CN220319074U - Climbing frame heightening and attaching device - Google Patents

Climbing frame heightening and attaching device Download PDF

Info

Publication number
CN220319074U
CN220319074U CN202321357762.8U CN202321357762U CN220319074U CN 220319074 U CN220319074 U CN 220319074U CN 202321357762 U CN202321357762 U CN 202321357762U CN 220319074 U CN220319074 U CN 220319074U
Authority
CN
China
Prior art keywords
climbing frame
heightening
attaching
horizontal
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321357762.8U
Other languages
Chinese (zh)
Inventor
张平军
陈一猛
严兴
车盈
王燕霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Engineering Bureau Construction and Development Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202321357762.8U priority Critical patent/CN220319074U/en
Application granted granted Critical
Publication of CN220319074U publication Critical patent/CN220319074U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a climbing frame heightening and attaching device which comprises a concrete breast board, a concrete floor slab, a concrete outer cantilever board and a concrete beam, wherein at least two groups of high-strength screws are arranged on the concrete floor slab in parallel and are respectively and fixedly arranged on the concrete floor slab and a horizontal attaching rod through nuts, one ends of a plurality of the high-strength screws are fixedly provided with two horizontal attaching rods (diagonal rods are arranged on the horizontal attaching rods), and the bearing capacity of attaching and fixing bases can be effectively increased. The utility model can ensure that the attachment rod piece of the climbing frame is attached to the floor surface in the building under the condition of not damaging the structural integrity of the high-level railing and the high-level anti-bank, so that the bearing capacity can meet the requirement, and meanwhile, the stability of the climbing frame is relatively higher.

Description

Climbing frame heightening and attaching device
Technical Field
The utility model relates to a climbing frame heightening attachment device.
Background
The climbing frame is used as one of beautiful scenery lines of various urban building projects at present, and various building matching processes derived from the climbing frame are also layered, wherein the climbing frame belongs to the most outstanding change of building structures.
The building construction project is generally represented by a full concrete outer wall serving as a climbing frame system, but the number of the climbing frame attaching problems derived from the full concrete outer wall is not reduced, wherein the climbing frame attaching difficulty problem caused by a high-position breast board and a high-position reverse bank is most remarkable, a wall penetrating hole is reserved on the high-position breast board or the high-position reverse bank in a traditional method, a space is provided for a climbing frame attaching rod to be attached to an inner floor, and the reserved hole is difficult to later repair, the repairing risk coefficient is high, the repairing effect is poor and the like, so that the problems become pain points of climbing frame construction of various construction sites. Therefore, the design of the climbing frame heightening and attaching device can ensure that the climbing frame attaching rod piece is attached to the floor surface in the building under the condition of not damaging the structural integrity of the high-position railing and the high-position anti-bank original, so that the bearing capacity reaches the requirement is the research direction of the utility model.
Disclosure of Invention
The utility model provides a climbing frame heightening attachment device which can effectively solve the problems.
The utility model is realized in the following way:
a climbing frame heightening attachment device, which comprises a concrete breast board, a concrete floor slab, a concrete outer cantilever board and a concrete beam,
the concrete floor is characterized in that at least two groups of high-strength screws are arranged on the concrete floor in parallel and are fixedly arranged on the concrete floor and the horizontal attaching rods respectively through nuts, two horizontal attaching rods are fixedly arranged at one ends of the high-strength screws, the bearing capacity of attaching and fixing bases can be effectively increased, inclined-pull short rods are fixedly arranged at one ends of the horizontal attaching rods, vertical keel connectors are connected to one ends of the inclined-pull short rods, and fixing bases are fixedly arranged at the lower ends of the concrete floor.
As a further improvement, one ends of the two groups of horizontal attaching rods are fixedly provided with fixed clamping seats, and one ends of the fixed clamping seats are fixedly provided with diagonal draw bars for transmitting shearing force and improving overall stability.
As a further improvement, a short heightening pad and a long heightening pad are fixedly arranged between the two groups of high-strength screws below one end of the fixing clamping seat, and the height formed by combining the short heightening pad and the long heightening pad is higher than that of the concrete breast board.
As a further improvement, the distance between the two groups of high-strength screws is less than or equal to 6m.
As a further improvement, one end of the other group of the horizontal attaching rods is fixedly provided with a horizontal truss connecting member.
As a further improvement, one end of the vertical keel connecting piece is connected with a vertical keel and fixedly connected with a rigid bracket, and a horizontal truss and a pavement plate are respectively and fixedly arranged between the two groups of vertical keels.
The beneficial effects of the utility model are as follows:
(1) According to the utility model, through the structures such as the added horizontal attaching rods and the diagonal rods, the bearing capacity of the attaching base can be effectively increased, the potential safety hazard of the climbing frame caused by insufficient bearing capacity of a single horizontal attaching rod is reduced, each horizontal attaching rod is fixed by two high-strength screws, the horizontal attaching rods can be attached to a concrete floor slab under the condition of not damaging the concrete fence by overlapping the long heightening pad and the short heightening pad, and the problem that the high-position fence and the high-position anti-bank of the climbing frame are difficult to attach is successfully solved; the horizontal truss is arranged between the two vertical keels, so that the problem that the horizontal attachment rod attached to the vertical keels is too close to an attachment point is solved effectively by adopting the horizontal attachment rod of the horizontal truss connector, and the bearing capacity of the attachment base is increased; the vertical keels at the two L sides of the pavement plate are connected through the rigid support, and the forces are transmitted to the attachment support together, so that the concentrated acting force of the attachment points of the vertical keels on the vertical keels is balanced, the integral gravity of the climbing frame is effectively transmitted, and the integral stability of the climbing frame is improved; the end part of the horizontal attachment rod is provided with the diagonal draw bar fixing clamping seat, so that a part of the whole acting force of the climbing frame can be transmitted to the diagonal draw bar, the problem of overlong attachment of the horizontal attachment rod is solved, and the attachment safety of the climbing frame is enhanced; the diagonal draw bar fixing base enables the upper concrete floor and the lower floor attached by the horizontal attaching rod to bear force together. The climbing frame fixed end is conducted by the inclined pull short rod and the vertical keel connecting piece, the two groups of acting forces are converged at one point, and the forces are balanced through the two triangular forces, so that the climbing frame acting force is counteracted, and the climbing frame is stable.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the embodiments will be briefly described below, it being understood that the following drawings only illustrate some examples of the present utility model and therefore should not be considered as limiting the scope, and other related drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural diagram provided in an embodiment of the present utility model.
Fig. 2 is a plan view of the present utility model.
Reference numerals illustrate:
1. a concrete breast board; 2. a concrete floor slab; 3. a concrete outer cantilever plate; 4. a concrete beam; 5. a fixed base; 6. a diagonal draw bar; 7. a fixing clamping seat; 8. a cable-stayed short rod; 9. a vertical keel connection; 10. a horizontal attachment bar; 11. a horizontal truss; 12. vertical keels; 13. a walkway plate; 14. a rigid support; 15. a screw cap; 16. a high-strength screw; 17. short heightening pad; 18. a long heightening pad; 19. horizontal truss connectors.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more apparent, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are some embodiments of the present utility model, but not all embodiments. All other embodiments, based on the embodiments of the utility model, which are apparent to those of ordinary skill in the art without inventive faculty, are intended to be within the scope of the utility model. Thus, the following detailed description of the embodiments of the utility model, as presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, based on the embodiments of the utility model, which are apparent to those of ordinary skill in the art without inventive faculty, are intended to be within the scope of the utility model.
In the description of the present utility model, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the present utility model, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
Referring to fig. 1-2, a climbing frame heightening attachment device comprises a concrete breast board 1, a concrete floor slab 2, a concrete outer cantilever board 3 and a concrete beam 4.
At least two groups of heights Jiang Luogan 16 are arranged on the concrete floor slab 2 in parallel, and are respectively and fixedly arranged on the concrete floor slab 2 and the horizontal attaching rod 10 through nuts 15. Specifically, the distance between the two groups of high-strength screws 16 is less than or equal to 6m, and the distance is limited according to the height of the climbing frame, in other words, the distance between the high-strength screws 16 changes along with the height of the climbing frame, but cannot exceed 6m; preferably, in order to avoid an operation error, the pitch of the high-strength screws 16 may be set to 6m, improving the safety of the overall structure. A short heightening pad 17 and a long heightening pad 18 are fixedly arranged between the two groups of high-strength screws 16 below one end of the fixing clamping seat 7, and the height formed by combining the two heightening pads is higher than that of the concrete breast board 1. Two horizontal attaching rods 10 are fixedly arranged at one ends of the high-strength screws 16, and a horizontal truss connecting piece 19 is fixedly arranged at one end of the other group of horizontal attaching rods 10 and used for improving the bearing capacity of the fixed base 5. Specifically, the setting of the horizontal truss connecting piece 19 can effectively solve the problem that the horizontal attaching rod 10 is too close without an attaching point, increase the bearing capacity of the attaching base, fix the horizontal attaching rod 10 through two groups of high-strength screws 16, and enable the horizontal attaching rod 10 to be attached to the concrete floor slab 2 through the superposition of the long heightening pad 18 and the short heightening pad 17 without damaging the concrete floor slab 1, thereby solving the problem that the climbing frame high-position fence and the high-position reverse sill are difficult to attach. One ends of the two groups of horizontal attaching rods 10 are fixedly provided with diagonal short rods 8, one ends of the diagonal short rods 8 are connected with vertical keel connectors 9, the lower ends of the other groups of concrete floors 2 are fixedly provided with fixed bases 5, one ends of the two groups of horizontal attaching rods 10 are fixedly provided with fixed clamping seats 7, one ends of the fixed clamping seats 7 are fixedly provided with diagonal rods 6 for transmitting shearing force, and overall stability is improved. Specifically, in order to guarantee the rigidity of the horizontal attachment rod 10, the horizontal attachment rod 6 is connected with the fixed clamping seat 7, and the other end of the horizontal attachment rod 6 is connected with the fixed base 5, so that partial force of the horizontal attachment rod 10 can be transmitted to the horizontal attachment rod 6 and the concrete floor slab 2 and the whole acting force of the climbing frame is conducted, the two groups of acting forces are converged at one point, the forces are balanced through the two triangular forces, the acting force of the climbing frame is counteracted, the problems that the overlength attachment and the rigidity of the horizontal attachment rod 10 are influenced are solved, and the safety of the attachment of the climbing frame is enhanced.
The end connectors adopted by the two horizontal attachment rods 10 are different from each other, and there are two connectors in total, wherein the vertical keel connector 9 is attached to the vertical keel 12, the horizontal truss connector 19 is attached to the horizontal truss 11, and the horizontal truss 11 connects the vertical keel 12 attached to the vertical keel connector 9 with the other group of vertical keels 12 nearest to the vertical keel connector, so that the two horizontal attachment rods 10 can bear force together.
The diagonal draw bar 6 and the horizontal attachment bar 10 have a certain angle, and are preferably 45-60 degrees; the angle of 45-60 degrees can maximize the supporting strength of the diagonal draw bar 6; the preferred angle of the utility model is 45 degrees, because the supporting surface with the angle of 45 degrees is the largest and is the firmest, the isosceles triangle is more stable than the isosceles triangle, the average stress on two sides can be realized, in the isosceles triangle, the more detailed degree of the vertex angle (the angle clamped by two isosceless) of a person is required to be determined according to the situation, but the smaller the angle is, the smaller the left-right pulling force to the bottom edge is and the tension to the vertex angle is, the bigger the vertex angle is, and the opposite is, because the gravity center can fall along with the increase of the vertex angle, the setting of the angle of 45 degrees ensures that the stability of the diagonal tension rod 6 and the horizontal attachment rod 10 is also improved to a certain extent, and the diagonal tension rod is not easy to shake.
Furthermore, if the height of the concrete breast board 1 or the concrete back sill does not need two heightening parts, a single heightening part can be used, the heightening parts are increased or decreased gradually according to actual conditions, and the heightening parts are structures such as the diagonal draw bar 6 and the like; in the whole construction process of the climbing frame, the diagonal members 6 can meet the stress requirement only by arranging two diagonal members when three diagonal members are vertically attached at the same position.
One end of the vertical keel connecting piece 9 is connected with a vertical keel 12 and is fixedly connected with a rigid bracket 14, and a horizontal truss 11 and a pavement plate 13 are respectively and fixedly arranged between the two groups of vertical keels 12. Specifically, the vertical keels 12 are connected with the horizontal truss 11, the rigid support 14 and the pavement plate 13, so that the whole gravity of the climbing frame is effectively transmitted, the triangular force is counteracted through two triangular forces, the triangle is the most stable graph, the gravity center of the triangle can be counteracted, the three sides of the triangle are tightly dependent, and the three sides are connected with each other, so that the forces of the triangle can be mutually supported and counteracted, the ideal effect can be achieved, and moreover, the vertical keels 12 on two sides of the pavement plate 13 are connected through the rigid support 14 and transmit the forces to the attachment support together, so that the concentrated acting force of the attachment points of the vertical keels 12 on the climbing frame is balanced, the whole gravity of the climbing frame is effectively transmitted, the problem of heightening attachment of the climbing frame is effectively solved, and the heightening attachment safety and stability of the climbing frame are improved.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, and various modifications and variations may be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. The climbing frame heightening and attaching device comprises a concrete breast board (1), a concrete floor slab (2), a concrete outer cantilever board (3) and a concrete beam (4), and is characterized in that,
the concrete floor (2) is provided with at least two groups of high Jiang Luogan (16) in parallel, and is fixedly installed on the concrete floor (2) and the horizontal attaching rods (10) respectively through nuts (15), one ends of a plurality of high-strength screws (16) are fixedly provided with two horizontal attaching rods (10), the bearing capacity of attaching and fixing bases (5) can be effectively increased, one ends of the two groups of horizontal attaching rods (10) are fixedly provided with inclined pull short rods (8), one ends of the inclined pull short rods (8) are connected with vertical keel connecting pieces (9), and the lower ends of the other groups of concrete floor (2) are fixedly provided with fixing bases (5).
2. The climbing frame heightening and attaching device according to claim 1, wherein one ends of two groups of horizontal attaching rods (10) are fixedly provided with fixed clamping bases (7), and one ends of the fixed clamping bases (7) are fixedly provided with diagonal rods (6) for transmitting shearing force and improving overall stability.
3. The climbing frame heightening attachment device according to claim 2, wherein a short heightening pad (17) and a long heightening pad (18) are fixedly arranged between two groups of high-strength screws (16) below one end of the fixing clamping seat (7), and the combined height of the two heightening pads is higher than that of the concrete breast board (1).
4. The climbing frame heightening attachment apparatus according to claim 1, wherein a distance between two sets of the high-strength screws (16) is not more than 6m.
5. A climbing frame heightening attachment according to claim 1, characterized in that one end of the other set of the horizontal attaching rods (10) is fixedly provided with a horizontal truss connection (19).
6. The climbing frame heightening attachment device according to claim 1, wherein one end of the vertical keel connecting piece (9) is connected with a vertical keel (12) and fixedly connected with a rigid support (14), and a horizontal truss (11) and a pavement plate (13) are fixedly arranged between the two groups of vertical keels (12) respectively.
CN202321357762.8U 2023-05-31 2023-05-31 Climbing frame heightening and attaching device Active CN220319074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321357762.8U CN220319074U (en) 2023-05-31 2023-05-31 Climbing frame heightening and attaching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321357762.8U CN220319074U (en) 2023-05-31 2023-05-31 Climbing frame heightening and attaching device

Publications (1)

Publication Number Publication Date
CN220319074U true CN220319074U (en) 2024-01-09

Family

ID=89419765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321357762.8U Active CN220319074U (en) 2023-05-31 2023-05-31 Climbing frame heightening and attaching device

Country Status (1)

Country Link
CN (1) CN220319074U (en)

Similar Documents

Publication Publication Date Title
CN202099881U (en) Connector clip of building frame structure and building frame structure
CN106638314A (en) Pylon cross beam non-floor stand and pylon cross beam construction method
CN220319074U (en) Climbing frame heightening and attaching device
CN109235268B (en) Construction method for efficiently pre-pressing tower column cross beam support
CN113565322B (en) Cantilever formwork supporting structure and erection method
CN213213375U (en) Precast concrete assembled photovoltaic support
CN214362885U (en) Cast-in-situ lower cross beam support frame
CN111321813B (en) Bidirectional sliding connection support
CN208151868U (en) A kind of counter-force base device for drawing jack placement for steel truss girder
CN214495334U (en) Construction elevator auxiliary stay device
CN216691095U (en) Adjustable triangular support for arc-shaped top plate
CN218025127U (en) Tower crane anchor supporting structure
CN216007527U (en) Support beam for giant inclined truss structure of high-rise building
CN109921724A (en) A kind of flexible photovoltaic bracket
CN213269044U (en) Reinforced structure of old building
CN219012068U (en) Super-large cantilever steel structure temporary support
CN220058781U (en) Adjustable cantilever outer frame support
CN220099676U (en) High pier large cantilever bent cap construction support
CN202627577U (en) Stand and supporting mechanism on lower portion of stand
CN217106067U (en) Building outer overhang vertical frame bearing structure
CN218912188U (en) Building machine top steel platform girder construction that encorbelments
CN220889485U (en) A high big formwork support for building upper portion supports
CN212836357U (en) Light steel structure stair
CN210217136U (en) Formwork support
CN214100702U (en) One-way antidetonation support of crane span structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant