CN220376089U - Utility tunnel hoist and mount positioner - Google Patents
Utility tunnel hoist and mount positioner Download PDFInfo
- Publication number
- CN220376089U CN220376089U CN202320195210.5U CN202320195210U CN220376089U CN 220376089 U CN220376089 U CN 220376089U CN 202320195210 U CN202320195210 U CN 202320195210U CN 220376089 U CN220376089 U CN 220376089U
- Authority
- CN
- China
- Prior art keywords
- support frame
- small
- bolt holes
- utility
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 55
- 229910052742 iron Inorganic materials 0.000 claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 24
- 239000010959 steel Substances 0.000 claims abstract description 24
- 238000003466 welding Methods 0.000 abstract description 3
- 238000004891 communication Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000002737 fuel gas Substances 0.000 description 1
- -1 heat supply Substances 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a comprehensive pipe rack hoisting and positioning device which comprises a first support frame, a second support frame, ropes, a steel plate, a support bottom plate, iron hooks, large bolt holes, small bolt holes, large common bolts and small common bolts, wherein the steel plate is arranged at the lower end of the first support frame, the small bolt holes are formed in the steel plate, the support bottom plate is arranged at the lower end of the steel plate, the small bolt holes are formed in the support bottom plate, the steel plate and the support bottom plate are connected through the small common bolts, the large bolt holes and the iron hooks are formed in the upper part of the first support frame, the first support frame is connected with the iron hooks through welding, the ropes are arranged on the iron hooks, the upper parts of the first support frame and the second support frame are connected through the large common bolts, and the second support frame is identical to the first support frame. The utility model discloses a realize the accurate location of utility tunnel hoist and mount through hoisting pipe gallery to between support frame and the rope, have simple structure, the practicality is strong, characteristics such as easy and simple to handle, use convenient safety, improved pipe gallery's hoist and mount efficiency.
Description
Technical Field
The utility model belongs to the technical field of comprehensive pipe racks, and particularly relates to a comprehensive pipe rack hoisting and positioning device.
Background
The utility tunnel is an underground urban pipeline utility tunnel, namely a tunnel space is built underground in the city, various engineering pipelines such as electric power, communication, fuel gas, heat supply, water supply and drainage are integrated, a special access opening, a lifting opening and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, and the utility tunnel is an important infrastructure and a life line for guaranteeing urban operation.
In the early hoisting process of the comprehensive pipe rack, the accuracy of pipe rack placement is high. In actual construction, due to the influence of various factors, the problems of deviation of the position of the pipe gallery, repeated hoisting and the like can occur in the hoisting process of the pipe gallery, thereby delaying the construction period, reducing the construction efficiency and being unfavorable for the assembly construction of the later pipe gallery. Aiming at the problems, the utility model provides the comprehensive pipe rack hoisting and positioning device which is convenient for hoisting the pipe rack.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides the comprehensive pipe rack hoisting positioning device, which realizes the accurate positioning of the comprehensive pipe rack hoisting by hoisting the pipe rack between the supporting frame and the rope.
In order to solve the technical problems, the utility model adopts the following technical scheme:
the utility model provides a utility tunnel hoist and mount positioner, a serial communication port, which comprises a first support frame, the second support frame, the rope, the steel sheet, supporting baseplate, the iron hook, large-scale bolt hole, small-size bolt hole, large-scale ordinary bolt, small-size ordinary bolt, first support frame lower extreme is provided with the steel sheet, small-size bolt hole has been seted up to the steel sheet, the steel sheet lower extreme is provided with supporting baseplate, supporting baseplate is provided with small-size bolt hole, steel sheet and supporting baseplate pass through small-size ordinary bolted connection, first support frame upper portion is provided with large-scale bolt hole and iron hook, first support frame is connected through the welding with the iron hook, be provided with the rope on the iron hook, first support frame and second support frame upper portion pass through large-scale ordinary bolted connection, the second support frame is the same with first support frame.
Preferably, 6 large bolt holes are formed in the upper portions of the first support frame and the second support frame, the 6 large bolt holes are in the same straight line, and the diameter of each large bolt hole is 8mm.
Preferably, the steel plate is provided with 4 small bolt holes having a diameter of 6mm.
Preferably, the support base plate is provided with 4 small bolt holes having a diameter of 6mm.
Preferably, the iron hook is located at one side of the inner end, and the opening of the iron hook faces upwards.
Preferably, two ends of the rope are connected with iron hooks on the first support frame and the second support frame.
Compared with the prior art, the utility model has the following advantages:
1. according to the utility model, the pipe gallery pipes with different sizes can be matched by adjusting the distance between the first support frame and the second support frame according to the actual size of the pipe gallery, and the pipe gallery pipe fitting device has the characteristic of wide application range.
2. According to the utility model, the steel plate is provided with 4 small bolt holes, and can be connected with the supporting bottom plate through small common bolts, so that the structural stability is enhanced.
3. According to the utility model, the supporting bottom plate and the steel plate can be connected through the small common bolts, so that the structural support is firmer.
4. According to the utility model, the iron hook is tightly close to the inner side of the support frame, so that the rope is tightly attached to the side surface of the pipe gallery pipeline, and the positioning is convenient.
5. The utility model connects the rope on the iron hook, so that the rope between the two supporting structures is straighter, and the positioning is more accurate.
Drawings
Fig. 1 is a schematic structural view of a utility tunnel hoisting and positioning device.
Fig. 2 is a partial a enlarged schematic view of a utility tunnel hoisting and positioning device.
Fig. 3 is an enlarged schematic view of a part B of a utility tunnel hoisting and positioning device.
Reference numerals
1-a first support frame; 2-a second support frame; 3-rope; 4-supporting a bottom plate; 5-iron hook; 6-a steel plate; 101-large bolt holes; 102-small bolt holes; 1001-large common bolts; 1002-small common bolt
Detailed Description
As shown in fig. 1 to 3, a utility tunnel hoist and mount positioner of this embodiment, a serial communication port, including first support frame (1), second support frame (2), rope (3), supporting baseplate (4), iron hook (5), steel sheet (6), large-scale bolt hole (101), small-size bolt hole (102), large-size ordinary bolt (1001), small-size ordinary bolt (1002), first support frame (1) lower extreme is provided with steel sheet (6), small-size bolt hole (102) have been seted up to steel sheet (6), and the lower extreme is provided with supporting baseplate (4), supporting baseplate (4) are provided with the bolt hole, steel sheet (6) with supporting baseplate (4) are connected through small-size ordinary bolt (1002), first support frame (1) upper portion is provided with large-size bolt hole (101) and iron hook (5), be connected through the welding with iron hook (5) on be provided with rope (3), first support frame (1) and second support frame (2) upper portion are through large-size bolt hole (1001), first support frame (2) are the same.
The utility tunnel hoist and mount positioner of this embodiment, a serial communication port, first support frame (1) and second support frame (2) upper portion are provided with 6 large-scale bolt holes (101), 6 large-scale bolt holes (101) are on same straight line, large-scale bolt hole (101) diameter is 8mm.
The utility tunnel hoist and mount positioner of this embodiment, a serial communication port, steel sheet (6) are provided with 4 small-size bolt holes (102), small-size bolt hole (102) diameter is 6mm.
The utility tunnel hoist and mount positioner of this embodiment, a serial communication port, supporting baseplate (4) are provided with 4 small-size bolt holes (102), small-size bolt hole (102) diameter is 6mm.
The utility tunnel hoisting and positioning device is characterized in that the iron hook (5) is positioned at one side of the inner end, and the opening of the iron hook (5) faces upwards.
The utility tunnel hoist and mount positioner of this embodiment, a serial communication port, the both ends of rope (3) are connected with iron hook (5) on first support frame (1), second support frame (2).
The working principle of the embodiment is as follows: firstly, hoisting a first pipe gallery at an initial position, enabling the inner surface of the first pipe gallery to be clung to the outer surface of the pipe gallery by adjusting the distance between the first support frame (1) and the second support frame (2), and then screwing a large common bolt (101) for fixing; according to actual engineering conditions, selecting a rope (3) with proper length, fixing the head end of the rope (3) on an iron hook (5) of a front support frame, fixing the tail end of the rope (3) on the iron hook (5) of a rear support frame, and tightening the rope to make the rope straight; and (5) hoisting the remaining pipe rack.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.
Claims (6)
1. The utility model provides a utility tunnel hoist and mount positioner, its characterized in that, including first support frame (1), second support frame (2), rope (3), supporting baseplate (4), iron hook (5), steel sheet (6), large-scale bolt hole (101), small-size bolt hole (102), large-scale ordinary bolt (1001), small-size ordinary bolt (1002), first support frame (1) lower extreme is provided with steel sheet (6), small-size bolt hole (102) have been seted up in steel sheet (6), and the lower extreme is provided with supporting baseplate (4), supporting baseplate (4) are provided with the bolt hole, steel sheet (6) with supporting baseplate (4) are connected through small-size ordinary bolt (1002), first support frame (1) upper portion is provided with large-scale bolt hole (101) and iron hook (5), be provided with rope (3) on iron hook (5), first support frame (1) and second support frame (2) upper portion are connected through large-scale ordinary bolt (1001), first support frame (2) are the same with first support frame (1).
2. The utility tunnel hoisting and positioning device according to claim 1, wherein 6 large-scale bolt holes (101) are arranged on the upper parts of the first support frame (1) and the second support frame (2), the 6 large-scale bolt holes (101) are on the same straight line, and the diameter of the large-scale bolt holes (101) is 8mm.
3. The utility tunnel hoisting and positioning device according to claim 1, characterized in that the steel plate (6) is provided with 4 small-sized bolt holes (102), the diameter of the small-sized bolt holes (102) is 6mm.
4. The utility tunnel hoisting and positioning device according to claim 1, characterized in that the supporting bottom plate (4) is provided with 4 small-sized bolt holes (102), the diameter of the small-sized bolt holes (102) is 6mm.
5. The utility tunnel hoisting and positioning device according to claim 1, wherein the iron hook (5) is located at one side of the inner end, and the opening of the iron hook (5) is upward.
6. The utility tunnel hoisting and positioning device according to claim 1, wherein the two ends of the rope (3) are connected with iron hooks (5) on the first support frame (1) and the second support frame (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320195210.5U CN220376089U (en) | 2023-02-13 | 2023-02-13 | Utility tunnel hoist and mount positioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320195210.5U CN220376089U (en) | 2023-02-13 | 2023-02-13 | Utility tunnel hoist and mount positioner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220376089U true CN220376089U (en) | 2024-01-23 |
Family
ID=89566955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320195210.5U Active CN220376089U (en) | 2023-02-13 | 2023-02-13 | Utility tunnel hoist and mount positioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220376089U (en) |
-
2023
- 2023-02-13 CN CN202320195210.5U patent/CN220376089U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205446924U (en) | Pipeline support's mounting structure can be dismantled to utility tunnel bolt formula | |
CN202074119U (en) | Circular pipe rack support and circular pipe rack | |
CN210395435U (en) | Collapse-proof supporting device for open excavation method construction of urban underground comprehensive pipe gallery | |
CN220376089U (en) | Utility tunnel hoist and mount positioner | |
CN201501730U (en) | Special hanger for blade of large-scale wind generator | |
CN204625030U (en) | The portable integrated side of a ship hangs | |
CN215797962U (en) | Steel-pipe pile triangle gallows | |
CN213143618U (en) | Pipe gallery concrete founds wall inside and outside reinforcing bar net piece thickness interval location connecting clamp | |
CN212226198U (en) | Pipeline combination seam adjustment alignment instrument | |
CN205932954U (en) | Simple and easy hoist device of pipe | |
CN220523458U (en) | Pipeline installing support | |
CN101913528A (en) | Special lifting appliance for lifting coke oven flue elbow | |
CN214889376U (en) | Nodular cast iron pipe gallery strutting arrangement | |
CN205918380U (en) | To one side straight dual -purpose rat hole pipe | |
CN215509731U (en) | Muffler flange welding frock clamp | |
CN217025158U (en) | Auxiliary tool for hoisting valve in limited space | |
CN213143902U (en) | Special frame for transporting and installing pipe gallery concrete reinforcing mesh | |
CN212745308U (en) | Underground pipe gallery engineering console mode metal pipeline fixing device | |
CN216807782U (en) | Fan single blade hoist | |
CN218844373U (en) | Z-shaped pipeline support for tunnel construction | |
CN216741509U (en) | Installation device suitable for shaft pipeline | |
CN213268594U (en) | Positioning support between pipe gallery concrete reinforcing bar net piece | |
CN217991409U (en) | Coke oven basement narrow and small space pipeline transportation group is to device | |
CN216336129U (en) | Auxiliary pile turning equipment for single pile of fan for offshore wind power | |
CN218940585U (en) | Communication pipeline on-site protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |