CN220354665U - Pipeline installation device for construction - Google Patents

Pipeline installation device for construction Download PDF

Info

Publication number
CN220354665U
CN220354665U CN202322118712.0U CN202322118712U CN220354665U CN 220354665 U CN220354665 U CN 220354665U CN 202322118712 U CN202322118712 U CN 202322118712U CN 220354665 U CN220354665 U CN 220354665U
Authority
CN
China
Prior art keywords
connecting rod
wall
plate
mounting bracket
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322118712.0U
Other languages
Chinese (zh)
Inventor
陆华春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Hongtai Sunshine Decoration Engineering Co ltd
Original Assignee
Chuzhou Hongtai Sunshine Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Hongtai Sunshine Decoration Engineering Co ltd filed Critical Chuzhou Hongtai Sunshine Decoration Engineering Co ltd
Priority to CN202322118712.0U priority Critical patent/CN220354665U/en
Application granted granted Critical
Publication of CN220354665U publication Critical patent/CN220354665U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline installation device for building construction, which comprises a beam plate, a mounting frame, a connecting rod and a supporting plate, wherein a telescopic spring is sleeved on one side of the outer wall of the connecting rod, which is positioned between a limiting plate and the inner wall of the mounting frame, an adjusting plate is symmetrically and fixedly arranged on the top of the outer side of the supporting plate through bolts, the adjusting plate is sleeved on the outer wall of the connecting rod, and a nut sleeve is sleeved on one side of the outer wall of the connecting rod, which is positioned below the adjusting plate, through threads; according to the utility model, the supporting plate can be installed between the two connecting rods through the matching of the adjusting plate and the connecting rods, and then the position of the adjusting plate can be fixed through the nut sleeve, so that the supporting plate is installed between the two connecting rods, and the height of the supporting plate can be adjusted through the position of the adjusting nut sleeve on the outer wall of the connecting rod, thereby facilitating the installation and the disassembly of the supporting plate, and further facilitating the hoisting of a pipeline below the beam plate.

Description

Pipeline installation device for construction
Technical Field
The utility model relates to the technical field of building construction, in particular to a pipeline installation device for building construction.
Background
When the fire-fighting pipeline is paved, the pipeline is usually hoisted on the beam plate by adopting a pipeline installation frame, the pipeline is supported by adopting a U-shaped frame in the existing installation mode, holes are processed at two ends of the U-shaped frame, and the U-shaped frame is fixed on the beam plate through the holes and bolts, so that the pipeline is hoisted on the beam plate.
However, when the existing pipeline installation frame is used, the following defects exist:
the installation flexibility of current mounting bracket is relatively poor, inconvenient dismantlement and the installation of pipeline, and the shock attenuation nature of current mounting bracket is poor simultaneously, and when the pipeline shakes, the pipeline can produce the impact force to the junction between mounting bracket and the beam slab, can cause the junction between mounting bracket and the beam slab to take place not hard up, appears the phenomenon that the mounting bracket drops easily, seriously influences the safety in utilization of pipeline hoist and mount.
Disclosure of Invention
The utility model aims to provide a pipeline installation device for building construction, which solves the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a pipeline installation device for construction, includes beam slab, mounting bracket, connecting rod and backup pad, the mounting bracket is provided with two, two the mounting bracket passes through expansion bolts symmetry fixed mounting the beam slab lower surface, the mounting bracket axle center department runs through the grafting has the connecting rod, the connecting rod is located the inboard one end of mounting bracket has the limiting plate through bolt fixed mounting, the connecting rod outer wall is located the limiting plate with telescopic spring has been cup jointed in one side between the mounting bracket inner wall, bolt symmetry fixed mounting has the regulating plate in the top in the backup pad outside, the regulating plate cup joints the connecting rod outer wall, the connecting rod outer wall is located one side screw thread of regulating plate below has cup jointed the nut cover.
One end of the telescopic spring is fixedly connected with the lower surface of the limiting plate through a bolt, and the other end of the telescopic spring is fixedly connected with the inner wall of the mounting frame through a bolt.
The connecting rod outer wall is located one side of the outer portion of the mounting frame is evenly provided with fastening threads matched with the nut sleeve, and the nut sleeve is sleeved on the connecting rod outer wall through the fastening threads.
The center of the surface of the adjusting plate is provided with a through hole in a penetrating mode, and the inner diameter size of the through hole is larger than that of the section of the connecting rod.
Wherein, the backup pad is the whole U plate structure that is.
Wherein, the backup pad inner wall bonds has the rubber pad.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the supporting plate can be installed between the two connecting rods through the matching of the adjusting plate and the connecting rods, and then the position of the adjusting plate can be fixed through the nut sleeve, so that the supporting plate is installed between the two connecting rods, and the height of the supporting plate can be adjusted through the position of the adjusting nut sleeve on the outer wall of the connecting rod, thereby facilitating the installation and the disassembly of the supporting plate, and further facilitating the hoisting of a pipeline below the beam plate.
2. When the pipeline vibrates, the pipeline can transmit vibration to the supporting plate, the supporting plate drives the connecting rod to move up and down through the adjusting plate, meanwhile, the connecting rod drives the telescopic spring to stretch through the limiting plate, impact force generated by the connecting rod on the mounting frame is consumed through stretching of the telescopic spring, looseness of the joint between the mounting frame and the beam plate is avoided, falling of the mounting frame is prevented, and use safety of hoisting of the pipeline is improved.
Drawings
Fig. 1 is a schematic diagram of the overall front view structure of the present utility model.
In the figure: 10. a beam plate; 20. a mounting frame; 21. an expansion bolt; 30. a connecting rod; 31. a limiting plate; 32. a telescopic spring; 33. fastening threads; 34. a nut sleeve; 40. a support plate; 41. a rubber pad; 42. and an adjusting plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, the present utility model provides a technical solution: the utility model provides a pipeline installation device for construction, including beam slab 10, mounting bracket 20, connecting rod 30 and backup pad 40, mounting bracket 20 is provided with two, two mounting brackets 20 pass through expansion bolts 21 symmetry fixed mounting at beam slab 10 lower surface, the grafting has been run through in mounting bracket 20 axle center department, connecting rod 30 is located the inboard one end of mounting bracket 20 and has had limiting plate 31 through bolt fixed mounting, telescopic spring 32 has been cup jointed to one side that connecting rod 30 outer wall is located between limiting plate 31 and the mounting bracket 20 inner wall, bolt symmetry fixed mounting has regulating plate 42 at the top in the backup pad 40 outside, regulating plate 42 cup joints at connecting rod 30 outer wall, the nut cover 34 has been cup jointed to one side screw thread that connecting rod 30 outer wall is located the regulating plate 42 below.
Wherein, through regulating plate 42 and connecting rod 30 cooperation, can install backup pad 40 between two connecting rods 30, then can fix the position of regulating plate 42 through nut cover 34 to install backup pad 40 between two connecting rods 30, and can adjust the height of backup pad 40 through regulating nut cover 34 in the position of connecting rod 30 outer wall, make things convenient for the installation and the dismantlement of backup pad 40, thereby made things convenient for the below with pipeline hoist and mount at beam plate 10.
One end of the telescopic spring 32 is fixedly connected with the lower surface of the limiting plate 31 through a bolt, and the other end of the telescopic spring 32 is fixedly connected with the inner wall of the mounting frame 20 through a bolt; when the pipeline shakes, the pipeline can transmit vibration to the supporting plate 40, then the supporting plate 40 drives the connecting rod 30 to move up and down through the adjusting plate 42, meanwhile, the connecting rod 30 drives the telescopic spring 32 to stretch out and draw back through the limiting plate 31, the impact force generated by the connecting rod 30 to the mounting frame 20 is consumed through the expansion of the telescopic spring 32, the connection part between the mounting frame 20 and the beam plate 10 is prevented from loosening, the falling phenomenon of the mounting frame 20 is prevented, and the use safety of the pipeline hoisting is improved.
The outer wall of the connecting rod 30 is uniformly provided with fastening threads 33 matched with a nut sleeve 34 on one side of the outer part of the mounting frame 20, and the nut sleeve 34 is in threaded sleeve connection with the outer wall of the connecting rod 30 through the fastening threads 33; the nut sleeve 34 can be adjusted in position on the outer wall of the connecting rod 30 by the cooperation of the fastening screw 33 and the nut sleeve 34, and the adjusting plate 42 can be supported by the nut sleeve 34 to be positioned at different positions on the outer wall of the connecting rod 30, so that the height of the supporting plate 40 can be adjusted, and then the pipes with different diameters can be conveniently placed on the supporting plate 40.
Wherein, the center department on regulating plate 42 surface runs through and has offered the jack that wears, wears the internal diameter size of jack and is greater than the diameter size of connecting rod 30 cross-section, and regulating plate 42 can reciprocate the position at connecting rod 30 outer wall through wearing the jack like this.
Wherein the support plate 40 is integrally formed in a U-shaped plate structure; this facilitates the placement of the pipe inside the support plate 40 and prevents the pipe from falling off the support plate 40.
Wherein, the inner wall of the supporting plate 40 is adhered with a rubber pad 41, and after the pipeline is placed inside the supporting plate 40, the pipeline is isolated from the supporting plate 40 by the rubber pad 41, so that the abrasion of the supporting plate 40 to the outer wall of the pipeline is avoided.
In the process of hoisting and installing the pipeline, a plurality of pipeline installation devices are required to support the pipeline, so that a plurality of groups of pipeline installation devices are required to be arranged at equal intervals below the beam plate 10.
Working principle: when the support plate is used, the mounting frame 20 is firstly mounted on the beam plate 10 through the expansion bolts 21, then the adjusting plate 42 is sleeved on the outer wall of the connecting rod 30, then the nut sleeve 34 is in threaded sleeve connection with the outer wall of the connecting rod 30 through the fastening bolts 33, the position of the adjusting plate 42 is supported through the nut sleeve 34, then the position of the nut sleeve 34 is adjusted according to the size of a pipeline, the height of the support plate 40 is adjusted, the position between the support plate 40 and the beam plate 10 meets the size requirement of the pipeline, after the position of the support plate 40 is fixed, the pipeline is inserted into the inner side of the support plate 40, the pipeline is hoisted on the beam plate 10 through the support plate 40, and when the pipeline vibrates, the pipeline can be transmitted to the support plate 40, then the support plate 40 drives the connecting rod 30 to move up and down through the adjusting plate 42, meanwhile, the connecting rod 30 drives the telescopic spring 32 through the telescopic spring 32, the impact force generated by the connecting rod 30 on the mounting frame 20 is consumed through the telescopic spring 32, the joint between the mounting frame 20 is prevented from loosening, the falling phenomenon of the support plate 20 is prevented, and the use safety of the pipeline hoisting is improved.

Claims (6)

1. The utility model provides a pipeline installation device for construction, includes beam slab (10), mounting bracket (20), connecting rod (30) and backup pad (40), its characterized in that: the utility model discloses a beam slab, including beam slab (10), mounting bracket (20), connecting rod (30) are located mounting bracket (20), mounting bracket (20) are provided with two, two mounting bracket (20) are in through expansion bolts (21) symmetry fixed mounting beam slab (10) lower surface, mounting bracket (20) axle center department runs through and has pegged graft there is connecting rod (30), connecting rod (30) are located mounting bracket (20) inboard one end is through bolt fixed mounting there is limiting plate (31), connecting rod (30) outer wall are located limiting plate (31) with telescopic spring (32) have been cup jointed to one side between mounting bracket (20) inner wall, adjusting plate (42) are passed through at the top in the backup pad (40) outside through bolt symmetry fixed mounting, adjusting plate (42) cup joint connecting rod (30) outer wall, connecting rod (30) outer wall are located one side screw thread of adjusting plate (42) below has cup jointed nut cover (34).
2. A pipe installation apparatus for construction according to claim 1, wherein: one end of the telescopic spring (32) is fixedly connected with the lower surface of the limiting plate (31) through a bolt, and the other end of the telescopic spring (32) is fixedly connected with the inner wall of the mounting frame (20) through a bolt.
3. A pipe installation apparatus for construction according to claim 1, wherein: the outer wall of the connecting rod (30) is located on one side of the outer portion of the mounting frame (20), fastening threads (33) matched with the nut sleeve (34) are evenly formed in the outer wall of the connecting rod (30), and the nut sleeve (34) is in threaded sleeve connection with the outer wall of the connecting rod (30) through the fastening threads (33).
4. A pipe installation apparatus for construction according to claim 1, wherein: and a through hole is formed in the center of the surface of the adjusting plate (42) in a penetrating manner, and the inner diameter size of the through hole is larger than the diameter size of the section of the connecting rod (30).
5. A pipe installation apparatus for construction according to claim 1, wherein: the whole supporting plate (40) is of a U-shaped plate structure.
6. A pipe installation apparatus for construction according to claim 1, wherein: a rubber pad (41) is adhered to the inner wall of the supporting plate (40).
CN202322118712.0U 2023-08-07 2023-08-07 Pipeline installation device for construction Active CN220354665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322118712.0U CN220354665U (en) 2023-08-07 2023-08-07 Pipeline installation device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322118712.0U CN220354665U (en) 2023-08-07 2023-08-07 Pipeline installation device for construction

Publications (1)

Publication Number Publication Date
CN220354665U true CN220354665U (en) 2024-01-16

Family

ID=89480327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322118712.0U Active CN220354665U (en) 2023-08-07 2023-08-07 Pipeline installation device for construction

Country Status (1)

Country Link
CN (1) CN220354665U (en)

Similar Documents

Publication Publication Date Title
CN110440059B (en) Intelligent damping pipeline support hanger
CN220354665U (en) Pipeline installation device for construction
CN210739704U (en) Pipeline gallows based on metal rubber three-dimensional damping
CN210461962U (en) Cross wear prevention protection device
CN209881303U (en) Movable cable and wire tube support structure
CN214023625U (en) Vertical drilling equipment under board
CN217784413U (en) Pipeline bracket for central air-conditioning engineering installation
CN216819340U (en) Energy-saving strain clamp
CN211183149U (en) Double-hanging type tension insulator installer
CN210770970U (en) Single-tube anti-seismic support and hanger
CN209309469U (en) Adjustable type pipeline elevator
CN220790290U (en) Height-adjustable connecting piece for suspended ceiling of biosafety clean room
CN214673943U (en) Traction device for overhead line
CN219833571U (en) Auxiliary device for cable laying
CN213177273U (en) Anti-seismic support with loading capacity
CN221704624U (en) Mounting bracket for process pipeline
CN212273278U (en) Diversified antidetonation support of mounting means
CN221402046U (en) Pipeline support and hanger mounting structure
CN221031672U (en) Support frame for civil engineering construction
CN110925898A (en) Outer quick-witted fixed bolster of air conditioner convenient to installation
CN211976129U (en) Fixing frame of pipeline for mining
CN220396747U (en) Pipeline bracket convenient to dismantle and install
CN219366980U (en) Pipeline supporting device
CN215521867U (en) Improved transmission device
CN217899069U (en) Novel electromechanical engineering equipment fixing base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant