CN220335680U - Combined beam bridge - Google Patents

Combined beam bridge Download PDF

Info

Publication number
CN220335680U
CN220335680U CN202320443737.5U CN202320443737U CN220335680U CN 220335680 U CN220335680 U CN 220335680U CN 202320443737 U CN202320443737 U CN 202320443737U CN 220335680 U CN220335680 U CN 220335680U
Authority
CN
China
Prior art keywords
steel
bridge
concrete
composite
nails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320443737.5U
Other languages
Chinese (zh)
Inventor
常付平
邵长宇
李文勃
王倩
张春雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN202320443737.5U priority Critical patent/CN220335680U/en
Application granted granted Critical
Publication of CN220335680U publication Critical patent/CN220335680U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a combined beam bridge, and relates to the technical field of bridge engineering. The composite girder bridge comprises: the girder comprises a plurality of foundations and piers, and is erected on the piers, wherein the girders are steel concrete composite girders, and the composite girders consist of transverse full-width integral precast prestressed concrete bridge decks and stiffening rib-free steel girders. After the construction process of the pier foundation is finished, the steel beam is firstly implemented through a hoisting or pushing process, then the precast concrete bridge deck is hoisted, high-strength mortar is poured between the bridge deck and the steel beam, and then transverse wet joint pouring is carried out. The utility model is suitable for rapid prefabrication and assembly construction.

Description

Combined beam bridge
Technical Field
The utility model belongs to the technical field of bridge engineering, and relates to a combined beam bridge.
Background
The combined beam bridge can fully exert the mechanical properties of two materials of steel and concrete, and can solve the problems of easy fatigue and poor durability of a steel bridge deck system; meanwhile, the combined beam bridge adopts a prefabrication assembly technology, so that the site construction progress can be accelerated, the site construction pollution can be reduced, and the realization of a double-carbon target can be promoted; moreover, the combined beam bridge has low economical efficiency and can save a great deal of social resources. Therefore, the composite girder bridge is increasingly favored by constructors in the construction of infrastructure in China in recent years. The traditional combined beam bridge deck 104 adopts block prefabrication, has a plurality of on-site wet joint interfaces, and is difficult to ensure the construction quality; another type of transverse full width integral prefabrication requires the reservation of larger rectangular group nail holes 211, which have poor interface durability and may even lead to weakened sections. In addition, the steel beam 103 of the traditional composite beam has more stiffening ribs, so that the on-site and later-period operation maintenance workload is greatly increased, and the durability of the structure is also greatly adversely affected. For this reason, a new type of composite girder bridge is required.
Disclosure of Invention
The utility model aims to solve the main problems of durability, quality and section weakening of wet joints or group nail hole interfaces in the prior art and provides a combined beam bridge.
The utility model solves the technical problems by the following technical scheme:
a composite beam bridge comprises a foundation, a pier and a steel concrete composite beam. The composite beam bridge deck adopts a transverse full-width precast concrete slab, the precast slab is provided with a longitudinal through length reserved groove, and high-strength mortar is poured through a reserved pouring hole to be connected with the steel beam.
The combination Liang Gangliang adopts at least two steel longitudinal beams without longitudinal and transverse stiffening ribs, steel cross beams are arranged between the steel longitudinal beams at intervals of about 6m, and the steel cross beams are not connected with the concrete bridge deck.
The prefabricated bridge deck boards are transversely prestressed and are connected through steel bars and UHPC transverse seams.
And 1 grouting hole is formed in the middle of each longitudinal through length reserved groove of the combined beam bridge deck, and 2 grouting holes are formed in two ends of each longitudinal through length reserved groove.
The welding nails for connection between steel and concrete are long and short, and the welding nails in the grouting holes and the grout-raising holes are long nails and the welding nails in other positions are short nails.
The utility model has the positive progress effects that: the combined beam bridge adopts a novel concrete slab and steel beam connection technology, overcomes the problems of poor durability and weakened section of the group nail preformed holes, and enhances the structural stress performance; the prefabricated bridge decks are connected through UHPC transverse joints, so that the construction quality difficulty of a wet joint interface is reduced, and the structural durability is improved; the grouting holes are formed in the middle of the bridge deck through groove and are cast through a special device, the grouting holes are formed in the two ends of the bridge deck through groove, and the grouting holes are plugged after mortar flows out from the grouting holes, so that the compactness of the mortar casting is guaranteed; the bridge deck boards are transversely provided with prestress, so that the durability of the structure can be effectively improved; the bridge deck transverse seam is firstly constructed to span the middle section, and then the pier top section is constructed, so that the tensile stress of the pier top bridge deck can be greatly reduced, and the stress performance of the structure is improved.
Drawings
FIG. 1 is a schematic diagram of a conventional deck slab group nail hole structure;
FIG. 2 is a schematic cross-sectional view of a main beam of the present utility model;
FIG. 3 is a schematic plan view of the deck slab of the present utility model;
FIG. 4 is an elevational schematic of the deck slab of the present utility model;
fig. 5 is a schematic view of an embodiment composite beam construction process.
Detailed Description
The novel composite girder provided by the utility model is further described in detail below with reference to the accompanying drawings and specific examples. Advantages and features of the utility model will become more apparent from the following description and from the claims. It should be noted that the drawings are in a very simplified form and are all to a non-precise scale, merely for convenience and clarity in aiding in the description of embodiments of the utility model.
Referring to fig. 2 to 4, the present embodiment is a composite girder bridge comprising a foundation 101, a pier 102, and steel concrete composite girders 103, 104, 105. The steel concrete composite beam bridge deck 104 adopts a transverse full-width precast concrete slab, the precast concrete slab is provided with a longitudinal through length reserved groove 201, and high-strength mortar 204 is poured through reserved holes 202 to be connected with the steel beam 103.
The steel beams 103 and 105 adopt at least two steel stringers 103 without longitudinal and transverse stiffening ribs, a steel beam 105 is arranged between the steel stringers at intervals of about 6m, and the steel beam 105 is not connected with the concrete bridge deck 104.
The prefabricated bridge decks are provided with transverse prestress 303, and the prefabricated bridge decks are connected by UHPC transverse slits 207.
Each longitudinal through length reserved groove 201 of the combined beam bridge deck 104 is provided with 1 grouting hole 205 in the middle, and two ends of each longitudinal through length reserved groove are provided with 2 grouting holes 206.
The welding nails for connection between the steel and the concrete are long and short, wherein the welding nails in the grouting holes 205 and the grouting holes 206 are long nails 301, and the welding nails at other positions are short nails 302.
The construction process of the combined beam bridge comprises the following steps:
step 1, two side piers 1021 are built, a plurality of middle piers 1022 are built between the two side piers, and a plurality of temporary piers or no temporary piers are arranged according to stress and process requirements.
And 2, processing the steel-concrete composite beam section in a factory, and installing the steel beam 103 in place on site through a hoisting or pushing construction process.
And 3, stretching the precast concrete deck 104, storing for more than 6 months, and hoisting the precast concrete deck after the steel beam is in place.
And 4, pouring high-strength mortar 204 through the reserved holes, completing the connection of the precast slabs 104 and the steel beams 103, and then completing the connection of the bridge deck transverse joints 207.
In the construction process step 4, the high-strength mortar 204 is poured from the grouting hole 206 through a special device, and the grouting hole is plugged after the mortar flows out from the grouting hole 206. In addition, in step 4, the bridge deck slab transverse seam is cast across the middle section 1041 portion and then the pier top section 1042 portion.
The combined beam bridge adopts a novel concrete slab and steel beam connection technology, overcomes the problems of poor durability and weakened section of the group nail preformed holes, and enhances the structural stress performance; the prefabricated bridge decks are connected through UHPC transverse joints, so that the construction quality difficulty of a wet joint interface is reduced, and the structural durability is improved; the bridge deck boards are transversely provided with prestress, so that the durability of the structure can be effectively improved; the bridge deck transverse seam is firstly constructed to span the middle section, and then the pier top section is constructed, so that the tensile stress of the pier top bridge deck can be greatly reduced, and the stress performance of the structure is improved.
The key point of the utility model is that the high-strength mortar cast by combining steel and concrete cannot guarantee the compactness of the high-strength mortar in the longitudinal through groove if the conventional method is adopted, and the expected purpose cannot be achieved. In order to overcome the problem, the utility model sets the pouring hole in the middle of the through groove, and pours through the special device, sets the slurry-overflowing hole at both ends, and plugs the slurry-overflowing hole after the slurry-overflowing hole has the slurry to flow out, so that the high-strength slurry compactness is ensured.
The above description is only illustrative of the preferred embodiments of the present utility model and is not intended to limit the scope of the present utility model, and any alterations and modifications made by those skilled in the art based on the above disclosure shall fall within the scope of the appended claims.

Claims (5)

1. The utility model provides a combination beam bridge, includes basis, pier and steel concrete composite beam, its characterized in that, combination beam bridge includes the panel, and the panel adopts horizontal full width whole precast concrete board, and the longitudinal through long reservation groove is established to the precast slab, through reserving slip casting hole pouring high strength mortar and steel concrete composite beam connection.
2. The composite girder bridge of claim 1, wherein the steel concrete composite girder comprises at least two steel stringers without longitudinal and transverse stiffening ribs, steel cross beams are arranged between the steel stringers at equal intervals, and the steel cross beams are not connected with the concrete bridge deck.
3. A composite girder bridge according to claim 1, wherein transverse prestress is provided in the prefabricated bridge deck, and the prefabricated bridge deck is connected by steel bars and UHPC transverse seams.
4. The composite girder bridge according to claim 1, wherein 1 grouting hole is formed in the middle of a longitudinal through length reserved groove of each prefabricated bridge deck of the composite girder, and 2 grout outlet holes are formed in two ends of each longitudinal through length reserved groove.
5. The composite girder bridge of claim 1, wherein the welding nails for connection between the steel and the concrete are long and short, and wherein the welding nails in the grouting holes and the grout-raising holes are long nails and the nails Kong Waihan are short nails.
CN202320443737.5U 2023-03-09 2023-03-09 Combined beam bridge Active CN220335680U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320443737.5U CN220335680U (en) 2023-03-09 2023-03-09 Combined beam bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320443737.5U CN220335680U (en) 2023-03-09 2023-03-09 Combined beam bridge

Publications (1)

Publication Number Publication Date
CN220335680U true CN220335680U (en) 2024-01-12

Family

ID=89458763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320443737.5U Active CN220335680U (en) 2023-03-09 2023-03-09 Combined beam bridge

Country Status (1)

Country Link
CN (1) CN220335680U (en)

Similar Documents

Publication Publication Date Title
CN103758023B (en) Prestressed concrete and steel truss mixed continuous rigid frame bridge and construction method thereof
CN108978434B (en) Bracket-free industrialized construction method of steel-concrete combined continuous box girder bridge
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN110792164B (en) Transverse assembling device and method for assembled shear wall
CN109914216B (en) Assembled large-span ultra-high-performance concrete box girder combined node and connecting method thereof
CN110924287A (en) Semi-fabricated large-span combined box girder and construction method thereof
CN110846996A (en) Construction method of continuous composite beam bridge and continuous composite beam bridge
CN108914778A (en) The method that the concrete slab of a kind of pair of combination beam top flange applies precompression
CN113653235A (en) Laminated slab, connecting structure of laminated slab and combination beam and construction method
CN110700103A (en) Construction method of continuous composite beam
CN109610311A (en) Prefabrication and assembly construction L-type floorings seam construction and implementation method
CN211522899U (en) Long-span steel-concrete composite beam convenient to erect by bridge girder erection machine
CN208039577U (en) Half prefabricated prestressed concrete floor slab of figure of eight steel bar girder
CN208362941U (en) One kind reinforcing the old hollow slab bridge construction of single hole by real abdomen Bars In Poured Concrete Slab
CN201381470Y (en) Assembled variable cross-section composite continuous bridge
CN220335680U (en) Combined beam bridge
CN216338993U (en) Longitudinal joint for steel-UHPC (ultra high performance concrete) assembled pi-shaped combination beam
CN113073557B (en) Method for mounting concrete bridge deck of steel-concrete combined continuous steel truss bridge
CN108411801A (en) One kind reinforcing the old hollow slab bridge construction of single hole and construction method by real abdomen Bars In Poured Concrete Slab
CN109972512B (en) Cast-in-place construction method of profiled steel sheet-concrete combined bridge deck slab
CN116219867A (en) Combined beam bridge and construction process thereof
CN110331649B (en) Transverse joint system for prefabricated steel-concrete composite beam
CN109958050B (en) Improved light modular steel-concrete combined small box girder simply-supported bridge
CN211256620U (en) Assembled combination case roof beam