CN220366489U - Outer machine mounting bracket of air conditioner - Google Patents

Outer machine mounting bracket of air conditioner Download PDF

Info

Publication number
CN220366489U
CN220366489U CN202320861134.7U CN202320861134U CN220366489U CN 220366489 U CN220366489 U CN 220366489U CN 202320861134 U CN202320861134 U CN 202320861134U CN 220366489 U CN220366489 U CN 220366489U
Authority
CN
China
Prior art keywords
layer
elastic support
outdoor unit
air conditioner
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320861134.7U
Other languages
Chinese (zh)
Inventor
张志远
焦政文
尚华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Sijian Construction Group Co ltd
Jinan Sijian Construction Development Co ltd
Original Assignee
Jinan Sijian Construction Group Co ltd
Jinan Sijian Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Sijian Construction Group Co ltd, Jinan Sijian Construction Development Co ltd filed Critical Jinan Sijian Construction Group Co ltd
Priority to CN202320861134.7U priority Critical patent/CN220366489U/en
Application granted granted Critical
Publication of CN220366489U publication Critical patent/CN220366489U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses an air conditioner external unit mounting frame which comprises a plurality of elastic supports, wherein the elastic supports are arranged at the top of a floor slab, a transverse steel plate and a concrete cushion plate are sequentially arranged above the elastic supports from bottom to top, a surrounding wall is arranged around the concrete cushion plate, a plurality of through drain holes are formed in the side face of the surrounding wall, and the section height of each drain hole is lower than the height of the upper surface of each elastic support. The installation frame optimizes the building space, avoids vibration generated by the operation of the equipment unit from being directly delivered to the floor slab of the roof structural layer, and reduces noise pollution to the top indoor space generated by the operation of the equipment unit.

Description

Outer machine mounting bracket of air conditioner
Technical Field
The utility model relates to the field of building construction, in particular to an air conditioner external unit mounting frame.
Background
With the continuous development and progress of society, the building quality of the building industry is also getting higher and higher. The air conditioning unit can be arranged at one layer of outdoor, an equipment interlayer or a top layer of outdoor roof as a constituent part of a building. When the air conditioning unit is arranged on the roof of the top layer of the building, the roof space can be effectively utilized, and the heat dissipation and the efficient indoor and outdoor air exchange of the air conditioning unit body are facilitated. However, floor vibration and noise generated by the operation of the air conditioning unit can influence the indoor use effect below the air conditioning unit, and the harm to the mind and the body of people is caused.
Disclosure of Invention
In order to solve the problems, the utility model discloses an air conditioner external unit mounting frame which optimizes the building space, avoids vibration generated by the operation of equipment units from being directly delivered to a roof structure layer floor slab, and reduces noise pollution to a top indoor space generated by the operation of the equipment units.
The utility model provides an outer quick-witted mounting bracket of air conditioner, includes a plurality of elastic support, a plurality of elastic support install in the floor top, a plurality of elastic support top have set gradually horizontal steel sheet and concrete pad from lower supreme, be provided with the enclosure around the concrete pad, the side of enclosure is provided with a plurality of penetrating wash ports, the cross-section height of wash port is less than elastic support's upper surface height.
Preferably, a vibration reduction backing plate and a vertical steel plate are arranged between the enclosing wall and the concrete cushion plate.
Preferably, a sealant layer is arranged between the enclosing wall and the concrete cushion plate, and the sealant layer is arranged on the upper surfaces of the vibration reduction base plate and the vertical steel plate.
Preferably, a waterproof layer, a heat preservation layer, a slope finding layer, a protection layer and a vibration isolation layer are sequentially arranged between the top of the floor slab and the elastic support from bottom to top.
Preferably, the vibration isolation layer is vibration isolation glue.
Preferably, the elastic support is a rubber support.
Preferably, the drain hole is embedded with a PVC pipeline.
The utility model has the beneficial effects that:
1. the utility model utilizes the building roof space to place the air conditioning unit, the air conditioning unit is not independently arranged outside and inside the first floor of the building, the integrity of the outdoor landscape effect is ensured, and the indoor space is fully utilized.
2. Flexible connection between the double-layer floorslabs; the air conditioning unit is not in direct contact with the building concrete structure floor, the floating floor is not in traditional rigid connection with the roof structure floor, but is connected through the rubber vibration isolation block with certain compressive strength, so that vibration generated by running of the unit is prevented from being directly specially delivered to the roof structure floor on the premise of ensuring that the load of the unit is met, and noise pollution to the top indoor space caused by running of the unit is reduced.
2. An integral waterproof structure; the floating floor is waterproof and the original roof is waterproof integrally, so that the original roof is waterproof to form a closed waterproof system, the slope finding direction of roof drainage is combined, strip-shaped equipment foundations are arranged in the same direction, and drainage holes are formed, so that hidden danger of roof rainwater leakage caused by the arrangement of the floating floor of a roof unit is avoided.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present application, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
in the figure: 1. the concrete floor comprises a drain hole, 2, a damping cushion layer, 3, a sealant layer, 4, a vertical steel plate, 5, an elastic support, 6, a transverse steel plate, 7, a concrete cushion plate, 8, a floor top, 9 and a enclosing wall.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings of the embodiments of the present application, and it is apparent that the described embodiments are only some embodiments of the present application, not all embodiments. All other embodiments, which can be made by one of ordinary skill in the art based on the embodiments of the present application without making any inventive effort, are intended to be within the scope of the present application.
In the description of the present utility model, it should be understood that the terms "inner", "outer", "left", "right" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the device or element in question must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
The utility model discloses an air conditioner outdoor unit mounting frame shown in fig. 1, which comprises a plurality of elastic supports 5 made of rubber, wherein the elastic supports are square structures made of rubber, the square structures are uniformly distributed on the upper surface of a building top 8 in a matrix mode, transverse steel plates 6 with the thickness of 2mm are paved on the upper surfaces of the elastic supports, and concrete cushion plates 7 are paved above the transverse steel plates. The concrete cushion plate is of a two-layer convex structure with the upper section area smaller than the lower section area.
Around the concrete cushion plate, a circle of enclosing wall 9 is arranged, and the enclosing wall is built by building concrete at the top 8 of the building. After the concrete enclosing wall is built, a rubber damping backing plate 3 and a vertical steel plate 4 with the thickness of 2mm are sequentially paved on one side of the concrete enclosing wall, which is close to the concrete backing plate, a plurality of through drain holes 1 are formed in the side face of the enclosing wall, and PVC pipelines are embedded in the drain holes. The section height of the drain hole is lower than the upper surface height of the elastic support, namely the drain hole timely drains water between the rubber supports to the outside, so that the position of the drain hole cannot be higher than the rubber supports. A waterproof layer, a heat preservation layer, a slope finding layer, a protection layer and a vibration isolation layer are sequentially arranged between the top of the floor slab and the elastic support from bottom to top.
The floating concrete foundation is used for locating the air conditioning equipment on the floating floor slab, so that the air conditioning equipment can be effectively separated from the floor slab of the roof structure layer, a certain number of cube rubber vibration isolation blocks are placed between the two floor slabs, and the vibration generated by the operation of the equipment unit can be effectively prevented from being directly specially delivered to the floor slab of the roof structure layer on the premise of meeting the equipment load, so that the noise pollution to the indoor space of the top layer caused by the operation of the equipment unit is reduced.
The construction process of the device is as follows:
before construction, the construction working face is cleaned up, and no sundries are ensured on the construction working face.
1. Floating floor enclosure construction
The outside of the floating floor is provided with a concrete enclosing wall, the enclosing wall is reliably connected with the original structural floor, and a PVC drain hole is arranged in the enclosing wall, so that rainwater on the inner side of the enclosing wall is discharged to an outer side roof through a bottom PVC drain hole and is discharged to a roof intercepting ditch through a roof slope finding.
The wall of the floating floor slab can be used as the wall of the floating floor slab by the outer wall of the original roofing equipment machine room and the outer wall of the out-roofing stairwell.
2. Roof waterproof layer construction
Before construction, the surface should be clean, dry, smooth, free of sharp protrusions or pores, and clean dust and dirt on the surface by a hard brush; the horizontal plane, the inclined plane and the vertical plane are smooth, flat, dry and have no nails; plastering at the internal and external corners should be performed to form an arc with the width of 50mm and serve as a reinforcing layer. When the base coat is coated according to the surface characteristics, the base coat must be coated uniformly without bottom leakage, and coiled materials can be paved after drying; the overlap length of the web must meet relevant regulations. The paving direction of the coiled material of the bottom plate is preferably along the long side direction, and the vertical wall is preferably along the vertical direction. The lap width of the long side of the coiled material is 100mm, and the lap width of the short side is 150mm. The short-side lap joints of two adjacent coiled materials are staggered by more than 600 mm. The lap joint of the coiled material is not less than 200mm away from the yin-yang angle; the vertical coiled material collecting head is fixed by a metal pressing strip firstly and then is sealed by coiled material sealing paste; the operation should be carefully and carefully, and defects such as air holes, bubbling, wrinkles and the like should not exist, and the next construction process can be performed after the inspection and acceptance are qualified.
3. Construction of roof heat-insulating layer
The base layer should be flat, straight and firm, and should meet the requirements of construction acceptance specifications. The deviation and dirt with bulges, hollows, looseness and adhesion blocking are removed, and mortar is used for leveling; before construction, typesetting the heat-insulating plates according to the design sizes of the roof and the ground, and better controlling the arrangement of the heat-insulating plates by using elastic wires; the insulation board should be extruded uniformly when being bonded, can be lightly knocked and fixed by a rubber hammer, strictly controls the flatness and verticality of the board surface, uses a guiding ruler with the length not less than 2m to carry out flattening inspection, and the adhesive extruded around the board should be cleaned in time; the seam is squeezed tightly, the adjacent plates are flush, the seam between the plates is controlled to be not more than 2mm during construction, and the height difference between the plates is not more than 1.5mm. When the gap between the plates is not more than 2mm, the gap is filled by the heat insulation batten.
4. Roof slope layer construction
The material and construction requirements of the slope layer are detailed in the table, the line is measured and paid off before the slope layer is found, control points are made, and the slope is constructed according to the design requirements of all roofs.
5. Roof protection layer construction
Setting up the parting strips, (if binding reinforcing steel meshes exists), pouring concrete, taking out the parting strips, curing, cleaning parting strip seams, and filling sealing materials; the spacing and the position of the reinforcing steel bar meshes are strictly ensured to be accurate, the reinforcing steel bars are required to be disconnected at the grid joints, the binding lap joint is not less than 250mm, and the joint area of the reinforcing steel bar meshes with the same section in the same grid is not more than 1/4 of the section of the steel wire; the width of the concrete cell seam is 10mm, and the concrete cell is divided into blocks according to the size of 3m multiplied by 3 m. The method of the inner side roof surface layer of the enclosing wall can be combined with the method of the adjacent roof surface layer of the outer side of the enclosing wall.
6. Placing the cube rubber vibration isolation glue and paving the steel plate (the construction process shows the connection of the rubber block and the top of the floor slab)
The rubber vibration isolator is placed in the floating foundation range, the rubber vibration isolator is generally arranged in a rectangular mode, and after the arrangement is completed, a steel plate is paved above the rubber vibration isolator to prepare for the next concrete pouring of the floating floor slab.
7. Floating floor and equipment foundation construction
During construction of the floating floor slab, the concrete at the side opening position should not be in direct contact with the enclosing wall of the floating floor slab, and a rubber vibration isolation pad is arranged between the concrete and the enclosing wall of the floating floor slab for flexible connection; the floating floor should find slopes to at least 1% of the periphery to avoid rainwater storage in the area of the floor.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (7)

1. The utility model provides an outer quick-witted mounting bracket of air conditioner, its characterized in that includes a plurality of elastic support, a plurality of elastic support are installed in the floor top, a plurality of elastic support top have set gradually horizontal steel sheet and concrete cushion from supreme down, be provided with the enclosure around the concrete cushion, the side of enclosure is provided with a plurality of penetrating wash ports, the cross-section height of wash port is less than elastic support's upper surface height.
2. The outdoor unit installation frame of claim 1, wherein a vibration reduction pad and a vertical steel plate are arranged between the enclosing wall and the concrete pad.
3. The air conditioner outdoor unit mounting frame according to claim 2, wherein a sealant layer is arranged between the enclosing wall and the concrete cushion plate, and the sealant layer is arranged on the upper surfaces of the vibration reduction cushion plate and the vertical steel plate.
4. The air conditioner outdoor unit mounting frame according to claim 1, wherein a waterproof layer, an insulating layer, a slope finding layer, a protective layer and a vibration isolation layer are sequentially arranged between the top of the floor slab and the elastic support from bottom to top.
5. The outdoor unit mounting rack of claim 4, wherein the vibration isolating layer is vibration isolating glue.
6. The outdoor unit mounting frame of claim 1, wherein the elastic support is a rubber support.
7. The outdoor unit installation frame of claim 1, wherein the drain hole is embedded with a PVC pipe.
CN202320861134.7U 2023-04-12 2023-04-12 Outer machine mounting bracket of air conditioner Active CN220366489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320861134.7U CN220366489U (en) 2023-04-12 2023-04-12 Outer machine mounting bracket of air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320861134.7U CN220366489U (en) 2023-04-12 2023-04-12 Outer machine mounting bracket of air conditioner

Publications (1)

Publication Number Publication Date
CN220366489U true CN220366489U (en) 2024-01-19

Family

ID=89518626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320861134.7U Active CN220366489U (en) 2023-04-12 2023-04-12 Outer machine mounting bracket of air conditioner

Country Status (1)

Country Link
CN (1) CN220366489U (en)

Similar Documents

Publication Publication Date Title
CN110607809B (en) Waterproof construction method for basement of building engineering
CN211286074U (en) Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall
CN211690988U (en) Concrete precast slab with waterproof function
CN112411901A (en) Waterproof and heat-insulating construction process for roof deformation joint
CN111305377A (en) Ultra-low energy consumption building treatment method for assembled steel structure
CN220366489U (en) Outer machine mounting bracket of air conditioner
CN110512831B (en) Construction method of public ventilation pipeline of civil building
CN215519271U (en) Be used for GSY outer wall board height to stride movement joint department connection structure
CN213626486U (en) Node structure of joint of wood floor and floor tile floor
CN114753675A (en) Assembled steel module system country villa and construction method thereof
CN211080616U (en) Roofing expansion joint structure under prefabricated apron
CN211008168U (en) Bathroom door mounting structure and bathroom door mounting device
CN113684957A (en) Combined floor slab and construction method thereof
CN209907844U (en) Bathroom falls board area and does wet subregion stagnant water steel sheet device futilely
CN208633307U (en) Gel bead suitable for door and window thin portion keeps the temperature plate exterior wall external heat preservation system
JPH03119241A (en) Composite floor of deck plate and grc panel, and dty method composite roof
CN111962715A (en) Hollow outer wall body structure and preparation method thereof
CN110565699A (en) box culvert type basement automobile ramp bottom plate settlement joint construction method
CN216552846U (en) Floating floor slab
CN220868796U (en) Cast-in-place board leak protection thick liquid structure of assembled steel construction house
CN210737800U (en) Building outer wall waterproof protection structure
CN212743174U (en) Steel column base connection node structure of heat-preservation accessible roof heat collector
CN211775159U (en) Roof board waterproof structure
CN115977326B (en) Floating roof construction method
CN210067253U (en) Energy-conserving roof high wall flashing node structure