Prior art keywords
chute
butt joint
plugboards
concrete
concrete pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321852837.XU
Other languages
Chinese (zh)
Inventor
纪军秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Shuangfa Construction Engineering Co ltd
Original Assignee
Tianjin Shuangfa Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Shuangfa Construction Engineering Co ltd filed Critical Tianjin Shuangfa Construction Engineering Co ltd
Priority to CN202321852837.XU priority Critical patent/CN220377869U/en
Application granted granted Critical
Publication of CN220377869U publication Critical patent/CN220377869U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chutes (AREA)

Abstract

The utility model discloses a concrete pouring chute, which comprises a first chute and a second chute, wherein the first chute and the second chute are fixedly connected through a butt joint chute, one end of the second chute, which is far away from the first chute, is provided with a blocking chute which is vertically distributed and detachably connected with the second chute, two symmetrically distributed second plugboards are respectively arranged at two ends of the butt joint chute, and a first plugboard is arranged between the two second plugboards at two ends of the butt joint chute. This concrete placement chute, through the cooperation between first picture peg and first socket and second picture peg and the second socket, easy operation has improved the compactness of connecting simultaneously, is convenient for piece together first chute and second chute respectively with the butt joint chute for when not needing to use, can disassemble into a plurality of parts with this pouring chute, thereby be convenient for accomodate and transport it, improved the practicality greatly.

Description

Concrete pouring chute
Technical Field
The utility model belongs to the technical field of engineering construction, and particularly relates to a concrete pouring chute.
Background
When concrete pouring is performed, when complex topography conditions are met, the grooves are deeper, the places are narrow or the working surfaces and concrete have larger height difference, the concrete cannot be directly conveyed to the working surfaces, pump trucks and the like cannot be used, and when large-volume concrete pouring is performed, excessive hydration heat is prevented, and the concrete is required to slide down from a high place by adopting a chute.
In the use process of the traditional concrete pouring chute, the integral structure is large, so that the installation and the transportation are inconvenient, great inconvenience is brought to construction, in addition, when the concrete moves up and down in the chute, the impact force is large, and the concrete is easy to be flushed out of a designated range.
Disclosure of Invention
The utility model aims to provide a concrete pouring chute so as to solve the technical problems in the background art.
In order to achieve the above purpose, the specific technical scheme of the utility model is as follows: the utility model provides a concrete placement chute, includes first chute and second chute, through butt joint chute fixed connection between first chute and the second chute, just second chute keeps away from first chute one end and perpendicular and detachably is equipped with the blocking chute.
Preferably, two second plugboards which are symmetrically distributed are respectively arranged at two ends of the butt joint chute, a first plugboard is arranged between the two second plugboards at two ends of the butt joint chute, and first plugboards and second plugboards which are respectively distributed in one-to-one correspondence with the first plugboards and the second plugboards are respectively arranged at opposite ends of the first chute and the second chute and the butt joint chute.
Preferably, the size of the first inserting plate is identical to the size of the first inserting opening, the size of the second inserting plate is identical to the size of the second inserting opening, and the second inserting plate is fixedly connected with the first chute and the second chute respectively through bolts.
Preferably, extension plates are arranged at the two ends of the butt joint chute below the first plugboard, and the upper surfaces of the extension plates are respectively contacted with the bottoms of the first chute and the second chute.
Preferably, two sides of the blocking chute are respectively provided with an abutting plate which is vertically distributed with the long side of the blocking chute, and two sides of one end of the second chute, which is far away from the first chute, are respectively provided with two symmetrically distributed L-shaped plates.
Preferably, a slot is formed between the two L-shaped plates, the size of the butt joint plate is identical to that of the slot, and the butt joint plate is fixedly connected with the second chute through two bolts.
The concrete pouring chute has the following advantages:
1. this concrete placement chute, through the cooperation between first picture peg and first socket and second picture peg and the second socket, easy operation has improved the compactness of connecting simultaneously, is convenient for piece together first chute and second chute respectively with the butt joint chute for when not needing to use, can disassemble into a plurality of parts with this pouring chute, thereby be convenient for accomodate and transport it, improved the practicality greatly.
2. This concrete placement chute blocks the concrete that flows down from first chute and second chute through the setting that blocks the chute, can reduce the impact force of concrete, can effectively prevent because the impact force is too big and make the concrete be washed out the phenomenon emergence of appointed position to make the concrete fall in blocking the opening that forms between chute and the second chute, make the concrete can fall in appointed position.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the embodiments will be briefly described below, it being understood that the following drawings only illustrate some examples of the present utility model and therefore should not be considered as limiting the scope, and other related drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of the structure of FIG. 1 from another perspective;
FIG. 3 is an exploded view of a docking chute in accordance with the present utility model with a first chute and a second chute;
FIG. 4 is a side view of a docking cradle of the present utility model;
FIG. 5 is a schematic view of a blocking chute according to the present utility model;
the figure indicates: 1. a first chute; 2. a second chute; 3. a butt joint chute; 4. blocking the chute; 5. an abutting plate; 6. an L-shaped plate; 7. a first socket; 8. a second socket; 9. a first plugboard; 10. a second plugboard; 11. an extension plate.
Detailed Description
Hereinafter, only certain exemplary embodiments are briefly described. As will be recognized by those of skill in the pertinent art, the described embodiments may be modified in numerous different ways without departing from the spirit or scope of the embodiments of the present utility model. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive.
In the description of the embodiments of the present utility model, it should be understood that the terms "length," "vertical," "horizontal," "top," "bottom," and the like indicate an orientation or a positional relationship based on that shown in the drawings, and are merely for convenience in describing the embodiments of the present utility model and to simplify the description, rather than to indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the embodiments of the present utility model.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the embodiments of the present utility model, the meaning of "plurality" is two or more, unless explicitly defined otherwise.
In the embodiments of the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured" and the like are to be construed broadly and include, for example, either permanently connected, removably connected, or integrally formed; the device can be mechanically connected, electrically connected and communicated; can be directly connected or indirectly connected through an intermediate medium, and can be communicated with the inside of two elements or the interaction relationship of the two elements. The specific meaning of the above terms in the embodiments of the present utility model will be understood by those of ordinary skill in the art according to specific circumstances.
The following disclosure provides many different implementations, or examples, for implementing different configurations of embodiments of the utility model. In order to simplify the disclosure of embodiments of the present utility model, components and arrangements of specific examples are described below. Of course, they are merely examples and are not intended to limit embodiments of the present utility model. Furthermore, embodiments of the present utility model may repeat reference numerals and/or letters in the various examples, which are for the purpose of brevity and clarity, and which do not themselves indicate the relationship between the various embodiments and/or arrangements discussed.
For a better understanding of the objects, structure and function of the present utility model, a concrete pouring spout according to the present utility model will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1-5, the concrete pouring chute comprises a first chute 1 and a second chute 2, wherein the first chute 1 and the second chute 2 are fixedly connected through a butt joint chute 3, two second plugboards 10 which are symmetrically distributed are respectively arranged at two ends of the butt joint chute 3, a first plugboard 9 is respectively arranged between the two second plugboards 10 at two ends of the butt joint chute 3, first jacks 7 and second plugboards 8 which are respectively distributed in one-to-one correspondence with the first plugboards 9 and the second plugboards 10 are respectively arranged at opposite ends of the first chute 1 and the second chute 2, through the matching between the first plugboards 9 and the first plugboards 7 and between the second plugboards 10 and the second plugboards 8, the connection tightness is improved, the first chute 1 and the second chute 2 are conveniently and quickly assembled with the butt joint chute 3, so that the pouring chute can be disassembled into a plurality of parts when the butt joint chute is not needed to be used, the pouring chute is conveniently stored and transported, the practicability is greatly improved, the first plugboards 9 are matched with the first plugboards 9 in size, the first plugboards 7 and the second plugboards 10 are respectively matched with the first plugboards 2, the second plugboards 11 are respectively arranged at the positions of the two ends of the butt joint chute 2, and the first plugboards 2 and the two end of the first chute 2 are respectively connected with the first plugboards 2 and the second plugboards 2 through the first plugboards 11 and the second plugboards 11 and the first plugboards 2 and the second plugboards 2 are respectively arranged at the positions of the two end of the butt joint chute 1.
The second chute 2 is kept away from first chute 1 one end and perpendicular and detachably is equipped with and blocks chute 4, block the both sides of chute 4 all set up rather than the perpendicular butt joint board 5 that distributes in long limit, the one end both sides that first chute 1 was kept away from to second chute 2 all are provided with two symmetrical distribution's L template 6, through the setting that blocks chute 4, block the concrete that flows down from first chute 1 and second chute 2, can reduce the impact force of concrete, can effectively prevent because the impact force is too big and make the phenomenon that the concrete was washed out the assigned position take place, and make the concrete fall in blocking in the opening that forms between chute 4 and the second chute 2, make the concrete can fall in the assigned position. A slot is formed between the two L-shaped plates 6, the size of the abutting plate 5 is identical with that of the slot, the abutting plate 5 is fixedly connected with the second chute 2 through two bolts, and the abutting plate 5 is matched with the L-shaped plates 6 to facilitate disassembly and assembly between the blocking chute 4 and the second chute 2.
It will be understood that the utility model has been described in terms of several embodiments, and that various changes and equivalents may be made to these features and embodiments by those skilled in the art without departing from the spirit and scope of the utility model. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the utility model without departing from the essential scope thereof. Therefore, it is intended that the utility model not be limited to the particular embodiment disclosed, but that the utility model will include all embodiments falling within the scope of the appended claims.

Claims (6)

1. The utility model provides a concrete placement chute which characterized in that: the novel automatic feeding device comprises a first chute (1) and a second chute (2), wherein the first chute (1) and the second chute (2) are fixedly connected through a butt joint chute (3), and one end, far away from the first chute (1), of the second chute (2) is vertical and detachably provided with a blocking chute (4).
2. A concrete pouring spout as claimed in claim 1, wherein: two symmetrically distributed second plugboards (10) are respectively arranged at two ends of the butt joint chute (3), a first plugboard (9) is arranged between the two second plugboards (10) at two ends of the butt joint chute (3), and first jacks (7) and second jacks (8) which are respectively distributed in one-to-one correspondence with the first plugboards (9) and the second plugboards (10) are respectively arranged at one ends, opposite to the butt joint chute (3), of the first chute (1) and the second chute (2).
3. A concrete pouring spout as claimed in claim 2, wherein: the size of the first inserting plate (9) is matched with the size of the first inserting opening (7), the size of the second inserting plate (10) is matched with the size of the second inserting opening (8), and the second inserting plate (10) is fixedly connected with the first chute (1) and the second chute (2) through bolts respectively.
4. A concrete pouring spout as claimed in claim 2, wherein: extension plates (11) are arranged at the two ends of the butt joint chute (3) and positioned below the first plugboard (9), and the upper surfaces of the extension plates (11) are respectively contacted with the bottoms of the first chute (1) and the second chute (2).
5. A concrete pouring spout as claimed in claim 1, wherein: two sides of the blocking chute (4) are provided with abutting plates (5) which are vertically distributed on the long sides of the blocking chute, and two L-shaped plates (6) which are symmetrically distributed are arranged on two sides of one end, far away from the first chute (1), of the second chute (2).
6. A concrete pouring spout as defined in claim 5, wherein: an inserting groove is formed between the two L-shaped plates (6), the size of the butt joint plate (5) is identical with that of the inserting groove, and the butt joint plate (5) is fixedly connected with the second chute (2) through two bolts.
CN202321852837.XU 2023-07-14 2023-07-14 Concrete pouring chute Active CN220377869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321852837.XU CN220377869U (en) 2023-07-14 2023-07-14 Concrete pouring chute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321852837.XU CN220377869U (en) 2023-07-14 2023-07-14 Concrete pouring chute

Publications (1)

Publication Number Publication Date
CN220377869U true CN220377869U (en) 2024-01-23

Family

ID=89566101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321852837.XU Active CN220377869U (en) 2023-07-14 2023-07-14 Concrete pouring chute

Country Status (1)

Country Link
CN (1) CN220377869U (en)

Similar Documents

Publication Publication Date Title
CN220377869U (en) Concrete pouring chute
CN207110059U (en) A kind of modular architectural non-corner module level attachment means
CN211306344U (en) Suction head connecting device
CN213042249U (en) Adapter of water cooling device of display card
CN216618189U (en) Bolt plug-in structure
CN206912586U (en) A kind of multistation demoulding folder welder
CN220868782U (en) Hook for steel springboard
CN218884258U (en) Movable ground source heat pump mounting base
CN212376084U (en) Assembled wallboard convenient to dismantle
CN221090910U (en) Part transfer device
CN220928678U (en) Couple that reinforcing steel springboard is connected
CN212718881U (en) Manual clamping groove structure
CN212002215U (en) Combined qualitative steel template
CN214696997U (en) Elevator shaft guardrail with adjustable height
CN212715335U (en) Truss connecting lock catch
CN214620807U (en) Novel large-scale heat exchanger tube bank of falling cauldron support
CN214337272U (en) Power distribution cabinet convenient to transport
CN219222860U (en) Base structure of heat pump water heater
CN213738130U (en) Elevator car wall connecting structure
CN210898123U (en) Power box connecting piece
CN221447264U (en) Pipeline connection structure and battery
CN213753651U (en) Assembled low voltage distribution box for distribution engineering
CN212725713U (en) Brush panel
CN219830024U (en) But quick assembly disassembly's chemical plant is with level gauge
CN210721454U (en) PCI slot structure for computer software test

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant