lock nut; 25. and a cushion pad.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all embodiments of the utility model; all other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
As shown in fig. 1 and 2, a support and hanger for installing a pipeline according to the present utility model includes a support and hanger body 1, wherein the support and hanger body 1 is composed of a main support 2, an adjustable reinforcing support frame 1, an adjustable reinforcing support frame 4, a pipeline fixing frame 5 and a pipeline fixing frame 6, the adjustable reinforcing support frame 3 and the adjustable reinforcing support frame 4 are respectively located at two sides of the main support 2, the pipeline fixing frame 5 and the pipeline fixing frame 6 are respectively fixedly connected at two sides of the top end of the main support 2, the pipeline is connected inside the pipeline fixing frame 5 and the pipeline fixing frame 6, and the main support 2, the adjustable reinforcing support frame 3 and the adjustable reinforcing support frame 4 are respectively connected at the bottom end of a building body in a hoisting manner;
as shown in fig. 2 to 5, the main support 2 is composed of a hanger plate 7, a plurality of first anchors 8 and a support bottom plate 9, the first anchors 8 are fixedly connected to two ends of the top of the hanger plate 7, the support bottom plate 9 is fixedly connected to the bottom end of the hanger plate 7, a plurality of limit through holes 10 matched with the first adjustable reinforcement support 3 and the second adjustable reinforcement support 4 are respectively formed in two sides of the top end of the support bottom plate 9, the first adjustable reinforcement support 3 and the second adjustable reinforcement support 4 are respectively composed of a fixed hanger beam 11, a plurality of second anchors 12, a movable hanger beam 13, a plurality of adjustable pull rods 14 and an L-shaped support plate 15, the movable hanger beam 13 is fixedly connected to two ends of the top of the fixed hanger beam 11 through a movable support shaft 16, the L-shaped support plate 14 is connected with the movable hanger beam 13 through the adjustable pull rods 14, one side of the top end of the L-shaped support plate 15 is fixedly provided with a plurality of limit inserting posts 17 matched with the limit through holes 10, the adjustable pull rods 14 are composed of a first screw 18, a second screw 19 and a screw sleeve 20, the first screw 18 is fixedly connected to the bottom end of the movable hanger beam 13, the second screw support plate 19 is fixedly connected to the fixed support base 23, the bottom end of the movable hanger plate 13 is fixedly connected to the fixed support base 23, the screw base 23 is fixedly connected to the top end of the movable support base 23, the fixed base 23 is fixedly connected to the screw base 23, the fixed base 23 is fixedly connected to the top end of the movable support base 23, and the fixed base 23 is fixedly connected to the screw base 23, and the base is fixedly connected to the top base 23 is connected to the top base 23, and the upper base is 23, the top end of the supporting base 21 and the bottom end of the movable clamping seat 22 are fixedly provided with buffer cushions 25;
when the pipeline is installed, the threaded sleeve 20 is rotated at first, the threaded rod II 19 is enabled to descend, the L-shaped supporting plate 15 is driven to descend through the threaded rod II 19, the limiting inserting column 17 is enabled to leave the limiting through hole 10, then the L-shaped supporting plate 15 is pushed, the movable hanging beam 13, the adjustable pull rod 14 and the L-shaped supporting plate 15 integrally rotate around the movable supporting shaft 16, at the moment, a pipeline installation gap is formed, then the movable clamping seat 22 is taken down from the connecting threaded rod 23, the pipeline is placed to the top end of the supporting base 21 from the installation gap, then the movable clamping seat 22 is installed, the pipeline is locked through the locking nut 24, the pipelines with different diameters can be installed through the supporting base 21 and the movable clamping seat 22, after the pipeline is installed and fixed, the movable hanging beam 13, the adjustable pull rod 14 and the L-shaped supporting plate 15 are integrally reset, then the threaded sleeve 20 is reversed, the threaded rod II 19 is driven to ascend, the reinforcing support of the hanging frame body 1 is achieved through the L-shaped supporting plate 15, and the integral stability of the hanging frame can be improved.
In operation, the main support frame consisting of the hanging plate, the first anchor bolts and the supporting bottom plate, the first adjustable reinforcing support frame and the second adjustable reinforcing support frame consisting of the fixed hanging beam, the second anchor bolts, the movable hanging beam, the adjustable pull rods and the L-shaped supporting plate are arranged, so that the quick installation of the pipeline can be facilitated, the pipeline can be placed from the side edge of the supporting hanger during the installation without penetrating from one end, the convenience of the installation and the disassembly can be improved, the stability of the whole supporting hanger can be ensured, the two pipelines can be supported, and the adaptability is improved; through setting up first and the pipeline mount second of the pipeline mount that comprises support base, activity cassette, a plurality of connecting screw and a plurality of lock nut, can support fixedly to the pipeline, can be adapted to simultaneously install the pipeline of different diameters.
Claims (5)
1. A support and hanger for pipe installation, comprising a support and hanger body (1), characterized in that: the support hanger body (1) comprises a main support frame (2), an adjustable reinforcing support frame I (3), an adjustable reinforcing support frame II (4), a pipeline fixing frame I (5) and a pipeline fixing frame II (6), wherein the adjustable reinforcing support frame I (3) and the adjustable reinforcing support frame II (4) are respectively positioned at two sides of the main support frame (2), the pipeline fixing frame I (5) and the pipeline fixing frame II (6) are respectively fixedly connected to two sides of the top end of the main support frame (2), the pipeline is connected to the inside of the pipeline fixing frame I (5) and the pipeline fixing frame II (6), and the main support frame (2), the adjustable reinforcing support frame I (3) and the adjustable reinforcing support frame II (4) are all connected to the bottom end of a building body in a hoisting mode.
2. A hanger for pipe installation as claimed in claim 1, wherein: the main support (2) is composed of a hanging plate (7), a plurality of first anchor bolts (8) and a supporting bottom plate (9), the first anchor bolts (8) are fixedly connected to two ends of the top of the hanging plate (7), the supporting bottom plate (9) is fixedly connected to the bottom end of the hanging plate (7), and a plurality of limiting through holes (10) matched with the first adjustable reinforcing support frame (3) and the second adjustable reinforcing support frame (4) are formed in two sides of the top end of the supporting bottom plate (9).
3. A hanger for pipe installation as claimed in claim 2, wherein: the adjustable reinforcement support frame I (3) and the adjustable reinforcement support frame II (4) are composed of a fixed hanging beam (11), a plurality of anchor bolts II (12), a movable hanging beam (13), a plurality of adjustable pull rods (14) and an L-shaped support plate (15), wherein the anchor bolts II (12) are fixedly connected to two ends of the top of the fixed hanging beam (11), the movable hanging beam (13) is connected to the bottom end of the fixed hanging beam (11) through a movable support shaft (16), the L-shaped support plate (15) is connected with the movable hanging beam (13) through the adjustable pull rods (14), and a plurality of limiting inserting columns (17) matched with the limiting through holes (10) are fixedly arranged on one side of the top end of the L-shaped support plate (15).
4. A hanger for pipe installation according to claim 3, wherein: the adjustable pull rod (14) consists of a first screw rod (18), a second screw rod (19) and a screw sleeve (20), wherein the first screw rod (18) is fixedly connected to the bottom end of the movable hanging beam (13), the second screw rod (19) is fixedly connected to the top end of the L-shaped supporting plate (15), and the screw sleeve (20) is sleeved on the first screw rod (18) and the second screw rod (19).
5. A hanger for pipe installation as claimed in claim 1, wherein: the pipeline fixing frame I (5) and the pipeline fixing frame II (6) are composed of a supporting base (21), a movable clamping seat (22), a plurality of connecting screw rods (23) and a plurality of locking nuts (24), the connecting screw rods (23) are fixedly connected to two sides of the top end of the supporting base (21), the movable clamping seat (22) is located at the top of the supporting base (21) and sleeved on the connecting screw rods (23), the locking nuts (24) are sleeved on the connecting screw rods (23), the top end of the supporting base (21) and the bottom end of the movable clamping seat (22) are of arc-shaped structures, and buffer cushions (25) are fixedly arranged on the top end of the supporting base (21) and the bottom end of the movable clamping seat (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321974790.4U CN220379066U (en) | 2023-07-26 | 2023-07-26 | A gallows for pipeline installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321974790.4U CN220379066U (en) | 2023-07-26 | 2023-07-26 | A gallows for pipeline installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220379066U true CN220379066U (en) | 2024-01-23 |
Family
ID=89561781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321974790.4U Active CN220379066U (en) | 2023-07-26 | 2023-07-26 | A gallows for pipeline installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220379066U (en) |
-
2023
- 2023-07-26 CN CN202321974790.4U patent/CN220379066U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220379066U (en) | A gallows for pipeline installation | |
CN216641383U (en) | Overhanging bearing frame for scaffold | |
CN214405200U (en) | Engineering equipment installation is with tight structure that rises | |
CN212428032U (en) | Horizontal rod for socket steel pipe support | |
CN215215063U (en) | Single-suspension-pipe anti-seismic support | |
CN219140059U (en) | Novel pipeline positioning device for gas engineering | |
CN218562940U (en) | Steel structure support of safety and stability | |
CN221001957U (en) | Post-pouring belt formwork-supporting-free device convenient to install and detach | |
CN213806546U (en) | Connecting piece for stably connected scaffold cross rod | |
CN216340861U (en) | Diagonal bracing structure for aluminum alloy template | |
CN219622943U (en) | Fan installation framework | |
CN219638116U (en) | Stable steel structure engineering support | |
CN215807550U (en) | Novel solar photovoltaic support | |
CN219138490U (en) | Conversion layer hanging bracket structure | |
CN218541644U (en) | Reinforced concrete reinforced structure | |
CN213626744U (en) | Connecting joint of square steel pipe supporting structure | |
CN220366029U (en) | Pipeline supports connecting device | |
CN220954676U (en) | Shear wall template perpendicularity adjusting device | |
CN215568448U (en) | Adjustable supporting base for pipeline installation | |
CN216807760U (en) | Assembled building construction hoist and mount lateral bracing system | |
CN219792294U (en) | Tower crane base mounting structure | |
CN210372791U (en) | Mounting bracket structure of display for electrical control | |
CN220747754U (en) | Reinforcing apparatus for building construction | |
CN218970024U (en) | Deep foundation pit inner support | |
CN212641284U (en) | Floodgate machine base support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |