CN220337648U - Pipeline construction positioning device - Google Patents
Pipeline construction positioning device Download PDFInfo
- Publication number
- CN220337648U CN220337648U CN202322085757.2U CN202322085757U CN220337648U CN 220337648 U CN220337648 U CN 220337648U CN 202322085757 U CN202322085757 U CN 202322085757U CN 220337648 U CN220337648 U CN 220337648U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- screw rod
- fixedly connected
- positioning device
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 54
- 230000002457 bidirectional effect Effects 0.000 claims description 14
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 9
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 9
- 241001330002 Bambuseae Species 0.000 claims description 9
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 9
- 239000011425 bamboo Substances 0.000 claims description 9
- 238000000034 method Methods 0.000 description 9
- 210000001503 joint Anatomy 0.000 description 4
- 230000002146 bilateral effect Effects 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a pipeline construction positioning device, which comprises a base and a positioning mechanism; and (2) base: the middle part of the sliding seat is provided with a sliding groove, the inside of the sliding groove is connected with sliding seats which are distributed symmetrically left and right, grooves are formed in the left side and the right side of the upper surface of the sliding seat, and the middle parts of the grooves are connected with clamping plates in a sliding manner; positioning mechanism: the two clamping plates are respectively arranged at the upper ends between the front clamping plate and the rear clamping plate; wherein: the utility model discloses a pipeline construction positioning device, including base, screw rod, pipeline construction positioning device, pipeline locking's firmness, the stability of location has been improved to the equal fixedly connected with handrail of both sides around the base, the equal threaded connection in four corners of base has the screw rod, the equal threaded connection in top of screw rod has the nut, the equal fixedly connected with supporting seat in bottom of screw rod, guarantees pipeline locking's firmness, has improved the stability of location, can adjust holistic equilibrium of positioner, adapts to different complicated construction scene, has improved the application scope of this device.
Description
Technical Field
The utility model relates to the technical field of pipeline construction, in particular to a pipeline construction positioning device.
Background
The construction of the pipeline is always an important content in the construction engineering, and in the process of pipeline laying and connection, stable positioning and fixing are required for the pipeline to ensure the butt joint and sealing of a pipeline interface, and along with the development of the construction industry, the pipeline construction requirement becomes increasingly complex, and higher requirements are provided for the stability, the adaptability and the flexibility of the positioning and fixing device.
At present, the common pipeline positioner mainly has simple and easy support frame, arm fixing device, pneumatic clamp etc. but these positioner all have certain problem, if the support frame can only realize simple supporting role, can not satisfy the demand of the stable location of butt joint mouth, and arm fixing device application scope is wide, but the structure is complicated, and is with high costs, and pneumatic clamp operation is inconvenient, is difficult to realize nimble taking.
In summary, the existing pipeline positioning device has the problems of inaccurate positioning, poor adaptability, inconvenient operation and the like, and cannot meet the requirements of stability of positioning, flexibility and adaptability of the device in pipeline construction, so we provide the pipeline construction positioning device.
Disclosure of Invention
The utility model aims to overcome the existing defects, and provides the pipeline construction positioning device which ensures the firmness of pipeline locking, prevents the pipeline from loosening in the construction process, improves the positioning stability, can adjust the overall balance of the device, can adapt to different complex construction scenes, improves the application range of the device, and can effectively solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a pipeline construction positioning device comprises a base and a positioning mechanism;
and (2) base: the middle part of the sliding seat is provided with a sliding groove, the inside of the sliding groove is connected with sliding seats which are distributed symmetrically left and right, grooves are formed in the left side and the right side of the upper surface of the sliding seat, and the middle parts of the grooves are connected with clamping plates in a sliding manner;
positioning mechanism: the two clamping plates are respectively arranged at the upper ends between the front clamping plate and the rear clamping plate;
wherein: the handrail is fixedly connected to the front side and the rear side of the base, the firmness of locking of the pipeline is guaranteed, the pipeline is prevented from loosening in the construction process, the stability of positioning is improved, the overall balance of the device can be adjusted, different complex construction scenes can be adapted, the flexibility is high, the cost is low, and the application range of the device in the pipeline construction process is improved.
Further, positioning mechanism includes screw thread post, fixed plate and screw thread section of thick bamboo, the equal fixedly connected with fixed plate of upside of splint, the equal threaded connection in middle part of the fixed plate of rear side has the screw thread post, the installing port has all been seted up at the middle part of the fixed plate of front side, the equal fixedly connected with screw thread section of thick bamboo of front side of installing port, the equal one-to-one correspondence in position of adjacent screw thread post and screw thread section of thick bamboo can control the interval of two splint to locking pipeline, threaded connection can guarantee its locking strength, prevents that the pipeline from becoming flexible in the work progress, has improved the stability of location.
Further, one side of the groove far away from the center of the sliding seat is slidably connected with a pull rod, one side of the pull rod close to the center of the sliding seat is fixedly connected with the side face of the clamping plate located in the same groove, and the pull rod can drive the clamping plate to move together, so that the function of adjusting the position of the clamping plate through the pull rod is achieved.
Further, all fixedly connected with spring between the side that splint's lateral surface and recess kept away from splint center, the surface of pull rod is all located to the spring cover, realizes the automatic centre gripping of pipeline, reduces constructor operation.
Further, the left inner wall and the right inner wall of the sliding groove are rotationally connected with the bidirectional screw rod through the bearings, the bottoms of the sliding seat are in threaded connection with the corresponding ends of the bidirectional screw rod, so that the symmetrical stable movement of two sides is realized, pipelines at different positions can be dealt with, and the application range of the device is improved.
Further, the right end of the bidirectional screw rod is fixedly connected with a rocker, and the bidirectional screw rod can be driven to move through manpower.
Further, the equal threaded connection in four corners of base has the screw rod, the equal threaded connection in top of screw rod has the nut, the equal fixedly connected with supporting seat in bottom of screw rod can the height of accurate regulation base and balanced, is that the device can adapt to various uneven ground, realizes the effective support to the base.
Compared with the prior art, the utility model has the beneficial effects that: this pipeline construction positioner has following benefit:
1. after the pipeline is clamped by the clamping plates, a constructor twists the threaded column to butt joint the threaded column with the adjacent threaded cylinder, the threaded column continuously penetrates into the threaded cylinder to drive the two clamping plates to be continuously close to each other until the pipeline is tightly locked between the two clamping plates, then the constructor can construct the pipeline, after the construction is completed, the constructor can release the pipeline by twisting the threaded column in the opposite direction, the distance between the two clamping plates can be controlled, thereby locking the pipeline, the locking strength of the threaded connection can be ensured, the pipeline is prevented from loosening in the construction process, the positioning stability is improved, the pipeline locking firmness is ensured, the pipeline is prevented from loosening in the construction process, the positioning stability is improved, the flexibility is higher, the cost is lower, and the application range of the device in the pipeline construction process is improved.
2. Before the construction, constructor is with carrying the handrail and removing pipeline construction positioner to construction region after, constructor twists four screws, and the screw rod drives the supporting seat and reciprocates the displacement, until with the supporting seat adjust to with construction ground keeps balanced, simultaneously the base also reaches balanced state, reaches the regulation to the whole balance of device through the regulation to four screws, can adjust the holistic degree of balance of device, is adapted to different complicated construction scenes, has improved the application scope of this device.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
fig. 2 is a schematic top view of the present utility model.
In the figure: 1 base, 2 armrests, 3 positioning mechanism, 31 screw thread post, 32 fixed plate, 33 screw thread section of thick bamboo, 4 splint, 5 spring, 6 pull rod, 7 slide, 8 two-way lead screw, 9 screw rods, 10 nuts, 11 supporting seat, 12 rocker, 13 spouts, 14 recess.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-2, the present embodiment provides a technical solution: a pipeline construction positioning device comprises a base 1 and a positioning mechanism 3;
base 1: the middle part is provided with a sliding groove 13, the inside of the sliding groove 13 is connected with a sliding seat 7 which is distributed in a bilateral symmetry way, the left inner wall and the right inner wall of the sliding groove 13 are rotationally connected with a bidirectional screw rod 8 through bearings, the bottom of the sliding seat 7 is in threaded connection with the corresponding end of the bidirectional screw rod 8, the right end of the bidirectional screw rod 8 is fixedly connected with a rocker 12, after the device is balanced, a constructor rotates the rocker 12, the rocker 12 drives the bidirectional screw rod 8 to rotate, the bidirectional screw rod 8 drives the sliding seat 7 on two sides and a positioning mechanism 3 on the sliding seat 7 to adjust the positions, the bidirectional screw rod 8 can be driven by manpower to move, the bilateral symmetry smooth movement is realized, pipelines in different positions can be processed, the application range of the device is improved, grooves 14 are formed on the left side and the right side of the upper surface of the sliding seat 7, the middle part of the grooves 14 are all in a sliding connection with clamping plates 4, the positions and the sizes of the pipelines can be self-adapted, the side of the groove 14 far away from the center of the sliding seat 7 is slidably connected with a pull rod 6, the side of the pull rod 6 near the center of the sliding seat 7 is fixedly connected with the side face of the clamping plate 4 positioned in the same groove 14, a spring 5 is fixedly connected between the outer side face of the clamping plate 4 and the side of the groove 14 far away from the center of the clamping plate 4, the spring 5 is sleeved on the outer surface of the pull rod 6, after the bidirectional screw rod 8 is well adjusted, a constructor places a pipeline to be positioned between the clamping plates 4, the pipeline extrudes the clamping plates 4 to displace to two sides, the spring 5 continuously applies pressure to the clamping plates 4, so that the clamping plates 4 clamp the pipeline, after construction is completed, the constructor pulls the pull rod 6, the pull rod 6 drives the clamping plates 4 to displace to two sides, the pipeline between the clamping plates 4 is released, the pipeline can be rapidly disassembled for next construction, automatic clamping of the pipeline is realized, and the operation of the constructor is reduced, the pull rod 6 can drive the clamping plates 4 to move together, so that the function of adjusting the positions of the clamping plates 4 through the pull rod is realized;
positioning mechanism 3: the positioning mechanism 3 comprises a threaded column 31, a fixed plate 32 and a threaded cylinder 33, wherein the upper sides of the clamping plates 4 are fixedly connected with the fixed plate 32, the middle parts of the fixed plates 32 at the rear sides are respectively in threaded connection with the threaded column 31, the middle parts of the fixed plates 32 at the front sides are respectively provided with a mounting opening, the front sides of the mounting openings are respectively fixedly connected with the threaded cylinder 33, the positions of the adjacent threaded columns 31 and the threaded cylinders 33 are respectively corresponding to each other, when a pipeline is clamped by the clamping plates 4, constructors twist the threaded columns 31 to butt the threaded columns 31 with the adjacent threaded cylinders 33, the threaded columns 31 continuously go deep into the threaded cylinders 33 to drive the two clamping plates 4 to be continuously close until the pipeline is tightly locked between the two clamping plates 4, then constructors can construct the pipeline, after the construction is finished, the workers twist the threaded columns 31 in the opposite directions, the pipeline can be released, the distance between the two clamping plates 4 can be controlled, the pipeline is locked, the locking strength of the threaded connection can be ensured, the pipeline is prevented from loosening in the construction process, and the positioning stability is improved;
wherein: the front side and the rear side of the base 1 are fixedly connected with handrails 2, four corners of the base 1 are uniformly connected with screw rods 9 in a threaded manner, the top of each screw rod 9 is uniformly connected with nuts 10 in a threaded manner, the bottom of each screw rod 9 is fixedly connected with a supporting seat 11, before construction, constructors twist four screw rods 9 by hand after moving a pipeline construction positioning device to a construction area through the handrails 2, the screw rods 9 drive the supporting seats 11 to move up and down until the supporting seats 11 are adjusted to be balanced with the construction ground, meanwhile, the base 1 also reaches a balanced state, and the overall balance of the device is adjusted by adjusting the four screw rods 9, so that different complex construction scenes can be adapted.
The utility model provides a pipeline construction positioning device, which has the following working principle: before the construction, constructor is with carrying handrail 2 and remove pipeline construction positioner to the construction region after, constructor twists four screw rods 9, screw rod 9 drives supporting seat 11 and reciprocates, until with supporting seat 11 adjust to with the construction ground keeps balanced, simultaneously base 1 also reaches balanced state, after the device reaches the equilibrium, constructor rotates rocker 12, rocker 12 drives two-way lead screw 8 rotatory, two-way lead screw 8 drives slide 7 and the positioning mechanism 3 adjustment position on slide 7, after two-way lead screw 8 has adjusted the position, constructor places the pipeline that needs to fix a position between splint 4, pipeline extrusion splint 4 is to both sides displacement, spring 5 is to splint 4 continuously exert pressure, make splint 4 clamp the pipeline, after the pipeline is pressed from both sides by splint 4 clamp, constructor twists screw thread post 31 with adjacent screw thread section of thick bamboo 33 butt joint, screw thread post 31 continuously stretches into and stretches into screw thread section of thick bamboo 33 and drive two splint 4 and constantly be close to each other, until with the pipeline tightly lock between two splint 4, then constructor twists screw thread post 31 in the opposite direction and then the back direction after the construction is accomplished, can release 6, then the pull rod is released to the pipeline 4, can be dismantled to the pipeline is released to the quick release 6, can be moved down to the splint 4.
The foregoing description is only illustrative of the present utility model and is not intended to limit the scope of the utility model, and all equivalent structures or equivalent processes or direct or indirect application in other related technical fields are included in the scope of the present utility model.
Claims (7)
1. The utility model provides a pipeline construction positioner which characterized in that: comprises a base (1) and a positioning mechanism (3);
base (1): the middle part of the sliding seat is provided with a sliding groove (13), sliding seats (7) which are distributed symmetrically left and right are connected inside the sliding groove (13), grooves (14) are formed in the left side and the right side of the upper surface of the sliding seat (7), and clamping plates (4) are connected in the middle part of the grooves (14) in a sliding mode;
positioning mechanism (3): the two clamping plates are respectively arranged at the upper ends between the two clamping plates (4) which are adjacent in front and back;
wherein: armrests (2) are fixedly connected to the front side and the rear side of the base (1).
2. A pipe construction positioning device according to claim 1, wherein: positioning mechanism (3) are including screw thread post (31), fixed plate (32) and screw thread section of thick bamboo (33), the equal fixedly connected with fixed plate (32) of upside of splint (4), the equal threaded connection in middle part of fixed plate (32) of rear side has screw thread post (31), and the installing port has all been seted up at the middle part of fixed plate (32) of front side, and the equal fixedly connected with screw thread section of thick bamboo (33) of front side of installing port, and adjacent screw thread post (31) all correspond with the position of screw thread section of thick bamboo (33) one by one.
3. A pipe construction positioning device according to claim 1, wherein: one side of the groove (14) far away from the center of the sliding seat (7) is slidably connected with a pull rod (6), and one side of the pull rod (6) close to the center of the sliding seat (7) is fixedly connected with the side face of the clamping plate (4) positioned in the same groove (14).
4. A pipe construction positioning device according to claim 3, wherein: springs (5) are fixedly connected between the outer side face of the clamping plate (4) and one side, far away from the center of the clamping plate (4), of the groove (14), and the springs (5) are sleeved on the outer surface of the pull rod (6).
5. A pipe construction positioning device according to claim 1, wherein: the left inner wall and the right inner wall of the sliding groove (13) are rotatably connected with a bidirectional screw rod (8) through bearings, and the bottoms of the sliding seats (7) are in threaded connection with corresponding ends of the bidirectional screw rod (8).
6. The pipe construction positioning device according to claim 5, wherein: the right end of the bidirectional screw rod (8) is fixedly connected with a rocker (12).
7. A pipe construction positioning device according to claim 1, wherein: four corners of base (1) are all threaded connection has screw rod (9), the equal threaded connection in top of screw rod (9) has nut (10), the equal fixedly connected with supporting seat (11) in bottom of screw rod (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322085757.2U CN220337648U (en) | 2023-08-04 | 2023-08-04 | Pipeline construction positioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322085757.2U CN220337648U (en) | 2023-08-04 | 2023-08-04 | Pipeline construction positioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220337648U true CN220337648U (en) | 2024-01-12 |
Family
ID=89447566
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322085757.2U Active CN220337648U (en) | 2023-08-04 | 2023-08-04 | Pipeline construction positioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220337648U (en) |
-
2023
- 2023-08-04 CN CN202322085757.2U patent/CN220337648U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2767566Y (en) | Clamp for mounting door and window frames | |
CN220337648U (en) | Pipeline construction positioning device | |
CN111843884A (en) | Novel fixed centre gripping is used to cast pipe spare device | |
CN219379575U (en) | Tower crane side's pipe member welding jig | |
CN211099735U (en) | Multifunctional hanging tool for steel structure coating system | |
CN210344814U (en) | Electromechanical device installs base convenient to angle regulation | |
CN206065974U (en) | A kind of two-way processing tool pressing plate | |
CN212056129U (en) | Fixed device that holds that adds of hydraulic engineering construction pipeline | |
CN207189055U (en) | A kind of point middle correcting fixture applied to the processing of symmetric curvature pipe fitting welding | |
CN221184919U (en) | Clamp for cutting port of three-way pipe fitting | |
CN219882380U (en) | Pipeline interfacing apparatus for hydraulic engineering | |
CN212000868U (en) | Water conservancy construction fastening processing apparatus | |
CN221102996U (en) | Electric power fitting with adjustable interval | |
CN218363047U (en) | Pressing mechanism of automobile welding fixture | |
CN221337939U (en) | Optical lens adjusting device | |
CN217968438U (en) | A butt fusion device for PVC pipeline processing | |
CN215101757U (en) | Valve installing support of being convenient for | |
CN220095523U (en) | MPP tubular product return bend device | |
CN216991246U (en) | Grinding device is used in valve processing with stabilize clamping function | |
CN221878298U (en) | Municipal administration rain sewage pipeline construction positioner | |
CN215153440U (en) | Architectural design drawing table | |
CN220698885U (en) | Disc positioning device | |
CN221313024U (en) | Hardware welding equipment | |
CN220347797U (en) | Thin wall positioning jig for numerical control machining production | |
CN221443545U (en) | Support arrangement for civil engineering is with strutting arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |